Hi there.
We are implementing CRM for the first time using version 5.0.
We wish to use ALE distribution via message type HRMD_ABA.
We have researched all main notes (312090, 550055 and 934372 to name a few) and have set up configuration accordingly.
We copied the HR to SRM/CRM 4.0 (with Qualifiations) distribution model template with data filter, distributed the model to CRM and succcesfully generated both partner profiles.
The outbound parameter generated a HRMD_ABA04 idoc type.
We note when using the RHALEINI program that IDOC segment E1P0006 is not included against our employees. Also IT0006 is not available as a selection in update mode.
We confirm the template filter includes settings for object P, IT0006, subtype 1 and such addresses are maintained for our employees.
Can you please advise suggestions why E1P0006 segments are not being included against the outgoing IDOC's.
Thank you and kind regards.
Stephen.
Hi Pratik,
Yes the IDOCs are passing successfully through to CRM with status of 03 (IDoc sent to R/3 System or external program). However segment E1P0006 is not included within the IDOC.
I performed an authorisation trace via ST01 whilst performing the distribution via RHALEINI and found no authorisation issues. The trace did note authorisations were passed for IT0000, IT0001 and IT0002. IT0006 was not checked.
It appears the data filter as copied from the template for object P, IT 0006, subtype 1 is being ignored?
Kind regards
Stephen.
Similar Messages
-
Issue in transfer of data from ECC to APO
Hi All,
I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
How should I proceed...Please help....this is an urgent requirement
Thanks & Regards,
SriLalithaHi,
you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
Determine Forecast of Replenishment Lead Time
Use
In this field, you specify how the extended safety stock planning determines
the forecast of the replenishment
lead time (RLT). The following values are available:
Supply Chain
The system determines the RLT forecast using the supply chain structure by
adding the corresponding production, transportation, goods receipt, and goods
issue times. If there are alternative procurement options, the system always
takes the
longest
option into account.
Master Data
The system determines the RLT forecast from the location product master
data.
Master Data/ Supply Chain
First, the system determines the RLT forecast from the location product
master data. If no RLT forecast can be determined, the system determines the
forecast using the supply chain structure (as described under
Supply
Chain
Dependencies
You can retrieve the replenishment lead time forecast yourself by using the
GET_LEADTIME
method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
Replenishment Lead Time in Calendar Days
Number of calendar days needed to obtain the product, including its
components, through in-house
production or external
procurement.
Use
The replenishment lead time (RLT) is used in the enhanced methods of safety
stock planning in Supply Network Planning (SNP). The goal of safety
stock planning is to comply with the specified service level, in order
to be prepared for unforeseen demand that may arise during the replenishment
lead time. The longer the RLT, the higher the planned safety stock level.
Dependencies
The field is taken into account by the system only if you have specified
master data or master data/supply chain in the RLT: Determine
Forecast field of the safety stock planning profile used.
Hope this helps.
The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
May be if you maintain the setting in the profile, you may get the value in RELDT.
Thanks. -
Hi ,
I'm trying to transfer data from ECC to SRM for creating bid document ( Function : BBP_PD_BID_CREATE ). After transferring the data I want to get the data back to ECC ( I need bid document number to write on delivery document's field ). What's the best way to do this ?
Regards.Hi vinit ,
I've written code to call 'BBP_PD_BID_CREATE' in ECC. But ECC and SRM have different structures. So i am not sure how i can define data to send SRM.
Here is my code in ECC program
CALL FUNCTION 'BBP_PD_BID_CREATE' IN BACKGROUND TASK
DESTINATION 'XXX'
IMPORTING
I_REF_GUID =
I_BAPIMODE =
I_PARK =
I_SAVE =
I_TESTRUN =
I_HEADER = I_HEADER ?
IT_ATTACH =
IT_DYN_ATTR =
IT_CONDITIONS =
EXPORTING
E_HEADER = E_HEADER ?
ET_ATTACH =
ET_DYN_ATTR =
ET_CONDITIONS =
TABLES
I_ITEM =
I_PARTNER =
I_LONGTEXT =
I_SDLN =
I_ORGDATA =
I_HCF =
I_ICF =
I_TOL =
I_WEIGHT =
IT_EXCHRATE =
E_ITEM =
E_PARTNER =
E_LONGTEXT =
E_SDLN =
E_ORGDATA =
E_HCF =
E_ICF = -
Transfer z-table data from ECC to CRM via Middleware
Hi,
I need to transfer some z-table data from ECC to CRM using middleware. Does someone have any tip or reference link?
AndréHi,
The following link shows the replication from CRM to ECC. The same can be followed for replication from ECC to CRM.
Replication of Z table from CRM to R/3 - No mBDoc Created
Regards,
Susanta -
How to transfer data from ECC to CRM via IDocs (Clfmas01),
Hi all,
how to transfer data from ECC to CRM via IDocs (Clfmas01), that to material master data from ECC to Production master data in CRM.
Need Information regarding, how to upload file to CRM from ECC, through, IDocs......Plz help me...
Edited by: khaja fareed on Jan 11, 2010 12:44 PMFirst of all push ECC data in to GTS server through T.code:/N/SAPSLL/MENU_LEGALR3. First click on Master data tab there enter customer/vendor number then execute.
2-Go to document tab there enter Sales order no/PO number then execute it.
Then go to GTS server in compliance management module you can get all the information.
Regards
Sitanshu Panigrahi -
How to get data from ECC --- Sales Order,Delivery,Transfer Order & Invoice
Hi,
Good day.
I'm ABAPer and I need to get Sales Order,Delivery,Transfer Order & Invoice data from ECC. The said data will be displayed in the custom form that I need to create. How exactly do i get the said data above?
Can I get them in the tables avaialable in GTS? Where?
Or do I get the data directly in ECC? How?
Thank you very much!
Best regards.
BrandoFirst of all push ECC data in to GTS server through T.code:/N/SAPSLL/MENU_LEGALR3. First click on Master data tab there enter customer/vendor number then execute.
2-Go to document tab there enter Sales order no/PO number then execute it.
Then go to GTS server in compliance management module you can get all the information.
Regards
Sitanshu Panigrahi -
Master/Transaction data from ECC to APO-BW
Hi All,
Normally we come across scenarios where Master/Transaction data is pulled from ECC to BW and then pulled into APO-BW. What are the pros and cons of CIF (direct connection between ECC and APo-BW) rather than pulling data from ECC to stand-alone BW and then into APO-BW?
Regards,
JoyHi Santhana,
If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
1. Create Generic Data Source in ECC for thet Sales Order table.
2. Replicate that data Source in to APO BW with Source System.
3. Create whole data flow process by using created Data Source.
Data Flow Process: 1. Info Package
2. Info Source
3. Info Cube
4. Transformation between DS & IS, Then IS & IC
5. Data Transfer Process.
4. Load data from ECC to APO BW
5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
Hope this will help you.
Regards
Sujay -
Hi,
I have fetch to data from ECC custom table to APO and create data, can anyone let me know the procedure.
Thanks in advanceHi Santhana,
If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
1. Create Generic Data Source in ECC for thet Sales Order table.
2. Replicate that data Source in to APO BW with Source System.
3. Create whole data flow process by using created Data Source.
Data Flow Process: 1. Info Package
2. Info Source
3. Info Cube
4. Transformation between DS & IS, Then IS & IC
5. Data Transfer Process.
4. Load data from ECC to APO BW
5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
Hope this will help you.
Regards
Sujay -
Transaction data from ECC to APO DP
Dear All,
Can you tell me if i can directly load transaction data directly from ECC to APO BW Infocube.
For example i want to load say sales orders from ECC.
Can i directly load from ECC --> APO BW Infocube --> DP Keyfigures.
Or any staging is required inbetween ECC and APO BW
Thanks
Santhana.Hi Santhana,
If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
1. Create Generic Data Source in ECC for thet Sales Order table.
2. Replicate that data Source in to APO BW with Source System.
3. Create whole data flow process by using created Data Source.
Data Flow Process: 1. Info Package
2. Info Source
3. Info Cube
4. Transformation between DS & IS, Then IS & IC
5. Data Transfer Process.
4. Load data from ECC to APO BW
5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
Hope this will help you.
Regards
Sujay -
Extraction of data from ECC to 3rd Party systems
Hi All,
I want to know all the options available for extracting data from ECC to a 3rd party system (custom datawarehouse like Teradata, hyperion etc). Also, I want know if there is a best practice documentation available for extraction of data from ECC to any 3rd party system?
Thanks,
SB.Hi SB,
Check the following link
http://expertisesapbi.blogspot.com/2010/06/how-to-transfer-data-from-sap-system-to.html
Ranganath. -
CIF of transaction data from ECC to APO
Hi,
I wanted to know where we maintain the configuration for real time transfer of transaction from ECC to APO.
I know for master data we have an option in CFC9 for real time/periodic transfer. Is there any similar config for transaction data too like sales orders etc.Hi Alok,
To allow online transfer of changes to transaction data from SAP R/3 to SAP APO, you have to activate generally the BTEs in SAP R/3.
This is done in R/3. This is the path:
SPRO --> Integration with Other SAP Components --> Basic Settings for the Data Transfer --> Change Transfer --> Change Transfer for Transaction Data --> Activate Online Transfer Using BTE
You can read about it here:
Change Transfer for Transaction Data - Integration via APO Core Interface (CIF) - SAP Library
Then of course you will need to generate and actiave your IModels.
Kind Regards,
Mariano -
Can we transfer customer master from ECC to SAP AII
Hi Experts,
We need to transfer the customer master data from ECC to SAP AII ( Auto-id system ) through XI system. There seems to be no std XI content for doing this ( there is std content for sending material master ). I have found out an idoc type BUPAFS_FS_CREATE_FRM_DATA201 in both ECC and SAP AII system. I think I can use this idoc for transferring the customer master. But how do i triggere this idoc whenever the cusotmer is created or chnaged?? ( like for MM we have BD10 transaction to do this )
thanks
sankarHello,
I do not get what is the sending message type and what is the receiving message type.
The MaterialIn Message Type in AII is used when you do replicate material master data from ERP to AII.
In ERP You sent IDOC Matmas01 or AINMatmas ( I am not exactly sure about the name, but it is contained in the configuration guide for flex delivery scenario.
When in this replication the gtin field is not populated.
Check the following:
open master data -> product in AII and check if you do have a table containing UOM and GTIN displayed for existing product or that you can create your own product and defining UOM and gtin for that.
If this is not possible, you have not maintained the relevant set type and product configuration in AII. This is stated in config guide again.
Michael
Now I will be off for two weeks with no access to internet. Hope that helps. -
Integrating Data From ECC to CRM
Hi Experts,
My requirement is, After Updating the Material master data in ECC , the same updated data is integrated with the corresponding data of the Product Master in CRM.
Problem: to map the data from ecc to CRM , I am supposed to call this RFC Fm ( existed in CRM side) from ECC using RFC Destination.
to map the data to this TABLE parameter , In ECC side I don't have similar strcture that was exist in the SRM side. so could any body help me how can i send the data from ecc to this fm existed in SRM.
Thanks & Regards.
Naga Priyanka. T
Edited by: Priyanka Tubati on Feb 2, 2010 10:35 AM
Edited by: Priyanka Tubati on Feb 2, 2010 10:38 AMHi Kumar,
Please select the following parameters when downloading the HR Org from CRM:
You can do this in the program RHALEINI (or in the transaction PFAL, which has the same function)
Tx: SM30--> This scenario is activated in T77S0: ALE REPLI
Objects:
1. Plan Version: 01
2. Object Type: *
3. Object Id: Copy the Object Ids which you want to transfer from HR System
4. Object Status: *
Reproting Period: All
Structure Parmaters: Blank
Transfer Mode:
Insert: Complete distribution, this will delete the exisiting and recreate it in Target System
Update: this will update the change records in CRM system
Message Types: HRMD_ABA
Also check SAP Note: 119780
Hope this helps.
Regards,
Madde -
Organization data from ECC to CRM
Hi Experts,
We need to download organization data from ECC to CRM, and our requirement is to download two different kinds of org structures, sales org structure and HR org structure. Could you please advise whether this is possible in the system and also if it is possible please advise how to download this.
Currently we are using ALE to download employees into CRM and transporting org structure in CRM systems from golden client.
Thanks&Regards,
Kumar.Hi Kumar,
Please select the following parameters when downloading the HR Org from CRM:
You can do this in the program RHALEINI (or in the transaction PFAL, which has the same function)
Tx: SM30--> This scenario is activated in T77S0: ALE REPLI
Objects:
1. Plan Version: 01
2. Object Type: *
3. Object Id: Copy the Object Ids which you want to transfer from HR System
4. Object Status: *
Reproting Period: All
Structure Parmaters: Blank
Transfer Mode:
Insert: Complete distribution, this will delete the exisiting and recreate it in Target System
Update: this will update the change records in CRM system
Message Types: HRMD_ABA
Also check SAP Note: 119780
Hope this helps.
Regards,
Madde -
I am extracting the data from ECC To bw .but Data Loading taking long tim
Hi All,
i am extracting the data from ECC To BI Syatem..but Data Loading Taking Long time. from last 6 hoursinfopackage is running.still it is showing yellow.Manually i made the red.and delete again i applied repeat of the last delta.but same proble is coming .in the status job is showing bckground job is not finished at source system.we requested to basis.basis people killed that job.again we schedule the chain also again same problem is coming.how can i solve this issue.
Thanks ,
chanduHi,
There are different places to track your job. Once your job is triggered in BW, you can track your load job where exactly it is taking more time and why. Follow below steps:
1) After InfoPackage is triggered, then take the request number and go to source system to check your extraction job status.
You can get the job status by taking the request number from BW and go to transaction SM37 in ECC. Then give the request number with begining '' and ending ''. Also give '*' to user name.
Job name: REQ_XXXXXX
User Name: *
Check the job status whether job is completed or cancelled or short dump. If the job is still running check in SM66 whether you can see any process. If not accordingly you got to check in ST22 or SM21 in ECC. If the job is complete, then the same in BW side now.
2) Check the data arrived in PSA, if not check whether Transfer routines or start routines are having bad SQL or code. Similarly in update rules.
3) Once it is through in Source system (ECC), Transfer rules , Update Rules, then the next task is updating the data might some time take more time which might be based on some parameters ( Number of parallel process to update database ). Check whether updating the database is taking more time and may be you got to check with the DBA guy also.
At all the times you should see minimum of atleast once process running all the time in SM66 till the time your job gets complete. If not you will see a log in ST22.
Let me know if you still have questions.
Assigning points is the only way of saying thanks in SDN.
Thanks,
Kumar.
Maybe you are looking for
-
Job_open,job_close
hello plz let me know how to use job_open,jib_sumbit,job_close, and the function modules related to it thanks aafaq husain
-
HT4864 Can i use my old email address on ICloud?
Can i use my old email address on ICloud?
-
IPhone: Appears in Windows but not in iTunes
hello my iphone appears in wind.7 but not in itunes already del itune and downlo again
-
I was working all last night on artwork using Illustrator and now I cannot get it to open. The message reads that there is not enough RAM. This is after a long pause of waiting for illustrator to read the file. The file is 37 MB large, so it doesn
-
Reducing Rendering time with JTable
Hi, Currently I have an application which builds a JTable from a fetched database resultset. The resultset contains a date field, which is shown in the JTable as well. I roughly have 100,000 records which are placed in the JTable. Now for the problem