We need transferring characteristic to APO from ECC. Only one characteristic. We're enter name of characteristic to field "Additional characteristics", but in created IM chosen, all existing characteristics. What we need to do to transfer only one required characteristic?
Thanks in advance,
Evgeniy.
Babu, sorry for my brevity.
I have one IM that contain list of characteristics relevant to class type 300 and organization area indicator "A".
Then I created new IM that contain only one characteristic without reference class type and organization area.
When I activate IM I can see that selected all existing characteristics, while I need to transfer only one of them.
How can I transfer only one characteristic? Is it possible?
I hope this is enough information to answer my question.
Regards,
Evgeniy.
Similar Messages
-
Proforma (Export Invoice) invoice not transferring to GTS system from ECC
Hi All,
below mentioned was the error that displayed while transferring the Proforma invoice( export invoice) from ECC to GTS system in SM58 t code . Can any please through some light on this error
Item category missing for item 1. I checked the Item categories for the item in sales order and delivery docs. It looks fine though.
cheersHi Sri,
you must align SD0C level.
Go to SPRO --> SAP Global Trade Services --> SAP Customs Management --> Document Structure --> Assignment of Item Categories from Feeder Systems --> Assign Item Category at Feeder System Group Level
For Example: SD0C TAN CLPOS Standart Item
When you are done, just re-execute LUW in SM58.
Regards,
Gabriel. -
How to Transfer factory calendar to APO from ECC
Dear friends,
I came across the statement in SCM210 material that factory calendar can be transferd from ECC to APO. If anyone knows about it can you please explain me with steps?
SreeSree,
you can transfer the factory calendars from ECC to PAO following these steps:
in APO:
Transaction RSA1
Select Source systems>SAP>your R/3 client.
Right click on the client>Select Transfer Global Settings.
Select Factory Calendars
Select Rebuild tables
Cheers!
Abhi -
Transferring Search Help values from ECC 6.0 to SRM 7.0
Hi SAP experts,
I have a requirement to display the search help values for a data element in ECC 6.0 into the custom data element that I created on SRM 7.0.
Is there a BAPI that I can use to retrieve the values for a search help element (for example SH_ANLKA) from the the ECC into SRM?
Your advise would be greatly appreciated!
Regards,
AndrewHi Andrew,
I have got a similar requirement to fetch the PO details from ECC search help to a new SRM search help. Please help me with the procedure you used for the above scenario.
Thanks,
Santosh. -
Transferring field "Unloading Point" from ECC to SRM
Hello Everybody,
I need to pass the field "Unloading Point" from the ECC side to the SRM side. Currently, SAP doesn't transfer this field when we execute the program BBP_EXTREQ_TRANSFER.
The field Unloading Point has been enabled in the SRM and is displayed properly for any Shopping Cart created there.
In order to pass the field, I have explored the BADI - BBP_BADI_EXTREQ_OUT, but there is no field in this BADI which can be used for passing the Unloading Point.
One solution that I have is to create a custom field in the BADI structure and then move the Unloading Point in this custom field. But then again, a question arises, how will SRM know that this is the Unloading Point field.
Also, will any of the following BADI's do the trick?
BBP_CREATE_REQ_BACK
BBP_TARGET_OBJECTS
BBP_CREATE_BE_RQ_NEW
BBP_GROUP_LOC_PO
Please let me know if there is any solution for this problem.
Thanks & Regards,
Nikhil.Hi Disha,
Thank you for your prompt reply.
As per your recommendation, I looked at the BADI "BBP_DOC_CHANGE_BADI", but it seems that the BADI is triggered when we order or hold the shopping cart and not when we transfer Purchase Requisitions from ECC.
Also, I had seen the thread previously, but it wasn't helpful to me.
I will be just creating the PR in the ECC side, and won't be having any SC in the SRM before I execute the program BBP_EXTREQ_TRANSFER. I want the field Unloading Point to be moved for every PR created whenever the program is executed.
If I have missed your point somewhere, do correct me.
Thanks!
Nikhil. -
Transferring the cost centers from ECC to Sourcing
Hello Experts
I have a requirement to synchronize cost centers between ECC and Sourcing systems . . The approach I am thinking is-
Schedule a import job in sap sourcing which will be pointed to FTP and can import data.
ECC will trigger the XML data from for any change / creation of cost centers .
This data will come to FTP and from there this would be imported by Sourcing .
Can anyone let me know if there is any particular XML format for Cost centers for importing to Sourcing ?
Thanks
SudiptaHi Sudipta,
If Cost Center data extracted from ECC is rendered in CSV format, then XML file may not be required for the import job.
The CSV file format should be available in the Enterprise/Company workbook.
Regards,
Parankush -
RE: DELETION OF CDP:CHARACTERISTICS IN APO - FROM COPY
G'day Team,
I am looking for some help in regards to CDP: Classes & Characteristics. The IT partner copied from Prod APO instance to a Dev syst. The BDLS was not performed and they further copied APO masterdata to Dev.
Can someone advise the /SAPAPO/ table this resides in.. Can you please advise the process to delete existing class / characteristics from APO, so that I can re-CIF transfer from ECC6 to APO.
The previous client IM (Prod ECC6) has been de-activated.
<< Please do not offer points >>
Many thanks,
Andrew Goz
Edited by: Rob Burbank on Sep 24, 2010 5:05 PMthere is a transaction in APO to delete CDP characteristics from a class.
/SAPAPO/MC01_CLCH_RM - Remove Characteristic from Class -
Transfer of PIR from ECC to APO - Time stamp
Hi Friends,
We are transferring Planned Independent requirements from ECC to APO through CIF.
In APO Product view Forecast requirements Date is sync fine with ECC date however the time is setting default to 03:00:00 am.
we want the time to be set to 06:00:00 am by default.
How we can we archive this?
Regards,
KrishDear Tiago,
I changed Product view Time zone settings, and issue resolved.
Thanks for your valuable reply. Awarded you the points.
Regards,
Krish -
How to Post Idoc's from ECC to SCM
Dear Friends,
This is Shalini Shah.
how to post the Idoc(MATMAS05)
from ECC to SCM-APO.
please give me the details on this topic.
Regards,
ShaliniShahPlease see the Wiki page details mentioned in this [sticky|Wiki page for SCM-APO; thread at the beginning of the forum.
Refer to the [CIF|https://wiki.sdn.sap.com/wiki/display/SCM/CIF] Wiki page for details on setting up and using CIF. I am not aware of the IDOC details but if it material master (as SB has mentioned) then your best option of transferring the master data from ECC to SCM / APO will be to use the CIF.
After intial CIF settings are maintained (see details inthe CIF Wiki page) you will need to create Integration Models and activate them for transferring the data.
Somnath -
CALL FM bapi_mosrvaps_getlist2 from ECC
Hi there,
I need to call function bapi_mosrvaps_getlist2 in APO from ECC remotely. However, this means copying all the interface's structures, data elements and domains into ECC, quite a big (and boring) job. Would anybody know an easier way of doing this?
Thanks in advance!
Roy van de KerkhofRoy,
I created a function module in APO that called this function module. I limited the parameters to only those fields needed in ECC.
Good Luck
Tim -
Vendor product relation not transfered from ECC to APO
Hi,
I am new to APO.
We are transferring the info records(me13n) details from ECC to APO by CIF .
But in APO system , when I check the product for the location(/sapapo/mat1) it says the product is not created for vendor.
but this details are present in info records in ECC.
Hence currently, we are manually creating the products for vendor.
Is there any BADI where all vendor-product link can be transferredHi Rachel,
You can use BAdI: /SAPAPO/CIF_ENHANCE_TPSRC (method CHANGE).
Take a look at SAP Note:
1873917 - CIF Purchasing Info Record - Product does not exist at
Vendor location
I never used that BAdI, but we made something similar. We made an enhancement some time ago to extend the Product at the Vendor Location. This was done for subcontracting at the time the PPM was transferred. I am not sure if this is your case, because you just mentioned that you needed for a vendor. If it applies, please check here:
483358
- Subcontracting: creating product masters automatically
Kind Regards,
Mariano -
Error during transferring PDS from ECC to APO
Hi,
When I transfer the PDS from ECC to APO, the follwing message is displayed. Can any one advise to overcome this issue.
Mode N50026289010001 001000000001 S is not assigne
Message no. CURTO1010
Diagnosis
The error described in the message 103 of message class /SAPAPO/CURTO occurred in SAP APO while generating the production data structure.
Procedure
You can find the associated message text in SAP APO in message 103 of message class /SAPAPO/CURTO.
thanks and regards
MurugesanHi,
I think you are transferring PDS through I-Model and I-Model is active for the required selection with SNP subcontracting parameter.
Ensure that the production version "check" status is green and with correct BOM (production) assignment.
If the I-Model is active, then you can also try sending the PDS using txn: CURTO_CREATE with SNP application.
Hope this helps
Thanks
Venkat DR -
How to delete Master Data transferred from ECC to APO via CIF
Hi, all
I'm connecting SCM 5.1 with ECC 6.0 via CIF.
When activating Integration Model in ECC, the following error occurred;
"Location 0001 of type 1001 (BSG 592BUSGP) already exists in APO"
This is because Location 0001 was already transferred from different ECC client via CIF, and not cleared.
I'm now trying to initialise master data transferred from ECC to APO via CIF, but in vain.
I suppose I have to first delete all master data CIFed from ECC in APO, or have to execute initialisation of APO master data with ECC data in ECC.
Please tell me how to do this.
For details, please read the followings;
I connected APO client with ECC client 590.
I transferred Plant and Material Master from ECC to APO via CIF.
After that, I wanted to change ECC client from 590 to the other.
I created the other client (592) by client-copying from 590 with SAP_ALL copy profile.
I deactivated Integration Model in ECC 590, and activated the same in ECC 592.
Here, I faced the problem.
The initial data transfer failed due to the duplicate of data.
Now I'm wondering how I can initialise master data in APO and transfer initial data from ECC.
Due to testing purposes, I have to change ECC clients from one to the other this time, but I cannot initialise master data in APO and cannot tansfer initial data from different ECC client.
thanks in advance,
HozyHi all,
Thank you very much indeed for lots of your replies.
Thanks to all of your advices, I'm getting to understand what to do.
Well, I'll say I have to create one more client for testing with other ECC clients or I have to rebuild the client by client-copying from 001 and implementing all transportation requests, for marking del flags to each master data and running del programme sound like tough work, and sound like odd ..
Then, I've got next issue here.
In SCM-APO, I use BI objects, and , if I have to create several clients for testing, I have to set up clients where you can use both BI objects and CIFed master data.
I suppose I have to change 'BWMANDT' in RSADMINA and make RSA1 accessable in other SCM clients and implement tests.
Also, I have to register BI System for newly created SCM clients in RSA1-SourceSystem.
Well, if you have any experiences on this kind of use, and if you have any advice on it, please give me any tips.
Particulary, I'd appreciate very much if you give me advice on which way you have chosen; creating several clients or rebuilding the one client in SCM-APO when you use both BI objects, CIFed master data and Demand Planning.
Thanks in advance.
Hozy -
Transferring Product Master Data Changes From APO to ECC/R/3
Is it possible to transfer product master data changes in APO to ECC via the CIF? If so, does it require custom coding?
Hi James,
In all the different clients where APO is being used with ECC systems. ECC system is always the main system (system of record) which contains all the master data and data present in ECC supposed to be the reference for APO system for planning purpose.
Generally it is not recommended to transfer master data from APO to ECC but as mentioned earlier by some experts you may have ways to do that.
I would be interested in the business scenario where one needs to transfer master data from APO to ECC.
Thanks,
Anupam
Edited by: Anupam Sengar on Aug 11, 2011 12:31 AM -
Issue in transfer of data from ECC to APO
Hi All,
I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
How should I proceed...Please help....this is an urgent requirement
Thanks & Regards,
SriLalithaHi,
you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
Determine Forecast of Replenishment Lead Time
Use
In this field, you specify how the extended safety stock planning determines
the forecast of the replenishment
lead time (RLT). The following values are available:
Supply Chain
The system determines the RLT forecast using the supply chain structure by
adding the corresponding production, transportation, goods receipt, and goods
issue times. If there are alternative procurement options, the system always
takes the
longest
option into account.
Master Data
The system determines the RLT forecast from the location product master
data.
Master Data/ Supply Chain
First, the system determines the RLT forecast from the location product
master data. If no RLT forecast can be determined, the system determines the
forecast using the supply chain structure (as described under
Supply
Chain
Dependencies
You can retrieve the replenishment lead time forecast yourself by using the
GET_LEADTIME
method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
Replenishment Lead Time in Calendar Days
Number of calendar days needed to obtain the product, including its
components, through in-house
production or external
procurement.
Use
The replenishment lead time (RLT) is used in the enhanced methods of safety
stock planning in Supply Network Planning (SNP). The goal of safety
stock planning is to comply with the specified service level, in order
to be prepared for unforeseen demand that may arise during the replenishment
lead time. The longer the RLT, the higher the planned safety stock level.
Dependencies
The field is taken into account by the system only if you have specified
master data or master data/supply chain in the RLT: Determine
Forecast field of the safety stock planning profile used.
Hope this helps.
The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
May be if you maintain the setting in the profile, you may get the value in RELDT.
Thanks.
Maybe you are looking for
-
How to open only one web page at a time?
I used to have it set so when I opened a new web page, the previous one closed. Now, nothing closes automatically and I have about 50 pages open that I have to close. How do I set it so that only one page opens at a time?
-
Does the Bone tool work with strokes created using the pencil or line tools?
I have a working bone rig in a document(CS4) that I created using a SINGLE pencil stroke, and applying the armature to it. Object drawing was off and it was a single piece with no part being a symbol. This was accomplished TWICE for two stick figu
-
Purchasing Info Record and Source list
Hi all, I am using purchasing info record along with a price for the vendor and material. This would get the net price into the Purchase order. Do i really need to create source list ? What will source list do for me ? Wouldn't having info
-
Has anyone experienced problems saving downloaded pdf files in Yosemite?
In Mavericks, I could choose the pdf file destination folder using the save dialog box's "search" entry to select the folder to save a file in. Now the search feature seems to have been disabled. Yosemite appears to have implemented a new method to c
-
CS6: Right Click - "Move to New Window"
When moving a new file to a new window, I don't like how they take up a whole screen. Can that get patched to they way it was in CS5/CS5.5? And maybe make a session manager out of it. I am known to have a few sites open at the same time, and each web