Transfer posting of subcontracting stock with mvt type 541 from project stk

Hi,
we run project MRP and the requirement is raised for subcontracting item also ,after converting the PR into PO when I try to transfer post material in MB1B using 541 ,system shows Error Purchase order does not contain any item even I have  material in my project stock,what may be the reason?
Regards
Kantha

Hello Kantha,
The components which you provide for a vendor are manged in a vendor-related special stock, O. This stock is updated at plant level, becuase material is actually not in your plant. If you want to provide stock to vendor the avialble stock types in subcontracting are from un restricted use and in quality inspection.
When you provide componets to vendor via transfer posting this needs to go from only unrestricted use stock to the stock of material provide to vendor movement type is 541.
So to execute the transfer posting for the stock of material provided to the vendor, you have to specify special indicator O, if not the transfer posting will not differ from normal transfer posting.
Also T-code MBLB will help you in evaluating the stock of material provided. So you need to transfer the stock from project stock to unrestricted stock to carry out the transfer.
Br,
Tushar

Similar Messages

  • While doing transfer posting  in  Tcode MIGO,with moment type 413e

    I am doing transfer posting with moment type 413 ,E
    changing the stock from one sale order to another sale order .
    and  the material is not related to planning .mrp type ND
    I am getting  warning messege
    "sale order (sobkz= ) is not  for this goods moment "
    Can any body help me  to remove this msg
    thanks in advance
    Srinivas

    when a cost center is created with KS01 transaction, then the user has to enter a validity period.
    So this cost center is just not valid for the given date.
    Check in KS03 and ask  the CO consultant to do the necessary actions

  • Post to Returns stock with movement type 632

    Hi all,
    I have configured SD Customer Consignment for my client. When consignment goods come back from the customer Movement Type 632 is used en the goods are posted in unrestricted use. My client want these goods to be posted in the Returns stock. Does anyone know if this is possible?
    Movement type 651 posts to the Returns stock. Where is teh actual setting made that this movement type posts to Return stock. Can anyone explain to me how this works.
    Thanks in advance.
    regards,
    Roel

    Have tested your scenario- Just now.
    Though you can change the mov type in sch.line cat, but it acts like as normal return scenario, so you will be loosing the track of Inventory available @ Customer as part of Consignment.
    Still, if you change the mov type, you will not be able to perform PGR for Consignment Returns in VL01N,its becasue that, special stock indicator-W in item cat:VOV7.
    FYI,
                         Sales doc type - Item cat -- SCh.line Cat- Mov type
    Consig Fillup - KB -
    KBN -
    E1/E0 - 631
    Consig.Issue -KE--KEN--
    C1/C0- 633
    Consig.Ret.-KRKRND0----634
    Consig.Pickup-KA--KAN--
    F1/F0- 632

  • Movement type 453 (Transfer posting to own stock from returns from customer

    Hi all,
    I have problem in goods movement type 453 (Transfer posting to own stock from returns from customer)
    it picking from from profit center from in material master under  sales:general/plant tab   but we need picking from based on account assignment group  in the material maser sales org.2.
    Other movement types are picking from based on account assignment group only . for that what i can do please help me on this.
    K.Satish

    Hi,
    In Co controlling are the automatic account assignment is only the default and it on the Priority.
    if you think what is picked up from the mm is wrong.
    the best way out will be to go with the substitution  rule.
    based on the movement type use the rule.
    hope this is clear , assign points.
    With regards
    Krishna

  • Automatioc TO creation with mvt type 331(WM)

    Dear Friends,
    I am facing following WM issue, Kindly go through it and reply me with your valuable solution.
    In my plant QM is active, so while receiving goods against any Purchase Order (MVT TYPE 101), all my stock goes to quality. After UD check, 99% material move to unrestrictd stock (321 mvt.type) and 1% used for quality (331 mvt. type).
    For an example if I have received 1000 kg material (which initially goes to quality), after UD 995 kg material come to unrestricted stock and 5 kg used for quality check.
    In my existing system for material document with mvt. type 321, one PCN is generated in the background, and using LT05 we make TO from PCN and confirm it.
    But is it posible to create the TO and confirm from the PCN (Mvt. 321) in the backgroung itself, i mean to say that while my QM user is doing UD, material document with mvt 321, one PCN and TO will be generated and TO will be confirmd in the background itself.
    I don't want to use LT05  separetely to make TO from PCN.
    Please reply me soon.

    Use RLAUTA11 SAP Report - Create transfer orders for posting change notices automatically.
    Thanks & Regards,
    Sudhakar

  • Transfer Posting of Restricted stock Plant to Plant

    Hi,
    How to do transfer posting of restricted stock Plant to Plant
    Kunal

    HI
    One step stock transfer from one plant to another is 301 movement type.. Remember the stock should be in unrestricted use. If it is in quality and or blocked the same will not work
    2 step process is 303 and 305
    From Stock transfer order Documnt type UB with item category as U. Movement type used is 351 and 101

  • IR of WITHOUT PO (WITH MVT TYPE 501)

    HELLO EXPERTS,
    when I go for GR without PO with movement type 501, i dint find any delivery note field in MIGO SCREEN.
    so can anybody help me how to get it.
    If it is not possible than how to do MIRO (invoice verification), with any reference document, like delivery note,vendor or something else.
    because my project is in GO-LIVE phase, there is some GR WITHOUT PO.
    so if I don't have any reference document, my data entry will get doubled (GR,than IR)
    SO can anybody suggest me , if there is some other way..so that while i m going for IR data is not required,i e. there is some reference document from which I can copy my data.( like PO BASED IR )
    kindly help me out.
    regards..
    Raghu

    Hi
    You can upload the initial balance of inventory (GRed but not Invoiced) in MM and let FI upload initial vendor balances (to be paid to vendors - open invoices). There after FI can match these two  (intial upload accounts). Or else do GR with mvt type 501 and then post FI invoice - debiting consumption account and crediting vendor account. But result is same as explained above.
    Thanks

  • Materail recevice with referance to material document with mvt type 303

    Hi Guru:
    In MB1B we are creating mateiral document with movement type 303 from one plant to other plant.
    Now same material we need to receive in other plant with movement type 305 in same T code Mb1B.
    Now as per user requirement if there is number of item are coming in material document which is generate with movement type 303, why we need to give all material, qty, batch again in MB1B movement type 305,
    while we are receving same material in plant.
    In MB1B there is link to create material document with referance to material document but we can use this facility for creating new material document for movement type 303 of same mateiral, qty and batch.
    Please suggest is there any way to use this 303 movement type material document with movement type 305.
    Thanks.
    Virendra
    09887603301

    Hi
    In my opinion in MB1B you can not have Material Doc. as a ref. Doc. for M.Type: 305...
    But for MIGO transaction you can have Material doc. as a ref. doc. for M.Type: 305
    Goto ---> OLME ---> Settings for Enjoy Transaction ---> Settings for Goods Movements -
    > Settings for Transactions and Referance Documents ---> There...for MIGO_TR...Transfer Posting ---> Referance Documents ---> For your M.Type: 305 assign Material Document as a Referance Documnt...
    Reward if useful
    Regards
    S.Baskaran

  • BAPI_GOODSMVT_CREATE used with mvt type 105

    Hi,
    That is easy.
    Somebody has worked with the mvt type 105* and the BAPI_GOODSMVT_CREATE in the same development?
    Release GR blocked stock for warehouse
    I am trying to use this combination but it does not work.
    Thanks in advance.

    The message is:
    M7 036 - No goods receipt possible for purchase order 4500001156 00000
    Let me explain my process.
    The users creates a goods receipt with mvt type 103 (blocked) and, in another moment, they will make a mvt type 105 (release). I am trying to convert it to an automatic process using a BAPI for this, but it does not work.
    That is my problem,
    Thanks in advance.

  • Stock with Valuation Type 'N'

    Hi all,
    i have stock in mmbe under storage location "0500", valuation type 'N'
    but when i created a line item in SO with same material and in sales A with valuation type as 'N' as shown below
    instead of confirming on same date, as there is enuf stock for this material as shown in the top, it giving me a confirmation date almost after 3 months. WHY ??
    Please Help
    Regards
    Abhilash

    yes it is same as delivery plant, if we remove valuation type 'N" from Sales tab A, it will confirm on the same day...so i guess it something to do with extra  check for stock with valuation type 'N"...but don,t know where to check this. Help

  • No authorization for this transaction with mvt type 101

    Has anyone seen this error:
    RFC BAPI Wrapper call:You have no authorization for this transaction inplant 1120      
    RFC BAPI Wrapper call:You have no authorization for this transaction with mvt. type 101
    RFC BAPI Wrapper call:You have no authorization for this transaction inplant 1120      
    The strange thing is that when I assign user with a different Personnel Number and it works just fine.  But when I switched back to his Personnel Number, then I get above error.
    Even though I don't get any order list but I got all notifications and technical objects.
    Also, this user has same roles with everyone else.  While everyone is working fine this user is the only one that getting the error and no order download to PDA.
    Regards,
    Dai Ly

    Hi,
    please run ther getlist and getdetail handler in the backend directly for that user - most likely you will get a better failure message there.
    Nevertheless - what Application  yre you using? Is it MAM? If yes, check the SPRO setup for this particular user,
    Regards,
    Oliver

  • Mvt type 541 Material to Vendor

    Hello Friends,
    I have a scenario in construction business,
    The company gives its own stock to vendor for a project, I have read abt Mvt type 541 Transfer posting
    stock of Material provided to Vendor. Wanted to know what will be the accounting entry & effect in system.
    For example
    Vendor has taken a Project for 10 Lac
    Comapny provides material for   5 Lac
    ================================
    Net Payment to Vendor                5 Lac
    ================================
    But the vendor will charge the bill for entire 10 lac with service tax extra on the amt,
    Whereas as Company only needs to pay 5 lac + service tax..
    & Whether Debit note should be raised w/o tax for bal 5 Lac
    Pls let me know Whether by Mvt type 541 i will be able to get the required result
    or is there any other way..
    Thanks
    Shashank

    Hi,
    If you do the transfer posting with movemen ttype 541, only the stcok will come in vendor stock but the owner ship will be with your company only there is no accounting entry generated for this, in you case you can follow the subcontracting process.
    Create the material code as project  XYZ,  make the BOM with CS01 with al the material which you want to send to vendor,
    then create subcontract PO with ME21N item category L for the project material all BOM componenet will come in the PO BOM componenet make the price of orderd material project XYZ as 5 Lac with service tax code,
    Do the transfer posting MB1B, Movement type 541 ref. to PO number (manitain J1ID for all material)
    create subcontract challan with J1IF01 ref. to MB1B document number then when project will be completec make the GR ref. to PO then GRIR wil be for the 5 Lac.
    Do the reconcilliatio J1IFR
    closet the challan J1IF13.
    Do the MIRO amount wil be 5 lac + service tax.
    regards,
    zafar

  • Error in Goods issue with movement type 541

    Dear Users,
    I have created a Sub contracting PO. After that when i m issuing the goods to vendor with movement type 541, its giving the following error: Movement type 541 is not planned for this operation.
    Please help me out

    You can provide material to vendor either using Transaction codes :
    1.  MIGO - Transfer Posting - Other - Movement type 541
    2.  MB1B - Movement type 541  or
    3.  ME2O - Mention the vendor & execute
    S. Kumar

  • Flow with update type SE3003 from 04.09.2014 was only fixed

    Hi Experts,
    I Have a warning message in TBB1 here.
    I want to post to GL!
    Thanks for any help with this.
    Flow with update type SE3003 from 04.09.2014 was only fixed
    Message no. TPM_TRAC1213
    Effects on Customizing
    You can define when this system message is to be issued in accordance with your requirements.
    You do this in Customizing as follows: Cross-Application Components -> Bank Directory -> Change Message Control.
    The application area and message number can be taken from the technical documentation.

    Hi Jyoti Mohta
    My screenshot is in Vietnamese!
    I customized SE3003 as Bond Discount. Here is my TBB1 screenshot.

  • 53A comm paper: Flow with update type MM1203- from 05.10.2011 was only fixe

    In TBB1 for a transaction of type 53A I get the message: ""Flow with update type MM1203- from 05.10.2011 was only fixed.
    What should I do in this case? And with which transaction?
    Edited by: EI18 on Feb 24, 2012 9:31 PM

    Hi,
    is this the 1st time you're posting this UT? If so, have you checked the "Indicate Update Types as posting relevant" customizing? If not, have you implemented SNotes recently? If so, check the OSS and in case there is no corresponding SNote to solve the problem -> create a OSS-message.
    Regards
    Lorenz

Maybe you are looking for

  • Apex Listener/Apache Tomact and filenames with spaces

    I've installed the Apex Listener with Apache Tomcat, and all seems to work fine. Except when I try to do a CSV file data upload via the utilities screen in apex. If the filename/directory path contains spaces, then Apex reports "File Must Be Specifie

  • Server App does not change SMB AFP option as expected

    I have been fighting SMB shares on Mac OS since upgrading to Mountain Lion (I skipped Lion) and I think I have the situation figure out at least in my case. First Opportunistic Locking needs to be turned off in Windows 7. It does not appear that Mac

  • Using key TAB to add line into JTable

    I would like to know if it's possible to use the key TAB to add a line on my JTable when i'm at the last cell of the last row. I don't know if I have to use a TableRenderer or TableListener Thanks for your help.

  • Distribution of the values.

    Hi, I have a requirement where in the planner puts in the total value in the layout and when they push the a function button then the values needs to be calculated automatically based on the prior period forecast value. For example the planner is pla

  • Save Form task TS17900108 database save failed but no workflow error

    Hello Friends, We are using process and forms workflow in business for various PA OM related processes. Some time (once in 2 weeks or so) what happens is we get ticket from users saying that they got approval emails for a actions stating that action