TR Releasing problem

Hi Everybody,
I have got some problem releasing Request from DEV to PRD.
when i try to release a TR child, it says, Create Document for Task
when i try to release its Parent, it says, "The system administration lets you make the
release in the background only. Release in the background?"
so, im not able to release my Transport Requests. wat may be the reason for this and whats the solution.previouslly it was working.
please help me out to resolve this issue
Regards,
Siva

HI,
If you have released the tr,some times it would take time to come in Production Queue. If you want this urgently in your production queue, then do the below.
Goto STMS=-Import overview(lorry icon),Select your Production system, Then in Menu, goto Extras - other - add- then give the transport request number,client and give ok and then it would prompt for user id and password for Production system, give the same.
After this you will be able to see tht TR in PRD system.
Regards,
jack

Similar Messages

  • Purchase Requisition Release Problem

    Hi All,
    I have a release procedure set up, and the strategy pulls up correctly when a PR is made.  When I view collective release from ME55, the PR's show up, and I am able to release line items from that screen.  However, when viewing the PR from ME53N, in the Release Procedure tab there is no green check next to the release code with which to release the line.  Also, if I do release the PR from ME55, I cannot go to ME53N and cancel the release from the Release Procedure tab. 
    I am a user with all security access, so it is not an authorization role problem.  The release group is also configured to release by line item, so that is not the problem.  I have set up other release procedures which allow the release/cancel release function from ME53N before... what could be the problem this time?
    Thanks,
    J

    hi.
    There are two ways of releasing purchase requisitions:
    Individual release  (Tcode - ME54)
    You release items of an individual purchase requisition or - if the requisition has to be released in total - by releasing one item you simultaneously release all the others.
    Collective release (Tcode- ME55)
    You release all requisition items or complete requisitions that are awaiting processing by your release code. This is the preferred method if you frequently have to effect release.
    Display PR -with release status  (Tcode-ME53N)
    One can only see release status in ME53N & can not change release.
    hope it helps to you.
    Regards,
    Rahul

  • Purchase Requisition Overall Release problem with several CostCenter

    Hello Gurus!!
    I need your comments!!! 
    I define the Purchase requisition as Overall Release, and woks !!  but I have a Issue.
    I have an entry in the CL24N txn as follow:
    AccAssgCat = K
    Plant              = CC01
    CostCenters = 10001
                            10002
                            10003
    totalAmt        = 1USD to 1000US
    So when I create my purchase requisition with only 1 Cost Center the release strategy is called and PR can be released.
    But When I create the purchase requisition with CC 10001 and 10003, the requisition is not subjet to release!!! (note TotalAmt = 15usd)
    I assume that as both are into the release strategy the system will take both CC and ask for release!!
    What I can do to fix this situation??

    Dear Marco Antonio,
    I have never faced your issue, but have an idea of what you can do.
    Activate Enhancement M06B0005   EXIT_SAPLEBND_004
    Then in the program zxm06u31 put the following code line:
    e_ceban = i_ceban.
    and also  a breakpoint so that it stops automatically upon PR verification or saving.
    Activate and then create a PR with the problem you are facing. On saving the program will stop in your breakpoint.
    Look at structure i_ceban there you will find the values that your release strategy is getting from the document and with which it will try to determine the strategy based on your classification.
    I the standar logic is not what you want maybe you can put some logic of your own based on account assignments in structure C_EBKN.
    Well, tell me what happens
    Best Regards,
    Sebastián Ligueros

  • Thinkpad A31 Ultrabay Plus release problem

    I have a Thinkpad A31 that I'm repairing - I removed the Ultrabay enclosure that the CD-ROM fits into.
    I've reinserted it and have issues with the eject lever.
    The release mechanism allows the eject lever to come out, but there is no resistance on the eject lever (when pushing it in) with a CD-ROM in the _Ultrabay Plus_.  This means that the only way to eject the CD-ROM is to manually pull it out, which requires the keyboard and plastic palm area to be removed.
    I have checked the springs and they are present on the eject lever mechanism.
    I have a copy of the A31 manual and have read up on the Ultrabay sections.
    http://www-307.ibm.com/pc/support/site.wss/document.do?lndocid=MIGR-39796 
    http://download.lenovo.com/ibmdl/pub/pc/pccbbs/mobiles_pdf/92p1902.pdf 
    I will work on getting images of the parts/pieces for further information.
    Thanks,
    Mike 
    Solved!
    Go to Solution.

    I've only had to do it once, and that was a while ago, but I believe there's a post by Ray Kawakami on TPF dealing with this problem, I'm just way too tired to look for it now......
    With no intention to insult you whatsoever, two bays exibiting the same problem sound like a human error to me...of course, being a human myself, I may very well be wrong...
    Good luck.
    Cheers,
    George
    In daily use: R60F, R500F, T61, T410
    Collecting dust: T60
    Enjoying retirement: A31p, T42p,
    Non-ThinkPads: Panasonic CF-31 & CF-52, HP 8760W
    Starting Thursday, 08/14/2014 I'll be away from the forums until further notice. Please do NOT send private messages since I won't be able to read them. Thank you.

  • [iPhone] AppStore release problem

    Hi Guys,
    I've got a little problem when I come to release an app.
    I've watched the video regarding AppStore releases on iTunes and read all the other stuff, I think my xcode is all setup fine.
    When I come to build the app using my release profile, it all builds fine. However when it comes to install the app on the phone, i get the error:
    Your mobile device has encountered an unexpected error (0xE800003A) during the install phase: Verifying application
    How can I fix this? To me it looks like the phone doesnt have the correct key install so it cant validate the app? I'm going to do a vanilla install of iPhone OS, any thoughts?

    Hey, I'm having a somewhat similar problem in that my development builds all work fine, my app is debugged and ready for distribution build so i can upload to itunes connect but for some reason the distribution prov. profile is not showing up as an option under 'Code Signing Provisioning Profile' in project info (i have 'Code Signing Identity' set to 'iPhone Distribution: MYNAME').
    I created a distribution certificate and distribution profile. I have both certificates in keychain access (development and distribution) as well as the WWDC certificate. i have a private/public key pair for each cert. i have the distribution provision file in the 'provision profiles' directory and it shows up under provisioning area under each device i have in 'organizer' (even tho i can't select it since it's distribution).
    I have spent like three hours no trying to figure this out. (i even deleted/revoked both development and distribution certificates and prov. profiles and started over to no avail) Anyone have any idea???

  • Billing releasing problem in vf02

    Hi
    At the time of releasing the billling document below error will appeared
    Delivered/invoiced quantities cannot be updated in CO
    This is the error messege
    Delivered/invoiced quantities cannot be updated in CO
    Message no. KI137
    Diagnosis
    For account assignment object WBS CP.0065.2, the delivered or billed quantity is to be updated in the unit of measure EA for material number 1025697.
    The system has found a totals record (COSL) that already exists for the account assignment object WBS CP.0065.2 with unit of measure KG. However, you cannot convert the quantity from EA to KG.
    System Response
    The quantity cannot be updated in the totals record, which means that the quantity is missing for the receiver after the settlement of WBS CP.0065.2 (for example in CO-PA). Only the posted quantity is saved in the CO line item (COEPL table).
    Procedure
    Change the material KG and define KG in the master data record as an additional unit of measure.
    If you can have the quantity in EA in the COSL totals record without it causing any problems, you can deactivate this error message  in customizing, or change it to a warning or information message.
    To do this, see the implementation guide (IMG) for "General Controlling" under the following activity: Change Message Control (work area KI, message no. 137).
    If you have any questions, contact your CO consultant.

    Solution is any of these.
    1. Change Units of measure of WBS element from EA to KG - PS
    2.Change the material unit of measure from KG to EA -MM
    3. Define conversion rules between UOM EA and KG - MM

  • WS2000077 (Purchase Requisition Release) problem

    Dear all
    workflow task WS2000077 (Purchase Requisition Release) causes the following problem:
    While executing an approval release (ME54N) through workflow, the result is always 'requisition release refused'.
    Does anyone know why?
    I appreciate your help in advance

    Hi,
      Go through the below links it may help you...
    Workflow Definition WS20000077 and sequence of the events, significantly...
    po release workflow issue/problem
    PR Workflow problem
    std workflow ; user to role agent assignment ?
    Regards,
    Udaya.

  • PO Cancel release problem

    Hi, experts:
      I am a beginer of SAP workflow,  I've got a problem when testing customized PO cancel release workflow.
      My workflow is quite simple, just test whether the event  'SIGNIFICANTLYCHANGED' was trigered when cancel PO. I will receive information in my SAP Business workplace.
    Here is the configuration of PO release  Strategies:
    RGroup Rcode Workflow Agent
    PO     C1     1     Blank
    PO     C2     1     Blank                   
    PO     C3     1     Blank                  
    PO     C4     1     Blank      
    In my customized workflow template, I use the event 'SIGNIFICANTLYCHANGED' to deal with PO cancel release.
    But I find that this event will not be triggered from Level C4  cancel to C3.
    Here is my test result:
    Cancel        Result
    C4->C3       Not triggered
    C3->C2       Trigered
    C2->C1       Trigered
    I can get the result from my Business workplace  except cancel PO from C4 to C3.
    Does anyone come across with this problem?
    Please tell me why and how to handle it, thanks a lot!
    Best regards!

    Hi,Swaminathan PJ
    Appreciate for your reply!
    So, shall we change another event or even customize our own event?
    My requirement is that send e-mail with PO item detail (*.xls file) to specified users when final release or cancel final release.
    Thank you for any good advice.
    Best regards!

  • Purchase Requistion : Overall Release Problem

    Hi everybody,
    Have a peculiar problem where Item Level release seems to be working fine. And the first time we want to use release at header level and its not working.
    The OverReqRel (overall requisition release) is 'checked' [at release group level].
    There is just one class, one characteristic within that class (document type).
    There is just one group, release code, release indicator and release strategy.
    The classification has 'NB' as the document type to be controlled.
    The simulation works fine.
    The 'Check Release Strategies' shows 'all green' with no errors.
    But when we create a PR (txn ME51N) for document type NB, this procedure does not kick in (hence i dont see a new tab at the header level asking for a release).
    We have been using item wise release before and are testing the viability of release at header level.
    FYI. This is a test system (sandbox) where we have NO configuration for release procedure. This is the first strategy that has been created for testing.
    Any help in getting this to work is most welcome.

    Hi,
    For the document type NB, did you flaged as PR header level release.
    Regards,
    Ramakrishna

  • PO releasing problem through ME28

    Hi,
    When i release the PO from ME28, system showing the following message : - No suitable purchasing documents found..
    Note: - I define the new number range for the another plant. also created the new document type for it. PO makes succesfully, but when i m releasing this, showing that message.
    What should be the problem here or we should define the release streatgy for New document type / number range.
    Plz help...

    Check following things
    1. You have correctly considered document types in classification
    2. All plants have been taken into account in classification
    3. Also check the PO value
    And also see whether charachterstics, classes has been created and there has been proper assignment of both.
    Regards,
    SS

  • Transport request main task releasing problem

    Hi friends,
    Environment is Linux, ECC5.0, Two system landscape,
    I have problem with Transport Request task releasing when I am going to release the subtask that willbe released success fully when I am trying to releasing the main task that task is not released and at that time the system wil hang( mesg on the status bar is tp is connected success fully) thats it we wait for long time then also that looks thats only no log will be generating in usr/sap/trans/log there will be a log on this one that log is
    WARNING:/usr/sap/trans/tmp/<username.LOS>is already in use (10), I'm waiting 3 sec(20070326124305). My name:pid 7265 on test(sd1adm)
    after saw the this mesg I kill the 7265 pid then also same proablem.
    I change the ownet of the request then the request is released but not uppeard in the import que. whn i am trying to import in que as manually that will appear in que but not importing when i press the import button the error is tp error 0203.
    I check the both users authorizations also bothe authorizations also same then why it wil happening ???
    then I check the nfc also that service also running ok the six services are 1.off 2.off 3.on 4. on 5.on 6.off.
    I mount the trans dir also the mounting points also ok tms configuration is also ok
    wt can i do plz help me with ur valuable suggessions
    Thankyou
    Ranjith

    Hello Ranjith,
    This is usually because the tp transport buffer lock file remains locked by the
    operating system (OS).
    You should be able to move or delete this file from the DIR_TRANS/tmp dir.
    After that the tp should run fine after.
    Thanks,
    George

  • MM Service Entry Sheet Release Problem - Plant Not Considered

    Dear Experts,
    I have a problem in Service Entry Sheet Release as it does not consider plant although it is maintained in Release Strategy.
    I have created 1 Class for Service Entry Sheet Release.
    This class contains 3 Characteristics, 1st for Plant, 2nd for Value of Services and 3rd for Purchasing Group.
    Now the problem is that during the Entry Sheet Release, system does not consider the Plant in deciding the Release Strategy.
    It considers the first Release Strategy found for Purchase Group and Value of Service combination, thus ignoring the Plant Characteristic.
    Characteristic for Plant is having 'Released' Status
    Please suggest what to do so that the Plant is also considered in Release Strategy.

    Dear Charlie,
    Thanks for your reply.
    When I go to CL40N and check then system gives correct Release Strategy as it considers plant there.
    But when actually the Entry Sheet is created/saved then system gives wrong release strategy as it does not consider Plant.
    Let me tell you that my Release Strategies do contain common Purchase Groups but the Plants are different. So each Release Strategy is unique in this way.
    But during Service Entry Sheet Creation system does not consider Plant in determining Release Strategy.
    Please Help.

  • STMS change request release problem

    Hi
    I am not able to release change requests, sab task able to release, but problem in main request, when I press , release directly, on the bottom it shows u2026tp successfully connected / check writeability of buffers finished with return cod 0. Then screen hangs u2026 manually I have to stop the transition.
    I have configured STMS 4,5 times but same problem, in SM59 all retaliated RFCs working fine.
    Our System is ERP 6.0, HPUX with DB2
    Kindly give me a solution.
    But in Tcode STMS >>Monitor>>TMS Alerts>>TMS Alert viewer showers following error:
    Date       Time       User           Function      Message                                            System   Clt
    23.05.10   17:29:07   TMSADM         TMS_TS_GET_TRLIST    NO_LOG                SID      000
    23.05.10   16:58:25   TMSADM         TMS_PS_READ_PROFILE_FROM_DISK                               READ_PROFILE_FAILED                                            SID      000
    23.05.10   16:57:30   TMSADM         TMS_PS_READ_PROFILE_FROM_DISK                                 READ_PROFILE_FAILED                                            SID      000
    23.05.10   15:55:59   TMSADM         TMS_TP_MAINTAIN_BUFFER                                        RFC_SYSTEM_FAILURE                                             SID      200
    23.05.10   15:05:36   TMSADM         TMS_TS_GET_TRLIST                                             NO_LOG                                                         SID     000
    23.05.10   15:01:29   TMSADM         TMS_TS_GET_TRLIST                                             NO_LOG                                                         SID     000
    23.05.10   14:53:00   TMSADM         TMS_TS_GET_TRLIST                                             NO_LOG                                                         SID    000
    23.05.10   14:51:38   TMSADM         TMS_TS_GET_TRLIST                                             NO_LOG                                                         SID      000
    Regards
    Sunny

    Hi Sunny,
    Its hard to tell what might be the problem.
    I would recommend that you:
    - update kernel to the latest patch level for your release
    - update your transport tools, tp and R3trans to the latest available for your release
    - go into STMS - system pverview and do the 3 checks: Connection test, transport directory, transport tool
    check if they all pass.
    - try to release a transport and then if it still freezes after all of the above, stop it and check the system log, trans.log, the latest logs in usr/sap/trans/tmp and usr/sap/trans/log to see what was the action it was doing before it froze. That will give a clue as to where the issue may be.
    regards,
    Paul

  • Releasing problem in workflow

    Hi All,
    I am facing the problem in the releasing of the document in the workflow..
    First step i am using the parked document and save as complete, which is working fine.
    But problem is next step i am using the RELEASE method of the FIPP BO..
    but i am able to get the workitem with RELEASE whover i am assigning.
    if they release, it is showing released, but when i check document is not released, but document getting lock..
    Please let me know this is problem with wf or customizing?
    I have binded Business Object corrctly for the RELEASE method
    Regards,
    Udupi

    Hi,
    Please refer below mentioned thread. I hope it will be helpful for you.
    http://www.saptechies.org/sap-pdf-books-download/FI_Document_Parking_workflow_tutorial292711300832628.pdf
    Regards,
    Sudeesh Soni

  • Help needed to install Flash Player : 'Non-Current Release' problem!

    I been encountering problems while trying to install Flash Player on my laptop running Windows 7.
    Originally Flash Player does not work as I understand it is not supported on 64-bit Internet Explorer.
    After installing 32-bit IE, the following issue of 'non-latest version' arises and all installation were aborted by the application :
    The below were steps I had taken to no success.
    1.  Via the 32-bit browser, downloaded flash player un-install program and did the uninstallation with success.
    2.  Rebooted the laptop.
    3.  Via the 32-bit browser, downloaded the flash player version 10.0.45.2 from http://get.adobe.com/flashplayer.
    4.  After downloading it automatically did the installation with 100% completion.
    5. The program proceeded to activate the flash player with a webpage saying if the flash player is working properly, I should see a video and Flash Player's logo.
    6.  Before anything was displayed, an error message popped up to say I was trying to install a non-current version and that I should go to same webpage to download the latest version. The activation was then aborted.
    Tried many times but always encountered same problem and hence cannot proceed to use the flash player.
    Need assistance to diagnose the problem and to get Flash Player working on my laptop. Appreciate any help to get it working.
    Regards.

    Thanks to efforts of eidnolb and Bob, the installation of flash player into my laptop is now working .
    Bob's installer enabled the download successfully.
    Eidnolb's link in post 6 trigggered me that I may have previously installed the pre-release version 10.1, thereby leading to the 'non-current-version' problem too. Post in that link adviced to uninstall 10.1 using the pre-release uninstaller.
    I suggest others who had encountered this non-current release to uninstall first using that specific uninstaller, before attempting to install the most current release. I may have installed the 10.1 pre-release in desperation after failing numerous times trying to figure out why flash player does not install in browser not knowing its currently-non-support of 64-bit browser.
    Once again thanks for support, eidnolb and Bob.
    Cheers.
    Kelvin

  • Inspection lot release problem

    hi guys,
    i have facing acute problem during  inspection lot release, 
    <b>errors area as listed below</b>
    <b>inspection lot status  CRTD, CHCR,SPRQ</b>
    1. characteristics result cannot be recorded for inspection lot 1000000...
    2.no task list was assigned to the inspection lot,
    plz help me out its very urgent,
    thanks in advance
    mohan.m

    Hi
    It seems there is inspection plan created for this material. You can create inspection in QP01 transaction and maintain usage 5 (Goods Receipt) and status 4 (released) in the header inspection plan.
    Once plan is created, go to QA02 (Change inspection plan) and enter inspection lot. Click on inspection specification tab, change key date to current date and click on task list/spec. button, Then plan will get assign to inspection lot. Save the inspection lot. Once again if you go to QA03 (Inspection lot display), you can find system status is chnged tp CRTD to REL.
    Then you can able to enter results recording and usage decision for the lot.
    let me know if you need any further help.
    regards
    Srinivas

Maybe you are looking for

  • Trouble installing Photoshop CS6 on Macbook

    I have photoshop cs6 installed on my desktop which is a PC. I also want to install it on my macbook but it is saying my serial number is invalid. I typed it in numerous times and it will not work. Help???

  • Preview full screen defaulting single page view

    Hello All, I like the full screen feature in OS Lion. This way i use Preview to read articles. When i open a doc, full screen mode gives two adjacent pages default view. I want to open an article an display it default as single page continuous. Is it

  • Getting files to my mac from Win XP

    Hi. I'm trying to work out how I can get the files from my Win XP computer to my iMac. I'm running Snow Leopard 10.6.5 and I don't have the slightest clue what to do beyond the following: I've enabled SMB, done the whole process in the "Sharing" menu

  • ABAP runtime errors    SAPSQL_ARRAY_INSERT_DUPREC

    Hi, Its a production dump.I know the functionality of this dump. But my question is  program [SAPLZED7] in the dump doesn't exist in the system.I am also forwarding details below replated to dump.Please give some hint how to solve it?? The ABAP/4 Ope

  • Insufficient memory to load catalog

    I get the error message "Insufficient memory to load catalog" when trying to load a model in systembuild. I'm running MATRIXx v6.3 on Windows 2000. The computer has 512M of RAM and I've not had this problem before. Any ideas?