Transfer material from Valuated project non valuated project

Hi Experts,
While i am trying to transfer material from Valuated project stock to Non valuated project with T.Code MB1B movement type 415 'Q', I am getting following error.
WBS element  has different inventory valuation
Message no. CN769
Diagnosis
The project definition for WBS element  only allows the following stock control:
No project stock
No project stock with defined valuation M
' ' = non-valuated project stock
'M' = valuated project stock
System Response
Account assignment not possible.
Procedure
Change the settings for the project stock in the project definition (Control tab) or use a suitable WBS element.
Kindly suggest me how to trafer material from Non valued project stock to valuated project stock.
Regards

Actually, you sohuld not be transferring stock to non-vlauated proejct directly. In case of non-valuated project, stock is never valuated while in case of valuated project it is valuated. So there is basic difference in valuation method. This will create inconistency if you attempt ot transfer it directly.
You should rather transfer this stock to general stock and then transfer to non-valuated project stock.
Regards,
Mahendra

Similar Messages

  • Transfer the material from one plant(non valuated) to another plant valuat

    Hi All,
    How to transfer the material from one plant(non valuated) to another plant valuated.
    Which Goods Movement type we required to use.
    Regards,
    Amit Shah

    Hello,
    Please refer the link below. hope it could be a help.
    stock transfer plant to plant
    split valuation
    Regards,
    Jana

  • Valuated or Non Valuated Sales order or Project stock?

    Hi,
    a) What factors should i consider before deciding on whether my Sales order or Project stock should be Valuated or non valuated?
    b) If i have decided to have the Project and Sales order stock as valuated how can i go about doing the settings for the same in SAP? How can i assess its value in financial accounting?
    Thanks

    Hi
    As per my knowledge, the Material type controls whether that material is valuated or not.
    Thanks,
    Ravi

  • Valuated and Non-valuated project stock in same SAP system

    Dear All,
      Can we operate with the system where projects are with valuated and non-valuated project stock at the same time. If yes, are there any precautions we need to take before doing this.
      Currently we are changing to 'valuated project stock' from 'non-valuated project stock' due to advantages of 'valuated project stock'. But since we are implementing this change in already stable system where projects are running with 'non-valuated project stock'. Please suggest of there are any complication with this.
      Thanks in advance !
    Regards

    Hi Muralidhar Lanka,
    Thanks for your time and efforts to share your thoughts with all of us. Hope you will not mind, did you done this kind of changes to profiles midst of the project in the past? or its your guess.
    Because, many times these kind of questions comes from business to change, but we are not sure how it will affect the existing as well new projects. In such circumstances, normally we politely propose to go with two profiles rather changing the existing one since we are not sure of how it will affect.
    It would be great help to all of us if you can share your experiences how the goods movement and value flows have taken in  system for old projects and new projects. What kind of changes you could notice after changing profile in terms of .. a few of them
    1.  Goods movement
    2. Consumption of production orders and internal order.
    3. Settlement and RA (customer projects/ investment projects)
    4. POC calcualtion of projects
    I am sorry if you find my questions are silly and not worth to answer, please disregard.
    Looking forward to hear from you at your convenient time.
    Thanks,
    PSR

  • Splitt valuation for non valuated material

    Hi all,
    Is it possible to make splitt valuation for non valuated material? if yes how?
    Our business scenerio
    Large no of spare parts (ERSA).Divide spare parts material type into 2,
    1 for valuated and another for non valuated,
    For non valuated spares,copy from ERSA make  it ZBLB for non val spares
    now
    How to make the split valuation for ZBLB material type material's ??
    Do u have any idea ??
    Regards,
    Hareesha

    Hi
    Split valuation is the concept used for individual valuating of different lots of same material.
    Here you have created a new material type ZBLB from ERSA for maintaining non-valuated materials. There are several significant points in your actions.
    1) When u  are able to maintain materials seperately with different material types, what way u want to use split valuation concept?
    2) As the non-valuated material implies for no value updating, the material type does not provided with accountign view. So no valuation class and obviously no valuation type. The prpcurement of non valuated material will be account assigned.
    3) For non-valuated materials, either u have to use standard material type UNBW or copy from UNBW. donot copy from ERSA.
    I hope your doubts are cleared. Please come out with your comments if any specific.
    warm regards
    sairam akundi

  • Split valuation for non-valuated materials

    Hi dudes,
    We are implementing SAP for our Subcontractor.
    our SC  receive all components from our company ( on free ) but sometimes they purchase the same material themselves for other uses. so we decided to use split valuation to separate valuated and non-valuated materials.
    I did configuration and created 2 valuation type ( valuated - nonvaluated )
    when I create Purchase order it askes for valuation type but even when I use non-valuation type in PO it asks for price!!!!
    do any of you have used split valuation for this target?
    have the same problem?
    what should I do actually??

    Hi,
    Is someone in the subcontracting plant going to do a process order on the materials you send them? Or are you only going to track the finished inventory once it reaches your plant?
    In the first case:
    1) Create a STO to the SC plant. This stock will have to be priced.
    2) Inventory reaches SC plant. They perform production process.
    3) finished inventory is sent using another STO.
    2nd Case:
    1) Create a SC vendor using the SC plant as a vendor.
    2) Create a SC PO to this vendor using this vendor and transfer goods to him. In this case, goods are transferred for 'free' as they really belong to you and not to the SC
    3) Once the production process is over and the finished product is sent back to you, do a GR. The raw material sent to the SC will be consumed.

  • Does table MCHB (batch stocks) contain both valuated and non valuated stock

    Hello
    Does table MCHB (batch stocks) contain both valuated and non valuated stock?
    Is it possible that material has both valuated and non valuated stock for the same plant and storage location?
    Thanks

    Hi ,
    Most of your queries has been answered by Jurgen.
    1)Does valuated or non valuated is linked with valuation type? yes ..if the material is valuated then only there is valuation type.It is used for split valuation .
    2)Where can I see whether material is valuated on plant or not?
    to check the valuation level IMG >Enterprise Structure>Definition>Logistics - General>Define valuation level
    and to check value and quantity updation at plant level check
    IMG >Logistics - General>Material Master>Basic Settings>Material Types-->Define Attributes of Material Types
    3)Case1
    I want material A to be valuated at the plant without split valuation
    Case
    I want material B to have 0 value at plant
    go as Jurgen has recommanded in the previous post . for material B used different material type which is not valuated at that plant .
    Regards,
    Anupam

  • Valuated and non valuated stock

    Dear Experts,
    I have 20 thousand PO i need to identify Valuated and non valuated stock, can any body suggest me  how i will go about this
    Any standard report is there or from tables ?
    Thanks
    Raj

    Hello,
    If you want to take report for Stock and Non-stock(consumables) items then you can execute ME2L and Filter with Account assignment category.Blank and Non blank as mentioned above.
    But if you want to take a report for Valuated and Non valuated then You have to take a report from Tables
    Go to SE16 enter Table EKPO
    Restrict the Entries with "changed on date" and Doc. Category " F".
    execute the entries,then download into excel and filter the datum with the Field
    Field Label:GR non-Valuated.
    Field name: EKPO- WEUNB
    Hope it is ok.
    Murug

  • Transfer material from one storage location to another storage location

    Is there any bapi  to transfer material from one storage location to another storage location

    Hi,
    You need to use the below BAPI
    BAPI_GOODSMVT_CREATE
    Regards
    Sudheer

  • Transfer Material From Vendor to Vendor

    Please can anyone  explain material can transfere from vendor to vendor....Thank you ....Raveendra

    Hi,
    What do you mean exactly by transfer material from Vendor to Vendor?
    Are these your materials provided to Vendor?
    Or are you referring to Consignment?
    Anyway, please have a look below.
    1) Go to MIGO_TR t-code
    2) Set it to Transfer Posting A08, Other R10
    3) Use movement type 542 to transfer from Vendor to our warehouse in storage location
    4) Use movement type 541 to transfer from the receiving location in step 3 and transfer it to the new Vendor.

  • STO to transfer material from Stor.Loc. 0001 to 0002 under the same Plant

    Dear friends ,
    Does anyone already have used the new functionlity to transfer material from Storage Location 0001 to Storage Location 0002 under the same plant  with STO ?
    Which delivery  and movement type should I use to do that ? we put a mov. type 311 but errors appear for us.
    best regards,
    Alessandro

    Hi Alessandro,
    You can very well create an STO keeping the issueing and receiving plant as same and mentioning the issue S.location and do the DO using VL10B and PGI using VL02N.
    at the time of GR you can specify the receiving S.location and post the GR.
    There is no any requirement for specific config.
    Regards
    Merwyn

  • Valuate the non-valuated QM characteristic during usage decision

    Hi Guys,
    I don't understand why during usage decision, system pops up the following message even though I have force the inspection completion on one particular inspection characteristic.
    Valuate the non-valuated QM characteristics manually? Yes button and No button
            After hits Yes button, another message appears...
    Class characteristic QNNVM1 can be manually evaluated.
    There are two inspection characteristics in this inspection lot, and one inspectin characteristic has been record as pass and accepted during result recording, while another inspection characteristic (which is a required characteristic on system setup) did not perform result record. Thus, during QA11, I force this required characteristic to inspection completion.
    My questin is why the system gave me "Valuate the non-valuated QM characteristics manually?" message?
    Thanks
    YY

    Plz. tell me whether sampling procedure is used for these characteristics ?
    If yes then whether valuation mode is 'valuate manually ' ?

  • Project stock options: valuated and non-valuated

    Hi Experts
    In some discussions, i have been told that the 'valuated project stock' option is adaptable for customer projects where as 'non-valuated project stock' option is for cost projects. is it right?
    May explain what circumstances non-valuated project stock option is chosen?
    If we choose non-valuated project stock option, the results analysis is must, is it right?
    warm regards
    ram

    Even Customer projects may be Non-Valuated. It depends on client requirement.
    Regarding result analysis it is  not must in case of valuated. Again depends on customer requirement.  Resulst anlysis can be used for both Valuated as well as Non-valuated projects.
    Venkat

  • Best Material Type for Handling Non-valuated Materials in Distribution

    Our distribution business will soon be handling non-valuated material and I am trying to determine the best material type to use.  I am considering material type UNBW but would like to know if anyone has advice.  We are strictly providing a service to the vendor for handling these non-valuated materials (for example, wood products).  We will not purchase or sell the product.  Our service consists of receiving the product into inventory from the vendor, tracking the inventory, (in Warehouse Management) and then shipping the material to a customer of the vendor's choosing.  For these non-valuating materials, we are paid strictly for our service of warehousing the material and shipping to a customer.
    Up until now, our distribution business has distributed only valuated materials, i.e., materials we purchase at a price and sell at a price.  We also use vendor consignment.  NOTE: This is not a vendor consignment scenario because we never buy the product.
    Here are our requirements:
    - We don't own the non-valuated product.
    - We need to be able to ship these new non-valuated products on the same shipments as the valuated product we own.
    - We use handling unit and warehouse management for all of our finished goods.
    - We would like to use our existing processes and HU/WM RF transactions to receive and pick the non-valuated product.  This means:
    1) Creating inbound deliveries and packing into HUs.  And applying our HU bar code labels.
    2) Physical inventory counts by HU.
    3) Creating sales orders that have both the non-valuated materials and valuated materials we own.
    4) Creating outbound deliveries and picking via transfer orders in WM.
    5) Assigning the outbound deliveries to a shipment.
    Questions:
    1)  Can a UNBW material that will be stocked but not valuated be received into inventory via a PO?  Any way to receive into inventory with an inbound delivery without using a PO?
    2)  Are there any problems with putting a non-valuated material on a sales order with a zero price?
    3)  Any challenges that other have run into?
    Thanks in advance.
    Rob

    I must be missing something regarding the use of material type UNBW.  When I post the goods receipt for a PO with a UNBW material, no inventory is created.  When I create the PO, an account assignment is required.  I tried both a cost center account assignment (K) and balance sheet account assignment (Z - using a Profit Center).  In both cases, I am forced to check the "Free item" checkbox to avoid entering a price; which also seems strange since the material is UNBW.
    I have searched everywhere for a "Best Practice" for my scenario with little results.  Again, we are simply managing the inventory for a vendor and shipping the inventory to our vendor's customers.  So we are acting as a third pary warehouse and shipper for the vendor.  We do not buy or sell the inventory - we are paid a monthly service fee by the vendor for warehousing their product and shipping it to their customers.  We may ship the product on sales order deliiveries that include both the "non-valuated" product (i.e., free goods we manage for this vendor) and goods that we actually own.
    As an alternative, I am wondering if I should look into somehow using vendor consignment with a settlement price (consignment info record price) of zero.  Vendor consignment is nice because you can track the stock by vendor.  However, we would never truly "settle" with the vendor because we would not be paying the vendor for the inventory and would never own it.
    Our business refers to this as "reload business" but I am not sure this is an industry standard term.
    Any other thoughts out there?

  • Material Ledger Functionality with Non Valuated Sales Order Stock

    We are in the process of setting up Make To Order (MTO) with Non Valuated Sales Order Stock. We currently use the Material Ledger in our other businesses that use Process Orders.
    Does the Material Ledger functionality support MTO with Non Valuated Sales Order Stock? I have been testing this and have not yet figured out how to get ML postings. We are using production orders that settle to sales orders. We do not bring this into inventory, the costs reside on the sales order.
    If this functionality does exist, I would assume I need to configure the Material Update Structure but I cannot find any documentation on this.
    Any help would be appreciated.
    Regards,
    Greg

    Hi Greg,
    no, material ledger will not be able to calculate and allocate actual costs for the sales order in the scenario you describe. It would of course, if you used the valuated sales order stock.
    Generally SAP sees in the valuated sales order stocks (avaliable since 3,1 or something) a great improvement and no real reason to use still the non-valuated scenario.
    best regards,
                          Udo

Maybe you are looking for

  • Price condition equal to VPRS cost of goods

    I have a senario ,which we will create sales orders for customers with sales price equals to the MAP(moving average price) at the  time when the SO being input .And the sales price in sales orders should be copy to the billing whether  the MAP has ch

  • DAQmx- create channel- no channels found

    Hello, i am new to labview. So maybe my question is easy... I want to generate a signal. That's why i am using the DAQmx-create channel.vi . I i created a control to chose the channel, where the signal is generated. But no channels are found. i am us

  • Error code:805a01f5 when trying to download apps o...

    I've been trying to download apps for my Lumia 800 for more than a day now, but I can't. The error message is "Marketplace isn't available at the moment. Please check back in a bit. Error code:805a01f5". I'm still able to download apps, as long as it

  • Unable to include report viewer web part. Error is, assembly has a higher version than referenced assembly

    I am making a web part in VS 2010 for SharePoint 2010. The web part uses Report Viewer control. The files I have referenced in my project with "Copy Local = True" option are: Microsoft.ReportViewer.Common.dll   Microsoft.ReportViewer.WebForms.dll Bot

  • Connection Refused Error

    Hi all! I've run into a problem while trying to interact with SAP via .NET Connector. Really, this problem occurs even when I try to login via SAP GUI. I receive the following error message partner not reached (host msk-krf5pzoq4, service sapdp00) Ti