Transfer of  material from Process plant to grading

I am having an issuse when I am transfering the material form process plant to grading plant, i have to generate a excise invoice and delivery packing slip.
so how to configure the same.

PLANT TO PLANT TRANSFER IN THE DIFFERENT GEOGRAPHICAL LOCATION UNDER THE SAME COMPANY CODE
Assume - plant 1 - 1000 ; plant 2 - 2000.
From 1000 - 2000 u shall transfer the parts using 641 movement By creating a Stock transfer order with the following conditions.
1, Master & source list to be extended for both the plants vice versa. including accounting & excise view
2. Create an Sto po in ME21n  for one time only /ME31N as scheduling agreement
3. Generate pick list and do Post goods issue in va02.
4. Create excise invoice & do the Gate entry in the other plant & stocks are up loaded.
5. In India excise rules are becoming stingent & you have to inform both the Excise ranges before starting the transactions

Similar Messages

  • Transfer the material from one plant(non valuated) to another plant valuat

    Hi All,
    How to transfer the material from one plant(non valuated) to another plant valuated.
    Which Goods Movement type we required to use.
    Regards,
    Amit Shah

    Hello,
    Please refer the link below. hope it could be a help.
    stock transfer plant to plant
    split valuation
    Regards,
    Jana

  • Refurbishment process - want to repair material from another plant

    Hello All,
    In a Refurbishment process, we can do repair either Internal resource(control key PM01) or with External resource(control key PM02) by sending out material to vendor with material outward slip. But in my case, i have to send material to my another plant(2222) for refurbishment & after repair want to take it back to my plant(1111).
    Can you plz guide me over here, how i can achieve this? which are the things need to be taken care? whether any other process(SD-Shipment process) need to involve here?
    Thanks to all in advance.

    Hi,
    you can use standard refurbishment orders and defining your plants and relevent storage locations at header level. just take care of following points:
    - Valuation types are defined for the equipment/ material.
    - movements of material from one plant/Sloc to other plant/ Sloc.
    - operations defined correctly in terms of internal/ external.
    - capture all labour costs in your plant (1111) cost centre related to carrying material from your plant to another plant and back  to your plant.
    - cost centre distribution rules maintained correctly.
    Ragards,
    Lucky.

  • Transfer of material from sales order stock to subcontractor

    Iam having subcontracting operation in routing. But i am not able to transfer of material from sales order stock to subcontractor when i do 541 movement

    Dear Mayuresh,
    You cannot move Sales Order assigned material directly to Sub contracting Vendor stock.
    For doing so firstly unassign the Sales order stock by transaction MB1B & movement type 411E.
    After this you can provide the stock to the vendor by transaction MB1B & movement type 541O.
    Other way is to create account assigned Purchase Orders. Thereafter create virtual sub contractor storage location in your plant. Transfer your Sales Order assigned material to these Virtual locations so that you can see the stock provided to the vendor. Now during Goods Receipt of the finished goods you can consume the material by movement type 543E.
    Regards,
    Subha.

  • TRANSFER OF MATERIAL FROM VENDOR TO VENDOR

    Hi *SAP MM GUYS*  Please check my scenario .
    I have send some material to a vendor for subcontracting jobbwork.
    after as he is delaying the work I want to send the material to another vendor.The first vendor has no problem with this.So how to transfer the material from vendor to vendor.Please give me detailed explanation.
    Awaiting your reply
    Veer

    Dear,
    Case1) Process flow IF material is Excisable:
    Do 542 of material
    Reconcile the challan with that dpcument
    Complete the challan
    Do 541 for second vendor
    Raise the s/c Challan
    Case 2) Process flow if material is non excisable
    Do 542 of material
    Do 541 to the second vendor
    OR u can do
    542 in MB1B wherein u can put the vendor where u want material to be sent.
    Regards,
    SNB

  • Selling Material From Multiple Plants

    Hi Experts,
    I have two questions.
    1. Is it possible to have more than one division for a material. If Yes, how we can do this.
    2. How to sell a material from multiple plants. What is the procedure,
    Thanks,
    Shan.

    hello, friend.
    1.  is it possible for a material to have 2 or more divisions?  yes and no.
    yes, if you leave the division in the material master blank.  the material, when processed in the sales order, then copies the division from the sales area of sales document.
    yes, if you configure cross-division, or if you configured the 'check division' options in the sales document type via VOV8.
    no, if you specified the division in the material master and you have made a sales transaction.  (it would still be a yes, if you made the right configurations using VOV8 described above).
    2.  how do you sell material from different plants?  by extending the material to the different sales org-distribution channel-plant using MM01.  be sure to maintain the Sales org 1 & 2, and Sales general/plant views for each combination.
    regards.

  • MM01 -- Update Was terminated while copying the material from one plant

    Hi Experts,
    While I am trying to copy the material from one plant like ETPE to another plant ETPZ , its telling that material created.
    But when we try to display the created material in MM02 for plant ETPZ , it says that material does not exist.
    Note : After creating the material , if we try to move any transaction code it shows the error message box and  says that Update was terminated .
    Kindly help us to resolve this.
    Regards,
    Vijay

    Hi rob,
    we have put the debugging , if there is any badi , enhancement the debugger would have gone to exit or enhancement line but its not going to any where.
    and I have checked in sm13 ..
    its giving the error like update was terminated
    from funtion module : MATERIAL_UPDATE_DB
    Report name :      LGRAPU37
    row : 360.
    ABAP/4 processor: POSTING_ILLEGAL_STATEMENT
    but if we go and see in the row 360 ...
    CALL SCREEN 100 line only
    is there , even if we put the breakpoint in this line , while we are debugging , debugger is not going to that line .
    Note : if we see the screen 100 it shows the empty screen.

  • Movement of material from one plant to other within the same country

    Hello,
    I would like to move material from one plant to other via tran MB1B.
    The system generates the following error while trying to save document :
    Account determination for entry BAS1 BSX 9000 ___ C100 not possible
    The system did not find an account for this transaction. This means that the account determination for key BAS1 BSX 9000 ___ C100 is not maintained in MM Customizing (Valuation). The key is made up of:
    Chart of account
    Transaction key (= Posting transaction)
    Valuation grouping code
    Account grouping code
    Valuation class
    System Response
    The system cannot update a G/L account for this transaction. You cannot post the transaction.
    Can you please tell me where the necessary setting should be made.
    Thanks

    Hi
    Please check the confirguration in OBYC for this combination and assign GL account for this combination of Valuation class, Valuation area.
    Regards,
    Lakshmanan Krishnan

  • Transfer of Inventory from One Plant to another with in the same company code

    Hello All,
    Can you please let us the possible option's for transfer of Inventory from one plant to another plant in different geographical location with in the same state.

    PLANT TO PLANT TRANSFER IN THE DIFFERENT GEOGRAPHICAL LOCATION UNDER THE SAME COMPANY CODE
    Assume - plant 1 - 1000 ; plant 2 - 2000.
    From 1000 - 2000 u shall transfer the parts using 641 movement By creating a Stock transfer order with the following conditions.
    1, Master & source list to be extended for both the plants vice versa. including accounting & excise view
    2. Create an Sto po in ME21n  for one time only /ME31N as scheduling agreement
    3. Generate pick list and do Post goods issue in va02.
    4. Create excise invoice & do the Gate entry in the other plant & stocks are up loaded.
    5. In India excise rules are becoming stingent & you have to inform both the Excise ranges before starting the transactions

  • How to transfer all materials from one plant to other plants?

    How to transfer all materials from one plant to other plants?

    Hi
    To transfer stock in one step  between plants belonging to same company code use movement type "301" and using transaction code "MIGO". IF you like in two step it helps to monitor stock in transit use movement type "303" and "305".
    303 Transfer posting plant to plant in two steps - removal from storage
    305 Transfer posting plant to plant in two steps - placement in storage
    to transfer stock between plants of diffrent company code go for stock transpor order using tcode "me21n"
    hope it helps

  • Authorisation for transfer of material from group of plants to another.

    Hi experts
    We need to control mvt of goods from group of plants to another group of plants by the same user. The group of plants may be combination of multiple plants or single plant also. Transaction to be checked is MB1B with 541/412 mvt. Basically this requirement is to check transfer of exempted material to Non-exempted material from the point of VAT implication. Can any body share your thought.
    rgds
    Raghu Shetty

    Hi,
    i still have some concerns about the creating new materials solution because we have to create the following relevant things:
    SD: condition record
    MM: infor record
    PP: new BoM
    we have 25 materials which will change profit center, there're a lot extra works we need to do.
    Is there any other way we can try?
    Regards

  • Transfer of material from RG1 to RG23A Part1

    Hi Gurus ,
    here I have a complicated scenario , actually this is client req regarding to captive consumption
    the scenario is as following
    they have one finished material say F01( FERT ) , normally they do sell of that material and sometimes they use this F01 as a raw material for power plant located in same plant under same excise registration , so what they want that is the material should be issued from RG1 to part 1  , they are taking that material in part1 .. in system we decleare that F01 as a RG1 in J1Id
    here we mapped the stock transfer scenario in same plant for differant storage location , in GR we take that material in part 1 and system allows this
    now we updateRG1( issue movement 641 )  by J1i5 and 23part1 ( classification ROP , movement type 101 ) , after extraction of both registers we can see issue entry in RG1 and receipt entry in RG23part 1 ,
    so please suggest modification in process , as this process seems not normal .
    Regards
    Chandan

    Dear,
    Case1) Process flow IF material is Excisable:
    Do 542 of material
    Reconcile the challan with that dpcument
    Complete the challan
    Do 541 for second vendor
    Raise the s/c Challan
    Case 2) Process flow if material is non excisable
    Do 542 of material
    Do 541 to the second vendor
    OR u can do
    542 in MB1B wherein u can put the vendor where u want material to be sent.
    Regards,
    SNB

  • How to transfer the requirement from one plant  to many plants(STO)

    hai gurus,
    My scenario is as follows:
    1) Plant "A" is Receiving plant.
    2) Plant "B" ,Plant "C", Plant "D" is three production plant.
    3) All the above 4 plant under same company code 1000.
    4) Now plant "A" gets the requirements and pass on to all the three production plants, which
    is based on forecast.
    5) How the requirement to be passed on from plant "A" to all the three production plants namely B/C/D
    under sap
    6) After production of fert under 3 production plants the final products is transferred to the plant "A"
    ware houses which is situated near by plants of B/C/D.
    7) Only one fert material( Fert 1) is common for all three plants produced based on the capacity at all three plants.
    8) Remaining fert material is plant specific, that is for Example Fert 2,3,4 produced only in plant" B"
    Fert 5,6,7 produced in plant "C" and Fert 8,9,10 produced only in plant "D".
    How to map into sap
    waiting for the positive reply
    Regards,
    sekar chand

    Hi again,
    For more details on stock transfer from alternative plant in MRP, see also the attached link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d5a44af11d182b40000e829fbfe/content.htm
    Regarding FERT1, you can place sales order, but it will not trigger requirements in the manufacturing plant. Also, because all plants are in the same CC it is not a good idea.
    If you are willing to do some manual/external work in determining how much of FERT1 will each manufacturing plant produce, then you can just manually create STOs accordingly. These STOs will generate MRP requirements in the manufacturing plants.
    Regards,
    Mario

  • Transfer of goods from Manufacturing Plant to Sales Depot plant

    Hi,
    The Client is having Manufacturing Plant and Depo Plant wherein the goods shall be transported to Depo with Exice Invoice and sold from there without any excise duty.
    As per SAP best practice, we have maintained the Price Control as 'S' in the Manufacturing Plant and 'V' at the Depo level.
    The Client requires that the valuation of Finished goods at the Depo level should be inclusive of the excise duty paid when the material is despatched from Manufacturing plant to Depo.
    How the excise duty paid amount can be loaded on to the material value and then sent to Depot?.
    Please offer your valuable suggestions on this issue.
    Cheers,

    Dear
    In manufacturing plant the stock transfer material's price control should be S and V for Depot material.
    And configure Excise duty as condition type in Stock transfer Purchase order, which will automatically change the moving average price.
    Prakash.

  • SYSFAIL Error in SMQ2 - Transfer of material from R/3 to CRM

    Hi,
    We are using standard BDOC to transfer material from R/3 to CRM. BDOC Type is PRODUCT_MAT, Queue name is R3AD_MATERIA<Material No>.
    There are some queues which are struck in SMQ2. There are no struck queues in R/3. The struck queue has the status SYSFAIL and when I double click, it shows Message - Error in Mapping (Details: transaction SMW01)
    I checked transaction - SMW01. The queue name which is in SYSFAIL status is not coming up in SMW01.
    I do not understand whereelse I can see the detailed error message.
    This error does not occur for all articles.
    As I don't have sufficient knowledge in CRM and BDOCs, any pointers regarding the issue will be very much helpful.
    Thanks and Regards,
    Lakshmi

    Hi Lakshmi,
    Please follow as below:
    SMWP-Middleware Monitoring Cockpit- This transaction gathers a wide set of information about the status of the Middleware & Downloads in both the CRM system, the R/3. All statuses should normally be green but there may be some circumstances which stop this occurring. Expand the section Generation Information which refers to the generation of BDoc Types. Where ever you see error you can right click and Select Analysis Tool then right click and check the error.The log shows the error.
    SMQ2- Select a Queue and select Display. Queues connected to R/3 start with a queue name of R3A/D.
    Double click on the Status field i.e SYSFAIL. Reason will be shown.In your case it is u201CError in Mapping (Details: transaction SMW01)u201D. Then Continue and select a queue and select Display.You can see the Individual BDocs are beoing displayed.
    SMW01- give Bdoc Type as " Product_mat". If it is not displaying then I request you to check if all the objects are generated properly.This may also happen if the objects are not properly generated.Use tx-Genstatus. That will give you a list of error objects to be generated.
    Regards...
    Arup