Transfer rules to the new source system not visible in Transport connection

Dear All,
Recently our source system has been changed from R3 4.7 to ECC 6.O. Corresponding to that all the activities in BI have finished successfully. All my datasources in 4.7 have been replicated in ECC 6 in BI and transfer rules re-assigned. I have also collected them in a Transport request.
Now when I am checking the entire flow in Transport connection, it shows me the transfer rules pointing to the old system only. That is, in RSA1 it shows the new system assignment. But in Transport connection not.
What I have to do so that I can crosscheck in Transport connection all my objects having transfer rules to new system ?
Regards,
Srinivas

I think you should check the source system assignment in the transport connection. It might have directed to the old sytem.
Cheers
Chanda

Similar Messages

  • Why does the new operating system not delete the moved files from their original location - it seems like an enormous waste of space, time and effort to clean up every file once you've moved it

    Why does the new operating system not delete the moved files from their original locations - it seems like an enormous waste of space, time and effort to clean up every file once you've moved it - also, when transferring large amounts of files it becomes a very large problem remembering which files were transferred and which not.

    You're going to need to be more specific, as I'm not quite sure I understand what you're talking about.
    If you're referring to copying from an external hard drive or flash drive, and you want to actually move files rather than copy them, you can hold down the option key to force it to do a "move" rather than a "copy." This is not new behavior, though... the Mac OS has worked this way as long as I can recall (and I've been using it since 1984).
    If you're having a problem with trying to move files from one place to another on a single drive causing them to be copied instead, that is likely because of some permissions issue preventing you from actually being able to move them.

  • Transfer Rules Deleted while recreating Source System

    Hi:
    We connected our QBW system to upgraded SAP ECC 6.0 QAT system. We needed to recreate the source system for ECC since that appeared inactive. After our Basis admin re-created the source system, all transfer rules were deleted. Now we can not extract data. We had done the same thing in BWD when the SAP Dev system was upgraded 3 weeks ago and we did not have this problem. Is it possible to activate all transfer rules in QAT again? Or do we have to restore a backup? Or do we have to collect them again from the Development and transport to QBW??
    Thanks

    Hi Sunil,
    yes when you delet the source system and recreate it evey thing will be vanished
    right click on the souce system click Replicate datasouce
    Then try with
    a) Right click on source system and click on Restore if it doesn't work
    b) Transport from Development to Quality
    and active all the transfer rules using the report RS_TRANSTRU_ACTIVATE_ALL
    hope this information helps you
    thanks
    kishore

  • Datasources . problem with the new Source System

    Hi friends!
    The ECC client were copy and now I have a new source system for this.
    If I select source system / verify, the msg is: ok
    In can read some data from the new ECC (ie: exchange rates updated), but I can not read any records using the datasources.
    The replication in Bi were done, and the data in source system is ok.
    -> What is wrong?
    Thanks!

    Check the profile parameters in WE20,We21... and also check scc4

  • Activating transfer rules for new source system

    Hi
    we are having 2 R/3 source system in BI. I had activated all the transfer rules with the first source system and now i have created a new source sytem connecting to a different R/3 client. I tried to change the transfer rules point to the new source system using the program RS_TRANSTRU_ACTIVATE_ALL giving the new source system and the infosource name. But i get the error "No Transfer Structure Selected" when i execute the prg.
    how can i change the source system without creating the transfer rules for the new source but use the existing transfer rules and just change the source system assigned to it????
    Regards
    Sujai

    Hi Sujai,
    There are many cases when this program is used.
    When the Trans rules get de-activated due to impact,we need to first replicate the data source and activate the TR using this program.This generally occurs during the data loads in prd.
    It does not makes sense to transport it when there r no changes done to the TR.So simply,u can use this program to activate.
    If the program does not work,then you are left with the transport option.
    Thanks & Regards,
    Suchitra.V

  • Transport InfoSources to New Source System

    Hi.
    When implementing BW in our QA environment, all InfoSources, and their related InfoPackages, Transfer Rules, Update Rules, etc.) were created using a temporary R3 QAS source system mapping (ex.TMP).  We are now removing this temporary client and  I now need to change my InfoSources (along with customized Start Routines, InfoPackages, etc.) to point to a new QAS source system (ex. PRM). 
    Note that this new source system is already identified as a source system for BW and all DataSources created on TMP have been transported to PRM.  Subsequently, all DataSources have been replicated from PRM to BW. 
    However, I'm having trouble on the BW end.  I can't easily
    transfer the InfoSources, etc. to the new source system.  I've asked some BW / Basis folks and they suggest transporting the InfoPackages out-of and then back-into the BW QA client.  Is this possible?  Is there a better way to push my InfoSources, InfoPackages, etc. from the old source client (TMP) to the new one (PRM)?  Thanks!

    Dear Dave
    Please do not attempt to change the logical system name your self, as I feel that you have not tried it before.
    This is some thing that your basis people have to do. Depending on the size of database this change can take from 2-24 hours (not exact times, but just some thing to show the magnitude of the task).
    Good luck
    /FZA
    Message was edited by: Fariborz Zangoui

  • Configuring of a new source system in BW

    Hi Experts
    We have to set up a BW system,  which will have 2 source systems( ECC)  clients 550 and 590 of the same ECC ( ECC QUALITY). One client is already there and we have to configure another client of source system with the sane BW Client 350. I understand that the dataflow is partly different (e.g transfer rules and datasources are source system dependent). My question are
    1.     How we can configure a Source System on BW.
    2.     What changes if any I have to make in the existing system (BW)
    3.     What will happens to the Existing Data-sources ( Do I have to replicate each and every data-source of the existing ECC clients to New ECC client.)
    4.     Do I have to create New transfer and update rule for the new client
    Any other point Pl. advice.
    Thanks in advance.
    Dinesh Sharma

    You can more than one source system to onw BW client.
    You have to use source system compounding to differentiate between characterstics values if you are loading to the same object. Otherwise you need to use separate characterstics for ex : Yxxxx object for one source system and Zxxxx object for another.
    Also the dataload timing should be setup properly. Otherwise it may leads to object locks.

  • Add new source system to BI

    Hello,
    Our requirement is to load data from a different R3 client to which we dont have a connection yet.
    The idea is to create a new connection but keep the existing one.
    Is there any automated tool to do this? We would like to avoid the manual creation of all infosources and transformations from the new source system, but to copy them from the existing one.
    We found that there is a tool for replacing the current source system with another one (BDLS), but we just want to create this new one in paralel with the current source.
    Thanks!!
    Pablo

    Hi,
    what you can do is, create a transport request containing all source system related things like the infosource/datasource assignment, transfer rules... and import that transport back into your dev system. Before the import you should maintain the settings for source system after transport accordingly.
    Siggi

  • Migrate Dataservices source system to new source system type in BW 7.3

    Hi All,
    We have upgraded our BW system to 7.3. In our old 7.0 environment we have linked Data Services 4.0 as an external source system. Now in BW7.3 we would like to migrate the developments on the old source system to the new source system type.
    Does anyone know if there is any migration tool which we can use for this?
    Best regards,
    F. Geldof

    Hi Valerie,
    Unfortunately i didn't find the answer yet. For the moment we have kept the old connection types to our DS environment.
    Good luck!
    Best regards,
    F. Geldof

  • BW: Connect to new source system via special transport

    Hello everyone!
    I have a BW system connected to an R/3 source system. I have made a copy of the source system. Now I want all my models to be connected to both source systems. I heard that this can be achieved via special transport (i.e. place all source system dependant objects into a special transport request to be imported back into my BW system, but with the new source system assignment). Does anyone have any documentation on how to do this?
    Best Regards and Merry Xmas!
    Luís Andrade.

    Hi Luis,
    There are two parts,
    1) If you want to transport all your objects from current R/3 system to newly created r/3 system then you can create a TR and use it in SCC4 transaction during client copy. In the same fashion you can use RSA1---> transport connection and use the TR for system copy. After that once you release this TR all the objects will move from one system to another.
    2) But if you have already moved all the objects in source system but now you want them to replicate in BI then go to SAP BI system select your source system and then from the context menu choose replicate datsources option, it will fetch everything from respective source system in BI.
    Regards,
    Durgesh.

  • How to delete old source system assignment and assign new source system.

    Hi Experts,
    I have bunch of datasource which are pointing to source system A (when I see it in RSA1). Recently all the datasources which are in source system A has been moved to source system B.
    Now I have replicated all the datasources from the source system B. But in RSA1, still I am seeing the datasources which are pointing to sourcesytem A. I want this to be pointed to source system B.
    Is there a way to do this?.  I have searched in forum and found that this ned to be done manually. Do i need to do it for all the datflows? Is there any thing we can do when running BDLS?.
    Please let me know if you need more inputs.
    Thanks a lot for you suggessions. Eagerly waiting for valuable suggessions.
    Thanks and Regards,
    Saravanan Payani.

    Hi Anindya,
    Thanks for your quick reply. I want to keep the data what ever there in the cube as of now. From now on I want to extract data from new source system.
    Basis team ran the BDLS but i don't see any changes. Still my datasources are pointing to OLD source system.
    Background : I have an infocube for which the datasourec is ZCRM_MKT_001, which is available at  source system IRDCLNT001. Now the above datasource has been moved to new source system IRXCLNT001. As my datasource is moved to new source system, I want the data from the new source system.
    My issue : But when i expand the data flow of the infocube in RSA1to the lowest node, against the datasource i can still see the source system as IRDCLNT001 (which is old) under 'Object Information' column. I want this to be pointed to my new source system that is IRXCLNT001.
    Is there any way to arrive at this?.
    Thanks for your time on this.
    Thanks and Regards,
    Saravanan Payani.

  • Assignment of Source System in quality after transport

    Hi Experts,
    We have implemented the Inventory management standard flow in Development,
    Now to tell you, we have multiple landscape over here,
    Depending on the project, and the fesiblility for the client, the tranport layer is been decided,
    But for sure we have multiple source system,
    By multiple source system, i mean not the other components like R/3, SRM or APO,
    but for R/3 itself we have multiple boxes at each layer,
    Now when transported to quality,
    the standard objects are reflecting after few errors corrected and re transports,
    But the source system which it has picked for the BF BX and UM datasource is not that i require according to the transports landing for the R/3 developments,
    AT DEVELOPMENT LAYER,
    BW development is GDA, which is having the source system connection to development R/3 (GD0),
    AT QUALITY
    We have BW as EQ3,
    For R/3 we have EQ0 and NR0,
    All the transports have reached in the respective target quality system,
    But the data sources are having source system connection to NR0 and not EQ0,
    I want it to be EQ0 as the data lies over there.
    How do i resolve this ?
    Thanks and should be appricated for your efforts in helping.

    Hi Daljeet,
    You should set the Source system Conversion option in Transport Connection before Transporting the objects to QA and PRD.
    You can do this using the button 'Conversion' next to the button 'Source System Assignment'. Here you can specify the Target source system name after the Transport.
    If you want to change all the assignments from NR0 to EQ0, this article will be helpful for you.
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/805eefcd-5428-2d10-c0ab-dc27a95b2c81
    Get the help of your BASIS team also.
    Refer this thread.
    Re: source system in RSA1 is diiferent to the datasource in infoprovider

  • New folder is not visible inside my project but shows in Windows Explorer.

    I created a new folder under another folder.  The new folder is not visible inside my project but shows in Windows Explorer.  Also, if I try to add another folder of that same name, it denies the action since the folder (although invisible) already exists.  My co-worker can access the same file (on a share drive) and see the new folder just fine.  This error occurs whether I was the one creating the new folder or she is the one creating the new folder.  I am new to RoboHelp and she has used it for years.  I suspect something is not yet set up right on my side.  Ideas? (I thought I posted this yesterday but I can't find it anywhere)

    Hi there
    What version of RoboHelp are you using?
    Did you create the folder from inside RoboHelp or did you create it using Windows Explorer?
    Cheers... Rick

  • How to transfer all the transfer structure to new source system ?

    Hello
    I have created a new source system on my BW system with new RFC connection .
    I want to replace all my old transfer structure with old source system to this new system .
    can u plz let me know how can i do this ?
    Regards,

    can u plz many help in this ?

  • Duplicating the existing sourcesystem assignments to a new source-system

    Hi all
    We have another new sourcesystem (logical system) in our BI system.
    This is a copy of the productive erp-sytsem, upgraded to EHP4.
    Now we want to test the connectivities and data load procedures.
    Is there a possibility to "copy" all the existing datasources/transformations of an existing system
    to this new system without using transports?
    We already tried using report 'RBDLSMAP' but it seems to overwrite the existing assignments.
    Any idea??
    Thanks
    Thomas

    Hello Thomas,
    You have to use a transport , to transport the source system dependent objects normally the following procedure is used:
    RSA1
    Transport Connection
    Button 'Collection mode'  set to 'start manual collection'
    Press 'Source system assignment' button (it's the one left of the
    'Request BEx' button)
    Select the source systems you want to save the transfer rules for
    Continue
    Button 'Grouping' set to 'Save for system copy'
    At the left border click on 'Object Types'
    Extend tree  'Source system' LSYS
    Double click on 'Select objects'
    Select the source systems you want to collect objects for
    the source system is now displayed in the right box
    Press collecting button ('gather dependent objects')
    this may take a while
    Right click on the root of the tree and select
    Transport all below
    Expand the whole tree and check if there isn't an object which is locked
    by an other open transport request !!
    (the column 'Transport request' has to be empty (BEFORE deleting the corresponding source system
    connection!)
    Kind Regards,
    Des

Maybe you are looking for

  • Using functions in plsql

    Hello All: My question is, Which is more efficient to use in Plsql: IF v_DestFile IS NULL THEN v_DestFile := in_DestFile ; END IF; OR v_DestFile := NVL(v_DestFile , in_DestFile); Using the second one requires a call to a function.. What are your thou

  • Composite key in Time dimension

    Hi All, I would like to know Time dimension with Composite key. I have a requirement where I want to store 2 Calendars in Time dimension table. for e.g : for one calendar Weekstarts from SUN-SAT and for another it is from MON-TUE DateKey   Type WeekS

  • Business connector ,problem

    Guy's i have one unique problem,in flow step of business connector ,i have used loop ,for example loop over "/Final/recordWithNoID",where recordWithNoID contain multiple records,this loop work's fine if there are more than one record,but fail when th

  • How to convert datetime to datepart

    Hi guys, I have a datetime and I would like to get the datepart from it. SELECT  DATEPART(WEEK,FK_DT_MAILING)   FROM [LNL_**].[***].[VD_***] Msg 8115, Level 16, State 2, Line 2 Arithmetic overflow error converting expression to data type datetime. An

  • How do I creater a indicator to read power factor

    The problem that I have is not that I can read power factor because our RTU gives me a analog input in numeric fomat for our power factor. I need to know if there is some sort of scaling or indicator ( such as a analog dial type gauge) that can be sc