Transfer requirements for material (WM)

Hi,
in trx LB11 I noticed that for a material there is transfer requirement number and the related requirement (production order).
If I execute trx SM12 I can see that a user is working on that transfer requirement.
When another user try to create a transfer order on the above transfer requirement , system
replies with an error which says that is not possible to create the transfer order. System doesn't tell which user name is
locking the transfer requirement
I cannot understand what is the problem and I always have to unlock by SM12 the transfer requirement so that it will available for another user
Could You help me to understand what is the problem ?

It seems that a custom trx groupes many TR and then creates transfer orders.
So user lock many TR....
I asked to the consultant to create a custom message which tells that a user is processing the same TR number....

Similar Messages

  • Transfer Requirement for Goods Receipt Item

    Hi All,
    We are trying to create Transfer Order for Goods Receipt items using an ITS mobile application.We are using the function module L_TO_CREATE_TR to create Transfer Order by passing the Transfer Requirement from the Goods Receipt as an input to the function module. Our requirement is to create one Transfer Orde per Goods Receipt item. We need to create Transfer Order for the items simulatneously from different terminals.Since we have only one Transfer Requirement for the entire Goods Receipt document, we are not able to create Transfer Orders simultaneously because of the system lock (Transfer Requirement is locked).
    Is it possible to create separate Transfer Rquirement for the individual items in the Goods Receipt via customizing/User exit.
    Your guidance in this regard will be great help for us.
    Regards,
    Shaju

    Hi Dirk,
    Thank you for your reply.
    Our enduser will be using handheld device for Transfer Order creation. The user will pick the GR item material from one storage type (902) and the Transfer Requirement will be locked at this moment.Later while placing the SU in destination bin the user will scan the destination bin and the Transfer Order will be created at the time of scanning. Till the completion of the entire process the Transfer Requirement will be locked and no one else can pick the materials of the same GR from 902 storage type.
    We are trying to create Transfer Requirements for each Goods Receipt Item and we are not able to find any user exit in Goods Receipt Creation or any customizing option.
    Can you please check and help us to resolve the same.
    Regards,
    Shaju
    Edited by: shaju tv on Apr 5, 2010 11:40 AM

  • Transfer Requirement for Movement Type 262 (Cancel With Ref to Reservation)

    Hi Experts,
    it is possible to configure the system to create a Transfer requirement for movement type 262 (Cancel With Reference to reservation) ?
    When i execute a movement type 262 (Cancel with reference to Order), the system creates a Transfer Requirement, i can process it in transaction LB12. Now i am using the movement type 262 to Reservation, but the system does not create a transfer Requirement.
    I am using SAP ECC 6.0.
    Thanks in advance,
    Alejandro López.

    Hi Alejandro,
    Can you clarify what process you are performing by this comment? .. "_Now i am using the movement type 262 to Reservation"_.
    As per standard process TR (transfer requirement) creation takes place as per the setting in IM-WM interface. Please check in Tcode OMLR, if TR create field is having "X" for the warehouse and reference movement type record. Normally whenever any material document gets posted in IM, MM-WM interface provide the decisions about which WM movement type to pick for warehouse and data about TR , PCN and TO creation.
    Hope this will help.
    Regards,
    Sudhir

  • Transfer Requirement for Movement Type 262 to Reservation

    Hi Experts,
    it is possible to configure the system to create a Transfer requirement for movement type 262 to reservation?
    When i execute a movement type 262 to Order, the system creates a Transfer Requirement, i can process it in transaction LB12. Now i am using the movement type 262 to Reservation, but the system does not create a transfer Requirement.
    I am using SAP ECC 6.0.
    Thanks in advance,
    Alejandro López.
    Edited by: Alejandro López on Feb 28, 2011 1:55 PM

    Hi Alejandro,
    Can you clarify what process you are performing by this comment? .. "_Now i am using the movement type 262 to Reservation"_.
    As per standard process TR (transfer requirement) creation takes place as per the setting in IM-WM interface. Please check in Tcode OMLR, if TR create field is having "X" for the warehouse and reference movement type record. Normally whenever any material document gets posted in IM, MM-WM interface provide the decisions about which WM movement type to pick for warehouse and data about TR , PCN and TO creation.
    Hope this will help.
    Regards,
    Sudhir

  • Error during creation of transfer orders for material

    Hi,
            We are doing a transfer of stock from one storage with WM to a storage without WM.
    But system does not finish the process automatically displaing the following error message:
    "Error during creation of transfer orders for material document 49000XXXX"
    System cannot find source storage bin
    Thanks in advance for the help
    Regard
    Enzo

    your picking strategy does not find the bin where the material is.
    So you need to check what value you have entered for picking in WM view of material master.
    then you have to check where your material is (storage type and bin)
    then you need to check customizing to where what storage types are included in the picking strategy that is tight to the material master entry.

  • Error during creation of transfer orders for mateRIA

    hi gurus,
    I am getting an error while moving material from sl0c2 to sloc1 which is connected to wh by mvmt 321. the document is getting posted and the stock is coming to sloc1,but the error is
    "Error during creation of transfer orders for mateRIAL.how to correct the error.
    regards
    murugan

    Hi,
    The material is maintained at the Warehouse level, hence warehouse transactions have to be completed, by creating a transfer order and the confirmation of the same will create a transfer posting from SL1 to SL2 in the system. This is trigerred automatically depending on the sytem configuration.
    Regards,
    raghu

  • Create transfer order for material document - 4.6C system

    Hi Gurus
    Can any one provide me the function module or BAPI to create transfer for material document in 4.6c system. I have to give input as supply storage type and bin and destination storage type and bin while execting the function module.
    Thank you in advance
    Regards
    Sarath

    Sarath,
    Thanks for responding, I finally found my answere via Thread: create transfer order for material document - 4.6C system
    Thanks again.

  • Update Transfer requirement for partially picked Transfer Order

    Hi,
    I am looking for a functionality to update a transfer requirement for a partial picking.
    For example, we have a TR for quantity 100 pieces and we have 80 pieces in stock, so we create a TO for 80 pieces and the remaining quantity on TR would be 20. Now we dont want to pick for the rest of the 20 pieces, instead we want the TR to be updated for  the quantity which will be picked i.e 80 Pieces.
    Also, is it possible to put some kind of a rule which govern that the TR should be updated only if we are picking for atleast 80% of the quantity originally mentioned in the TR.
    Thanks in advance,
    Mike

    Hi Frenchy,
    Thanks for the answer. I have one more question.
    Is it possible to automate it based on a movement type, so that every time we create a Transfer Order for this movement type the relevant TR will be automatically marked for 'final delivery'. This would help us, because then we would not have to go to WAM everytime to mark it as complete.
    Or some kind of configuration that will dictate that only one Transfer order will be allowed for a Transfer Requirement and the TR will be set to complete as soon as the TO is confirmed.
    Thanks,
    Mike

  • How to consider internal transfer movement for material aging Z report

    Hello Expert ,
    we are developing Z repot for material ageing .
          In this we are using BSIM table  but in our case internal transfer movement such as ( 411 ,412 ,413 ,etc.) create debit credit entry in BSIM for this reason value of material getting correct but age of material get disturbed .
    we are having sale order stock (E), WBS stock(Q) , Collective stock , Vendor Stock (o) & stock transfer between stock type possible.
    For all above consideration how to calculate material Age.

    Dear experts
    i have the same issue, could you pls advise the answer?
    another question; how to unify the stock locations rather than maintaining different locations such as sales order stock, free goods, commercial stock and in the same time the margin reporting to be based on transaction/line item in sales invoice?
    thanks

  • Open Transfer Requirements for Mvmt 261 in LL01

    Hi all
              We recently made a change to our warehouse structure by reassigning storage types from an earlier storage location A to a storage location B. These storage types involve Production Supply areas (PSAs) and also storage areas for raw materials.
    After the change we have ended up with roughly 2000 open transfer requirements related to movement type 261 GI to order. They all show up as critical processes in LL01 (Warehouse Activity Monitor)
    Does anyone know what could be the reason
    Thanks a lot

    Before you change your structure of wharehouse you need to clean up all the pending document otherwise you will be in trouble like you have now.
    so please clear all the document first.

  • Transfer requirement for STO

    Hi all ,
    Can some one help me on this .
    In a scenario there are 2 plants one is Domestic and other is Export Oriented Units .
    I want to transfer the Raw materials from Domestic  and Export to each other using automated STO.
    What are the excise complications involved in this process.
    I want use the MRP run for the supplying plant  is that any procedure in Std SAP so that  the requirement transfer happens between the plants .
    Thanks,
    ksr

    Hi ,
    I am not able to recall any info on excise(CIN) ..But STO is possible using MRP 2 , special procurement type on material master.
    Check help on this std config.
    Thanks,
    sudhakar

  • Is License transfer required for what I intend to do?

    Hi
    Adobe has an enticing offer of 50% off off the Production Premium suite. It's available in many markets, but not here in India. However, I have an uncle who lives in Canada. I intend for him to make the purchase from the Adobe Online Store. A cursory search indicates that a few people have done this before. However, a couple of queries:
    1) if my uncle creates an Adobe ID and buys the software as an ESD, does he automatically become the original licensee or just remain the purchaser until it's registered? He won't download the software after purchase, unless I ask him to. Does the same answer apply to retail box purchase?
    2)If he does become the original licensee, just via the sale transaction, the License Transfer form should suffice to get it in my name, right?
    3)If he does NOT become the original licensee, can I then register the product with my Adobe ID?
    Thanks.

    All download software is pre-registered to the purchaser's user account, so yes, a transfer of license may be required at some point. It has no influence on activation, though. So as long as you're on good terms with your uncle and get the serials, you can "keep it in the family", I guess and need not rush the transfer.
    Mylenium

  • Proper Profit center required for Material Master in Costing1

    Dear All
    We have 2 Profit center X_Pctr & Y_Pctr, while create a Material code & material code should be valid for X_Pctr, if user give
    the Y_pctr the system give the error msg invalid Pctr.
    Pls advise any enhancement. Is the BADI_MATERIAL_CHECK correct ?
    Regards
    Avijit

    Profit center is linked to Plant. There can be only one to one relationship between a plant and profit center. So if you want to transact on a material on 2 different profit centers, then you need to two plants and you have create that material in these two plants.

  • Creating Transfer Order for a Material document

    Hi,
    I am transferring the Unrestricted stock from one material to another material through Movement type 309.
    I am creating a material document through BAPI_GOODSMVT_CREATE. Once the Material document is created and if the stock is in multiple storage types or storage bins, then I need to perform LT06. Instead of doing BDC recording I am using L_TO_CREATE_MULTIPLE function module for creating the TO. I am passing all the necessary values to this FM. TO is getting created but the Material document is not reflecting in that TO.
    As per the configuration, movement type 309 will create the posting change only not the Transfer Requirement.
    Does anybody have encountered the same problem?. If so please let me know how you have resolved the issue.
    Regards,
    Kishore.

    Hello Kirankumar,
    It is possible to assign external number ranges for Storage unit, so maintain storage unit number range to assign SU number externally.
    Now when you create Transfer order for material document at that time you can assign SU number externally.
    Hope this helps.
    regards,
    Arif Mansuri

  • Splitting a Transfer requirement .

    Hi All,
    I have a requirement for splitting a Delivery in to Transfer requirement for every line Item. If this is possible . Cause i have to receive this delivery in RF Using LM71 transaction, so if i receive i only get one Transfer requirement created. and at the same time i also need to print labels for every Line Item.On the other hand the delivery is not received by line Item but as a whole.so is there any back ground logic which can be used for splitting the transfer requirement by line Item for each delivery.
    Thank you
    Raj

    Hi Ranga,
    Thanks for a quick reply.
    I cannot use storage type to cancel the TO confirmation, because all the TOs that I am trying to clean-up do not belong to the same storage unit. I have a bunch of TO numbers which I would like to clean-up.
    Regards,
    Swapnil

Maybe you are looking for

  • How to pack attribute values in a soap request?

    Hello, We are trying to make an external webservice call through GWWS. The (soap) request contains an element which looks like: +<Request Version="1.0" RequestID="11111111" TypeOfRequest="type1" Echo="false">+ +<Info>+ +<Account xmlns="http://somethi

  • Exporting Cystal Reports into CSV format

    Hi, I wanted to export some reports in CSV format with following options checked in Crystal 2008: These options are given under separated Values exports options: 1. Mode = Standard Mode 2. Isolate Report/Page sections and Isolate Group Scctions check

  • Question about Siebel.

    hi, how are you, sorry for posting this in this forum, but i didnt find any other way to know this, since i dont know where to find experts to answer this. I have worked 2 years and a half in Incident support and implementation using siebel tools (7.

  • SB Z (HD_AUDIO) to old X-Fi Fata1ity front panel I/O (AD_EXT) ???

    I upgraded from X-Fi Fatal1ty Edition FPS with front panel I/O to Sound Blaster Z. Is it possible to connect the Sound Blaster Z to the old I/O panel? I'm not able to find a pre-made modded AD_EXT cable to connect to the Sound Blaster Z's HD_AUDIO pi

  • Black Screen on a RDP Session on a Windows 8 VM (with a RemoteFX 3D Card) running on Windows Server 2012 HyperV

    Hi, I am trying to test a Windows 8 VM (RTM) with a RemoteFX 3D adapter (I used Powershell command to add the RemoteFX adapter to the VM) and when I connect the machine with the RDP Client (Windows Server 2012 RTM), I just get a black screen. Off cou