Transfer Asset Under Construction

Dear Forum members:
We want to transfer an asset from one Cocode to another due to settlement under the wrong Cocode. Is it possible to transfer Asset under construction from one company code to another. So far, tests carried out with abt1n have been futile.
What factors need to be considered before hand in carrying out an intercompany asset transfer?

HI,
Provide another settlement rule for the Order for which asset you want to transfer balances from AUC and made settlement run again.
Murali

Similar Messages

  • New Depreciation Area in Asset Master Data, for assets under construction.

    Hi,
      The issue is relating to New Depreciation area. We have created new Depreciation area as 80=IFRS.  We had followed three steps
    1. Create Depreciation area via OADB.
    2. Activate Depreciation area via OAYZ.
    3. Automatic opening of new depreciation are via AFBN and program RAFABNEW :-
    3.1 u2013 Indicator: Leave values initial = ticked.  Set this indicator if you want to open the newly created depreciation area without any values i.e. blank.
    In this we have find that the old assets value has been copied. But when we are doing internal order settlement through KO88 i.e. from pre-cap to AUC we are not finding new Depreciation area 80=IFRS in AUC. We had checked in AW01N.
    Letu2019s assume that creating a new deprecation area is normally not required since these assets are not depreciated. But During the final settlement, the new depreciation area should also automatically supplied with values from the reference depreciation area from the AUC(assets under construction) in the completed assets. But we doesnu2019t find any values of in Dep Key = 80 IFRS for final assets.
    In Assets Class of AUC we had used  Investmnet Measure as Status of AUC.  
    Kindly provide solution for the same.
    Nikhil

    Check Transfer Variant 5 (under Transactions->Intercompany Asset Transfers->Automatic Intercompany Asset Transfers->Define Transfer Variants):
    5     Investment measure settlement
    Your Transfer Method is most likely 1 now (without transfer to dependant areas), change it to:
    4     Gross method with transfer of values to dependent areas
    This should help.

  • Asset Under Constructions - Settlement

    Dear Gurus,
    I am trying to do an Asset Under Construction - Settlement using T.Code AIBU, when i click on proceed, it gives me an error:
    SYST: You cannot determine the period for rule 02 to 12/31/07                                                                     
    Message no. AA613                                                                               
    Diagnosis                                                                               
    The system could not determine depreciation periods on 12/31/07 for period control 02 of calculation key 0000.                                                                               
    What to do                                                                               
    Maintain the allocation of the periods for the period control you entered.                                                                               
    Proceed                                                                               
    If the period control you entered is a standard period control, you can set up the allocation of periods automatically.                                                                               
    Procecd
    Could you guide me through this...
    Thanks in advance for your help.
    regards,
    Raj

    Hi,
    Please check
    Note 357375 - Settlement: AA613 for AuC intracompany transfer
    There are two possibilities how to solve this problem:
    a. Define period control 02 with Transactions OA84 or OAVH.
    b. If you work with self-defined period controls, you can enter another period control instead of 02 in depreciation key 0000.
    Rgds.

  • Steps for completing Asset under Construction

    hi,
    i have created the AUC  asset class  with line settlement checked.
    will somebody be kind enough to show me the futher steps involved in customization along with postings and settlement procedure....
    regards
    sayeed

    Hi,
    You can manage the asset under construction in the system in two different ways, depending on the types of functions that you need. The asset under construction can be either a normal asset record, or a master record with line item management. As a result, the transfer from the asset under construction to completed fixed assets can be handled in one of two ways:
    ·        Summary transfer from a normal asset master record to the receiver assets (transaction type 348/349)
    ·        Line item settlement of an asset under construction that has line item management
    The Investment Management (IM) component is recommended for handling large-scale capital investments. Using the IM component, you can manage a capital investment in parallel: for financial accounting purposes as an asset under construction, and for controlling purposes as an internal order or project. For more information, see the documentation for the Investment Management component.
    Assets under Construction Without Line Item Management
    The procedure corresponds to the procedure for the transfer between two assets within the same company code (see Posting the Splitting or Moving of an Asset). Before carrying out a full transfer of an asset under construction, you have to reverse any down payments that were posted in the current fiscal year. Down payments are ignored for a partial transfer.
    Special transaction types for the transfer of assets under construction allow for transfers to be displayed in the asset history sheet as acquisitions to fixed assets.
    Assets under Construction with Line Item Management
    In the FI-AA component, you can accumulate costs under purely technical aspects in an asset under construction. You do not need to consider the later creation of fixed assets at this point. During the construction phase, you can accumulate all acquisitions for an investment in a single asset. These acquisitions include
    ·        External activity (acquisition from vendor)
    ·        Internal activity (internal order)
    ·        Stock material (withdrawal from warehouse)
    in a single asset. When using this 'collective management' of assets under construction, it is possible to manage the individual acquisitions as open items over the course of several fiscal years. At completion, the line items must be cleared and then distributed to the various receivers. The system activates open item management when an asset under construction is created, if you set the corresponding indicator in the asset class. In addition, you have to assign a settlement profile to the company codes involved, in Customizing for Asset Accounting, in order for the line item settlement to work (see Define Settlement Profile in the Implementation Guide). The main function of the settlement profile is to specify the allowed receivers (such as, assets or cost centers).
    Hope this helps you. Let me know if you need any other information.
    Rgds
    Manish

  • Write off asset under construction

    we have one AUC, we have create a PO for this AUC, the AUC has amount of 200K USD, we haven't transfer it to fixed assets, how to write off the AUC, (we want to completely write off  this AUC, because the company code which creates this AUC going bankruptcy), I tried ABAON, ABAVN, but this is specific to asset, asset under construction can't be used. any idea? thanks

    Hi,
    1)  AIAB - Distribute  (update a rule with G/L settlement with a GL account for 100%)
         AIBU - Settle (Execute settlement)
    Or
    2)
    Posting direct FI entry.
    FB01
    Debit 40 posting key GL expenses to which you write off,
    Credit 75 posting key Asset #
    Best Regards,
    Madhu

  • Asset Under Construction data upload

    Hi!
    I am doing Asset Data Transfer through AS91, how to upload Asset under construction data from legacy to SAP.
    can any one explain process along with accounting entries to be passed in FI?
    regs,
    ramesh

    Hi Ramesh
    Please see the following link:
    http://help.sap.com/erp2005_ehp_05/helpdata/EN/01/dfd83705c0c931e10000009b38f842/frameset.htm
    and go to ink: Transfer of Assets under Construction 
    Note 68802 rule 25 is important.
    Further notes which have been helpful:
    49563
    29706
    regards Bernhard

  • Asset Under Construction Settlement - transaction types 340 & 345

    Hi all,
    My understanding is that
    a) If an Asset Under Construction (AUC) item is settled completely through transaction AIBU, then transaction type 345 is used to credit the AUC GL Account in asset accounting document
    b) If an AUC item pertaining to previous fiscal year is settled completely through transaction AIBU in current fiscal year, then transaction type 340 is used to credit the AUC GL Account in asset accounting document
    Please confirm if my understanding is correct.
    Also, please clarify, which is the program or configuration which proposes transaction type 340 or 345 for AUC settlement accounting document. I understand that transaction type 340 or 345 can't be entered manually & they are automatically determined by the system at the time of settlement
    of AUC through transaction AIBU.

    Hello
    The transaction types posted with AIBU are defined in the IMG:
    Financial Accounting > Asset Accounting > Transactions > Intercompany Asset Transfers > Automatic Intercompany Asset Transfers > Define Transfer Variants
    Transfer variant used in this case is number 6.
    They are also used for settlement purposes. And it is really important their definition regarding dependant areas. As the revaluation area.                                                                               
    It is recommended that transfer variants 4, 5 and 6 do have as transfer method 4. You can check this information in the following SAP notes 300273 and 327088.  
    Regards
    Javier Reviriego

  • AIAB Asset under Construction to Materials

    Hello,
    can anyone tell me if it's possible to transfer from Asset Under Construction to Materials using AIAB and AIBU transactions?
    Thank you,
    Nuno Anjos

    Hi,
    Please check the information in the SAP Library for settlements to material. There is quite some information that will help: e.g http://help.sap.com/erp2005_ehp_05/helpdata/EN/a9/ab778a414111d182b10000e829fbfe/frameset.htm
    or
    http://help.sap.com/erp2005_ehp_05/helpdata/EN/5b/ae39a94b8611d182ba0000e829fbfe/frameset.htm
    Kind regards,
    Brigitte

  • Settlement of WBS element down payments to an asset under constructions

    The down payment (of the transactions tcode F-47 and tcode F-110), are
    always settlement wbs element (tcode CJ88), we do not want to post down
    payments to the receiving asset under construction (transaction type
    180 or 181).
    In the down payments are always taken into account in the settlement to
    an asset. The settlement of the down payment is the actual reason for
    the previous update of down payments in FI (Transaction type group
    15). Furthermore, the settlement of down payments to assets should
    not be capitalize.

    When you search on this forum try to put Date range "ALL" to get more results. Please read below threads and you will get the solution.
    MIRO:Transaction in area 15 contradicts the net book value rule
    Transaction in area 01 contradicts the NBV
    Looks like you have a negative balance in your WBS which you are trying to settle to FA.

  • Creation of internal order (investment order- asset under construction)

    I want to capture the cost of asset under construction through internal order (controlling) not throgh Investment Measure module. How i can do this.

    Hi
    It is the same flow as explained by AP above
    If Investment management module is active, then on settlement i believe the AUC asset is automatically generated. Therefore you have to define an asset master and then include this asset in the settlement rule of the IO. Thus on settlement the cost in the IO would flow to the asset
    Thank You,

  • Error in dep run - Asset under construction

    Hi!
    Could someone please help me with the following:
    My customer has a large amount of assets under construction (AuC) and also other assets. None of the assets under consctruction should have a depreciation key (or depreciation key 0000) and no depreciation accounts are allocated in transaction AO93 for AuC . But my customer now has incorrectly created a few AuC (that should NOT be depreciated at all) with depreciation key LINK. What happened?
    1) Test run depreciation (AFAB) for all assets in period 1 during 2010. In test run no error log was created, everything looked fine.
    2) Executed depreciation in background.
    3) When looking at each of the assets in transaction AW01N I can see that all assets (both real assets and AuC with depreciation key) has depreciation posted in period 1. BUT, no depreciation has been posted in general ledger on any of the asset classes!
    4) I have now changed the depreciation key on all AUC in AS02 to 0000 so that no depreciation will be calculated.
    5) Trying to run AFAB again for period 2 but error message says that period 1 was terminated and that period 1 should be restarted.
    6) Trying to run period 1 again in AFAB with restart but error message says "Account 'Acc.dep. accnt.for ordinary depreciation' could not be found for area 01" and refering to all of the incorrect AuC that I have corrected (to no depreciation key)
    Please how can I go on? I want to reverse the depreciation in period 1 since I didn't get any posting i the general ledger. And then I want to make a new depreciation run only with correct assets (only depreciation on real assets, not on AuC).
    Please help!
    I am very thankful for any help!
    Many many thanks in advance!
    with regards,
    Prabhakar

    Hi,
    I had the similar situation couple of months back.  I followed below mentioned process and it worked out well.
    1) Maintain GL account for depreciation in AO90
    2) restart depreciation run for the relevant period
    3) change the depreciation key to 0000
    4) repeat depreciation run for the same period (It will post a reverse entry in the same month itself.  So the net impact of depreciation in the same month is zero).
    By the way I have a suggestion to prevent this issue in future.
    You may not be able to detect this issue on test run if you execute on foreground mode because the test run execution is restricted to 1000 assets.  If the error is on 1001th asset, you will not know. 
    Hence, always execute depreciation test run on background mode, check for any errors and execute production run only if there are no errors.
    Hope this helps....
    Best Regards,
    Madhu

  • Error in depreciation run - assets under construction

    Hi!
    Could someone please help me with the following:
    My customer has a large amount of assets under construction (AuC) and also other assets. None of the assets under consctruction should have a depreciation key (or depreciation key 0000) and no depreciation accounts are allocated in transaction AO93 for AuC . But my customer now has incorrectly created a few AuC (that should NOT be depreciated at all) with depreciation key LINK. What happened?
    1) Test run depreciation (AFAB) for all assets in period 1 during 2010. In test run no error log was created, everything looked fine.
    2) Executed depreciation in background.
    3) When looking at each of the assets in transaction AW01N I can see that all assets (both real assets and AuC with depreciation key) has depreciation posted in period 1. BUT, no depreciation has been posted in general ledger on any of the asset classes!
    4) I have now changed the depreciation key on all AUC in AS02 to 0000 so that no depreciation will be calculated.
    5) Trying to run AFAB again for period 2 but error message says that period 1 was terminated and that period 1 should be restarted.
    6) Trying to run period 1 again in AFAB with restart but error message says "Account 'Acc.dep. accnt.for ordinary depreciation' could not be found for area 01" and refering to all of the incorrect AuC that I have corrected (to no depreciation key)
    Please how can I go on? I want to reverse the depreciation in period 1 since I didn't get any posting i the general ledger. And then I want to make a new depreciation run only with correct assets (only depreciation on real assets, not on AuC).
    Please help!
    I am very thankful for any help!
    Many many thanks in advance!

    Hi, Can you please how the issue is solved because i have the same problem which i need to resolve immediately. Please reply me as soon as possible
    with regards,
    Prabhakar

  • Capitalize borrowing costs to asset under construction u2013 IAS23

    Dear experts,
    According to IAS 23 we are required to calculate interest on capital invested in an asset under construction.
    Borrowing costs that are directly attributable to the acquisition, construction or production of a qualifying asset form part of the cost of that asset. Where funds are borrowed specifically, costs eligible for capitalization are the actual costs incurred less any income earned on the temporary investment of such borrowings. Where funds are part of a general pool, the eligible amount is determined by applying a capitalization rate to the expenditure on that asset. The capitalization rate will be the weighted average of the borrowing costs applicable to the general pool. The amount of borrowing costs that an entity capitalizes during a period shall not exceed the amount of borrowing costs it incurred during that period.
    Detail scenario
    The construction of a qualifying asset is controlled by an investment measures that are managed as projects - WBS elements and settled to an asset under construction periodically.  The calculated interest shall update only the determine depreciation area set on the interest profile (OPIB).
    The borrowing operations are managed by money market transaction on TRM (Prod. Category  550  Interest rate instrument).
    Using the interest calculation function (CJZ2 - Individual Processing or CJZ1 - Collective Processing) we encountered several problems/ restrictions.
    1 u2013 When funds are borrowed specifically to a qualifying asset for example, an interest rate instrument as a money market transaction on TRM should be capitalized according to the actual incurred borrowing cost and not by a capitalization rate. How to assign the value to the WBS element?
    2 u2013 When funds are part of a general  pool, although we can calculate and update the effective interest rate for each borrowing transaction (TMEZ) how to determine the weighted average capitalization rate by company code and define it on the Reference Interest Rates (OBAC) to be used in the interest calculation?
    3 u2013 Even if the capitalization rate is defined and updated manually in the reference interest rate for the interest calculation, how to limit the amount of borrowing costs that will be capitalized during the period? The calculated interest in period shall not exceed the amount of borrowing costs it incurred during that period.
    Is there any other functionality to support interest calculation and capitalization of borrowing costs to asset under construction according to IAS23 requirements?
    Please advice.

    Hi,
    The interest rates for capitalization and for appropriation can be collected in separate cost centers and apportioned to WBS . If you incur interests at the group level,then using accrual apportion the relevant portion to the respective C/Codes.
    For arriving the weighted average i assume you take the planned interest.For restricting the planned to the actual ones use the " Budget Manager" functionality,give the actual value,set zero tolerance.This will help restricting  to the actuals.
    Hope this helps.
    Regards
    Ramesh

  • Asset under construction-IM module

    Hi,
    I am planning to manage the asset under construction (AUC) by the PS module. This means to create the AUC through the WBS element, and finally settle to the final asset. For doing that I understand that the asset under construction class should be created as an investment measure.
    I am asking if it is necessary to implement the IM module to manage the AUC by PS module.
    If it is not necessary which is the difference of having IM implemented?
    Regards,
    Cecilia

    Hi Cecillia,
    To answer your questions:
    You need to define specific asset class for AuC (status of AuC "investment measure" in OAOA)
    You do not need to "implement" IM by creating investment programs but what technically make a internal order or WBS element an investment measure is the presence of an "investment profile" in their master record that will pilot the creation of the AuC. Investment profiles are defined in transaction code OITA that can be found of the IM part of the IMG
    I second Ajay comment regarding the use of WBS elements (PS) vs. internal orders (CO) as investment measures: PS offers a lot more possibilities and options than CO but the set up, maintenance and daily use is much more complex. Take the time to consider both options.
    Good luck and best regards
    Thomas

  • Settlement of an Internal Order to Asset Under Construction

    We are running SAP 4.7 and Iam trying to settle an Internal order to AUC and I get the following error
    You cannot use this transaction type to post to this asset
    Message no. AA834
    Diagnosis
    The transaction type entered belongs to transaction type group 15. According to the specifications for this transaction type group, posting with transactions types belonging to this group are only allowed in specific asset classes (for example, asset classes for assets under construction).
    The asset to which you are posting belongs to class 18000 (chart of depreciation SEEF). You cannot post to this class using the transaction type you have entered.
    Procedure
    Check the asset number entered. You may want to allow posting with this transaction type group for the asset class of the asset.
    **Please take note that the costs which have come on the internal oder are through GR( Goods receipt) and not down payment. Also note that last month, the order settled without any problems!**

    Hi,
    thanks for your answer.
    I want to do that because of some french tax rules.
    These rules say that goods, hours or services produced internally for the contruction of an asset can be "delivered" to itself.
    So you can register output tax based on the value produced but you have also to register input tax for the same amount.
    Finally the balance for VAT amount is 0.
    I was interested to know if that was possible to automize. If not, there is still the possibility to make a separate postings at month end or year end.
    Best Regards

Maybe you are looking for

  • MBeanServerConnection is null exception while running a composite app

    I am not sure how to fix this connection problem below. Each time I ran my test case created in my composite application under NetBeans 6.5.1, I got the connection failure saying that "MBeanServerConnection is null". I tried to change the destination

  • Changing fonts in Mail

    Hi, can anyone tell me how to change fonts in MacMail when composing new messages? Thanks, Bob Tomsak

  • G/L account does not exist but cannot create G/L account.

    Hi Guys i got this error which says G/L account NO. 121000 does not exist in the chart of accounts INT, but when i tried to create the G/L account in FS00, the system says ths G/L account exists in company code PS01.this company code PS01 has the cha

  • What format should I use

    Wondering if anyone knows the quicktime compression format used for movie trailers. I'm looking for a great looking streaming video compression. Got about 40 videos to post. Thanks

  • Apple Remote Desktop conflict with iChat/iSight

    I have found an irritating but reproducible conflict between Apple Remote Desktop (ARD) and iChat. If I try to set up a video chat (either within our local network or to the outside world) when ARD is running on my computer (PB 12" 1.5GHz, 10.4.4), t