Transferring APO scheduling agreeement through CIF

When we transfer scheduling agreement through CIF to APO, they automatically get created as type "OLTP". APO however, does not recognize vendors if the scheduling agreement is not of the type "APO".
We would appreciate it if anyone knows a setting in CIF which would create scheduling agreements of type "APO" in the APO system.
Thanks.

Hello,
In R/3 side in sch. agrrement ( ME32) if you go to additional data , the field External planning controls whether it is OLTP or APO SA .
If you select it 1 it will transfer as APO SA if it is blank and still you CIF the SA to APO it will view as OLTP SA in APO.
Pl. let me know if you required further information.
Regards,
Rajiv

Similar Messages

  • Change component level special stock indicator for Purchase Ord-through CIF

    Hai,
    my requirement is to change the the spoecial stock indicator at the component level for the PO .
    The purchase reqqusition is available in APO system.At the time converiosn to PO, the PO will get created in R/3 through CIF.
    When the Purchase Order is getting saved in R/3 then I need to check the component level Special stock indicator(SOBKZ) & I need change its value.
    I am currently using the user exit 'EXIT_SAPLCPUR_001' to change the same.in this user exit, I am changing the component level SOBKZ in the table IT_INPUT & I am also setting X in IT_INPUTX table.
    But the changes are not reflecting in the newly created PO.It always shows the value 'E' for SOBKZ.
    can any one tell me is this the right user exit to change the above value? if yes please expalin me in rdetail on how to change this.
    Thanks,
    Bhaskar.

    Hai Saurabh,
    I have tried changing the CP_POSITION-SOBKZ field in the user exit EXIT_SAPLMEPI_006.This one changes the SOBKZ of the item of PO i.e, the change reflects in EKPO table.
    What I am looking for is to change the Component level SOBKZ of the ITEM of the PO.The change reflects in RESB-sobkz table.
    I think,  In the User exit EXIT_SAPLCPUR_001, the field IT_INPUT-SP_STK_IND is meant for this.But this is not working.
    Please inform me how the RESB-SOBKZ can be changed?
    Thanks,
    Bhaskar

  • Schedule lines through MRP

    Hi Friends,
    I have a scenario where in After running MRP, new schedule lines are being generated for an ROH inspite of having sufficient stock(in unrestricted use) & also some open schedule lines to fulfill the requirements. Kindly suggest as to how can i control the generation of schedule lines through MRP.
    Regards,
    SK

    Hi Bala
    The MRP type maintained is PD.
    Rgds,
    SK

  • Diff between Detail scheduling & Apo Scheduling

    Hi all,
    Diff between Detail scheduling & Apo Scheduling
    Thanks & Regds
    Dhinakar

    Hi Dhinakar,
    i hope u are asking about difference Between Detailed scheduling of R/3 and APO scheduling.
    R/3 Detailed Scheduling.
    It is infinite scheduling - ie in which production orders and opeartions are scheduled without taking into  account of  existing workcenter load.  Here over loading will be happened.
    APO scheduling.
    It is finite scheduling where by
    existing capacity load is taken into account while scheduling. over load will not occur.
    Here system will not schedule two production orders at same time. This one of the advantages of APO
    Regards
    Pradeep

  • Possibility of deleting the scheduled jobs through reports

    hi friends
    is it possible to delete the schedule jobs through report making?
    i mean i have to enter a particular user name
    list of jobs scheduled by him has to be listed
    and selecting the unwanted job have to delete all the jobs
    Thanks and regards
    s.janagar

    Jangar,
    Yes. This can be done. Write a delete statement and use it on the table TBTCO.
    Note: Any other operations can be done on the tables TBTC*
    Thanks,
    Babu Kilari

  • A extra field, which not evaluate in APO - R/3 via CIF Interface

    Hello all,
    in one of our project a question came up:
    Scenario:
    A customer send us the requirements for weeks as an xml file. This xml file contains a field with a specific number for this requirements (each file as the same number). We send all information to APO - BW. And than via CIF - Interface into the R/3 System.
    So far so good, but now we have to send back a suggestion to the customer include the certain amount and delivery date and the specific number field. The certain amount and the delivery date ...-> no problem. But we lost the specifc number. The reason behind is, that our APO Specialist mentioned, that are no possibilities to bring the  field from the APO-BW via CIF to R/3. But I couldn't belive it.
    So my question is now, maybe it is possible to put the number in a field, which we can pass-through features to R/3.
    Thanks
    Kind regards
    Stephan

    Hi Stephan - I also agree that this is not standard functionality in SAP. However you can move customer specific data from APO into R3 using the CIF with CIF enhancements. Most or all transactional data enhancements have extension tables where SAP customers can move non-SAP defined data through the CIF. Look in customizing for enhancements and also identify the APO-BW tables where your data is stored. A developer should be able to take it from there. One thing to think about is where in R3 you want to store this data - make sure there is a field available or some logic to receive the data.
    Regards
    Andy

  • Route in APO- Scheduling

    Hi Experts,
    I am testing the scheduling using the Condition Technique- the path as below mentioned.
    And SAP Easy Access Menu - Advanced Planning and Optimization -->Master Data -->Application-Specific Master Data -->Transportation and Shipment Scheduling -->/SAPCND/AU11 - Create Scheduling Step
    Could some one please help me how can I create the Route in APO to work out this.
    I have ciffed shipping point, plant, customer and product but I could not find any information on "Route"
    Could you help please where we can create route in APO.
    Thanks,

    Hi,
    Route is not created in APO. It comes as a part of Sales order. It will be there on sales order line item.
    Look into the tables /sapapo/posmapn and /sapapo/sd_field,/sapapo/shipping.
    You just need to maintain the route here and the time so that your scheduling will up the same while scheduling your sales order.
    Regards,
    Jit

  • GETWA_NOT_ASSIGNED error while scheduling job through F9

    Hi All,
    i am getting <b>GETWA_NOT_ASSIGNED</B> dump while scheduling a job through F9 and giving local printer as LP01.
    any pointers regarding this ?
    thanks
    kunal kishan

    Hi Ankesh,
    can you please elaborate on this.???
    Basiclly when i am trying to schedule a job by pressing F9 and setting it to immediate. when i chek in SM36, the job gets cancelled. The dump says "GETWA_NOT_ASSIGNED" error. The source code where the error is soming is a refresh statement.

  • Scheduling Report through InfoView - Destination Email

    My question pertains to InfoView in Crystal Report Server 2008.  I am trying to set up a scheduled report to run once, and be emailed as a pdf to my own email address.  I am using the administrator account and can successfully do this through the CMC, but when I try to schedule the report through InfoView, the destination always reverts back to the Inbox destination rather than the email destination.  The job has a successful status, but the destination is always the Inbox.
    I am fairly confident my job servers are set up with the proper SMTP information since I am successful when trying this through the CMC and I am setting everything the same through InfoView. 
    Any ideas?

    Hello,
    This is Crystal Report Server 2008 and I guess Business Objects Enterprise 3.0.  
    When scheduling a report through InfoView I do the following:
    Recurrence - Now
    Format - I choose PDF, although it doesn't really matter for the problem I am having.  
    Destination - I choose email from the dropdown, there is no checkbox to ignore the defaults.  I have to input my own information.  I populate the From, To, and Subject boxes.  I also choose to have an attachment sent.  
    I click the Schedule button and I am taken to the History window.  The job has a status of Running.  I choose refresh and the job completes with a status of Success.  However, when I click the status and the Instance Details are shown, the external destination line reads as Inbox and no email is delivered.  The report is delivered to the InfoView user's inbox, but not in an email as I selected.  
    This process works when performed through the CMC, but not through InfoView.
    Edited by: vtrujillo on Oct 8, 2009 5:13 PM

  • Scheduling PI through Tivoli

    Hi All,
    I want to schedule my PI scenarios through Tivoli.
    Tivoli takes care of job scheduling and dependencies for SAP n NonSAP jobs.
    Is there any way to make PI scenarios dependent on Tivoli jobs?
    Thanks,
    Atul.

    Hi Nisar,
    Thanks for ur reply....
    I have multiple jobs running say Job1->Job2->Job3 in a sequence. Out of this Job1 and Job3 are NonSAP jobs and are scheduled in Tivoli. Where as Job2 is PI scenario which is File to file scenario.
    Now i want to trigger Job2 only when Job1 is completed. And i am not able to trigger this scenario.
    Is there any way in which we can trigger scenario through Command Line or something?
    Thanks,
    Atul

  • Scheduling Report  through  Command Line

    Post Author: gunjesh
    CA Forum: Administration
    Hi All,
              I would like to know how to schedule a  Webi (infoview) report of Bussiness Objects XI Release2    through Command line , Not through CMS.
    Command line options
    1. To schedule a report from CMS but using a command line. What all parameters are needed in order to do this ?
    2. To stop/reschedule a report being refreshed/running at this moment. What all parameters are needed in order to do this ?

    Post Author: sgolby
    CA Forum: Administration
    Did you have any luck finding out how to do this ?   We would like to trigger reports from the command line on demand. (or via an API is fine too)
    Thanks,
    Scott

  • Automation of scheduling agreement through EDI

    Hi,
    My Client want to update the scheduling agreement automatically through EDI, so wants need to be configured in SD point of view.
    looking for configuration details step by step
    thanks.

    hi all,
    any one can give idea or information about this.
    thanks.

  • Scheduling scp through crontab in Solaris

    Hi All,
    I am trying to schedule the scp command in crontab in solaris production environment. It asks me to type the password seperately. Is there a way to schedule the scp without any interrupts like providing passwords.
    If there is any script can you kindly share it with me.
    Can anyone kindly help me please.
    Warm regards,
    Dan

    To configure SSH, complete the following:
    D.1.2.1 Create SSH Directory, and Create SSH Keys On Each Node
    Complete the following steps on each node:
    Log in as the software owner (in this example, the grid user).
    To ensure that you are logged in as grid, and to verify that the user ID matches the expected user ID you have assigned to the grid user, enter the commands id and id grid. Ensure that Oracle user group and user and the user terminal window process you are using have group and user IDs are identical. For example:
    $ id
    uid=502(grid) gid=501(oinstall) groups=501(oinstall),502(grid,asmadmin,asmdba)
    $ id grid
    uid=502(grid) gid=501(oinstall) groups=501(oinstall),502(grid,asmadmin,asmdba)
    If necessary, create the .ssh directory in the grid user's home directory, and set permissions on it to ensure that only the oracle user has read and write permissions:
    $ mkdir ~/.ssh
    $ chmod 700 ~/.ssh
    Note:
    SSH configuration will fail if the permissions are not set to 700.
    Enter the following command:
    $ /usr/bin/ssh-keygen -t dsa
    At the prompts, accept the default location for the key file (press Enter).
    Note:
    SSH with passphrase is not supported for Oracle Clusterware 11g release 2 and later releases.
    This command writes the DSA public key to the ~/.ssh/id_dsa.pub file and the private key to the ~/.ssh/id_dsa file.
    Never distribute the private key to anyone not authorized to perform Oracle software installations.
    Repeat steps 1 through 4 on each node that you intend to make a member of the cluster, using the DSA key.
    D.1.2.2 Add All Keys to a Common authorized_keys File
    Complete the following steps:
    On the local node, change directories to the .ssh directory in the Oracle grid infrastructure owner's home directory (typically, either grid or oracle).
    Then, add the DSA key to the authorized_keys file using the following commands:
    $ cat id_dsa.pub >> authorized_keys
    $ ls
    In the .ssh directory, you should see the id_rsa.pub keys that you have created, and the file authorized_keys.
    On the local node, use SCP (Secure Copy) or SFTP (Secure FTP) to copy the authorized_keys file to the oracle user .ssh directory on a remote node. The following example is with SCP, on a node called node2, with the Oracle grid infrastructure owner grid, where the grid user path is /home/grid:
    [grid@node1 .ssh]$ scp authorized_keys node2:/home/grid/.ssh/
    You are prompted to accept a DSA key. Enter Yes, and you see that the node you are copying to is added to the known_hosts file.
    When prompted, provide the password for the grid user, which should be the same on all nodes in the cluster. The authorized_keys file is copied to the remote node.
    Your output should be similar to the following, where xxx represents parts of a valid IP address:
    [grid@node1 .ssh]$ scp authorized_keys node2:/home/grid/.ssh/
    The authenticity of host 'node2 (xxx.xxx.173.152) can't be established.
    DSA key fingerprint is 7e:60:60:ae:40:40:d1:a6:f7:4e:zz:me:a7:48:ae:f6:7e.
    Are you sure you want to continue connecting (yes/no)? yes
    Warning: Permanently added 'node1,xxx.xxx.173.152' (dsa) to the list
    of known hosts
    grid@node2's password:
    authorized_keys 100% 828 7.5MB/s 00:00
    Using SSH, log in to the node where you copied the authorized_keys file. Then change to the .ssh directory, and using the cat command, add the DSA keys for the second node to the authorized_keys file, clicking Enter when you are prompted for a password, so that passwordless SSH is set up:
    [grid@node1 .ssh]$ ssh node2
    [grid@node2 grid]$ cd .ssh
    [grid@node2 ssh]$ cat id_dsa.pub >> authorized_keys
    Repeat steps 2 and 3 from each node to each other member node in the cluster.
    When you have added keys from each cluster node member to the authorized_keys file on the last node you want to have as a cluster node member, then use scp to copy the authorized_keys file with the keys from all nodes back to each cluster node member, overwriting the existing version on the other nodes.
    To confirm that you have all nodes in the authorized_keys file, enter the command more authorized_keys, and determine if there is a DSA key for each member node. The file lists the type of key (ssh-dsa), followed by the key, and then followed by the user and server. For example:
    ssh-dsa AAAABBBB . . . = grid@node1
    Note:
    The grid user's /.ssh/authorized_keys file on every node must contain the contents from all of the /.ssh/id_dsa.pub files that you generated on all cluster nodes.
    D.1.3 Enabling SSH User Equivalency on Cluster Nodes
    After you have copied the authorized_keys file that contains all keys to each node in the cluster, complete the following procedure, in the order listed. In this example, the Oracle grid infrastructure software owner is named grid:
    On the system where you want to run OUI, log in as the grid user.
    Use the following command syntax, where hostname1, hostname2, and so on, are the public hostnames (alias and fully qualified domain name) of nodes in the cluster to run SSH from the local node to each node, including from the local node to itself, and from each node to each other node:
    [grid@nodename]$ ssh hostname1 date
    [grid@nodename]$ ssh hostname2 date
    For example:
    [grid@node1 grid]$ ssh node1 date
    The authenticity of host 'node1 (xxx.xxx.100.101)' can't be established.
    DSA key fingerprint is 7z:60:60:zz:48:48:z1:a0:f7:4e.
    Are you sure you want to continue connecting (yes/no)? yes
    Warning: Permanently added 'node1,xxx.xxx.100.101' (DSA) to the list of
    known hosts.
    Mon Dec 4 11:08:13 PST 2006
    [grid@node1 grid]$ ssh node1.example.com date
    The authenticity of host 'node1.example.com (xxx.xxx.100.101)' can't be
    established.
    DSA key fingerprint is 7z:60:60:zz:48:48:z1:a0:f7:4e.
    Are you sure you want to continue connecting (yes/no)? yes
    Warning: Permanently added 'node1.example.com,xxx.xxx.100.101' (DSA) to the
    list of known hosts.
    Mon Dec 4 11:08:13 PST 2006
    [grid@node1 grid]$ ssh node2 date
    Mon Dec 4 11:08:35 PST 2006
    At the end of this process, the public hostname for each member node should be registered in the known_hosts file for all other cluster nodes.
    If you are using a remote client to connect to the local node, and you see a message similar to "Warning: No xauth data; using fake authentication data for X11 forwarding," then this means that your authorized keys file is configured correctly, but your SSH configuration has X11 forwarding enabled. To correct this issue, proceed to "Setting Display and X11 Forwarding Configuration".
    Repeat step 2 on each cluster node member.

  • Scheduling jobs through dbconsole

    Just trying to clear my concepts about automating jobs, my understanding is we can automate jobs through crontjobs (on unix) /taskscheduler (on windows)
    The other option is DBMS_SCHEDULER.
    any jobs like RMAN backups or sql scripts running should show up in below query(they are not running through Scheduled Tasks (its window box)
    but i see few jobs & RMAN backups running on one db but i can't see them in this query, what i am missing?
    SQL> SELECT owner, job_name, enabled FROM dba_scheduler_jobs;
    OWNER JOB_NAME ENABL
    SYS AUTO_SPACE_ADVISOR_JOB TRUE
    SYS GATHER_STATS_JOB FALSE
    SYS FGR$AUTOPURGE_JOB FALSE
    SYS PURGE_LOG TRUE
    ORACLE_OCM MGMT_STATS_CONFIG_JOB TRUE
    ORACLE_OCM MGMT_CONFIG_JOB TRUE
    6 rows selected.
    Edited by: DBA2011 on Jun 21, 2012 9:09 AM

    DBA2011 wrote:
    Just trying to clear my concepts about automating jobs, my understanding is we can automate jobs through crontjobs (on unix) /taskscheduler (on windows)
    The other option is DBMS_SCHEDULER.
    any jobs like RMAN backups or sql scripts running should show up in below query(they are not running through Scheduled Tasks (its window box)
    but i see few jobs & RMAN backups running on one db but i can't see them in this query, what i am missing?
    SQL> SELECT owner, job_name, enabled FROM dba_scheduler_jobs;
    OWNER JOB_NAME ENABL
    SYS AUTO_SPACE_ADVISOR_JOB TRUE
    SYS GATHER_STATS_JOB FALSE
    SYS FGR$AUTOPURGE_JOB FALSE
    SYS PURGE_LOG TRUE
    ORACLE_OCM MGMT_STATS_CONFIG_JOB TRUE
    ORACLE_OCM MGMT_CONFIG_JOB TRUE
    6 rows selected.
    Edited by: DBA2011 on Jun 21, 2012 9:09 AMdepends on how the job was scheduled. You should also check DBA_JOBS.
    And of course, there is no guarantee the job you expect to see actually exists in database B just becaue it existsin database A .....

  • APO schedules order having REL and PCNF status

    Hello,
    We are using PPDS for planning and scheduling. The planned orders are converted to production orders and sent to R/3. After order release in R/3, user may adjust the quantity and reschedule the order in R/3 to extend the orders when needed. This can be the case for partially confirmed orders also.
    But as soon as user reschedules order in R/3 APO overwrites the dates. How can we stop this so that R/3 has the control on orders with REL and PCNF status.
    Thanks
    PE

    Hi,
    Can you check the settings defined in /SAPAPO/CP3 for retransfer.
    Thanks,
    nandha

Maybe you are looking for

  • Fiscal year change not yet made for company code

    1. We have opened new company and enter data from FY 2009. All posting has happened properly, but when we are trying to see report S_ALR_87011963 we are facing following problem. We have already check everything on SDN and followed, but our problem s

  • External loading .txt file can I link URL in txt file?

    So, I can't remember and it's not working. I basically want to add this to my text file: <a href="http://www.gap.com" target="_blank">Go here</a> which obviously doesn't work. what's the easiest way add HTML tags to a TXT file without changing the wa

  • Validation when creating G/L Account

    Hello, At the present moment I have all company codes with the same account group. But I need to make one field obligatory for some company codes and not obligatory to others company code. Is there any standard way of doing it? Thanks everyone.

  • Blocking of general ledger

    Hi, Experts can u explain the variations of these blocking levels. when we  use FS00 and click on lock you have two tabs there i. Block in chart of account (a) Blocked for creation : (b)  Blocked for posting: if i click this check box it will block f

  • Can I have a .swf file play in a lightbox-type window on link click?

    Hello, I have a thumbnail on my page that I would like to link to a video. However, I do not want it to open in a new tab or window, rather, I'd just like it to appear like a lightbox display, fading out the background and playing the video within th