Transport of changes to quereis and CKFs & RKFs

Hi Gurus,
I have a Multicube and a  number of queries that has been transported to HIQ already.  I have made a significant changes to these queries in HID, i.e. chges to CKFs, RKFs, including description changes as well as deleting some KFs, and additional KFs.
I have tried to transport to HIQ by collecting these specific queries and all below and putting the multicube in a separate transport with only necessary objects.
I transported the Cube first and then all 25 queries in one transport.
My problem is that in HIQ I have RKFs & CKFs and Queries that I have deleted or renamed in HID.  How do I get both enviroments back in sync ?
Thanks for your help.
Laura

Hi,
1) Do I need a separate transport for each query ?
No you can capture multiple queries in one transport
2) Do I include the Multiprovider in one of these transports ? and/or the Cubes in the MultiCube ?
No, there is no need to include multiprovider or cube.
-Mayuri

Similar Messages

  • Changes in holiday and factory calender ?

    Hi Gurus,
    i have to delete a holiday from my holiday calendar ? i  have some doubts about transporting the changes to quality and prd can anybody explain how we have to trans Port CALENDER

    Hi Mahesh Kumar,
    The Best Practice in mantaining Factory Calendar is to Transport the calendar from development to quality and to Production. However, it comes with it's own share of risks as it is a table transport.
    To avoid those risks, it is suggested to block SCAL via SM01 for users and give access when the changes need to be moved. There is a process which needs to  be set up which creates the necessary checks and balances involving the change.
    Now, when you transport, you need to make sure that the changes you are moving are only the changes you did currently. Changes which have been done by someone else in the FC would remain with the object as FC object does not ask for transport when you are saving the changes.
    So, in order to accomplish the above objective, you need to compare the Factory calendar , Holiday calendar tables. Compare the tables of Development & Production, download the tables to excel. Use some excel formulaes to match the entries of table in one worksheet with the entries in other worksheet. The conclusion of the comparison would be that only changes which you are doing currently are moving with the transport and no other changes are moving.
    There are 3 important tables out of 13-14 which need to be compared: TFACS, TFACD & THOCI.
    BR
    Rahul

  • How to Transport Factory Calender to QTY and PRS systems

    Hi All,
    I had done a small change to Holiday calender in SCAL. I have read that it's not suggestive to transport it. Can any one let me know the procedure to transport the change to QTY and PRD systems.
    The transport button is greyed out .
    Best Regards,
    Sri

    The following OSS Notes have also been checked.
    356483 : Customizing: Current settings in the test system.
    077430 : Customizing: Current settings .
    328916 : Cust Changes despite "System cannot be changed" setting
    Can any one provide an input on the procedure to move a factory calender - Individual entry..
    Thanks in advance
    Sri

  • Rename RKF and CKF in query using ABAP

    Hi guys,
    I am supposed to rename RKF and CKF in query using ABAP.  (RKF: restricted key figures, CKF: calculated key figures)
    Right now, I am using FM RSZ_X_COMPONENT_GET to load query definition. I can find and rename all used RKF and CKF technical names and rename them in returned tables and then save it using  RSZ_X_COMPONENT_SET.
    But  I see that both RKF and CKF are reusable elements and they are can be probably used somewhere else.
    Can you tell me where can I find information in what header table are they saved or maybe some "where used" table.
    What FM am I supposed to use to rename CKF and RKF in given query and also in other parts of SAP system?
    Even some information how to get deeply into this problem would be very helpful.
    Thanks.

    Hi,
    You can see the query element definitions in RSZ* tables, but not sure if you will be able to find complete info, like a particular RKF is restricted by following selections by looking at the tables. Also, please do not try to change the info directly in the tables even though you seem to have a lot of objects to changes.
    Hope this helps...

  • BO Explorer - using RKF and CKF of a query

    Hi,
    I am currently in the learning phase of Business Objects 4.1 tools and have some unanswered questions.
    I have recently started learning about the Explorer tool and was wondering whether there is a way I can use BEx queries as source in the Explorer tool. For now, I have created a relational data universe over the InfoCube using the Information Design Tool and used this new universe as a source in the Explorer tool but this did not bring in any of the existing BEx restricted key figures and calculated key figures.
    Are there any other ways I can connect directly to the BEx query directly to take advantage of the defined restricted key figure and calculated key figure. There are about 100 RKF and CKF over an InfoCube and I would really like to take advantage of the existing elements.
    I read through the discussion forums and found couple of different replies based on the version number.
    Please do guide me if you have resolved a similar issue. Thanks for reading.

    Ajay Gupta wrote:
    Grame,
         The relational method is the only option with Explorer.  You have other options when using WebI & Analysis for OLAP but NOT with Explorer.
    Regards,
    Ajay
    Thanks for the reply Ajay. I was following the below thread that mentions about creating universe using XI 3.1 and then using the constructed universe through Explorer. Is this available in BO 4.1, please do explain about this if possible.
    http://scn.sap.com/thread/3417905

  • Changing Original System and Transport Target System for Objects

    Hi Gurus,
             I need to do mass transport of all the Infoobjects to newly defined system. Since these objects have different Original system. Its giving me error. Again, for other objects, Transport Target system is QAS, But we want to change it to NBW (A new system to which we want to send transport) . I am able to change package of Infoobjects. Is there mechanism to change Original System and Transport Target for System? Please let me know ASAP.
    Regards,
    Harpal
    Message was edited by:
            Harpalsinh Gohil

    If you simply edit your original post, it will go to the top of the list. There's no need to post duplicates.
    Subjects with a subject of "Urgent" will be filtered out by a lot of responders.
    Why not close this thread and bump the other one?
    Rob

  • BWA 7.2 RKF and CKF

    Ongoing from Jamie Hylton's thread...
    If we had BWA with the blades configured for both SBOE and BW access - in what scenario does BW access actually get to use the "query snapshot" functionality?
    We read that BWA 7.2 comes with RKF and CKF but as far as I see - this only applies to the CKFs and RKFs in the query snapshot load for SBOE and not for normal BW access
    Or did I read wrongly?

    Hi
    You can use BWA 7.20 with BW 7.01 SP05 and the indexing RKF and CKF functionalities are supported only with this combination of BWA and BW and finally reporting in Explorer.
    Also as Marc has mentioned the exploring of data with the Infoproviders having RKF and CKF is possible only in Explorer.
    The CKF and RKF as part of Multiprovider Snapshot Index can also be used to explore the data in the Explorer.
    c.f note : 1332392.
    Hope this helps!
    Regards, Hyma
    Edited by: Hymavathi Yanamadala on Mar 16, 2010 1:16 PM

  • BW 7.0 to 7.3 upgrade-Post upgrade activity and Transport the changes

    Hi Experts,
    We have upgraded our BW system from Release 7.0 to 7.3. As part of Security post upgrade activity I ran Migration steps,
    RSECADMIN-Extras->Migrations->Migration:Release 7.0 to Release 7.3. and later SU25 steps too.
    I fixed the Roles appeared in SU25 Step 2C and made below Characteristics as auth relevant,
    0TCAACTVT
    0TCAIPROV
    0TCAVALID
    But I have few doubts before Quality movement,
    1) Do I need to Run the Migration steps again in Quality and Production?
    RSECADMIN-Extras->Migrations->Migration:Release 7.0 to Release 7.3
    2) Do I need to transport only above Characteristics to Quality and Production or need to transport all the Characteristics and Analysis Authorization?
    3) How to transport Characteristics?
    Please provide your views.
    Regards
    Parag

    Hi,
    Technically its possible but it has its own consequences again based on the kind of object that you are going to Tranport.
    The above statement is applicable considering that you have 3.x flow in Bi7.0 system and with no DTP's or transformation etc...
    And if the BI7.0 is Unicode and 3.5 system is non-unicode then you will have lot of issues and most of the times you need Basis help to resolve the issues. So its bit risk to move the transport this way.
    So its better to develop the objects once again in 3.x system and then transport from D to Q and to P as a standard practice.
    Hope this helps.
    Murali

  • CKF, RKF or Structures locking queries in Development sytem.

    Our BW environment is set up to allow "Z" and "Y" queries. When creating a "Z" or "Y" query in the dev environments if a previously transported CKF, RKF or structure is added to the query, it locks after closing. Our QEA and PEA system allows creation of a "Y" query using transported CKF, RKF or structure without the query becoming locked. (The CKF, RKF or structures remained locked). Can anyone tell me how to get the DEA system to behave like the other two systems? Or if there is an OS Note that addresses this issue?
    The development system is open and the ELEM type is set to everything changeable.
    Thanks for your responses in advance

    CKF = Calculated Key figures, RKF = Restricted Key figures.  Our "Z" queries are transported queries and "Y" queries are for temporary ad-hoc reports and can be created in the production and quality control systems.
    Thanks,
    Joe

  • How to transport Parameter changes in a crystal report

    Hi All,
    Very Good morning!!!
    I have designed a crystal report with static parameters. Earlier i used to have a dropdown kind of input selection for my parameters.
    Now i got a new requirement for a direct input in the field....tht means no dropdown ...single date field is to be entered directly.
    Accordingly i have removed the dropdown and changed to a single direct date field. I saved these changes to a request and transported to quality. Not sure whether the parameter changes are collected into a request.
    Whereas i couldn't found any changes of my parameters in quality. They are as same dropdown manner in the quality whereas i need them to be a direct field date entry which did not affected the quality server after transporting the changes.
    Could some one please let me know how to reflect these changes in quality server regarding parameter changes in a crystal report for BW.
    Thanks in Advance.
    Jitendra

    Please re-post if this is still an issue or purchase a case and have a dedicated support
    engineer work with your directly

  • Transport of changes in 3KEI

    Hi All,
    I made changes to 3KEI table, When i generate transport system is showing up objects in the request. System allows me to change directly in Quality & Development. But how can i transport new changes to Production? Is there any way or program to transport to production.
    Its urgent please help.
    Thanks

    If you have captured the changed made in transaction 3KEI, release the transport request to QA, Check  and if happy , move to production.
    It does not matter, whether the QA is directly changeable or not. But, in order ensure the QA is test was good, ensure, that the QA is not changed while you are testing. Then move to PRD.

  • How to change Validity Start and end dates on a lane ?

    Hi,
    I am trying to change Validity start and end dates on a lane for a product specific assignment.
    What I see is as follows
    1) Lane created by system /others I can delete and give the required start /end date ?
    I want to know if I can change the end date without deleting the lane as its tough to delete a lane in production.
    Thanks
    -Venky.

    Hi,
    we can change the start period and end period in the Transportation lane using the table /SAPAPO/TRPROD.
    And then using the update command you can change the start time and end time of the product.
    Regards,
    Hyma.

  • Steps for making the changes in DC and checking into NWDI

    Hi Experts,
    I  am new to the NWDI
    I have some questions related to the NWDI and NWDI integration manggement.
    We have some set of SC's got from some team. Now we need to upload to our NWDI .For that  I have done the following steps.
    I have created some track in the CMS.
    I have loded that SC in to the track.
    I have imported that track in to the NWDS.
    The track which imported contains the SC , this SC contains some DC's .
    for getting the project in to the local mechine.
    In the DC prospective -> Inactive DCs -> done the  right click on the respective DC's and choosen as Create project option. Then i am able to see the DC project in the webdynpro prospective.
    Now the project in the local mechine see the code and i need to rebuild and deploy .
    What  are steps need to be done. Please provide the step by step information for doing this
    Thanks& Regards
    vijay

    Hi Vijay,
    Follow this:
    1.Import a development configuration.
    The first step for you as a developer is to import an appropriate development configuration. The development configuration is your connection to the NWDI. By importing a development configuration, you get access to all resources relevant for your work without having to search for the right sources, libraries and servers.
    2.Select the components you want to develop.
    In the Development Configurations perspective, you can create projects for existing components to add them to your development list, The development environment automatically loads the required source files and archives into your local file system and tries to build the selected components locally
    3. Create new components.
    You can use the Development Configurations perspective also to create new components .Create the new component directly in the DTR. The development environment may propose a change list ("activity") or prompt you to create a new activity to be used to record the creation of the component.
    4.Synchronize the source files and libraries.
    From time to time, you should resynchronize your local sources and libraries with the NWDI to receive the most up-to-date changes of other developers.
    5.Change the component sources.
    Before you can change a source file, you must make the intended change known to the DTR (to check out the file) and agree on an activity to record the change. You can create a new activity or use an existing one.
    6.Edit components.
    Depending on the type of the component you develop, you can perform components development using the Java, J2EE, WebDynpro, Dictionary or any other suitable perspective.
    7. Release the changes for the central build.
    After checking the changes in, you can pass them to the Component Build Service (CBS), that is, you perform the activation process.
    8.Release the changes in the development landscape.
    After a successful activation, pass your changes to the Change Management Service (CMS) of the NWDI, which transports your changes within the development landscape, for example, between a development system and a consolidation system.
    Thanks
    Krishna

  • Transporting Workflow changes to QA

    Hi Experts,
    I have some Qs regarding transporting the changes made to the Workflow.
    My Question is that, a custom workflow has lot of requests associated with it ..( both customizing and workbench ).
    Once my workflow has been transported to QA. Now i have to make sm changes to the send mail step.
    I have made the change and linked it to a transportable workbench request.
    Now releasing this request alone will move the change . Or i have to goto basic data and Active the Strt condition again and transport that too, so that the change works fine in QA ?
    Hope my Qs is clear.
    Regards,
    Radhika.

    I have made the change and linked it to a transportable workbench request.
    Now releasing this request alone will move the change
    Yes, there is no need of transporting again the linkage request.Only the changes are reflected to the other system when ever you try to export a request to other system.
    And make sure each time you do a change and when the request is ported to the other system then run the TXn SWU_OBUF and refresh the organizational assignment . this makes the workflow environment to run smoothly.

  • How can we change the description and name of Process Chain in Production

    Guys,
    Can anyone please help me to understand how can we change the name and description of the process chains in Production in SAP BI?
    Regards

    open the process chain and go to edit mode and then press Ctrl+F6 for a rename... you can only rename the description and not the technical name.
    If you want to edit PC in production - esp one which has been transported - go to transport connection and change the object changeability for the same to everything changeable ( right click on the same to get this option )

Maybe you are looking for

  • Take 2_Newbie question re. tables/frames/layers

    Hi all I have created this as a new post as the original one by DummyPete has become a bit too long and the topic has altered somewhat :) DummyPete orignially wrote: "Basically, I'd like to create the fairly common design where the left sidebar has h

  • N82 battery

    help me what time duration need for phone complete charging? my phone need 1 hour 40 min for complete charging. is this good or bad? with many thanks Solved! Go to Solution.

  • Problems setting up Mail in Snow Leopard

    Just downloaded Snow Leopard and when I lauch Mail and go through the set-up, it gets to the optimizing part and crashes/closes. Help!!!

  • Insert Data in a Oracle VAARAY

    Hi I'm trying to insert Data in a Table with an VARRAY Attribute. Here is my Model: CREATE OR REPLACE TYPE TelNrTyp AS ARRAY(10) OF NUMBER(20); CREATE OR REPLACE TYPE AdresseTyp AS OBJECT (Strasse VARCHAR2(20), TelNR TelNrTyp); CREATE OR REPLACE TYPE

  • I am a new developer in iOS, need info about iTunes Store

    I am a new developer in iOS, I have created an weather app just to show recruiters about my work and to get the work or job from them. This is not for sale, i know apple provide built in weather app. Can i add this app to iTunes store.