Transfer Control in CK40N

Dear all,
i trying to update the standard cost of a material and those components that are in its multi-level BOM.
Scenario:
Material     Level      Std Cost
A                  1            $0
|
B                  2            $1
|
C                  3            $0
Material A has 3 levels in its multilevel BOM. I trying to update the std cost of material A and C without updating cost of B and std cost of B was previoulsy updated by CK24.
I tried to use transfer Control in CK40N but transfer Control once recongise that its BOM has a std cost won't procced on to the next . Is it possible whereby i can updates cost of those selected materials and their multilevel BOM that do not have a cost estimate?
Regards
YM

Dear Yiming,
While executing CK11N only single level BOM explosion will be happening and the system calculates
the cost.
If you execute CK40N for the same product then the system considers multi level BOM and calculates
the Sub-assemblies standard cost also, provided if they dont have any standard cost estimate for that
current period.
If you execute CK11N,then for marking and release you have to use CK24 for marking and release.
In CK40N cost estimae ,marking and release can be carried out in steps.
Regards
Mangalraj.S

Similar Messages

  • Transfer control in Costing Run

    Hi ,
    I was trying costing a material in ck40n using standard costing variant.Here if I don't specify any
    Transfer control, I am able to cost the material multiple times. How ever if I use a specific transfer control,
    The material is nor getting selected for costing run.Is there any specific reason for the same.
    Please highlight.
    Regards
    Rudra

    Hi
    The purpose of Transfer Control is to transfer the existing Cost Estimates... It cant prevent the selection of a material for costing
    In Transfer Control - You can choose Single Plant / Cross Plant strategy.... based on that, the existing cost estimates are either Transferred or not transferred
    br, Ajay M

  • How to transfer control along with Data to the another page (Out of JVM)

    Hi,
    Please bear with me, incase this turns out to be a dumb question.
    I want to transfer control to a non JSP page after I hit submit. Apart from
    this I am also sending some data as a HTTPS POST. In case of using
    response.sendRedirect(), it doesn't take care of the POST data.
    So, can anybody help me with what's the best practice in sending POST
    request from a Struts (1.3.8) based J2EE application to another page (which is not a J2EE Application)
    Thank you

    Hi,
    you should run two different import comand.
    The first import with only metadata, just to recreate the structure.
    With the second import you will import data only for the tables you need.
    I think this is the simplier solution.
    Acr

  • OKTZ what is Transfer Control use for?

    Hello all:
    can anybody explain in very easy meaning what is this apply for?
    Best Regards,
    Manthana

    Hi
    Transfer control is a tool to customise the way SAP has handle cost estimates. With Tcode OKKM you can do the customising. Press F1 to look at what SAPhas to say to it: "Key that determines, for each plant, how the system is to search for existing cost estimates."
    Re: Error Message CK 170 and CK 171
    Hope this will help you.
    Regards
    Edited by: Dublin on Nov 16, 2009 9:19 PM

  • How SAP use transfer control or material cost estimate

    Hello!
    I have strategy "3-Previous standard cost estimate" in transfer control material cost estimate.
    I have cost estimate for product AAA with status KA and costing date from 01.01.2014.
    Product AAA produced from component BBB.
    Component BBB has two cost estimates with costing date from 01.01.2014 and 01.02.2014.
    I run cost estimate for product AAA with costing date from 06.03.2014.
    Cost estimate not use existing cost estimate for component and create new cost estimate.
    In help.sap.com contains next information about transfer strategy 3 - The system searches for existing previous cost estimate.
    why my system does not use the existing cost estimate for component?
    Thanks for attention.

    Thanks, Szymon!
    I use russian interface and read russian help. Where stragegy 3 has name "Прошедшая плановая калькуляция" which means "The last planned cost estimate".
    This led me astray.
    In english help i read next:
    Previous standard cost estimates
    The system searches for an existing previous standard cost estimate.
    You are completely right!
    two more questions:
    - We can not use strategy 3 if we not realesed cost estimate as standard price?
    - What strategy we should use for transfer material cost estimate with status KA?
    Thanks

  • Transfer control Strategy

    Hello all,
    What is relevenece of using transfer control in costing variant
    why we use it.
    suggest

    Hi prem
    It is for partial costing. The purpose of partial costing is to prevent the system from creating a new cost estimate for a material when costing data already exists. Instead, the existing costing data is simply transferred into the new cost estimate. This improves performance.
    You can create at TCode OKKM
    Cheers
    Srinivas

  • Liquid transfer control/monitoring using valves, pumps, & sensors

    Hi there,
    My project is writing a labview program to control & monitor the transfer of a liquid from a tanker truck to a 70-tonne storage tank, and from the storage tank to multiple 3-tonne railroad tankers. We will be using a NI controller (I don't remember the name of it right now) to control this system. The piping network for this transfer process consists of several remote control valves, 1 flow meter, 2 pumps (centrifugal & diaphragm), level sensors, & load cells. The labview program needs to:
    1. control the flow of liquid (i.e. start/stop transfer, open/close valves & activate/deactivate pumps when certain setpoints are reached)
    2. monitor the inventory of liquid in the tanker truck, storage tank, & railroad tanker (flow meter will indicate the flow rate, level senors will be in both tankers to indicate levels, and storage tank has a load cell which can be used to indicate the inventory of liquid iside the tank)
    The transfer is split into 2 phases: tanker truck to storage tank & storage tank to railroad tanker. Both are separate processes (i.e. they do not occur simultaneously). So my labview program needs to be able to switch between these two processes.
    I am relatively new to using labview, and this is a pretty tall order. I was just wondering if anyone had any advice on how I could set the program up? Or possibly lead me to some example programs I could look at to help me out.
    I appreciate any feedback.
    Thanks,
    Daryn

    Daryn,
    You are right that "this is a pretty tall order" for a LabVIEW beginner. However, if you are patient and do not try to do too mcuh too quickly, you should be able to get it working.
    First, I recommend that you get some LV training to make sure that you are sound on the fundamentals before you do mcuh on this project.  Fumbling around making novice errors could become a big problem for a project like this.
    Next, break the problem down into "bite-sized" chunks. You will need to be able to read from the sensors. Write to controllers. Perform logical decision-making. Display data to the operators. Probably log information to files. Certainly handle error conditions.  LabVIEW makes it easy to keep things modular by using subVIs.
    Also, carefully design the program before you write much code.  Your system will probably include a state machine. Document the states, what happens in each state, and the conditions for transition to other states. (Do not forget error conditions and "that will never happen" possibilites).  This state design document will make writing the program much easier.
    Then look at the examples which come with LV. There are examples for data acquistion, for control, for state machines, and for other relevant parts of the code.  The examples most likely will not be directly useful in your final program but will save you lots of time in learning how to do some of these essential parts of your project.
    Lynn

  • Bin to bin transfer control

    Dear All,
    User request to restrict some bin to bin stock transfer between some specific storage types.
    ex. 320 --> 321 allowed
         302 --> 320 disallowed.
    Is there anybody knows how to make this control in configuration ?
    Thanks in advance
    Regards
    Corey

    Dears,
    I've tried enhancements MWMTO001 and MWMTO003 but not work.
    Is there anyone know which enhancement I should set up?
    Regards
    Corey

  • Transfer Control

    Hi,
    I have a function that inserts a blob column into the database. I am using that in the WHEN_BUTTON_PRESSED form trigger. The problem is that the control goes to the function and then it ends there, due to this the next part of trigger code is not being run. Here is the trigger and function code.
    declare
    file_name varchar2(30) := name_in('FILE_NAME');          
    get varchar2(20);
    begin
    get := blob1(file_name);
    /*THIS PART NOR BEING DISPLAYED*/
    message('This is the filename '||file_name);
    message(' ');
    end;
    create or replace function blob1(file_name varchar)
    return varchar
    as
    a blob;
    loc bfile := bfilename('D1','''||file_name||''');
    begin
    insert into das.pictures values(empty_blob())
    returning photo into a;
    /*opening the location to load the file*/ dbms_lob.fileopen(loc);
    /*loading into the blob variable which inturns
    loads into the table*/
    dbms_lob.loadfromfile(a,loc,dbms_lob.getlength(loc));
    /*closing the location*/
    dbms_lob.fileclose(loc);
    return 'TRUE';
    end;
    Can anyone tell me how to transfer the control back to the form? Also is there a way to attach a screen shot in this forum?

    I know this will seem really silly...but
    loc bfile := bfilename('D1','''||file_name||'''); - Text Literal error
    loc bfile := bfilename('D1',file_name); - Running fine
    Thanks for your time guys

  • Inter company stock transfer control issue

    Hello All,
    In inter company Stock Transfer process, plant A has received scheduling agreement or PO from plant B. Is there any possibility of receiving material by plant B w/o sending / dispatching material by plant A? I guess this should not be possible.. but in our case it is happening. Being document type is of ZUB (which is similar process as intra company process).. also we have implemented WM. Material issuance or receipt will happen from outbound or inbound process.
    Though there is a process violation but system would have restricted user not to receive materials. Can someone let me know is there any configuration issue ? If yes how to fix the issue? If no how to restrict user?
    Edited by: Krish9 on Aug 13, 2011 10:03 PM

    Hi,
    As per your scenario you described, it is rather unclear what you are trying to achieve there.
    How would the stock posting be balanced if we do not relief materials from Plant A if we are receiving it in Plant B?
    The stock have to come from somewhere in order for Plant B to receive it. The same quantity of stock has to be reduced accordingly from the source plant (be it Plant A or some other plants).
    I reckon if you just merely do not want to reflect that the stock is being dispatched from Plant A to Plant B, then you may want to consider using a dummy plant to represent Plant A or something to that effect.
    Hope the above helps.
    Thanks.

  • Transfer control back to calling program from infotype screen

    i've developed a module pool program that uses 'call transaction pa30'BDC  to an custom infotype screen... after the 'save' button is pressed the control goes to the infotypes initial screen.
    but i want the control to come back to the calling module pool program.. how do i do that??

    Hi Joseph,
    have you considered using function module HR_INFOTYPE_OPERATION with parameter DIALOG_MODE = '2' instead of CALL TRANSACTION?
    Regards,
    Christian.

  • Unable to transfer control from one action to another action

    In my jsp i ve one html link, in that <html:link action=" " ></html:link>
    i ve given the respection path. with the same name i specified in the
    struts-config.xml file also.
    When i am pressing that html link, i am unable to get the respective
    jsp page.
    What i need to do ? pls help me in this area.
    Advance thanks.
    with regards,
    chandu

    You will need to phyically copy the file from your one pc to the other. Then drag it into iTunes (drop it on the rigntone menu).
    Then try to play it in iTunes (it will ask to enter login info to authorize it).
    Then from there it is on that machine ready to go.
    I belive the location it saved the file is
    C:\Documents and Settings\YourLoginName\My Documents\My Music\iTunes\Ringtones
    I would put it in the same location (editing login name part of the path of course) before dragging it into iTunes.
    Message was edited by: DaVBMan

  • No materials selected when run CK40N

    Dear All Expets,
        I am trying to use CK40N to run the standcost for 6 semi-finished goods, and we also use transfer control, but when I run the first step for selection, the system shows message as below:
        Could you tell me how to solve it?
        Thanks !
    Xinling Zhang

    Hi Xinling,
    Its nice to hear that your issue has been resolved and for your query regarding 'Always Recost Materials",please go through the link provided below for more understanding.
    http://help.sap.com/saphelp_470/helpdata/en/7e/cb826f43a311d189ee0000e81ddfac/content.htm
    Hope this will help you.
    Regards
    Eugene

  • CK40n diferent to CK11n

    I run CK40n for all materail and the value for a material XXXX is defferent in some plant.
    BUt when I analizy this material with the CK11N the value is the same in all the plant.
    Someone can help me? Thanks  FLAVIA

    in general differences between CK11n and CK40n
    are explainable by checking your settings
    Do you make use of "transfer control"? Did you
    flag "alwasy recalculate" in selection screen?

  • In DEV client i have to copy controlling area or i mantain controlling area

    Hi
    in DEV client i have to copy controlling area or
    i mantain controlling area which is preferable.

    Hi,
    Transfer Controlling area created request from golden client to Dev client.
    Rgds
    sunfico

Maybe you are looking for

  • IMac Still Has Video Problems after Upgrade

    I did the firmware and software upgrade to my iMac, which was supposed to fix the video problem, however the problem continues. I am using OS 10.4.11. My computer never "froze" however the screen went haywire. I would have to do a soft restart (if I

  • HP 5440 Pryamid of black ink under the HP92 black cartridge

    I am getting a black cartridge error and the resume button/light flashing. I took the black cartridge out and tried a test print from the computer and the paper feeds in and out fine but no ink is on the paper.  I will be getting a new HP 93 color ca

  • Indesign, word, mathtype problems...wmf-scaling defect

    hello Word document with mathtype equations, place doc  in indesign, everything look fine, BUT: 1. some equation is scaled to 90.9% horizontaly,  some not. Why? 2. indesign makes embeded eps files from equations.  When exporting it to folder via unem

  • Error Partitioning

    Hi, I used disk utility to decrease the size of my main partition so I could create another one and install ubuntu. I didn't like ubuntu at all so I uninstalled it and deleted the partition I created. But now when I try to increase the size of my mai

  • Data form for entering conversion rates

    Hi, I am trying to create a data form for input of conversion rates. For example in the line given below I want to create a data form to convert USD to euro and I want to enter 1.05742 through the data form. I am not sure how to select USD and EUR fr