Transfer purchase requsition from ecc to apo

Hello,
When creating purchase requirements in ECC, they are not transferred to APO although there is model integration. If I activate again the model, the pur req are trasnferred.
In CCR
It gives the error 181 in Schedule line does not exist in APO
Schedule line does not exist in APO
Message no. /SAPAPO/CIF181
And the Queue is not bloqued, and the model is active.
Thanks

Hi Fernando,
Based on the information given, it seems there is problem in
activation.
1) Check is there more than one model activated for purchase
requisitons
2) Check the master data (purchasing view) has been
maintained for those items in R/3 level
3) Check distribution definition is maintained in APO
customisation
4) I have a query in which, in general PR transfer will be
from APO to R/3, in your case it is reverse, is there any
business requirement?
5) Check transfer to SNP orders to OLTP system in APO
customisation
Regards
R. Senthil Mareeswaran.

Similar Messages

  • Unable to transfer Purchase Requisition from ECC to EBP

    Dear Friends.
    We are unable to transfer PR from ECC to EBP. System issue stop message in SLG1 transaction for object BBP_EXTREQ
    Stop Message Type: Document type for determined backend system is missing.
    Warning Message Type: Grant 1111 does not exist.
    As per configuration guide we have performed following setting in EBP client
    1. We have created organization unit “Entry Channel” under company code.
    2. Under Entry Channel we create Local Purchasing Organization.
    3. Under Loc Purchasing Org we created Local Purchasing Group with
        - attribute BUK as backend company code
        - attribute BSA as backend PR type (NB)
        - this group is responsible for Entry channel procurement (setting in Function tab)
    4. Under Loc Purchasing Group we assigned RFC user which is same defined as RFC user in both EBP and ECC client.
        - attribute DP_PROC_TY defined as backend ECC PO type (NB)
    5. Attribute CUR define for entry Channel.
    6. Remote connection established with the same user defined under Organization Unit
    7. Remote user has profile sap_all and sap_new authorization.
    8. Material group, Material Type and Vendors are replicated from backend system.
    9. Sourcing always allowed is set for all product categories in “Define sourcing for Product Category”.
    10. Extended Classic Scenario is active.
    11. Defined Tolerance check and assigned TOG attribute.
    Performed following setting in ECC client.
    12. Defined RFC connection and user same as defined in Organization unit.
    13. Defined profile which reference to EBP logical system
    14. Maintained table V_T160EX with Material group/Pur group/ Profile combination.
    Finally transfer Purchase Requisition from ECC to EBP via report BBP_EXTREQ_TRANSFER. Further the outbound Queue fails with status ANORETRY. Also the log displayed the error ‘Application aborted due to serious problems’
    SLG1 in EBP issues stop message “Document type for determined backend system missing” and warning message “Grant 1111 does not exist”.
    Any idea what could be the reason?
    Please help!!
    Sandeep

    Hi
    It seems there is some problem with the Configuaration settings in SRM as well as R/3 side.
    <u>Anyways, please have a look at the following links, which might help.</u>
    <b>Direct Procurement</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/b7/15d4396898042fe10000000a114084/frameset.htm
    <b>Prerequisites for External Requirements</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/18/db183d30805c59e10000000a114084/frameset.htm
    <b>Attributes for the SRM Scenario</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/84/a7e3389870c05ce10000000a114084/frameset.htm
    <b>Direct Material Scenario: Other Planned External Requirements</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/6a/4b9e3b891da20ee10000000a114084/frameset.htm
    <b>Number range settings</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/5d/fd7d3cb7f58910e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/b7/15d4396898042fe10000000a114084/frameset.htm
    <b>Define Transaction types</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/10/fd7d3cb7f58910e10000000a114084/frameset.htm
    <b>Direct Material Scenario with Planning in SAP APO</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/d3/4b9c3b122efc6ee10000000a114084/frameset.htm
    Hope this will help.
    Regards
    - Atul

  • Issue in transfer of data from ECC to APO

    Hi All,
    I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
    How should I proceed...Please help....this is an urgent requirement
    Thanks & Regards,
    SriLalitha

    Hi,
    you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
    Determine Forecast of Replenishment Lead Time
    Use
    In this field, you specify how the extended safety stock planning determines
    the forecast of the replenishment
    lead time (RLT). The following values are available:
    Supply Chain
    The system determines the RLT forecast using the supply chain structure by
    adding the corresponding production, transportation, goods receipt, and goods
    issue times. If there are alternative procurement options, the system always
    takes the
    longest
    option into account.
    Master Data
    The system determines the RLT forecast from the location product master
    data.
    Master Data/ Supply Chain
    First, the system determines the RLT forecast from the location product
    master data. If no RLT forecast can be determined, the system determines the
    forecast using the supply chain structure (as described under
    Supply
    Chain
    Dependencies
    You can retrieve the replenishment lead time forecast yourself by using the
    GET_LEADTIME
    method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
    Replenishment Lead Time in Calendar Days
    Number of calendar days needed to obtain the product, including its
    components, through in-house
    production or external
    procurement.
    Use
    The replenishment lead time (RLT) is used in the enhanced methods of safety
    stock planning in Supply Network Planning (SNP). The goal of safety
    stock planning is to comply with the specified service level, in order
    to be prepared for unforeseen demand that may arise during the replenishment
    lead time. The longer the RLT, the higher the planned safety stock level.
    Dependencies
    The field is taken into account by the system only if you have specified
    master data or master data/supply chain in the RLT: Determine
    Forecast field of the safety stock planning profile used.
    Hope this helps.
    The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
    May be if you maintain the setting in the profile, you may get the value in RELDT.
    Thanks.

  • How to transfer Sales BOM from ECC to APO DP

    Hi,
    Demand planning require Sales BOM from ECC. Sales BOM in ECC will not have Routing & Work center, then how a PPM with Sales BOM can be transferred.  If i have to create a dummy routing & WC for those sales BOM it will be tidious job to create all the master data. Is there any way to transfer the BOM alone from ECC to APO.
    Please throw some light on it.
    Thanks & Regards
    Shan

    Hi Somnath / Ritesh,
    Are you sure about ciffing Sales BOM(usage 5)to APO as PDS ? Did you test it or your comments are based on SAP documentation?
    I tried to CIF Sales BOM as SNP PDS, it is creating PDS with only parent item.Child items are missing.I have not used any production version here.
    If i use production BOM(usage 1), it is creating PDS with both parent and child items.I have not used any production version here also.
    SAP says BOMs can be ciffed to APO as PDS. No productions versions are required. but it has not mentioned about BOM's usage. May be , Is it by default production BOM?
    One more question, Is it possible to create production version with BOM usage 5? It has no meaning right..
    I think system does not allow you to create production version with BOM usage 5.
    I also tried with BOM usage 2. In this case also it behaves like sales BOM.
    looks like only production BOM can be ciffed with proper BOM structure in APO.
    if required i can send you the link to share screen shots.
    Pls comment..
    regards,
    Umamahesh

  • Transfer product division from ECC to APO

    Hi Experts,
    To transfer product division field from ECC to APO, I have made changes in FM EXIT_SAPLCMAT_001 to add entry in table OT_CIF_MATKEYCUS. And it is populating record correctly.I have added a field for product division in table /SAPAPO/MATKEY.but product division field value is not transfered to APO side. Is there any change I need to do at APO side ??

    Hi,
    have you checked documentation for FM EXIT_SAPLCMAT_001? It's written there that you need to implement user exit APOCF005 in SAP APO.
    Cheers

  • Transfer of PIR from ECC to APO - Time stamp

    Hi Friends,
    We are transferring Planned Independent requirements from ECC to APO through CIF.
    In APO Product view Forecast requirements Date is sync fine with ECC date however the time is setting default to 03:00:00 am.
    we want the time to be set to 06:00:00 am by default.
    How we can we archive this?
    Regards,
    Krish

    Dear Tiago,
    I changed Product view Time zone settings, and issue resolved.
    Thanks for your valuable reply. Awarded you the points.
    Regards,
    Krish

  • Transfer field Value from ECC to APO

    Hi,
    I want to transfer a field from material master to APO. For this i am, using a CIF user exit... The field is not available in the ECC side (EXIT_SAPLCMAT_001), but i found a user exit on APO which has this field (EXIT_SAPMMDUSER_005) which i m not sure if it is called.. please help...

    Hi,
    Could you please send the details..What field you are checking..Field name ?
    You can explore the below 2 table in ECC EXIT EXIT_SAPLCMAT_001. It has the option for expansion.
    OT_CIF_MATKEYCUS
    OT_CIF_MATLOCCUS
    Thanks
    RKS

  • Transfer of fields from ECC to APO

    Hi All,
    I have a requirement where in I need to implement logic for Repl. Lead time as follows -
         1. check if the purchase info record exists
              if exists, then check if the current date is between lifba and lifbi of EINA table
                   if exists then pass EINE-APLFZ to AT101 field of cif_matloc
         2. if purchase info record does not exist, then pass the lead time from Material Master data.
    I have done the coding in Exti_SAPLCMAT_001 (ZXCIFU01).
    the issue is, its not checking for the existence of info record, directly the lead time is being taken from material master data.
    Pls help...this is an urgent issue.
    Thanks & Regards,
    SriLalitha. 

    Hi SriLalitha,
    I have loaded a document explaining how you can set defaults values in APO MAT1 when the material is CIFfed. See this document, here you have the ABAP code:
    http://scn.sap.com/docs/DOC-56755
    This need to be done in APO, thru BAdI: BADI SMOD_APOCF005. In the ABAP code in APO you will need to use function: 'RFC_READ_TABLE' in order to get the details from table EINE. In my example, I am doing something similar checking values from tables MARA and MARC.
    Thanks and Regards,
    Mariano

  • Problems when trying to transfer location from ECC to APO

    Hello,
    I am trying to transfer some locations from ECC to APO via CIF, but a system error appears: "Message no. SR053, data error for the location address 1000". For this reason I have not been able to transfer any location to APO. Could anybody tell what could the problem?
    Thanks in advance,
    David

    Hello Tiemin,
    Thanks for your answer. Based on your answer we changed some settings and now we are able to transfer locations from ECC to APO, but the error message is still showing, so even tough the error is not stopping the transfer now, we are not able to find what could be the problem.  Any more ideas about what we need to check?
    Thanks againg for you help.
    David.

  • CIF of transaction data from ECC to APO

    Hi,
    I wanted to know where we maintain the configuration for real time transfer of transaction from ECC to APO.
    I know for master data we have an option in CFC9 for real time/periodic transfer. Is there any similar config for transaction data too like sales orders etc.

    Hi Alok,
    To allow online transfer of changes to transaction data from SAP R/3 to SAP APO, you have to activate generally the BTEs in SAP R/3.
    This is done in R/3. This is the path:
    SPRO --> Integration with Other SAP Components --> Basic Settings for the Data Transfer --> Change Transfer --> Change Transfer for Transaction Data --> Activate Online Transfer Using BTE
    You can read about it here:
    Change Transfer for Transaction Data - Integration via APO Core Interface (CIF) - SAP Library
    Then of course you will need to generate and actiave your IModels.
    Kind Regards,
    Mariano

  • Error during transferring PDS from ECC to APO

    Hi,
    When I transfer the PDS from ECC to APO, the follwing message is displayed. Can any one advise to overcome this issue.
    Mode N50026289010001 001000000001 S is not assigne
    Message no. CURTO1010
    Diagnosis
    The error described in the message 103 of message class /SAPAPO/CURTO occurred in SAP APO while generating the production data structure.
    Procedure
    You can find the associated message text in SAP APO in message 103 of message class /SAPAPO/CURTO.
    thanks and regards
    Murugesan

    Hi,
    I think you are transferring PDS through I-Model and I-Model is active for the required selection with SNP subcontracting parameter.
    Ensure that the production version "check" status is green and with correct BOM (production) assignment.
    If the I-Model is active, then you can also try sending the PDS using txn: CURTO_CREATE with SNP application.
    Hope this helps
    Thanks
    Venkat DR

  • Transfer of global settings from ECC to APO

    I know there is the 'transfer of global settings' option from within transaction RSA1 in APO to transfer units of measure, fiscal year variants etc from ECC to APO, to ensure synchronisation.
    How does this actually work? For example, suppose we have 14 units of measure in ECC, but already have 16 units in APO. If we run the synchronisation transaction, what will end up in APO? Is the complete table of units replaced in APO, so we would have just 14 units?
    Thanks, Bob Austin

    there is some explanation to what you have mentioned in Re: Factory Calendar
    this talks about calendars and is relevant till SCM 4.x
    I would imagine the situation would be the same for UOM
    In SCM 5 you have the option to update the tables, Rebuild the tables and also a simulation option

  • Subcontracting Purchase Order from ECC sent to APO creates a Plnd Order

    Subcontracting Purchase Order from ECC sent to APO creates a Plnd Order with the same Purchase Order# in APO.
    We want to influence the source of supply for this internally APO created planned order.
    For this, I would like to know what user exit can be used, I have already looked at
    (1) BADI: SOURCE DETERMINATION
    (2) CIF INBOUND EXTERNAL PROCUREMENT on APO side.
    Any other user exits or has someone worked on this scenario.
    Thanks
    Kumar

    sources of supply for planned orders can be changed with the following BADI method:
    Definition name               /SAPAPO/RRP_SRC_EXIT
    method RRP_USEX_SOURCE_FILTER

  • Master/Transaction data from ECC to APO-BW

    Hi All,
         Normally we come across scenarios where Master/Transaction data is pulled from ECC to BW and then pulled into APO-BW. What are the pros and cons of CIF (direct connection between ECC and APo-BW) rather than pulling data from ECC to stand-alone BW and then into APO-BW?
    Regards,
    Joy

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Fetching data from ECC to APO

    Hi,
    I have fetch to data from ECC custom table to APO and create data, can anyone let me know the procedure.
    Thanks in advance

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

Maybe you are looking for

  • How do you set-up a floating image in a header or footer?

    I want to place a floating image in the header or footer so it repeats on every page of a section. Somehow this has been achieved in the Project Proposal Template but I can't work out how you set something like this up from scratch. Can you help me?

  • How to change the screen resolution in the Mobile Emulator

    so far we tried the Mobile Emulator in the netbeans, it is alway 240*320, but many real device is WVGA(480*800) whether does that mean the JavaFX Mobile only support the 240*320? if not, how can I change the screen resolution of the mobile Emulator,

  • DPM 2010 fails to backup virtual guests on a Hyper-V Cluster Shared Volume using hardware VSS provider

    We have been battling with this problem for 2 years now and have raised calls with Microsoft and EMC both of which have not resulted in a resolution. We have an 8 node CSV with about 40 virtual servers on it.  The Hyper-V hosts are Windows 2008 R2 SP

  • LabView VISA problem

    Hi, I'm very new to LabvView and I'm having trouble with communicating with an instrument. It's on an RS232 port Com1. I decided to test if LabView could communicate with the device so I loaded the setup software that came with it which established a

  • Curve 8520 - won't lock when going into case

    I have a magnetic Blackberry case and have set my phone under password options to lock handheld upon holstering but it doesnt do it....any ideas why??