Hi all,
I had a meta chain which carries 4 master chains.
now we made change in the order ( before order 1-2-3-4 changed order 1-3-4-2) of the 4 master chains in the Meta chain.
collected the meta chain and transported to test system but the changes are not reflecting in Test system.
could any one please tell, what are all i need to collect to transport the meta chain with new chains.
regards
sandy

Hi,
You only needed to collect the meta chain and not the other one's, if your transport was successfull then simply goto your target system open the chain in change mode and you will see the changes. Simply activate that chain and it'll be perfect.
Regards,
Arminder Singh

Similar Messages

  • Transport Collection includes Logical System?

    Hi, I am collecting up Object for the BW Admin Cockpit and the collected list includes the BW Logical System as well.  I can't understand why this would get picked up and I don't know what the consequences are for transporting this.  The Transport Connection will not allow me to unselect it!
    So I am thinking of just creating the transport with it and then manually deleting it in the transport. 
    Can anyone shed any light
    1. why this is being included in my transport?
    2. what the consequences of sending it might be
    3. Is it OK to just manually delete it from the actual transport and not worry about it.
    Here's a picture of the Transport Collection for review http://i44.tinypic.com/ofx1lv.png
    Thanks for any insight...

    1. why this is being included in my transport?
    This would get connected, if u selected 'Grouping' option In dataflow before or In dataflow before and afetrwds
    2. what the consequences of sending it might be
    The corresponding logical system would be there in target system. Hence this is not required to transport
    3. Is it OK to just manually delete it from the actual transport and not worry about it.
    U can delete that manually

  • Error while collecting the process chain in a transport request

    Hi Gurus,
    I am getting an error while collecting my process chain in a tranpsort request.I have to transport the request from DEV to QA system.
    When in RSA1--->transport connection i drag & drop the chain from left to right side pane then the Error occurs.
    1.Object 'REQUDELZPAK_48RZW8GZX87CNEH7S897TFQSD' (RSPV) of type 'Process Variants' is not available in version 'A'
    Sap help given
    You wanted to generate an object with the name 'ZPAK_48RZW8GZX87CNEH7S897TFQSD' (in transport request RSPT) of type 'Process Chain Starter' (TLOGO). This is, however, not available in the BW Repository database. It does not exist in the requested version A. If the version is 'D' then it is possible that an error arose during the delivery or installation. If the version is 'A' then the Object was either not created or not activated.
    2.Object 'ZPAK_48RZW8GZX87CNEH7S897TFQSD' (RSPT) of type 'Process Chain Starter' is not available in version 'A'
    Sap help given
    You wanted to generate an object with the name 'REQUDEL   ZPAK_48RZW8GZX87CNEH7S897TFQSD' (in transport request RSPV) of type 'Process Variants' (TLOGO). This is, however, not available in the BW Repository database. It does not exist in the requested version A. If the version is 'D' then it is possible that an error arose during the delivery or installation. If the version is 'A' then the Object was either not created or not activated.
    From one of the threads:
    (https://forums.sdn.sap.com/click.jspasearchID=10081153&messageID=4623856)
    i though it was the problem of patch level sap note(966131).
    Accordingly i tried collecting process chain in the request where the patch level is high(24).But same error is seen.
    I have activated chain again & then tried collecting the request i the process chain.But did not solve the error.
    I have to collect Process chain in a transport request.Can you help me out to solve the problem?
    Thanks in advance!
    Regards,
    Pallavi

    Hi,
    take a look:
    Data Warehousing
    "Errors occurred during post-handling RS_AFTER_IMPORT for MPRO L "
    Errors occurred during post-handling RS_AFTER_IMPORT for ROUT L
    Try to set the Process Chain Start to Immediate(background jobs) in the schedule, because this will trigger the process chain once tranported and may cause similar errors.
    Regards
    Andreas

  • Removing Meta Chain from Schedule

    Hi
    I got a meta chain scheduled in BBD & BBQ...
    Now for my testing purpose i want to remove them from schedule for a 3 nights and want to schedule them back to normal again
    How can i do this and do i need to raise any transport request for this
    Thanks

    u dont require any transport req for this..
    Just remove from the schedule in RSPC using Meny Bar --> Process Chian --> remove from Schedule
    And then reschedule the chain with the new time schedule which is after 3 days as per ur requirement..
    For scheduling the chain --> double click on the Start process of the PC.
    From Variant screen goto the scheduler screen where u can give ur Date and time with the proper periodicify and then save the settings and schedule the chain...
    This will work for ur requirement..
    Thanks
    Assign points if this helps

  • Modifiying, Transporting and Scheduling Process Chain

    Hello ALL,
    i have to create a new process chain for a delta Load and put this process chain in a big existing Meta Chain, after i have to transport to Quality System.
    if i control the difference between Dev and Quality system to have an idea i see that the Infopackages in Dev have the execution tab: Load Data Immediately without job: BI_BTCH
    in Quality some Infopackages have execution tab: run successively in batch with job like this:
    BI_BTCH LX6CW08S1ICM04I4O06KOPL
    can you tell me please in detail how should i complete this activity:
    - wich type of control should i do before creating and modifiying process chain in DEV and Quality
    - how should i do to control in Quality the scheduling of a process chain
    - if i modify a process chain in DEV and after i will transport in Quality what will be the affect in Scheduling, the scheduling will be the same without problem or i have to schedule again
    - in generale how can i schedule a process chain, wich transaction and how in detail
    Thanks a lot for your help
    Bilal

    Hi Bilal,
    1) EVENT: When you want to have a process chain 'A' to be started after completion of a process chain 'B' or any process in process chain 'B' we can use this event.  These two chains can also be from different BI systems.  Like Chain 'A' could be from one production system and Chain 'B' could be from different production system.  As soon as the chain A finished an event will be triggered and this event will trigger the chain B.  The start time of chain B might differ because it depends on the completion of chain A. To schedule a process chain using an event, Go to Tcode: RSPC look for your chain. Switch to change mode. Right click on the start variant and select maintain variant. Click on "change selections. click on "after event," give the event name in the slot and select the periodic job.
    2) RUN JOB PERIODICALLY: When you want to have the chain run for more than once periodically we select this option.  Suppose, chain B has to run after completion of chain A periodically we have to use this option.  If you do not check this option, your chain B will run only once when the event is triggered after completion of Chain A.  From the next time onwards, it not run even the event is triggered.
    3) JOB: For every process when it runs a job will be created assainging it to a work process in the system.  Similarly, when the chain starts a job will be created containing the log of the run.  Also, in the scheduling options of a process chain, you can have your process chain started after completion of a particular job in the system (ex: an attribute change).  For this, Go to Tcode: RSPC look for your chain. Switch to change mode. Right click on the start variant and select maintain variant. Click on "change selections. click on "after job" give the job name in the slot and save the settings.
    4) SCHEDULING PROCESS CHAIN: Means to make settings to a process chain so that it will run on a periodic basis at a certain time.  If you want to start a chain immediately, you will choose the option immediately and trigger it.  It will run for only once.  But, if you want to have your chain run everyday at 7:00 am in the morning, you have to schedule it using the scheduling options as below:
    In Tcode: RSPC look for your chain. Switch to change mode. Right click on the start variant and select maintain variant. Click on "change selections." Click on Date/Time button. Give the start date and time in the Scheduled Start slots. (Ex: 09-04-2009, 7:00, to have the chain run at 7:00 everyday starting from tomorrow). Tick the check box Periodic job in the bottom and click on "periodic values" button and select the option as daily and save it. Then click on "Restrictions" button to specify the factory calander. The Tcode for calander is SCAL, where you can see all the factory calanders in the system and you can choose that suits your requirement. Save the changes and navigate back to process chain maintaince screen and click on "Schedule" button.
    Now your chain is automated for trigger

  • Unschedule Local Process chain from meta chain

    Hi There,
    We have a meta chain, in which there are several local chains one for each process area. Due to a transport I have to unschedule one local chain and let the other local chains run. Please let me know what is best way to do it?
    Thanks,
    Raju

    Hi.
    You can maintain the start variant of the local chain and switch it to Direct Scheduling. You can leave it in the "Master" chain and let that one run normally, however, your local chain will fail and no following chain will be triggered. So this approach could only be used if your local chain is a dead-end.
    I would consider making a copy and delete the local chain. Then run this one. Make the copy either right in production, because it is an exception anyway, or in development and transport to prod. Switch to running the copy in either case and switch back to original chain and delete the copy (again either straight in prod or in dev and transport the deletion).
    regards
    Jacob

  • Meta Chain Issue

    Hi All,
    I have some meta chains in the process chain and all of the meta chains are triggered using-
    "Start using Meta Chain or API"
    Its evident that, once we triggerr the start varinat in the main chain the rest of meta chains get triggered. In our case one particular meta chain is not getting triggered at all. But the rest have gone fine. In the process chain Log view, its staying in yellow for a long time and in SM37, the job is getting cancelled.
    the message I got in Log view, at the time the meta chain gets triggered is, "Process chain variant is ZA******** is not scheduled waiting for event RSPROCESS 4A******"
    I have tried all the possibilities of "Repeat, Kill the process in SM51"
    Can you please advise, the solution for this.
    Thanks in advance,
    Cheers,

    hi,
    right click on that meta chain yu will reach the planning view there in change selcetion icon .. you set the setting to immediate and remove the tick for perodic and then schedule it ..
    hope this helps you ..
    regards,
    Shikha
    Edited by: Shikha Goel on Oct 21, 2008 8:20 AM

  • Email Alert for Process Chain for ABAP Process Type

    Hi BW Experts,
                             I created a process chain based on ABAP Process Type ( for Broadcasting rsrd_broadcast_starter). I want to add alert message for each ABAP process if it is failed. But I cant see any option showing Successfull or Error or Always when I select create message option on the process type. How ever I can see for other process chain which is loading data (Process Type is Info Package ) from SAP into BW.
                             Please some one tell me why it is not showing alert message for ABAP Process Type.
    Thanks
    Ganesh Reddy.
    Edited by: Ganesh Reddy on Jul 13, 2009 10:16 PM

    I dont have the exact answer for your question, But as a work around i can suggest you that.
    If these ABAP programs are included in a chain and this local chain is a part of meta chain then you can create a message on the local chain.By right clicking on the local chain >Create Message>Success
                                                                                    --->Failure
    >Always
    Hope this resolves the problem tempervorly.I will get back to you once i have
    Or the permanent solution is
    Its big and also easy method to perform, by this you will be able to get all the options for a ABAP Program also.If you have any questions please let me know.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/business-intelligence/a-c/creating%20an%20abap%20process%20type%20for%20process%20chains%20in%20bi.pdf

  • Error while Transporting changes in Process chain

    Hi All,
    I have added a Hierarchy InfoPackage in Process chain and added this InfoObject in Save hierarchy and Attribute change Run Process types.
    My transport Request is showing only three entries each for
    save hierarchy , attribute change run and one for Process Chain.
    Now when I transport this changes to Process chain to Acceptance its showing Error message in Acceptance as
    Results of check for process LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 in chain ZMDH_HTS:   
    Process variant LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 does not exist in version A       
    Results of check for process LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 in chain ZMDH_HTS:   
    InfoPackage   no longer exists in object version A in table RSLDPIO                      
    Results of check for process LOADING ZPAK_4AY55YMC1H454OQWJUBNJCYE9 in chain ZMDH_HTS:   
    Variant 'ZPAK_4AY55YMC1H454OQWJUBNJCYE9' of process type 'LOADING' not found in A version
      Errors occurred during post-handling RS_AFTER_IMPORT for RSPC L  
    The errors affect the following components:                      
       BW-WHM (Warehouse Management)    
    My question is , Why the Transport request is not transporting  the InfoPackage.
    Is there any solution for this?????
    Thanks in Advance
    Best Regards
    Pratap Sone

    Hi Pratap,
           The infopackage has not yet been assigned to a package in all probabilty. Change the package and then transport the IP and then transpost the process chain request.
    Regards.
    Edited by: Ansel D'Souza on Sep 8, 2008 7:31 AM

  • Emails for process chains

    Hi Friends,
    I need your valuable suggestions for a problem we are currently facing regarding emails in process chains.
    An explanation of the issue is as follows:
    The users who load data (present at different geographical locations Ex. A, B, C) use a custom ABAP program to load and this program only triggers the process chain. The final status of the load is to be communicated back to the users.
    If the email feature of process chain is used and the users list from locations A, B and C is maintained, then users from B and C get emails regarding loads abt C and so on. In other words users from A, B and C have irrelevant emails in their mailbox.
    Also the users have no technical knowledge of BW and hence cannot interpret the Process chain log. So there is another technical team which will receive the detailed email messages.
    All the users need to know is whether the load was successful or not.
    ---Accessing the Monitor using RSMON is not an option
    ---Maintaining email groups is not an option.
    Has anyone faced a similar problem before? If so, how did you resolve it?

    You have now 1 chain that is triggered by A, B and C and they all get e-mail when the chain is finished?
    Create 3 meta-chains C1, C2 and C3. Users A, B and C trigger their respective chain. The actual chain that is doing the work is C4. C4 is a subchain of C1, C2 and C3 so you need to model it only once. At the end of C1, C2 and C3 you can send email to your users.
    C1
    - C1 trigger
    - C4
    - C1 finish & email A
    C2
    - C2 trigger
    - C4
    - C2 finish & email B
    C3
    - C3 trigger
    - C4
    - C3 finish & email C
    You could optionally connect the technical e-mail to the last process in C4. and the user e-mail to C1, C2 and C3.

  • How to change package for Process chain

    Hi Experts,
               How do i change the package in the Transport connection. Iam transporting a PC from D to Q.
    1. I have some routines created in the infopackage.So i selected this one in the transport connection. I noticed under infopackages the following are also checked. a. infoobjects b. DataSource c. Infopackage d. Infopackage e. infosource f. transfer structure g. source system.will that cause problem in Q as I have them already in Q and P
    2. How do i change the package in the transport..Currentl all of them are &tmp. Please help me with the navigatioln steps.
    3. After clicking the truck icon, what shld i do ..do i have to transport the request as well. please provide me with steps.
    Thanks
    Dave
    Message was edited by: Dave Marcus

    1. I have some routines created in the infopackage.So i selected this one in the transport connection. I noticed under infopackages the following are also checked. a. infoobjects b. DataSource c. Infopackage d. Infopackage e. infosource f. transfer structure g. source system.will that cause problem in Q as I have them already in Q and P
    Ans : If you have ticked Transport Check button for Infopackage then only Infopackage is transported. Underlying Infoobjects, Transfer Structure etc. will not be transported.
    2. How do i change the package in the transport..Currentl all of them are &tmp. Please help me with the navigatioln steps.
    Ans : once you have pulled the necessary objects in the Transport Connection, Right click on the relevant object and select 'Change Package' to change the package from $tmp to others.
    3. After clicking the truck icon, what shld i do ..do i have to transport the request as well. please provide me with steps.
    Ans : Assign the Package by following question2, then assign Transport Request by clicking on the Truck Icon in Transport connection for the objects you have collected and then go to 'SE01' Transaction give the request number which you assigned in Transport connection and click on 'Display' which displays the request and all objects assigned to the request. select the Task Request and click on Truck icon which will release the task and then select the Main Request and click on Truck icon again which will release the main request.
    Thanks,
    Vamsi

  • Query regarding meta chain in SAP BI

    Hi can any body solve the problem on this Meta chain in SAP BI..
    There is a meta chain which holds three process chains say N1,N2,N3. in a sequential order.
    Now here as soon as the meta chain is triggered the process chain N1 is executed properly and is is in green..but after this the next process chain N2 is not getting  triggered..can anybody tell me the reason for that??

    check the start parameter of 2nd chain
    it should be immediate

  • How can we use meta chain in process chains

    hi friends,
      anyone tell me about meta chain in process chains and give me one example.
    thanks,
    sree
    Please search the forum
    Edited by: Pravender on Jun 28, 2010 8:04 PM

    Dear Suman,
    To initiate the mails we first need to have SMTP connection. To check the same go to so00 and try sending mails to ur ID. If is successful it states that u have the SMTP access.
    To create mails to Process chains:
    Right Click on the Process varient select the Create Message in the context menu.
    Select the type of mail i.e for successful, Error, Anyways.
    Then follow the screens.
    Note: The recipient type should be Via Internet.
    Hope this helps u.
    Regards,
    Kishore.Pulla

  • How to create transport request for standard web template

    hi all
    can any one tell me the step by step procedure to create transport request for standard template?
    thanks
    shalini

    Business Content --> Choose & Install the standard web template & then collect the object for transport...Assign a Package & when prompted for Transport Request --> Opt for a new transport request.
    Message was edited by:
            Jerome

  • Failed meta chain maintenance in Process chain in SAP BI

    Hi all,
    I have a Process chain having the meta chain of master data population.When successful , proceeds with the further steps in process chain. It has been scheduled in midnight.
    After monitoring the PC , found the error in the master meta chain , so i repeat the step.
    Here , after success of meta chain all steps gets running down the line till the end step in PC.
    I do not want to re-run the steps below meta chain after repeat step.
    Any Ideas to ignore the re-run ??

    Hi,
    If your Process is still running(Yellow color status) then right click it and go to Schduled Jobs. On this you will go to Job Overview there you can press STOP.
    Else go to the SM37, there you can go and select your process using your process ID and STOP it.
    And if you want to kill the complete process chain then go for Remove from Schedule.
    Different Ways to stop process chain
    1)SM37 -->Kill Job
    2)SM50/sm66- ->Kill process
    3)RSPC>Job Log>Make the process RED forecefully.
    4)RSPC>Process chain> main Menu"Remove from Scheduling" OR
    5)se37-->RSPC_API_CHAIN_INTERRUPT
    give RFC BW system name(technical) and process chain name(technical)
    Steps 1 -3 stops the chain running in process
    Steps 4-5 stops the chain AFTER the current job which is running is completed as sucessful or Failure by nature.