Transport FG from Quality to Production

Dear All,
I have created couple of function group and transported to Quality system. Now as per the requirement I have made the changes in different FM of these FG as well as includes. So there are few versions in DEV system.
Now finally i want to transport the these FG to production system. So which transport request I have to use to move to the production?? In Quality it showing different request for each FM and include (Latest version request number).
Can anybody tell me how I can transport my all FG to the production via Quality??
Is it good way to create one more request for all FG using SE03 tcode, so that all FM with includes i have final request in DEV system which I can move to Production via Quality....
Good suggesstion are most welcome.....
Thanks in stack......

Hello Nilesh
This is quite a common problem with function groups.
However, if you have at least one system where the entire function group is complete (i.e. contains all function modules and the TOP include contains all data definitions and the frame program all additional includes) then you can go to the workbench (SE80). Right-click on your function group and choose "Other functions" -> "Write transport request entry". The CTS puts the function group into the transport request which should then be transported entirely.
I highly recommend first to "synchronize" your DEV with your Quality system, repeat the tests there and, if everything was successful, transport to Production.
Regards
   Uwe

Similar Messages

  • Reg: Error while transporting from Quality to Production

    Hi ,
    I am facing a problem while transporting ODS from quality to production.. The same works perfectly when i transport from Dev to quality.
    The Error Displayed while transporting is
    Start of the after-import method RS_ODSO_AFTER_IMPORT for object type
    The creation of the export DataSource failed
    Password logon no longer possible - too many failed attempts
    Error when creating the export DataSource and dependent Objects
    Error when activating DataStore Object
    The creation of the export DataSource failed
    Password logon no longer possible - too many failed attempts
    Error when creating the export DataSource and dependent Objects
    Error when resetting DataStore Object to the active version
    Kindly give me some suggestion ..
    Thanks in advance
    Regards
    Guru

    go to the source system RFC connection in SM59 and do a remote login - if you get the login page there then there is an issue with the RFC connection. also check if any other system is using the same RFC.. we had a situation where th R/3 connection was being used by 3 BI instances and everytime we reset the password , another system would lock the sme , ultimately we identified the systems and did a password reset in all the systems and then the issue got resolved.
    but then we also faced the same issue you faced and it was related to login issues - check the remote login and that will tell you.

  • Error while transporting the request from quality to production of BI

    Dear all,
    When transporting a request (which contains elements of correction - in Bex designer) from quality to production of BI the following error is displayed and the request transport fails. Can the experts throw some light on this.
               Execution of programs after import (XPRA)
               Transport request   : RBDK904992
               System              : RBP
               tp path             : tp
               Version and release: 372.04.04 700
               Post-import methods for change/transport request: RBDK904992
               Post-import method RS_AFTER_IMPORT started for ELEM L, date and time: 20080406140407
               Start of the after-import method RS_ELEM_AFTER_IMPORT for object type(s) ELEM (Activation Mode)
               Error when activating element EY2CXLKXP5X5AY0RQ2XKN9EX8
               Element 5E4II2344I3JG4R6ACMYQ441Z is missing in version M
               Start of the after-import method RS_ELEM_AFTER_IMPORT for object type(s) ELEM (Delete Mode)
               Errors occurred during post-handling RS_AFTER_IMPORT for ELEM L
               The errors affect the following components:
                 BW-WHM (Warehouse Management)
               Post-import methods of change/transport request RBDK904992 completed
                   Start of subsequent processing ... 20080406140407
                   End of subsequent processing... 20080406140408
               Execute reports for change/transport request: RBDK904992
               Reports for change/transport request RBDK904992 have been executed
                   Start of................ 20080406140408
                   End of.................. 20080406140408
               Execution of programs after import (XPRA)
               End date and time : 20080406140408
               Ended with return code:  ===> 8 <===
    Thanks in advance.
    Regards,
    M.M

    Hi,
    First try to figure out the object type from the text obtained by following steps above.
    Goto Development server ,create fresh request (using transport connection) , transport to QA and then in to production.
    After successful transfer of the request for this object ,try to reimport the request which caused error and it should go smoothly without any error.
    Hope it helps.
    Regards
    Mr Kapadia

  • How i can transport request created in R3AR2 from Quality to Production ?

    Hi, Gurus !
    I'm new in CRM 7.0, and need your help. Well, we made our implementation in 7.0 version, and the things will be fine, until the start of work.....
    Well, the initial download of CUSTOMER_MAIN (in transaction R3AR2) do'n't run OK, because a lot of customers in selection have a bad data.... and this time, anybody change this data,
    Today, i know how to re-made this task.....
    But my question is : how can transport this request, created in R3AR2, from Quality to Production ?
    If the transport is not possible, the answer for the question is remake the request in Production ?
    Thank you very much.....
    Loduca

    Did you put your development in a transport when you first saved it? If yes, and if your transport system is properly configured you can release the transport using SE09 and import it into the production using transaction STMS.
    Markus

  • Transport of object from Quality to Production.

    Hi,
    I am a technical designer and have a limited understanding on the transport management system and basis.
    I had recently created an object on the development system and provided my user with the transport request number. She had moved it to Quality and tested it. The object is working fine and she wants to move it to the production system.
    I was under the impression that the request would show up on the production system and could be imported from quality but it is not.
    Could some one explain as to what I am missing here? Is there anything I could do from my side to get the object moved from Quality to Production?
    Regards,
    Prem.

    Hi Prem
    Plz check  whether your request is relased and transported
    correctly.
    for this log into quality system and type the tcode STMS_IMPORT.
    search for your request,
    if available ,check if there is a green tick mark against that, if yes then it can be imported to production system ( that has to be done by your BASIS personell).
    if not,
    check  any filter criteria is set in the fields displayed and  remove / change  if required that as per requirement.
    or , use the menu path GOTO -> IMPORT HISTORY (Ctrl+F7) and search ther (here also check for the filter criteria).
    it should be available, if it is transported correctly.
    do the same in your production system also, u can find your request (but unless transported to production there will not be the green tick mark against that)
    reward if useful.
    Regards
    Prabumanoharan

  • Transport of activity from Quality to production for webDynpro Java applica

    Hi,
    can anybody tell me how do i go for transporting activity in webdynpro java applications from quality to production server.
    i have done some changes in webdynpro code  and deployed in quality system. i have created activity and now want to transport that to production so that the changed functionality should reflect in production system.
    Its urgent so your quick suggestion will be appreciated.

    Hi,
    can anybody tell me how do i go for transporting activity in webdynpro java applications from quality to production server.
    i have done some changes in webdynpro code and deployed in quality system. i have created activity and now want to transport that to production so that the changed functionality should reflect in production system.
    Its urgent so your quick suggestion will be appreciated.
    Hi Vijayalaxmi,
    Following are the steps for transporting the content from DEV to QA
    1. Check in the activity into DTR and activate it. Once it is activated successfully it will show green
    2. Now go to transport view and release the activity by drilling down in waiting... node.
    3. Once the activity is released it becomes available in the Consolidation tab of CMS.
    4. Import the activity in consolidation tab
    5. Assemble the components in the Assembly tab.
    Once you assemble an .SCA file is created in \usr\<SID>\trans\CMS
    6. Copy this file manually and deploy it using SDM in QA.
    Hope it clears your doubts
    Best Regards,
    Ravi

  • Transport of Employees from Quality to Production

    Hello,
    This is regarding Employee assignment in CRM Sales Organizations (using T code PPOMA_CRM). We have around 1200 employees to be assigned in CRM Sales Organizations & we have to assign USER ID's for each of these employees.Since we do not have all 1200 employee master data in Development Server we will have to do this excercise in Quality Server. We want to save all these assignments in a Transport request directly from Quality server, so later same can be transported to Production Server .
    Kindly let me know standard procedure for transporting all the assignments of employees & user ids from Quality to Production.
    Regards,
    Rajendra

    Hi Rajendra,
    Salesorganisation assignment to employee is masterdata and it willl not involve any tranport .
    You need to create the assignment in production client. Sales organisation Id will change from client to
    Client.
    Regards
    Pavan.A

  • Error while uploading roles from quality to production

    Dear friends,
    I have to upload roles from quality to production.
    I have downloaded it from qualtiy but while uploading to production it is giving me an error "File does not contain valid data".
    Can anybody tell me what could be the problem and how to resolve it.
    Thanks in advance
    regards
    Nirgun

    HI matore,
    the best way is to transport the roles from DEV to QA and then to production as julius suggested
    are you trying for mass down load are single role
    Mass download
    go to PFCG >> utilities>> Mass download>> select all the roles which you want to move it to production
    and execute save it on desktop
    now go to production system>> go to PFCG>>in menu click on roles>>click on upload>>select the file which is saved in desktop and click ok
    mass generation of roles
    in the menu click on utilities>>mass generation>>give the role names with you have uploaded and click on execute select all click on genetate button
    download a single role
    go to PFCG>>in the menu click on role>>click on down load and save it on desktop
    now go to production system>> go to PFCG>>in menu click on roles>>click on upload>>select the file and click ok
    now you needs to manully generate the role
    do the user comparison
    hope this helps
    thanks
    kishore

  • Problem while loading data from quality to production

    Hai,
    We are using standard extractor 2LIS_11_VASCL, and in test case in QTY 300, we were able to make some changes and see the changes and see the results of the changes in T-CODE RSA3. When we try the same changes in PRD300, No Changes are triggered and T-CODE RSA3 shows no changes.
    Can any one suggest me regarding this prolem...

    Hi bandi,
    Instead of trying for the same changes in production, why cant you do the transport the object from Quality to Production & then check for the changes in RSA3.
    You are transporting the object only from Quality to production.
    As no data is present in PRD, u may not be finding any changes in RSA3.
    Hope it helps.

  • Process of moving TR from Quality to Production

    Dear Experts,
    we are in a process of moving TR from Quality to Production. While moving we faced transport incositencies like some old requests have been overwritten into the new one and dependant objects were failed during import in PRD. Now production rehearsal client is kind of messed up. what is the right procedure to transport the requests from Quality to Production. (actually we transferred the TR individually based on the list send by the respectivr module owners). Please help me to findout the solution for this issue.
    regards,
    Yasin.

    Hi,
    This situation comes every now & then when you don't have any client strategy define in your landscape I'm not blaming you but for your Project Manager and then rest of the team adopt SAP standard practice if you really want things to go well act NOW..!! here is the basic to start:
    Ex,
    DEV ::
    100 => Golden Client
    200 => Customizing Client
    300 => Test Client
    Things to check before importing request in QAS :
    1) Always get the request in sequence format ask the owner of the request for the sequence to avoid dependency issues
    2) Technical Specification doc - this doc will be prepare by Functional / Developer on what changes are included in TR
    QAS::
    400 => Quality Client
    Things to check before importing request in PRD :
    1) User acceptance doc i.e UAT - client / customer will check the functionality if it's on then move this to PRD
    2) Get the request in sequence format
    3) Approval for production transport
    PRD::
    500 => Production Client
    Thanks,
    Saleem

  • Objects moving from quality to production

    Hi All,
      I need a step by steb documentation for objects moving from quality to production.please do the needful.
    Thanks in advance
    Ram

    Hi Ram,
    What is the transport system u r using?
    Check the below links for different transport systems.
    CMS
    http://help.sap.com/saphelp_nwpi71/helpdata/en/49/630650f75d4df6a3dc2f93d51eb864/content.htm
    CTS
    http://help.sap.com/saphelp_nwpi71/helpdata/en/9a/775de286874bc78dcb1470bc80f0f9/content.htm
    FIle Transport system
    http://help.sap.com/saphelp_nw04/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/content.htm
    Thanks,

  • Cannot transport from quality to production due to syntax error

    Hi all,
    I have modified the program in Development system in which i have added on field to the internal table structure. Internal table is declared in the top include of the program. Now the program is transported to the Quality server which ends with the error for top include as"Original object cannot be replaced". But when i check the top include in quality server, the field which i have added is available. Now for transporting to production server, it ends by syntax error saying "The data object ITAB does not have a component called <field>".
    Please guide me for the above error.
    Thanks & Regards
    Akshay Korade

    >
    Akshay Korade wrote:
    > The production system contains the version before the changes and the error comes while transporting to production system. So the changes are not reflected in the production system.
    I've been doing SAP for a while and I can tell you, definitively, that syntax errors do not prevent import.
    >All the includes are activated and free from syntax errors in quality system.
    >Now for transporting to production server, it ends by syntax error saying "The data object ITAB does not have a component called <field>".
    If there are no syntax errors in quality, then where is that syntax error showing?  It must be in production.  It will be an inactive version in production that has the syntax error.  Go into production, try to activate the program.  Activation will fail because of the syntax error.
    You get the syntax error because the defintion has not made it into P.  If you transport the whole program, as R3TR PROG zprog, and have the correct flags set on import to overcome the message "Original object cannot be replaced", then your problem will be solved.
    matt

  • Setting up of TMS from Quality to Production systems

    Hi ALL,
    I have a query:
    I have to setup the TMS in such a way that the transports from Client 110 of Quality server should ONLY go to Client 110 of Production server.
    Similarly for client 120 of quality -> client 120 of Production.
    Please be so kind to advice and help with detailed steps.
    Rgs
    Ipsita.

    Hi Ipsita Guin
    you create a route via Tcode STMS_PATH and create route Quality to Production.Logon Client 000 configure transport route.Now u can u define u r server
    name.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/14/94fc3f8fc2c542e10000000a1550b0/frameset.htm
    Thanks & Regards
    Pankaj Kumar

  • How to transport requests from development  to production server

    hi gurus
    i am new to SDN
    can u pls give me detailed information how to transport requests from development server to production server?if possible give me screen shot documents
    regards
    surya

    Hi
    Transporting
    There are help pages that discuss creation of transports.
    In simple terms, you: create a transport package
    add objects to the package  export the package, plus optionally any related objects to a predefined folder/directory on the portal server into a file with an extension of .EPA copy the .EPA file to the import folder of your QA system and import it  test the contents on the QA system  copy the .EPA file to the import folder of your production system and import it  Create a transport package file
    Here is the step by step procedure to create a transport package:
    For Export
    1. Go to system administration, and click on transport?export.
    2. In the middle pane, select the folder you want to export and right click on the Transport Package. 3. Fill in the General Properties i.e the name of the package, id and description. 4. And say finish and open the object for editing.
    5. When the object has been opened then right click on the object you want to transport, and say "Add object to the Transport Package".
    6. Check the checkbox of the item u have added and see the properties if it has been added properly. 7. Now click on the save button.
    8. After the object is saved, click on the export button. 9. U will have an option to select where to store the .epa file which will be generated. U can overwrite an existing one by selecting the browse button, or store it with the generated name in the location it automatically generates. 10. Now Click on the Start Export button.
    11. once the export is completed, it shows a report on how much time is taken to generate the .epa file. 12. Here there is an option for downloading the .epa file. Click on the link and download the file. This file is ready to be uploaded into any other EP Server.
    For Import:
    Pre-requisites: You have to copy the .epa file created while export into the local drive. Optionally, you have to manually copy the .epa file generated in the export function into the Import directory of the server ie. chooseFollow the steps below for importing a certain file. 1. Go to System Administration in the portal, and click on Transport?Import. 2. For the source of the package, Click on the radio button Server for the .epa file you have copied lately. Else, click on the radio button on client if you are operating in the client and select the .epa file you have stored on the local drive. 3. Now select the file from the browse option and click on Upload.
    4. Now click on the import button. 5. Once the import process is finished, the report is shown. In the whole process, the par files are not included in the .epa files. For the par files to be included into the .epa files then we have to change the pcdStartup.properties file in the server. The property to be changed is Pcd.TransportApplication.Export.ExcludeObjectTypesAfterRuleProcessing: Keep this property's value as empty for enabling the par files to be uploaded into the .epa. You can check for this property in the portal in the following -System Administration-Support-Portal Content Directory-PCD Configuration.

  • Can I transport changes thru Quality to Production without dropping data?

    Hi,
    I have data on a Quality system which is being used and it has become critical to extent that the Quality system is treated as Production.
    Now, there have been some changes in Development: 5 new key figures and 10 new characteristics. As a result, there have been modifications in the Infosource, update rules, ODS, Multiproviders, etc on Development.
    The plan is to transport these changes on Dev to Production and load data on Production for comparison against the data in Quality.
    (It may sound weird but that is the plan since there are some problems on Development)
    My question:
    Since the changes have to go through Quality to Production, will there be problem on the data on Quality?
    The goal is to freeze the data in Quality. Can the changes go through Quality without the need to drop the data in Quality?
    [Note that the objects are going to Production the first time: we do not overwrite any existing objects on Production]
    Thanks

    Hi,
    You need not do anything special while releasing the request.  If anything needs to be done, Basis should do it.
    For that matter, Basis should be able to copy the  CO and DAT files of a particular released request, to the import queue of any SAP system and import it there.  They would do that using operating system level commands.
    For us lesser folks, ther are above the table methods:-)
    If you go to transaction STMS in the development system and click on the 'red truck' (transport overview) you would be able to see the import queues of the D, Q and P systems.
    You can double-click on each system to see the requests.
    If you have released a change request, it would be exported and available in the import queues of the Q and P systems.
    If the request has been imported the status will show with a 'yellow triangle'.
    If the request is yet to be imported it would show with a 'green square'.
    In a particular import queue, you may choose the request that is not imported and import it into the system.
    Having said all this, it is quite possible that Basis may have configured the transport domain in a different manner.  It is possible that the Quality system is configured for Quality assurance.  That is why it is important to do this in association with the Basis team.
    Since the possibilities are many, a link is attached for further reading:
    http://help.sap.com/saphelp_nw04/helpdata/en/44/b4a09a7acc11d1899e0000e829fbbd/content.htm
    Mathew.

Maybe you are looking for