Transection code Co88

Hello,
This issue is regaridng to execution of transection code Co88.
When I execute the transection I got the error like
"Internal error in FORM/FUNCTION CKMLKEPH_ROLLUP in position 2 with RC 4"
can any body tell me where i was wrong.
Regads
Ravi

Hi
Check the the system statuses and user defined statuses if any for the internal order.
Cheers
Muralidhar

Similar Messages

  • Can not find role for some transection code

    Dear Gurus,
    EWA  alert with security issue.
    Many user grant access some t-code etc. SE16,SM59,SE17,SE16 and I found users at SUIM t-code can access. 
    But , when I find role for t-code that I should remove.
    Not found,
    Please advise.
    Thank .

    Hi,
    can you please try this
    SUIM > Roles by complex criteria or RSUSR070 to find out this.
                Go to the Selection by Authorization Value.
                In Object 1 put S_TCODE and hit enter.
                And put SU01 in Transaction code and hit execute (clock with check) button.
                I use authorization object, as you can use this to test any object.
    You can also get this information directly from table, if you have access to SE16 or SE16N. Execute SE16N
                Table                AGR_1251
                Object              S_TCODE
                VALUE (low)  SU01
    Regards,
    Srinu

  • Regarding production order closing and demand closing

    Hi Gurus,
    I am new to pp module..
    I have the requirement on production order closing and demand order closing.
    The requirement needs plant,reuirement plan no ,basic finish date and percentage in selection screen.
    In the output display plant,requirement plan no,PIR No,order,order finish dat ,***.order qty,***.delivered qty,qty difference,percentage%,order status as in alv grid display.
    And in the output it has 2 buttons named technically complete and demend close .whener user click on first button system should take all the orders which r selected to the program with the same reuirement plan as for the selected order and then technically close all the orders with the same reuirement plan number.
    when user clicks on demand close button,system should take the respetcive requirement plan number,order finish date and material and it has to take the pir no which match the above and deactivate the pir and save.
    I need the help about this.
    Thankx in advance.

    Dear Chandu,
    First settle the production order using the T Code CO88,and then close the production order.
    Prerequisites
    Prerequisites for setting the CLSD status are:
    The order must have the status Released (REL) or Technically completed (TECO)
    The order balance must be 0
    There can be no open purchase requisitions, purchase orders or commitments
    There can be no future change records from confirmation processes
    Regards
    Mangalraj.S

  • Consingment stock report with values

    Hello guys,
    I need one standard report, which includes amounts (values in money) of consignment stock. Could you please help ?
    Thanks guys !
    Best regards,
    Laimonas

    Hi,
    In the transection code MB52 select the Special Stock Indicator W in the selection screen and run the report.
    Regards,
    Manish

  • How to create a group of cost element

    Hi,
    i want to integrate a group of cost element in KP06, but i don't know how to create it.
    please what is the transaction to do that ?
    Regards.

    Hello,
    To create the Group of Cost Element
    Go to transection code KAH1 Give any name or number to your cost element group then make the proper standerd hirerchey as you need or simply click on the cost elemt and add all cost element which you want to make a group.
    Hope it will solve you probem,
    Regards
    Ravi

  • Invoice Cancellation in MR8M

    Dear Consultants,
    I have posted invoice in MIROu2026
    Now I want to cancel the Invoice document in MR8Mu2026
    When I am doing so, the system is throwing a Error message as The Tax amount must not be greater than the tax base. I Checked the Invoice Document in MIR4u2026the Tax amount is lesser than the Tax base onlyu2026
    The message Application Area is FF   and the message no is 747.
    We cannot make the message as a Warning messageu2026
    Kindly throw some lights with respect to this issueu2026
    Your fast and proper suggestions in this regard will be highly appreciated thro reward pointsu2026
    With Regards
    S.Baskaran

    Hello,
    Try the transection Code OBMSG.Form here yiu can change the message.
    Make sure before the change .
    Regards
    Ravi

  • PI 7.1:  Transport configuration using the file system

    Hi!
    How can I transport the configuration objects from DEV to QA, when I have different business systems in DEV and QA (BS_dev and BS_qa)?
    I use individual landscapes per system (DEV, QA and PROD).
    What have i done?
    1. Export the software componet version from DEV/SLD in a file. --> ok
    2. Import in the QA/SLD --> ok
    3. Export of the objects from DEV/ESR in a file --> ok
    4. Import in QA/ESR -->
    5. Export of the objects from DEV/ID in a file --> ok
    6. Import in QA/ID --> error (different business systems)
    Thanks in advance!
    Edgar

    Hi.
    There are two ways to transport ID and IR Object to transport .
    1. CTS + : Totally automated Way .,
    2. .tpz : Manual Lagacy Import / Import way .
    Now . Steps .are :
    There are two types of transport mechanisms in XI/PI.
    1. File Transport System.
    Files are imported and exported into SAP XI OS Level for Development and Quality Server,
    This Process is risky as there is no automated system and there is no track record of imported or Exported Files,
    as in this syetem exported files are transported to QA System from DEV System.
    file Extension in file transport System : - .tpz
    2. Through CTMS(Change Transport Managment System).
    GUI Based tool, Installed on SAP XI BOX, This system provides the automated transport system , which keep tracks of transported Objects and Failed objects.
    There are initial level efforts to set up transport system.
    Transport Procedure for Various System :-
    DESIGN OBJECTS ---> (ENTERPRISE SERVICE REPSITORY OBJECTS) -
    > INTEGRATION BUILDER.
    Step -I
    1. Select NameSpace to trasport.
    2. Right Click on NameSpace to Transport.
    3. Select Export Option.
    4. Check or Select the Software Component Version.
    5. Check the Mode of transport.
    CTS MOde:-
    5.1 Select a required type of Object Set:
    IN OUR CASE: ALL OBJECT OF INDIVIDUAL NAMESPACE.
    5.2 Select Transort request.
    5.3 Finish the Process.
    TRANSPORT USING FILE SYSTEM:-
    5.1 Select a required type of Object Set:
    IN OUR CASE: ALL OBJECT OF INDIVIDUAL NAMESPACE.
    5.2 Finish the Process.
    Step II
    1. GO TO TOOLS OPTION IN MENU BAR
    2. OPEN CTS TRANSPORT ORGANIZER
    3. Select the request to Release.
    4. Press Button Release.
    Step III( Steps to be Perform at Target System).
    1. Execute Transection Code STMS.
    2. Check your Transport Request Number.
    3. Focus on that Trasport Request Number Through Mouse.
    4. Now Import The Transport Request on Specific client of Target System.
    5.Click Ok.
    FINAL :- NOw on Quality Server all Transported Objects Need to be activated.
    CONFIGURATION OBJECTS ---> (INTEGRATION DIRECTORY) -
    > INTEGRATION BUILDER.
    Step -I
    1. Select Configuration Scenario to trasport.
    2. Right Click on Configuration Scenario to Transport.
    3. Select Export Option.
    4. Check or Select the Configuration Scenario.
    5. Check the Mode of transport.
    CTS MOde:-
    5.1 Select a required type of Object Set:
    IN OUR CASE: ALL OBJECT OF Selected Scenario.
    5.2 Select Transort request.
    5.3 Finish the Process.
    TRANSPORT USING FILE SYSTEM:-
    5.1 Select a required type of Object Set:
    IN OUR CASE: ALL OBJECT OF Selected Scenario.
    5.2 Finish the Process.
    Step II
    1. GO TO TOOLS OPTION IN MENU BAR
    2. OPEN CTS TRANSPORT ORGANIZER
    3. Select the request to Release.
    4. Press Button Release.
    Step III( Steps to be Perform at Target System).
    1. Execute Transection Code STMS.
    2. Check your Transport Request Number.
    3. Focus on that Trasport Request Number Through Mouse.
    4. Now Import The Transport Request on Specific client of Target System.
    5.Click Ok.
    FINAL :- NOw on Quality Server all Transported Objects Need to be activated( CHANGE OBJECTS).
    Regards,
    Venkata S Pagolu

  • Movement Type for Expired Materials

    Hi Qm Gurus,
       I have one scenario, my client wants that raw materials which have reached their expiration dates must be posted to a virtual stock type, for instance, expired, however, they should not be used for MRP and production order, because their confirmation that they shall be posted to blocked must be done first before they should automatically be blocked. How shall we make the configuration for this one??Expired materials must not be posted to blocked not until they shall be confirmed by the client. Thanks
    Regards,
    Matildo, edsel F
    QM Consultant

    Hi,
    There is standard SAP functionality available for such cases,
    You can use Transection code QA07 - Dead Line Monitoring of Batches
    This transection works for 2 different cases.
    1) In case of Retesting/Next Inspection or Recurring Inspection
    2) Batch Status change when expiration date reached.
    You can run this transection manually or by seting  back ground job.For Back ground job You can use Transection code QA05.
    Now After set this Back Ground job if you don't want to include such kind of stock (Resticted use / Quality inspection stock) during MRP run you have to set your Checking rule (Transection code OPJJ) acordingly.
    For this you have to remove tick from Include Restricted stock, so system will ignore this stock during both MRP and Availibility check during order processing.
    Hope it will help.
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Jul 8, 2008 3:37 PM
    Edited by: Dhaval Choksi on Jul 8, 2008 3:43 PM

  • Issue related to STO return billing

    hi expert,
    1) user have created PO then created delivery
    then Invoice. now user have created return
    delivery and when user try to bill the return
    quentity. system give error" sales organisation is
    not define"
    so guid me where to check and its transection
    code.
    Alicia

    Alicia,
    Can you please explain the scenario totally, is it a intercompany transfer or intracompany transfer, based on that scenario we can have solution.
    Venkat

  • Debit / credit indicator

    Hi all
    For a movement type in T156 , we can get the debit / credit indicator.
    like wise for a Transaction in Invoice verification where can we get the debit / credit indicator.
    thnks

    In Transection code MIRO click on G/L Account tab,You will get the credit/debit tab.
    Regards,
    Manish

  • Not Check Internal Order - Budgeting in ME21N

    Hi Expert;
    Please help me.
    When PR is converted into a PO using account assignment:F, System do not check budget ???
    Internal Order = 30007 and Budget =  100,000.
    Thanks.

    Hi,
    Have you activated Committement management in transection code KOT2_OPA, KOAO and OKKP
    Regards,
    Manish

  • Issue telated to STO return invoice

    hi expert,
    1) user have created PO then created delivery
    then Invoice. now user have created return
    delivery and when user try to bill the return
    quentity. system give error" sales organisation is
    not define"
    so guid me where to check and its transection
    code.
    2) can any body tell me the process of STO
    delivery,billing . then STO return process in detail
    with Tcode.in how many ways we can perfrom
    the STO scnario.
    Regds
    Alicia

    Hi,
    Check this out please :
    Re: stock transport order
    almost same.
    Best regards,
    Sridhar

  • Special gl  activity and groups not assigned  urgent

    hai  all
    plese any one can help me out i am getting error in special purpous ledger
    This document will not be posted in a FI-SL ledger, because no ledger is assigned to the combination activity/company code or activity/global company.
    System response
    The posting is not carried out.
    Procedure
    Check the assignment of the ledgers to the activity/company code or activity/global company.
    Customizing Ledgers
    This error message only appears if you defined the activity, so that each document line has to be posted to FI-SL.
    Customizing Activities
    error in abve transacton cods
    kindly needful urgent
    thanking you
    babu
    Edited by: babu sap on Apr 14, 2008 7:16 AM

    Hello,
    Please check the transection code GCG2 make proper assigment there.
    Regards
    Ravi

  • New field in ME28 output in ALV grid

    Dear All,
    In ME28 - PO release transection code, when we run in ALV gird, we have a TAX code field but not the tax code description.
    Can we have this, if yes let me know the procedure.
    Thanks,
    SAmir Bhatt

    Hi,
    As per my knowledge, system will not allow to add the " Description of Tax Code". Plz check in customization for Reporting.
    Regards,
    Raghunath

  • Integration builder config obj transported from DEV to QA but not found

    Hi,
    I have a new development in PI DEV. I exported the ESR objects in a transport as well the Integration builder config objects in the same transport. Asked my admin to move it through CTS to PI QA. Its done.
    In PI QA system, I am able to see the new ESR objects in the Enterprise services Builder.
    But not able to see the config objects in Integration Directory (Integration Builder).
    I researched the forum got some tips tried but in vain.
    1. I chose Tools menu --> Find transports option but no transports found.
    2. I cleared cache (full refresh)
    3. Closed and reopened Integration builder
    I just want to see those config folders as it was designed in the dev !!
    Help is appreciated please.
    thnks

    Hi!
    Yes , you can transport the ID Objects through CTS, But the catch is : -
    After transport ID Objects, will not directly come into ID object list Like ESR Object Did , here in ID transported Object first Move into Change Object list , There you need to acticate Them. then these Object will be appear in ID Object List,
    Method CONFIGURATION OBJECTS ---> (INTEGRATION DIRECTORY) -
    > INTEGRATION BUILDER.
    Step -I
    1. Select Configuration Scenario to trasport.
    2. Right Click on Configuration Scenario to Transport.
    3. Select Export Option.
    4. Check or Select the Configuration Scenario.
    5. Check the Mode of transport.
    CTS MOde:-
    5.1     Select a required type of Object Set:
         IN OUR CASE: ALL OBJECT OF Selected Scenario.
    5.2        Select Transort request.
    5.3      Finish the Process.
    TRANSPORT USING FILE SYSTEM:-
    5.1     Select a required type of Object Set:
         IN OUR CASE: ALL OBJECT OF Selected Scenario.
    5.2      Finish the Process.
    Step II
    1. GO TO TOOLS OPTION IN MENU BAR
    2. OPEN CTS TRANSPORT ORGANIZER
    3. Select the request to Release.
    4. Press Button Release.
    Step III( Steps to be Perform at Target System).
    1. Execute Transection Code STMS.
    2. Check your Transport Request Number.
    3. Focus on that Trasport Request Number Through Mouse.
    4. Now Import The Transport Request on Specific client of Target System.
    5.Click Ok.
    FINAL :-  NOw on Quality Server all Transported Objects Need to be activated( CHANGE OBJECTS).
    Regards
    Prabhat Sharma.

Maybe you are looking for

  • How can I remove songs in a playlist?

    I have a "Christmas" playlist in iTunes, and in December, I downloaded all the songs in it to my iPhone (by selecting it, and tapping Download All).  I have iTunes Match. Now Christmas is long gone, but Genius keeps picking Christmas songs.  I want t

  • Hyperlin on inputfield in Table

    Hi Guys, I have defined in my model in one table hyperlink on inputfield. Some how hyperlink is not working. can anyone tell me the reason for that? I did try with read only and also with editable. I am calling through this hyperlink only Google webs

  • How to Install Stacpack

    Hello Guys, I am using oracle 9i database on windows operating system. Database is very slow and needs to be tuned. Kindly advice me how to install STACK PACK on my database. Where the script files is located. Regards, Imran

  • Need help re: authentication design

    Hi all. I'm designing an app from the ground up on 9i+HTMLDB (yay!), but am still climbing the learning curve WRT all the authentication issues, especially where database links are involved. I've tried to piece together an understanding from posts he

  • ITunes Store Not Available Error Msg. since ugrading to 7.0.2

    Since upgrading to iTunes 7.0.2, I get an "iTunes Store is Temporarily Unavailable" error when browsing the store... Not all the time, just enough to be getting old... Between having my store changed to something other than the U.S. (my default) and