Transfer posting from Non-WM manage plant to WM manage plant

Hi Guru,
I want to trasfer FG from storage location of Non-WM manage plant to storage bin of WM manage Plant. I did this posting with Movt type 301 , in destination section WM tab is activated for WM manage plant but after posting , its not generating TR no which is necessary for TO while posting material to bin. But material is showing in storage location of WM manage plant.
what to do in this situation? I want this finish goods be in destination bin of storage type.
regds
neeraj

As I understand in OMJJ WM fields are allowed for IM-mvt 301 and you define the storage type and bin when executing the goods movement in IM.
If the system directly posts the goods into the destination storge bin why do you need TR and TO?
If you do not want to post the goods directly into the storage bin (=you do not define the values for the WM-fields of mvt 301) then you have to check your settings in SPRO > LE > WM > Interfaces > IM > Define Movement Types.
Here you can set TR creation for the IM-mvt and then you can create TO by processing the TR from LB10.
You can find several threads how WM-IM interfaces should be maintained.

Similar Messages

  • Transfer Posting: From Valuation Type to Valuation Type

    Hi Guys,
    When i do Transfer Posting: From Valuation Type to Valuation Type  in same plant and same Storage location with mvt type 309 system gives Error as below
    "Stock to be removed from storage same as stock to be placed into storage
    Message no. M7104"
    Can any one suggest the solution
    Regards,
    Ashish Vats

    Hello Ashish,
    As you are trying to transfer same material but one val type to another type, the system checks the source location and destination location, but in your case both are the same it throws information/error message. You need to put the source valuation type and destination type as mentioned by Sanjay.
    Hope this will help.
    Regards
    Arif Mansuri

  • Transfer posting from batch to batch using 309 or 311 issue

    Hi Experts,
    Need your help, I'm facing the following issue, I'm trying to transfer posting from batch to other batch using 309,
    Using MIGO
    the material, plant, storage location are the same but the batch number are different, I didn't get any message and when I save, there's nothing is changed, I checked the material document and found that the destination batch is same as source batch.
    Using MB1B
    the material, plant, storage location are the same but when I entered the source batch, the batch number is copied to the destination batch number and I got message  M7104 "stock to be removed from storage same as stock to be placed into the storage" and I can't change the destination batch number.
    Please advise how can I solve this issue or if there's any alternative way to transfer from batch to other by one step.
    Regards,
    Mohamed Mansour.

    You can well use 309 movement type in MIGO or MB1B and also you can well change the receiving batch number during the transaction..
    MB1B
    MIGO
    I think you can able to change the receiving batch.
    What the status of receiving batch shows in MIGO or MB1B ?
    Also check you field selection for movement type 311
    Go to OMBW, double click on 311, then double click on Transfer Posting
    It should be as optional entry.
    Then try again MB1B.
    Regards
    Dev

  • MB1B: Transfer posting from material to material

    hello,
    I would like to add material validation mechanism in MB1B for transfer posting from material to material, that is we can define only particular materials can be transfer to receiving material and validate in MB1B with specified movement type, how to do this?
    Is there any thing available in standard?
    we can do this using user exit but I couldn't find any exit relevant for this scenario?
    I appreciate your earliest responses.
    regards,
    Jawed Ali

    well I have checked all these exits but none was called during the process:
                                                                                    MBCF0002            Customer function exit: Segment text in material doc. item               
    MBCF0005            Material document item for goods receipt/issue slip                      
    MBCF0006            Customer function for WBS element                                        
    MBCF0007            Customer function exit: Updating a reservation                           
    MBCF0009            Filling the storage location field                                       
    MBCF0010            Customer exit: Create reservation BAPI_RESERVATION_CREATE1               
    MBCF0011            Read From RESB and RKPF For Print List in  MB26                          
    MBCFC003            Maintenance of batch master data for goods movements                     
    MBCFC004            Maintenance of batch specifications for goods movements                  
    regards,
    Jawed Ali

  • Transfer posting from storage to storage locn

    Dear All,
    I understand we can do the transfer posting from storage location to storage location through Mvt type 311.
    The scenario is I have to transfer the goods from Storgae locn 1 unrestricted to storage locn 2 quality inspection.
    Kindly let me know if it is possible.

    Hi,
    There is no direct movement type. You have to do this in 2 steps. 1st with 311 for St.Loc-St.Loc then 322 for Unrestr to QI.
    Hope it helps
    Shiva

  • WMS Transfer posting from Q to unrestricted issue.

    Hi All
    Im having some issue  in when I change from Quality inspection to Unrestricted stock.
    When I GR using MVT 101, the stock will go into Interm Area 902 with Q status in the warehouse
    I then use MVT 321 to post the certain material from Q to unrestricted.
    When I use LS26 to check, the stock status of the material has changed from Q to unrestricted.
    However when I create a TO, the status in the TO is still "Q". ( it should be unrestricted so when i do confirm the TO , it will be placed into the propose bin as unrestricted stock not Quality Inspection )
    I check the TR that was created for that material and the stock status is still "Q".
    Is there some setting im missing from my configuration , as the system should automatically change the TR from stock status "Q" to unrestricted after the transfer posting from MVT 321?
    Thanks in advance !

    Hi Frenchy
    Thanks for the reply.
    As explained before. When I do a MIGO from inbound, in the WMS warehouse it should go to a general receipt area ( 902 ) as it should not directly go to bin because its needs to pass IQC before it should be properly transfer from the general receipt area to the bin. In the warehouse via LS26. It's status is Q, and you are correct, when I create the MIGO it automactically creates a TR with the status. After it has pass IQC, ( via inspection lot QA11), a transfer posting is created to for the material ( by batch code ) to change to unrestricted stock. Again in WMS view via LS26. The stock with the batch code is changed to unrestricted.
    Now, my question is, after MVT 321 for transfer posting, in WMS is there a linkage where it should automactially change the TR status to unrestricted so when i create a TO via material document of the GR, it should go to unrestricted instead?

  • Transfer posting from functional area A to functional area B

    When running the F.50 transaction some currency gain/loss postings have been posted to the wrong functional area. Can somebody help me how I can do a transfer posting from one functional area to another if it's possible? Or do you know another solution to this issue?

    Hello,
    Please try once transfer posting with clearing through T.code F-51
    and choose transfer posting with clearing.
          Please try this once in development i tried this for other like changing of business area amount cost center like that..
          Regards,
    Sankar

  • Transfer posting from material to material ( for blocked stock)

    Dear All,
    Whether transfer posting from material to material can be done for blocked stock also? because through 309 movement type i did not find any option, so let me know if there is any option
    Regards,
    Balakrishna R.V

    Dear
    Transfer posting of material can't be done if material is in Block Stock.
    When block stock is inspected in quality test in inquality inspection stock then it goes to Unrestricted use stock.
    finally Transfer posting is possible for unrestricted use stock material.

  • Transfer posting from HU managed SLOC to Non-HU managed SLOC.

    I have some qty of stock available in HU managed SLOC (In blocked stock)
    I need to transfer some qty from this location to a non-HU managed SLOC in the same plant.
    I am able to transfer the stock from BLOCKED to UNRESTRICTED, in HU managed SLOC using VLMOVE T,Code. But i 'm not sure about the method to transfer the same to a Non-HU managed SLOC.
    Please explain the steps involved here.
    Thanks in advanve for your help.

    Dear,
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOHU/LOHU.pdf
    Regards,
    Syed Hussain.

  • Transfer posting from one plant to another plant

    Friends i want to transfer goods from one plant to another plant of same company code and iam trying this one in transaction migo if post for this it gives an error
          "posting only possible in periods 2006/05 and 2006/04 in company code" what error it is

    Hi,
    Use the MMPV to open the new posting period date.
    here you have to use your company code & Current date , then execute to open the new posting period.
    while running this transaction you ensure that GR open screen should be closed.
    hope it helps....
    manoj Singh

  • Linking A service PO to Transfer Posting From Plant To Plant Movement

    Dear All ,
               We have 11 plants in all . So every time some goods need to be transfered from one plant to other usually a service vendor does the work .
               So my client wants to create as many Open service PO as service vendors  and every time we do goods transfer posting in MB1B/301 it wants to assign the respective PO number (It will be decided on the basis of vendor who is doing transfer posting) to that transfer post document .Later bill passing will be done on the basis of these assignments .
               Can anybody let me know the complete mapping for this scenario if it is a practical requirement .

    >  Can you re-explain to me this step by step ?
    Hi,
    In VOV6 create one Z schedule line category by copying any std sch. line.
    Give values as below
    order type = NB
    Item Category = 7
    Acc *** Category = Blank
    Item relevant for delivey = Ticked
    PR del scheduling = Ticked
    Movement type = 601
    Maintain same material in both the plants
    Create vendor master for supplying plant
    Now,
    When you create and save sales order, automatic PR would be generated with NB type
    Create PO wrt this PR.
    Create delivery through VL10D wrt created PO using 641 movement type
    Do GR using 101 movement type in receiving plant.
    Then create normal outbout delivery for customer wrt Sales Order and then invoicing using VF01
    Doc. flow would be
    Sales Order - PR - PO - Del (641) - GR (101) - Del to customer (651) - Billing
    Hope you get some inputs
    regards,
    Sagar

  • Transfer posting from plant to plant

    Hi Friends,
    I am doing 303 movement type via mb1b transaction. system is showing an error message "Use one step procedure for transfer posting to material subject to valuation".
    Earlier also i have done 303 mvt, but this time it is showing this message. When I go to error details, it is showing " receiving plant is subject to split valuation".
    Pl tell me what to do now?
    Regards,

    Hi,
    check the entries in the following transaction.
    Path: SPRO->materials mgmt.->purchasing->purchase order->setup stock transport order->assign document type,one-step procedure,underdelivery tolerance
    click on execute,
    check the entries.
    supplying plant ,   plant, doc.type,one-step procudure,tolerance
    check box.

  • Transfer Posting from Own stock to customer stock

    Hi ,
           I have two storage location. Now i wanted to transfer stock from one storage location to other , but while transferring the stock should be received against a sales order in the receiving storage location.
    For e.g.. i have a storage location in the plant and another one in port. I want to transfer stock from the plant one to the port one.So when the goods are received in Port storage location it is received against a sales order that is booked against a sales order. can this be done?
    how to do this?
    ram.

    try it with movement type 412, I can enter a receiving storage location different from the issueing storage location while doing the transfer posting own to customer stock

  • Mass Transfer Posting From Quality Stock to Return Stock with FI Effect

    Dear Gurus,
    1 Is there any way To do Transfer Posting At a stretch 1500 material list from Quality Stock to Returns Stock within a plant ?...
    2 Effect of Financial Entries eg Cost ?..
    Thanks & Regards
    Darvesh

    Hi Shoib,
    Is there any way To do Transfer Posting At a stretch 1500 material list from Quality Stock to Returns Stock within a plant ?...
    2 Effect of Financial Entries eg Cost ?..
    Sol:  1  ans is No. You Can not  transfer a 1500 material  from quality to unrestricted stock, Cause  the  Transfer of material is based on Either  PO or material doument
         If you  still want to do it  Chek with your ABAper to  develop a BDC  wich can transfer the material and or each PO  it should crreate a Accounting Document

  • Need information on the transfer posting from WM To IM

    Hello All,
    Is there any scenario in WM and IM, where you are doing the transfer posting in MIGO_TR and creating the material doc for it. Now the stock moves in IM but when u create TO for the material doc and confirm the TO. That's where the stock moves in WM.
    1) MB1B-311 Movt type---create TO for the mat Doc---i am moving the stock from one storage location to another location...then it moves the stock in IM, but i create TO and confirm in LT06...that's where, the stock moves in WM.
    2) MB1B---321 MOVT TYPE...LT06...the stock category changes in IM and WM respectively...
    I know the above scenarios work fine but there is any scenarios in SAP, where the posting happens first in WM and then in IM.
    i need the clarity on the below scenarios, which is similar in case.
    transfer-WM to IM
    Backflushing of WIP to an interim storage location?
    Thanks,

    As Manish mentions above, when you are performing a posting change in a WM-managed SLOC, the preferable method is to use LQ02.  This is because you already know the exact quant involved in the posting change and if your configuration is set properly, it is a single transaction for the end user.
    If you start with MIGO, you must then follow on with LU04 as a second step to convert the Posting Change Notification in the foreground - otherwise you risk carrying out a posting change on the wrong quant!
    You will first need to create custom WM movement types for the constellation of movements you want to perform these posting changes with (e.g., U > S, S > U, etc.).  For the examples I just named you can copy the appropriate 3xx WM movement as a template.  I would recommend that you set these movement types for automatic creation, automatic confirmation and post to the same bin.
    In the IMG you can go to WM > Interfaces > IM > Define Posting Changes and link the IM and WM movements and also the source/destination stock categories (or special stock).  Then in LQ02 you can simply enter the warehouse, storage type, bin and WM movement involved and you should be able to tick the quant(s) to change and post.
    One limitation of using LQ02 for initiating the posting change in WM is that you must transform the entire quant.  If, for example, you have a quant with 100 EA and only 41 EA are to be blocked, you should first quickly perform a bin-to-bin movement of the stock to be blocked to some other bin, perform the posting change, and then move it back.  This has been my experience.  If someone knows a way to do a partial posting change using LQ02 I'd love to know how to do it. 
    Good Luck!
    Jason

Maybe you are looking for

  • Adobe Media Encoder where is it?

    I saw the media coder in a lynda.com tutorial and it was presented as if it were a stand alone app and it shows up on the adobe site as part of the CC, but it's not listed under the apps on the creative cloud. Where can I find it? Thanks

  • Safari is not working on my Macbook Pro.

    Safari will open fine, but then when I type in a website or click on a bookmark, it will stay loading for ages. It usually is about 1cm of blue and doesn't move. My other browser Google Chrome works fine. Any ideas of what is going on?

  • CProjects Project status report not generated

    Hi I am facing problem of getting Project status report for a project in cProjects 4.0 I am at client side and accessing the IDES ECC6.Her I am trying for getting Project status report for the project created. The error I am getting is : "WebDynpro E

  • Slow login time from GDM to Gnome

    Hello everyone, for a long time now I have been experiencing very slow login procedures. It takes about 40 to 60 seconds after I entered my password to get to Gnome shell (almost feels like Windows). There have been discussions about similar problems

  • Converting pictures into PDF files

    How do I convert pictures into PDF files, is this possible?