Transit time , SNP CTM

Hi,
I am facing another scenario:
we are using CTM for SNP.We have maintained transit time of 3 weeks for certain products from a certain vendor location. Vendor location was not CIFed from R/3, but was created by extending the product to a location in APO. After the CTM run, planning book is showing 4 weeks transit time for one particular product only.
ANy suggestions on this will be appreciated.
Thanks for your time.
Shankar
Message was edited by:
        Shankar V

Can you confirm what you see is 4 weeks by looking at the requirement and availability date of the order/req created in the system at the destination? Can you confirm there is no Stock transfer horizon at source? Also confirm whether there are no holidays either in the receiving calendar at destination or shipping calendar at source? Are you maintaining calendar in T lane mode?

Similar Messages

  • Promised Date Calculation based on Need by Date and Transit Time

    Hi,
    I have created PO with NBD as D25 (Day 25) and approved it. This means that i need the goods to be at my premisis by D25.
    Now the requirement is
    Promised date in my PO should be calculated to D25 - Transit Time. So that supplier will be notified D25-Transit time.
    Or Is there any workaround to overcome this.
    Thanks,
    Jey

    Jey-SCMFG wrote:
    Hi,
    I have created PO with NBD as D25 (Day 25) and approved it. This means that i need the goods to be at my premisis by D25.
    Now the requirement is
    Promised date in my PO should be calculated to D25 - Transit Time. So that supplier will be notified D25-Transit time.
    Or Is there any workaround to overcome this.
    Thanks,
    JeyHi Jey,
    Where you are capturing your lead time. You can do it in item master.
    Once it is there, write a personalization to calculate the promised date and update the field.
    Thanks,
    PS.

  • Purchase-How could I consider Transit time and lead time in imported mat.

    My doubt refers about master data configuration of imported material.
    My sittuation is :
    Material - Lead Time:  (depend on source)
                   Transit Time: (depend on source)
    My company is responsable to transport all bought material. Besides, I can buy of differents suppliers.
    Considering these rules, It s impossible to fix dates in material master, because material purchase is related with center and not with supplier. By the way, I need to discover other master data to configure it maybe : Inforecord, quotization... Whatever...
    I need to correct this to generate Purchase order with dispatched date of my source against required date of my company after execute MRP.
    I tried to study this scenario but until now I ve not got a solution.
    Probably, you have had it before and can help me.
    I hope your help!
    Thank you!
    Regards!

    Create POs with respect to either PIRs (if you don't need to print out) or Contract/item, both of these are Vendor/material specific so you can set lead times accordingly .  Probably best to use Source List and set requirement in material master too (Purchasing view).
    Regards,
    nick

  • Transit time in consignment fill-up

    Hi,
    As we know that after consignment fill-up in MMBE unrestricted stock become the consignment stock,but if stock take 3-4 days to reach the customer site.So this duration( transit time) how will we show in our system.
    Because system immediatly show the unrestricted stock to the consignment stock.But in actual it takes 3-4 days.
    Regards
    Prabudh

    Hi Prabudh,
    Once you done the PGI in the consignment fill up process as per the satndard the system will take in to the stock as special stock.
    The underlying goods movement type is a stock transfer. This ensures that when goods issue is posted, consignment special stock is created for the customer concerned. If special stock of this kind already exists in the delivering plant for this customer, the goods are posted to this special stock.
    I hope it will not help you,
    Regards,
    Murali.

  • Transit Time in Calendar Days?

    Hello,
    For quite a long time, I thought in transportation and delivery scheduling the TRANSIT TIME is measured in Calendar Days, which means weekends and public holidays are also included. For example, if the delivery date is 2007-12-31, and transit time is 8 days, the system will calculate Loading Date as 2007-12-31 minus 8, which is 2007-12-23.
    But a few days ago, I found my understanding is not correct. It seems the TRANSIT TIME is also measured in work days, in the route factory calendar (not the shipping point factory calendar). In this case, the loading date in above example will be calculated as 2007-12-19, for a typical calendar.
    Can someone confirmed this?
    Regards, Ke

    Yes that's right Ke.
    The calendar you maintain, if has a weekly off or for that matter country specific holidays these days will be considered as non working days in SAP. however if you want to change this you can define your own calendar having 365 days working.
    Regards
    Ranjeet

  • Delivery date and transit time

    Hello,
    we have such a problem that we want to model vendor delivery transportation time in Purchase order and also in MRP run.
    That is, vendor confirms delivery date, but that date is that when goods are at vendor premises ready for delivery.
    So there is several days delivery time in between until goods are really in our premises.
    And our planner orders transportation from third-party and only then we know what is the real delivery date.
    SAP's Planned delivery time contains both (making of goods by vendor and transport) and thus it not suitable for our purposes due the fact that vendor is not responsible for transportation.
    Could you help and tell is it somehow possible to set transit time separately to purchase order? So that we have delivery date for vendor and another delivery date for transportation and that date is relevant for materials planning??
    In that way we could plan our purchasing more accurately.
    Thank you in advance.
    -Juha

    Hi Juha,
    Do you use Routes (Transaction 0VTC)?  If so - you can specify a 'Transit Duration' value on the Route.
    Routes link 'Transporation Zones'.  So for example if your Third-Party Logistics provider belongs to 'Transportaion Zone' A and your ordering Plant belongs to 'Transportation Zone' B - then you can have a Route A <-> B with a Transit Duration Value maintained on it.
    This may be a possibility given the specifics of your scenario.
    Hope this helps.
    Ravelle

  • Delivery Date in SO not calculated with Route Transit Time

    Hello Experts,
    We are not able to calculate the delivery date in Sales Orders based on the Route transit time.We are using the Transportation group from Material master , Shipping condition from sold to Party , and Receiving issuing plants and zones .
    One thing I notices is if we don't use the Transportation group in the material master , then the delivery date calculated based on transit time.Not sure not why its not working with using Trans group in Mat master
    Please advise.
    Thanks in advance

    Hi,
    Kindly do not post same questions twice
    HI,
    For delivery scheduling enter time
    IMG >> SD >> Basic functions >> delivery scheduling and transportation >> maintain duration
    Maintain here route, pick/pack & loading time
    For in house production maintain time in material master in MRP view
    Then now system will take in account what is production time + pick/pack + load time and then will schedule
    Kapil

  • Use the Transit Times of route stages ?

    Hello. I would like to now if I somehow can use the transit time of the route stages instead of the header route transit time to reflect correct ATP. Current SAP is 4.7.
    Business Scenario behind my request is mainly for Ocean Liner Shipments:
    For Liner shipments most of the times there are fixed sailing Days ( i.e. every Friday ).
    Here I use a route with two stages:
    Shipping point to port of depature
    Port of depature to final destination port.
    As a possible solution I thought to use a Transportation connection point in between which should reflect the waiting time at the port having a factory calendar behind. But during first testing I recognized that any time specific date in the route stages are not take into calculation when creating a sales order ?
    Help please !
    Thanks
    Joerg

    I think the sales order picks up the time and dates from header of the route and applies stages and leg determination during shipment creation depending upon your shipment doc. type settings, hence, I think doesnt add stage values during order creation.
    If I understand the problem right, perhaps a user exit or something can help you get the days to next Friday to add to the transportation lead time and get to the right dates. Check if this idea can help.

  • Routes and Transit times with Global ATP

    If Global ATP is used where are the transit times managed usually? in SAP or APO. Since Transit Times are in Routes in SAP. Is there any equivalent data management point in APO?
    Thanks
    venkat Jupudy

    Hi Venkat
    You can either call scheduling locally in R/3 and also in APO as part of GATP function.
    Transit times are maintained in scheduling steps( creating condition records of condition technique scheduling) for condition type TRAN.
    Route determination can be done in R/3. There is a possibility of dynamic route determination in APO but I guess it requires TP/VS and gatp functions.
    Regards
    Mohan Venkat Ramana Chunchu

  • Transit Time determination based on special process indicator - Shipment Process

    Hello,
    I want to add 5 days more to transit time (which is getting picked from route) when I use special process indicator as PTL (Partial Truck Load) while doing shipment. Is this possible ?
    Please let me know if this can be done in SAP.

    Hi,
    Both planning (MRP) and ATP is carried out at plant level in ECC6.0 (standard system). If you want to optimize your process above plant level you should use SAP APO (in my opinion).
    Regards,
    Csaba

  • Transit time setting in Route determination

    Hi All
    I am configuring route determination. We have a transit time of 5 days for one route and if the system encounters a Sunday in between, it  considers sunday as holiday and confirms delivery after 6th day. Please note that we have maintained Sunday as holiday in the factory calendar because it should not allow shipping activities or any other activities on Sundays in the plant and shipping point, but transit should be allowed. (I mean, if a truck leaves on Friday, it will not take holiday on Sunday)
    Please let me know how I can do that

    Hi Monika,
    I havent really tried this...but my logic says that you maintain the holidays and working hours by factory calendar under
    SPRO -> Logistics Execution -> Shipping -> Basic Shipping Functions > Scheduling > Delivery Scheduling and Transportation Scheduling > Define Scheduling By Shipping Point
    Here you would be able to maintain working hours and holidays for your plant/shipping point and Sunday would be a holiday.
    In customizing for route determination maintain a new calendar with no holidays. So regardless of which day the truck leaves it doesnt have any holiday.
    Here you would need to activate delivery and transportation scheduling based on shipping point.
    Regards,
    Amit
    Edited by: Amit Iyer on Jun 8, 2011 3:56 PM

  • Long Mail Transit Time

    Can anyone help to explain why the mail transit (enqueue to dequeue) takes so long to complete according to imslog.pl?
    Is this a network issue or a MTA issue?
    Message delays (time from enqueue to dequeue):
    Channel <2 sec <10 sec <1 min <5 mins <1 hour >1 hour Max
    ims-ms 0.1% 0.1% 0.1% 0.3% 3.1% 96.1% 17.45 hours
    reprocess 0.0% 0.0% 2.9% 0.0% 14.3% 82.9% 13.19 hours
    tcp_local 0.0% 0.0% 50.0% 0.0% 0.0% 50.0% 6.35 hours
    Message transit times
    Time from enqueue to dequeue, top 20 hosts by total transit time):
    Host <2 sec <10 sec <1 min <5 mins <1 hour >1 hour Max
    esuria.com.bn
    0.0% 0.1% 0.3% 0.3% 3.7% 95.6% 17.45 hours
    ims-ms-daemon
    33.3% 0.0% 0.0% 0.0% 0.0% 66.7% 9.38 hours
    fortinet.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 6.35 hours
    ingrammicro-asia.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 6.35 hours
    pb.com.bn
    0.0% 0.0% 100.0% 0.0% 0.0% 0.0% 12 secs
    Retry counts
    Channel 1st time 2nd time <5 times >5 times
    -------------- -------- -------- -------- --------

    Hi,
    I have run the updated script against my mail.log (comm4). I do not have production data for comm5 as I am still evaluating it.
    There are about 305 lines of "Found an unsupported record type". Examples of such record are:
    a)
    U TCP|172.16.3.65|25|125.225.102.102|4409 SMTP No such user 535 5.7.8 Bad username or password (Authentication failed).
    b)
    U TCP|172.16.3.65|25|172.16.2.102|3653 SMTP Switched to channel tcp_auth user@domain 235 2.7.0 LOGIN authentication successful.
    The following is the transit time from the latest script.
    Message delays (time from enqueue to dequeue):
    Channel <2 sec <10 sec <1 min <5 mins <1 hour >1 hour Max
    ims-ms 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2818.57 hours
    process 0.0% 12.5% 12.5% 0.0% 0.0% 75.0% 1094.82 hours
    reprocess 0.0% 0.0% 0.0% 0.0% 0.6% 99.3% 2221.15 hours
    tcp_local 0.0% 0.0% 0.0% 0.0% 0.1% 99.9% 2477.14 hours
    Message transit times
    Time from enqueue to dequeue, top 20 hosts by total transit time):
    Host <2 sec <10 sec <1 min <5 mins <1 hour >1 hour Max
    local delivery
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2818.57 hours
    esuria.com.bn
    0.0% 0.0% 0.0% 0.0% 0.3% 99.7% 2221.15 hours
    sun.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2453.58 hours
    mail.esuria.com.bn
    0.0% 0.0% 2.6% 0.0% 0.0% 97.4% 2117.02 hours
    rbts.com.bn
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 1172.28 hours
    gmail.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2446.80 hours
    singnet.com.sg
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2473.61 hours
    pb.com.bn
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2477.14 hours
    microsoft.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2354.20 hours
    rba.com.bn
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2472.90 hours
    simpur.net.bn
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2447.76 hours
    yahoo.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2470.18 hours
    oracle.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 1828.41 hours
    cshlawyers.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2454.05 hours
    freme.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2310.15 hours
    ingrammicro-asia.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 1829.23 hours
    techdisti.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2279.72 hours
    baiduri.com
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 843.18 hours
    brunet.bn
    0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 2454.69 hours
    Retry counts
    Channel 1st time 2nd time <5 times >5 times
    The times taken are still unreasonably high. What could be the problem?

  • External Location Ship Method and Transit Time

    Hi
    I have got scenario -
    1: Primary Suppliers are in APAC region.
    2: They send the units to a site for consolidation
    3: Based on the receiving site, east coast or west coast the lead time is different
    4: If I cannot place orders to these suppliers then I can place order with local supplier and then the lead time is different
    Now I have modeler following -
    1: The lead time between supplier and consolidation site is in the Processing LT at ASL Level
    Now the issue comes in replicating the lead time between consolidation site and the receiving site.
    I can put this in Post Processing LT. But when I want to evaluate the local supplier, then the post processing LT kicks in which makes it even longer total time for local suppliers.
    I am evaluating to capture this in shipping method.
    But I am not finding any setup or document where I can setup Shipping Method and Lead Time between Supplier Site and Inventory Organization.
    I setup a location in inventory but this location is not appearing in the Inter-Company Transit Times. I am trying with 'Extenal Location' as source.
    Can you please help me on this?
    Regards

    Hi ,
    Please try using Plant and Ship To combination, I saw it does not work with Route and shipping point.
    Thanks,
    Pavan Verma

  • Transportation Lead Time and Transit time

    Hi All,
    How to calculate the transportation lead time and the transit time from the delivery document in SAP. Please clarify me.
    Regards
    Srikkanth

    Dear Srikkanth,
    [How to calculate Lead Time|lead time]
    Also refer:
    [Scheduling|http://www.sap-img.com/sap-sd/backward-and-forward-scheduling-in-sap-sd.htm]
    [Scheduling - |http://www.sap-basis-abap.com/sd/what-is-forward-and-backward-scheduling.htm]
    Best Regards,
    Amit
    Note: Path
    SPRO --> IMG --> Logistics Execution --> Shipping --> Basic Shipping Functions --> Scheduling --> Delivery and Tranportation Scheduling --> Maintain Duration

  • Transit Time

    Hi,
    A sales order is created on 06/10/2010 and the requested delivery date was entered as 18/10/2010. The sales order has 3 line items and all were confirmed for 18/10/2010. The route has a 1 day lead time. If I go to schedule line and view the shipping page for all 3 items, the delivery date is shown correclty as 18/10/2010. But rest all dates (Goods issue date, Loading date, Material avail.date and Transportation Plan. Date) is showing as 16/10/2010. Why there is a difference of 2 days b/w the GI date and Delivery date when the route has a lead time of only 1 day? The pick/pack, loading etc would have been already considered while determining the GI date itself wright? Is there any other time factor other than the transit time to determine the delivery date?
    Regards,
    Raghav

    Hi,
    17/10/2010 is Sunday. Do you ship on Sunday ? If you would like to have goods available on MOnday and you have 1 day transit time, then they would need to leave your DC on Sunday.
    Please verify:
    1) shipping point definition and specifically factory calendar inside shipping point.
    2) route definition - there is possibility to enter factory calendar inside the route.
    Change the calendar to something having 7 working days and retest.
    Best regards
    Witek Prawecki

Maybe you are looking for

  • Went from an iphone 4 to a 4s to a new 4 and itunes only sync last backup from first iphone 4. How can i get my texts, photos, calendar data back?

    Had an iPhone 4, lost it, bought a 4s, got stolen. Now I bought another iPhone 4, tried to sync it with itunes, I only get the data up to the last day I used the old iphone 4, all data, texts, photos, calendar during the use of the 4s no longer shows

  • Report file name as parameter

    There's probably a simple answer to this but I can't figure it out... I have made a jsp-page to view my report using CR4E's Create Viewer JSP wizard. Instead of hard-coded report file name, I'm taking the name from URL parameter like this myviewer.js

  • Safari copy url button doesn't work

    I just upgraded from an ipad2 to an iPad air 2. Before, if I wanted to copy and paste a url I'd use the copy button. Now,on the new iPad air 2, the copy button just wipes out whatever I've previously copied, and doesn't copy the url.

  • Edit multi-level categorization

    Hi All, working on the multi-level categorization for service tickets. There are currently 4 levels and i want to extend this to 6 levels. Want to know how can i edit the existing categorization schema to add 2 new additional levels. Is anything to b

  • Facetime Audio Difficulty

    I was using facetime once on my macbook pro and used headphones during it. Before this I had no audio problems at all. Now whenever I use facetime on my macbook pro I need to use headphones or I cannot hear the people I am talking to and they cannot