Transaction OMCT (about batch level)

Hello people,
I would like to know if anybody can help me with the transaction OMCT. We are trying to change the batch level (conversion). Right now we have the same batch number for one material in two different plants and we also have the same batch number for two different material. When I throw the program in that transaction (OMCT) many incidents come out so I would like to have same information about how this program works.
Thank you very much

Go thorugh the OSS note 41715 adn 533377
OSS note 41715
OMCT, OMCE
Reason and Prerequisites
This function is not implemented in the standard system.
Solution
On principle, SAP recommends to stay on material level.
Reason:
1. If the batch level is defined on plant level, batch properties of a material batch of the same name are not transferred in case of cross-plant processes (see also Note 156299). In addition, a material batch may have the same name but different properties (e.g. expiry date) in different plants, since two plant-dependant batch masters exist. This should be considered in particular regarding the increasing importance of batches and the obligation of keeping a cross-reference without any gaps. A synchronization of patch properties beyond plant boundaries can only be guaranteed using the material level or the client level.
2. If a material is to be handled differently in different plants regarding the requirement of managing batches, this can only be realized using the plant level. For this case, however, we recommend nevertheless to stay on material level and create a dummy batch in the plant where batch management is not desired. In this dummy batch, all stocks of the material are managed. This has the advantage that the batch management requirement can be later introduced without any problems.
3. WIth SAP products R/3 Enterprise 4.7, APO 4.0, and CRM 4.0, the batch is increasingly used in cross-system processes. For those cross-system processes, plant level is not supported.
If the plant level is to be recreated nevertheless, please consider the following:
Since this type of conversion is very complex, it should be executed in a test system first.
After the conversion, check all batch data randomly for consistency.
It is recommended to inform the SAP Development department (distribution list DESDFUNC) by means of REMOTE consulting or through your personal consultant about the following points prior to a conversion in the production system:
1. Is classification for batches being used?
2. Is batch status management being used?
3. Are long texts for batches being used?
4. Is split or individual batch valuation being used?
5. Number of records for class type 023 in table INOB
6. Number of records for class type 023 in table AUSP
7. Number of records for class type 023 in table KSSK
8. Number of records in table MCH1
9. Number of records in table MCHA ========================================================================
This type of conversion can only be made as of Release 3.1I. Proceed as follows:
1. For all releases earlier 4.5B, apply the correction as well as the modification in RM07CHDX as specified in the correction instructions.
2. Create report ZCHTCUCH which is specified in the attachment.
3. Execute this report in the client in which you want to reset the batch level to plant level.
4. Call Transaction OMCT.
5. Check whether the batch level is set to "Batch unique at plant level".
6. Perform function "Batch level -> Convert".
7. Determine a plant for a possibly missing plant view.
8. Always execute the report in the test mode first. Analyze the error log.
9. If no errors occurred, you can execute the report in the production mode.
10. In case you are using long texts for batches, you should run report ZM07CHDX_TEXT afterwards (in the test mode first).
OSS note  533377
You want to convert the batch level from plant to material. The standard report (transaction OMCT) provided by Customizing of the batch management cannot execute the conversion, because
the plant definition cannot be explicitly defined for individual batches, or
the batch management requirement is not cross-plant unique for individual materials - in this case you must take Note 533276 into account.
Other terms
OMCT, RM07CHDX
Solution
You can solve the problem that repeatedly occurring batch numbers are flagged for deletion and then reorganized or archived with standard means. Batch stocks, which may exist, have to be cleared in advance.
In the case of a larger number of affected batches you can alternatively use a special conversion-report of the batch development, which executes the conversion without further manual interventions. However, the prerequisite here is that you can determine a 'leading plant' which then defines the plant batches whose data is retained during the conversion.
We have developed the main features of this report, but it must be adjusted to individual business processes in a customer project that is subject to charges.

Similar Messages

  • Batch Management- batch level

    Hi,
    Pls explain abt batch levels and its usage and
    which batch level sap recommends and
    which level most of the companies are using??
    as well, how to check which batch level  is using for a client??

    Hi,
    You can detail document about batch level in given path help documentation.
    SPRO-IMG-Logistics general-Batch management-Specify Batch Level and Activate Status Management.
    In this IMG activity, you specify the following:
    The level at which batch numbers are unique
    Whether batch status management is active in the client
    The plants in which batch status management is active
    The initial status of new batches
    Batch level
    Batch numbers can be unique at the following levels:
    At plant level
    At material level
    At client level for a material
    If you choose plant level, the batch number is unique in conjunction with the respective material and the plant. If you choose material level, the batch number is unique together with the material. At client level, the batch number is unique in the whole client.
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to batch numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical.  In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    Standard settings
    In the standard delivery batches are uniquely defined at material level.
    Activities
    To change the batch level, proceed as follows:
    1. Choose the level at which you want your batches to be unique.
    2. Save the new settings and choose Back.
    3. Choose Batch level -> Conversion.
    4. If necessary, carry out the conversion in test mode first.
    Regards
    Ravi shankar.

  • Err in change Batch level

    D/ friends,
    In OMCT, in Batch level option, Batch level is defined at material level by default. I want to change it to plant level. When Iu2019m selecting the option u201CBatch unique at plant levelu201D, sys is giving err: u201CThis typ of conversion is not yet implemented. Message no. CZ 308u201D. Pls help how to solve this err.
    Iu2019ve searched the forum but to no avail.
    Thanks.

    Check SAP note 911975 with your BASIS person.It maybe due to some program error.
    Regards,
    Indranil

  • About the effect for batch level conversion from material to plant level

    Dears,
    Now  we use batch management at material level in our system, now we want to change to batch level from material level to plant level, what effects or risks it will bring during the process of conversion?
    Thanks a lot
    Zhongkai

    Hi
    check the following SAP help link it is very helpful:
    http://help.sap.com/saphelp_40b/helpdata/es/d2/1d4b6e5733d1118b3f0060b03ca329/content.htm
    at the link you can find the following
    Specify batch level and activate status management
    In this IMG activity, you specify the following:
    the level at which batch numbers are unique
    whether batch status management is active in the client
    the plants in which batch status management is active
    the initial status of new batches
    Batch level
    Batch numbers can be unique at the following levels:
    at plant level
    at material level
    at client level for a material
    If you choose plant level, the batch number is unique in conjunction with the respective material and the plant. If you choose material level, the batch number is unique together with the material. At client level, the batch number is unique in the whole client.
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical. In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    Standard settings
    In the standard R/3 System, batches are unique at plant level.
    Activities
    To change the batch level, proceed as follows:
          1. Choose the level at which you want your batches to be unique.
          2. Save the new settings and choose Back.
          3. Select function Batch level -> Conversion.
          4. If necessary, carry out the conversion in test mode first.
    Further notes
    Note that you cannot reset conversion from plant level to a higher level in the standard.
    If you create a client by copying an existing client, initially, there are no settings in the target client at batch level. The system makes the settings in the target client only when you have carried out an activity (maintaining master data or posting a goods movement, for example).
    SETTINGS BEFORE/AFTER CLIENT COPY:
    Source client Target client
    Client level Material level
    Material level Material level
    Plant level Plant level
    Batch status management
    Batch status management is an additional function provided by the standard R/3 System.
    Standard settings
    Batch status management is not active in the standard R/3 system.
    Activities
    To activate batch status management, proceed as follows:
          1. Choose Batch status management active.
          2. Save the new setting and choose Back.
          3. Choose Batch status management -> conversion.
          4. If necessary, carry out the conversion in test mode first.
    Further notes
    Batch status management is linked to the batch level. At material and at plant level, the status management settings are valid within the client, that is for all plants. However, if you have defined batches to be unique at plant level, you have to select the plants in which status management is to be active using function Plants with status management.
    If you activate status management, all existing batches are assigned status 'unrestricted'. If you deactivate status management, the systems transfers all restricted batches to unrestricted stock within conversion. Restricted stock only exists if status management is active.
    If you create a client by copying an existing client, status management is automatically activated if batches exist in the target client, independent of the settings in the source client. If no batches exist in the target client, it is not activated. In this case, you have to activate or deactivate status management manually, if required.
    Plants with batch status management
    Activities
    To select the plants in which status management is to be active, proceed as follows:
          1. Set characteristic Batch status management for those plants in which batch status management is to be active.
          2. Save your settings and choose function Back.
          3. Choose function Batch status management -> conversion
          4. If necessary, carry out the conversion in test mode first.
    Initial status of a new batch
    Using this function, you can specify for each material type which initial status new batches are to be assigned. However, if you use a quality management system, this specifies the status of the batches.
    Hope it will help
    Best Regards

  • Changing Batch Level

    I want to change my Batch level in my prototype company.  However in transaction OMCT the option for "Batch Level" is greyed out.  That makes me think I need to run the conversion for Batch Level.  However, that option is greyed out as well. 
    Is there a pre-requisite step to running the conversion?  The 3 boxes for Batch Status Management are all available.

    I figured it out.  I had to run the conversion for Batch Status Management first.  After that completed successfully the Batch Level option was no longer greyed out,

  • Changing Batch Level from Material Level to Plant Level.

    I want to create the batch class with the class code 22 instead of 23. As the batch class is maintained at the Material Level, not at the Plant Level. So is it possible to change the batch class from Material to Plant Level and create batch class with code 22.
    Kindly suggest.

    Hi, Thanks for ur reply.
    I have applied SAP notes and changed the batch status from material level to plant level...But still i am getting the class type as 23.
    What are the next steps to be done. Currently in OMCT, Batch Level Conversion tab is active and rest all the tabs are in inactive state. so please guide.

  • Goods issue error at batch level stock

    Hi Experts,
    In MMBE for Material 12121426 Plant 6348 storage location  0001,batch 4065634891 in storage
    location level have stock is 12.000 EA and batch 4065634891 level stock is
    4,164.000 EA
    User is performing Goods issue through MB1A 261 movement type For 4,164.000 EA EA but showing error
    is Deficit of SL Unrestricted-use 4,152 EA : 12121426 6348 0001 4065634891
    Please suggest any one why batch level stock not updated to storage location level and why system not allowing batch level stock in MB1A How to rectify this error
    Regards
    Mohan

    You probably have to contact SAP. There is hot news about inconsistencies between batch stock and storage location stock: 1930161 - Stock inconsistencies in table MCHB for batches
    See as well KBA 1963022 - More details on the stock inconsistencies situation mentioned in Hot News 1930161

  • Bin at Batch LEVEL

    Hello Experts,
    We have bins that are set up at batch level ...we dont want this setting cos when we are running analysis it is giving a wrong value in one of the key figure....
    can any one tell me is it cycle counting at batch level can we change it to storage location level please explain ...
    EXample: we use an exception ...when ever the  bin is empty it should trigger the exception but suppose there are 3 batches in the bin whenever you issue a batch it is trigerring the exception ...suppose if there are three issue it should trigger once but it triggers three times PLEASE HELP
    Will award full points
    Thanks
    J

    In general, the fixed bin strategy allows you to specify the bin to which a material will be placed during a putaway transaction (provided the concerned storage type has putaway strategy configured as F).
    I understand your requirement is to place different batches into different bins ie the bin is determined depending on the batch.
    While not possible in standard, you can try making use of an exit for this purpose. The exit MWMTO003 may be used in CMOD to develop your own putaway strategy. You will have to activate the exit (a checkbox) in the putaway control parameters in the storage type configuration.
    Check the documentation in the following IMG path:
    Logistics Execution > Warehouse Management > Strategies > Putaway Strategies > Develop Extensions for Putaway Strategies
    Hope this helps.
    Regards,
    Aroop

  • What's the purpose of "Conversion of Batch Level"?

    Hi, MM Gurus!
    T-Code OMCT is to activate the Conversion of Batch Level.
    Is this step mandatory? Why?
    If batch management is requried only at material level, still needs to run OMCT?
    Thanks in anticipation.
    Regards,
    Jason

    Hi,
    SAP allows a configuration setting for 3 different batch levels. This wills effective your possibilities. Option Number 2 is the default configuration for SAP out of the box:
    1.) Plant - can allow for the Batch Management Flag on a material sold out of 2 different plants to be set independently. Batch numbers can be used for multiple materials, and batch specifications and analytical results can be different for each batch (multiple batch Master records).
    2.) Material - Batch Management flag is set the same for the material across all plants that use it. Batch numbers can be used for multiple materials, however, batch specification and analytical results are the same for the batch (one Batch Master Record).
    3.) Client - Batch Management flag is set the same for material across all plants that use it. Batch number can only be used for one material across the client. (One Batch Master Record).
    If the Batch level flag is set at the Client level, it allows for a batch number to be used with only one material throughout the entire SAP client. This is troublesome with products which are produced in bulk and then packaged into smaller size containers for sale. Due to the limitation of having only one batch number per material, when the product is packaged, new batch numbers have to be assigned to the finished packages, even though the same bulk material is being used inside the package. Because of this work-a rounds have been created and business processes adjusted to accommodate this restriction.
    May be some one explain some more details.
    regards

  • Batch level acknowledgments from Bank not getting processed.

    We are using BCM, (Bank Communication Management) module. We send pain.001.001.03 xml files to bank for the payment and receive three levels of acknowledgments or Pain.002.001.03 files: File level (based on MsgId) , batch level (basedon PmtInfId) , transaction level (based on EndtoEndId)
    however, in the standard mapping of CPON (Collective Payment Order Notification) PmtInfId (OrgnlPmtInfId in pain.002.001.03) is mapped in
    the same place as MsgId (OrgnlPmtMsgId in pain.002.001.03)[This is as per the mapping given in note 1803299]
    So, when PmtInfId is different than MsgId (and that happens whenever there are more than one batches in a payment due to more than one payment methods or currencies) then we get an error in
    system that :
    'No batch found for the incoming header id ...'
    We've already applied note 1498987, but that makes no difference.
    So please tell us how to process the batch level acknowledgments where OrgnlPmtInfId is different than OrgnlMsgId in the inbound pain.002.001.03
    files.

    We are using BCM, (Bank Communication Management) module. We send pain.001.001.03 xml files to bank for the payment and receive three levels of acknowledgments or Pain.002.001.03 files: File level (based on MsgId) , batch level (basedon PmtInfId) , transaction level (based on EndtoEndId)
    however, in the standard mapping of CPON (Collective Payment Order Notification) PmtInfId (OrgnlPmtInfId in pain.002.001.03) is mapped in
    the same place as MsgId (OrgnlPmtMsgId in pain.002.001.03)[This is as per the mapping given in note 1803299]
    So, when PmtInfId is different than MsgId (and that happens whenever there are more than one batches in a payment due to more than one payment methods or currencies) then we get an error in
    system that :
    'No batch found for the incoming header id ...'
    We've already applied note 1498987, but that makes no difference.
    So please tell us how to process the batch level acknowledgments where OrgnlPmtInfId is different than OrgnlMsgId in the inbound pain.002.001.03
    files.

  • Stock transfer valuation error at batch level

    Dear All,
    I have an issue with Stock valuation at batch level, when a site to site stock transfer is done in the ERP.
    As a consequence, Stock values in reporting are completely wrong.
    As a standard behavior for stock transfers, we have the following article movements in the ERP :
    MatNo      MovTyp Date      Plant      Stor.loc.    Batch      Qty.    Value
    MAT1      101    01.01.06 USD1      0001         HJ01       1         180000
    MAT1       641    15.01.07 USD1    0001          HJ01       -1      -180000
    MAT1       641    15.01.07 3041                                     1      180000
    MAT1       101    16.01.07 3041      0001           HJ01       1       0
    We are using 0IC_C03 cube, with 2LIS_03_BX, 2LIS_03_BF and 2LIS_03_UM.
    In 0IC_C03 cube, if we do a query at site level for this article, everything is correct :
    MatNo     Plant     Qty.    Value
    MAT1      USD1     0     0
    MAT1     3041     1     180000
    Then if we go at batch level, the value for the batched article is wrong (0).
    The real value is held by the "empty batch" article.
    MatNo     Plant     Batch     Qty.    Value
    MAT1      USD1     HJ01     0     0
    MAT1     3041               0        180000
    MAT1     3041     HJ01      1     0
    We already implemented the workaround on storage location level (How to "Realize summarized display of stock values on
    storage location level").
    But the same principle wouldn't work here, as the purpose of the batch is to have different valuations by article.
    If we have then several batched article in the same site, we would apply an average value to them, which would also be wrong.
    I tried to apply OSS note 589024, but for the same reason as described above, this is not working.
    Would you have any clue or similar experience ?
    Thanks for your help,
    Stephane.

    Hi.
    I would also appreciate an answer to this problem, if you have one. . .
    Thanks in advance,
    Ian.

  • How to use BAPI_MATERIAL_AVAILABILITY Function Module at batch level?

    How to use BAPI_MATERIAL_AVAILABILITY FM to check material available at batch level?
    And another question is what's the meaning of 'CHECK_RULE' in this FM. Thanks!

    Field name : PRREG
    fcheck more details on  f1 help...
    check_group defines the checking procedure to be used for  availability check in individual applications.
    along with the checkg group, checking rule  specifies the final procedure for chkg..
    eg:
    ST  for  stock transport order
    AQ for SD order project srock
    also chk this help doc.
    http://help.sap.com/saphelp_470/helpdata/en/cf/70124adf2d11d1b55e0000e82de178/content.htm
    search the forum for sample code..
    How to use BAPI_MATERIAL_AVAILABILITY Function Module....

  • MM42 change material, split valuation at batch level, M301, locking table

    Dear All,
    I'm working on ECC 6.0 retail and I have activated split valuation at batch level.  Now in MBEW for this specific material I have almost 14.400 entries.
    If I try to change some material data (MM42) I receive an error message M3021 A system error has occurred while locking and then Lock table overflow.
    I used SM12 to see the table (while MM42 is still running) and it seems that MBEW is the problem.
    What should I do?  For any material modification the system has to modify every entry in MBEW? Is there any possibility to skip this?
    Thank you.

    Hi,
    Symptom
    Key word: Enqueue
    FM: A system error has occurred in the block handler
    Message in the syslog: lock table overflowed
    Other terms
    M3021 MM02 F5 288 F5288 FBRA
    Reason and Prerequisites
    The lock table has overflowed.
    Cause 1: Dimensions of the lock table are too small
    Cause 2: The update lags far behind or has shut down completely, so that the lock entries of the update requests that are not yet updated cause the lock table to overflow.
    Cause 3: Poor design of the application programs. A lock is issued for each object in an application program, for example a collective run with many objects.
    Solution
    Determine the cause:
    SM12 -> Goto -> Diagnosis (old)
    SM12 -> Extras -> Diagnosis (new)
    checks the effectiveness of the lock management
    SM12 -> Goto -> Diagnosis in update (old)
    SM12 -> Extras -> Diagnosis in update (new)
    checks the effectiveness of the lock management in conjunction with updates
    SM12 -> OkCode TEST -> Error handling -> Statistics (old, only in the enqueue server)
    SM12 -> Extras -> Statistics (new)
    shows the statistics of the lock management, including the previous maximum fill levels (peak usage) of the partial tables in the lock table
    If the owner table overflows, cause 2 generally applies.
    In the alert monitor (RZ20), an overrunning of the (customizable) high-water marks is detected and displayed as an alert reason.
    The size of the lock table can be set with the profile parameter u201Cenque/table_size =u201C. specifies the size of the lock table in kilobytes. The setting must be made in the profile of the enqueue server ( u2026_DVEBM.. ). The change only takes effect after the restart of the enqueue server.
    The default size is 500 KB in the Rel 3.1x implementation of the enqueue table. The resulting sizes for the individual tables are:
    Owner table: approx 560.
    Name table: approx 560.
    Entry table: approx 2240.
    As of Rel 4.xx the new implementation of the lock table takes effect.
    It can also be activated as described in note 75144 for the 3.1I kernel. The default size is 2000 KB. The resulting sizes for the individual tables are:
    Owner table: approx 5400
    Name table: approx 5400
    Entry table: approx 5400
    Example: with the
    u201Cenque/table_size =32000u2033 profile parameter, the size of the enqueue table is set to 32000 KB. The tables can then have approx 40,000 entries.
    Note that the above sizes and numbers depend on various factors such as the kernel release, patch number, platform, address length (32/64-bit), and character width (Ascii/Unicode). Use the statistics display in SM12 to check the actual capacity of the lock table.
    If cause 2 applies, an enlargement of the lock table only delays the overflow of the lock table, but it cannot generally be avoided.
    In this case you need to eliminate the update shutdown or accelerate the throughput of the update program using more update processes. Using CCMS (operation modes, see training BC120) the category of work processes can be switched at runtime, for example an interactive work process can be converted temporarily into an update process, to temporarily increase the throughput of the update.
    For cause 3, you should consider a tuning of the task function. Instead of issuing a large number of individual locks, it may be better to use generic locks (wildcard) to block a complete subarea. This will also allow you to considerably improve the performance.

  • Batch level settings conversion from plant-to-plant to material-level

    If someone has worked on conversion of Batch level settings within SAP from plant-to-plant to material-level batch management, please let me know what are the challenges involved in doing this. Thanks.

    Check help !!!
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to batch numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical.  In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    Standard settings
    In the standard delivery batches are uniquely defined at material level.
    Activities
    To change the batch level, proceed as follows:
    1. Choose the level at which you want your batches to be unique.
    2. Save the new settings and choose Back.
    3. Choose Batch level -> Conversion.
    4. If necessary, carry out the conversion in test mode first.
    Further notes
    Note that you cannot reset conversion from plant level to a higher level in the standard.
    If you create a client by copying an existing client, initially, there are no settings in the target client at batch level. The system makes the settings in the target client only when you have carried out an activity (maintaining master data or posting a goods movement, for example). The client level is not transported. If you copy a client with client level, you have to manually set the client level in the target system.

  • Process for batch level at plant level

    Folks,
    In case we have set batch level at plant level, how does the system reacts in case of an STO? I.e. I ship batch 1 for material 1 from plant A to plant B. In plant B, this batch might already exists as the level of batches is on plant level. HOw will the GR react? Will it create a new batch number in plant B?
    Regards,
    MdZ

    Hi,
    Thanks for the reply. Just to be sure; in case of a scenarion in which we have an STO, an outbound delivery with message type SPED which creates the inbound delivery and copies over the batch numbers in the inbound delivery and we do a GR on the inbound delivery, the system will try to do GR for these specific batches. Will the system then also either receive the batches on the inbound delivery in case these do not exist and create new ones in case they do exist?
    Regards,
    MdZ