Transport of Config

Hi,
I found out that while transporting a ABAP code a file is created at the server for that transport.But it is not the same for the Config transport.Is there some place from where transport logs for config can be extracted.
thnx in advance
Regards,
Chirantan

i need to create a report that will display the status for a TR..i.e. to which all systems it has been moved to.I have been able to do that successfully to some extend.
What sap does in this case is that it creates a file at the server that contains the log for that particular TR,this file can be used to determine the status of the TR at a particular server.
But in case of a "config TR" no such log file is created.Now, I need to check(without these logs-since they are not available) that they have moved to other systems.
I hope the situtation is clear now.
null

Similar Messages

  • Transporting SRM Config

    Hi,
    If i transport SRM configs from one system to another, is there anyway i can change backend references in target system. Any program/transaction code?
    Regards,
    Kamal

    Hi. What I normally do is try and leave target system blank and see if that works. It does for some config and then it can be transported fine because there is nothing tying it to 1 backend system.
    For example, the link from product category to G/L account can be configured with no backend system, as long as you configure it before the product categories have been replicated to SRM.
    Some config is entirely dependant on backend system though, and even the SRM cookbooks tells you to configure manually in each client by opening the client as part of the initial set up.
    Regards,
    Dave.

  • Transport of config objects...business system prblem...

    Hi Gurus,
        We want to transport dev and config objects from XI qua to a XI test server... we hav successfully transported all design objects...but we are facing problem while transporting the config objects because of business and technical system issue....the business system in quality points the ECC quality....how can i tranposrt the config objects with same business system name....is there any way??
    Thnx in advance...

    Hi,
    This will be Maintained in SLD .You know what will be Business system name in Quality or Production.
    While Creating Business system you need specify in the Transport Tab which is your Target Business System and also the Group like Production or Quality ,
    When you do transport from Development and for the Dev_Bs (Bussiness system ) if you assign the Qaulity System Bussiness system ,it automatically move the object under Quality Business System.
    if this setup is done in SLD when you do transport the Configuration Object It Automatically assigns the Quality and production Business System  if you are doing Transport from Dev Respectively.
    hope this helps.
    Thanks,
    Madhu
    Edited by: Madhusudhan Honnappa on Sep 3, 2009 8:11 PM

  • Transport retraction config

    Hello All
    Have done the config for retraction of Funds management data from BI to ECC. It works fine in dev. However when I transport the same into ECC QA, nothing is visible.
    I guess the config done in ECC Dev is stored against the BI Dev client and hence it is not visible in ECC QA.
    As we do the mapping of dev source system to QA source system in BW, do we have something similar in ECC to map the dev logical client to QA client?
    Apprecaite your quick response.
    Regards
    Raghu

    Hi Martin,
    I have transported the config and the transport was successful.
    As the configuration for retraction is done for BW system like BI1CLNT001 which is the BW Dev, when you transport the same to QA, this should be change to BI2CLNT002.  Could you please let me know where and how this is mapping or conversion is done in ECC?
    Regards
    Raghu

  • How to 'transport' CPS config from QA to Prod?

    Hi,
    I setup a full job schedule with definitions and chains for a ECC6 system QAS (in isolation group QAS).
    I like to move this same QA config now to be valid for out Production system PRD.
    Is there any way of 'transporting' this config rather than having to redevelop the whole schedule for PRD?
    Thanks,
    Adriaan

    You have to buy the full license of CPS to get this 'nice' important feature.

  • Transport Of Config Table

    Hi Guys
    I've written an update program that makes changes to the T510 table in one client but I need to transport it programmatically to another client.
    Programmatically in the sense that after the update program has finished I need it to come up with the appropriate dialog boxes, these dialog boxes are bog standard dialog boxes that appear when the T510 table entry is changed on a transportable client.
    1) Maintain Table View Initial Screen
       One with table/view  name and 4 buttons Display, Maintain, Transport and Customizing.
    Upon pressing Transport button
    2) Should prompt me for the Country Grouping, Pay scale type and Pay scale area dialog.
    Green tick this.
    3) Prompt for customizing request - i.e. where you can select an existing transport or create a new one i.e. where the DVLK<no> appears.
    Green tick this.
    4) Finally the transport view "pay scale groups" overview dialog.
    Here you would highlight the entries and then press the Include In Request button.
    Many thanks in advance.

    Hi
    Generation interrupted; process mBDocs first (see description)
    Could you please check if there are unprocessed BDOCS in your system, you can use transaction SMW01. You might need an application guy to decide how to handle them.
    Best regards, Michael

  • How to transport deletion config entry

    Hi
    I have deleted payment terms in Development client and want to reflect the same in Quality.It did not ask for Transport request while deleting.I am aware in case of any addtion or modifications we select the particular new/modified entry and create a transport request by including the changes.
    Here I can't do that since  entry is deleted.How do I delete the entry in Quality.
    Please help.
    regards

    Hi,
    Good afternoon and greetings,
    You can recreate the Transport Request in the following way
    1. By seeing the entry in QA recreate the Payment Method in Development client and at the time of saving ensure that a transport request is prompted.
    2. You will have to delete the Payment Method and SAVE IT IN THE SAME Transport request and then release it to see the effect in the QA client.
    Please reward points if found useful
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • Performance Management - Transporting "Define Tabs and Process config"

    Good Morning Experts,
    We are moving from Development into our PPT (pre-production test) environment and have successfully transported the Performance management category settings/values, as well as the Template itself.
    Upon executing the Performance Management toolset from the portal side, I see that my tab configuration for the template did not transport.  I have searched high and low for any reference to transporting this config step, but have been unsuccessful, thus this post.
    Does anyone have any suggestions for transporting this configuration.  As you know the IMG Personnel Management > Personnel Development > Objective Setting and Appraisals > Define Tabs and Process Configuration for Template launches a webdynpro app to make this configuration step, so saving these setup selections is the only option.   How can I force these changes across ? I look forward to your responses !
    Chris Thomas
    Duke University and Health System

    All - the solution:
    SAP Note 1428054, implement the corrections according to the note.
    Run the report, RHHAP_Transport_tab_config which will generate the transport containing entries from tables:
    hrhap_tab
    hrhap_tab_data
    hrhap_tab_t
    Basis implemented, I ran report,  transported the tabs and and all is well. 
    Chris

  • Transport abt ALE Config

    Hi,
    We have done all IDOC to File scenarios
    We have configured the ALE settings on SAP R/3's DEv server.
    Can i transport these Config to SAP R/3's QTY Server or Should i create them as it is appear in the SAP R/3's DEV server???
    Regards
    Suman

    Hi Suman..
    This was the ALE settings...
    Steps
    SAP XI
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (IDX1)
    a) Select create new button
    b) Enter the port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Load Meta Data for IDOC (IDX2)
    a) Create new
    b) IDOC Message Type
    c) Enter port created in IDX1.
    SAP R/3
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (We21)
    a) First Select Transactional RFC and then click create button
    b) Enter the destination port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Create Partner Profile (WE20)
    a) Create New
    b) Create the Partner no. name as same the logical system name of the destination system.
    c) Select Partner type LS
    d) Enter details for Type: US/USER, Agent, and Lang.
    e) Click on the + button to select the message type.
    f) Select Partner no. and LS which ever create above.
    g) Select Message type
    h) Select Process code related to the Message type.
    I) save.
    In SLD – System Landscape Directory
    TS for R/3 (Logical system):-Assign the client name created in R/3 as Logical system Name.
    Ts for Third Party (Logical system):-
    BS for SAP R/3 (Logical system):- Assign the client name created in R/3 as Logical system Name.
    BS for Third Party (Logical system):-Enter the XI logical system name.
    In Transaction SALE
    Define and Assign the logical system name.\
    idoc to idoc
    /people/swaroopa.vishwanath/blog/2007/01/22/ale-configuration-for-pushing-idocs-from-sap-to-xi
    /people/venugopalarao.immadisetty/blog/2007/01/24/troubleshooting-file-to-idoc-scenario-in-xi
    regards,
    Kishore

  • XI Config transportable?

    Hi,
    We have done some config in our XI for CCM catalogue upload etc. I have exported the configuration objects into a /sapmnt/<XI>/.../export/abc.tpz file in our Dev system which we have moved into the /sapmnt/<XI>/.../import/abc.tpz folder in our QA system. However when I go into Import config objects in our QA system, it does not find anything to import.
    Can anyone please tell me if this is the way to transport XI config, or does it actually need to be done in each system?
    Thanks,
    Paula.

    Hi Paula
    Do you have exported / imported the design objects as well? This is done via the integration repository (Design: Integration Builder). This you need to do before you try to export / import the configuration objects because they build on the design objects.
    How did you export the configuration objects? Did you export all objects of a partner, service, scenario or just a single object? In case of scenario: are all your configuration objects you want to transport assigned to the selected scenario?
    Is your SLD correctly configured? During transports from DEV to QA platform the system transforms business system names participating in a scenario. This is done in order to avoid wrong configs after a transport to QA (or later PROD) platform and thus to avoid messages being sent to the wrong systems.
    But after a successful transport you'll have to adopt your config anyway. Some config attributes are never transported.
    Not sure if this helped you. I'd suggest to post your problem in the XI forum. There you will for sure find someone able to give a solution or at least to give some guideance.
    Kind regards,
    Renaud

  • Profit center config transportation

    Dear experts,
                     I am doing configuration for profit center accounting. It is not asking request while saving the config. please help me how to transport this config to testing client as well as production client.
    Regars
    Jay

    I suppose you are implementing Classic PCA in CO.
    The transportation can be done thru
    SPRO - Controlling - Profit Center Accounting - Tools - Transport Customizing Settings
    Enjoy.
    Venkat.

  • How to transport number range group Configuration in Material Master

    Hi,
    I have this query regarding how to transport number range group in material master from one server to another.
    Problem: There was no number range assignment done for a particular material type. So, i assigned the particular mat. type to a group which had some number range intervals with the help of T-Code MMNR.
    But when i want to transport this config. to other sever, it is only transporting the interval but not the assignment done to that group. In the menu bar only Interval transport option is there.
    Can anybody help me with this I hope the query is clear.
    Regards
    Vivek

    Hi,
    Number range objects can be transported using Workbench requests.
    Thanks
    Kishore

  • EP6 SP2 Km Config Export / Import

    Hi,
    In EP6 on 640 you can transport KM config by exporting it into an .configarchive file and then importing it.
    Is there an equivalent in SP2?
    Cheers
    Paul

    Hi Paul,
    not really, only LayoutSets are ex-/importable, see http://help.sap.com/saphelp_ep60sp2/helpdata/en/c7/f66dbc34d4bb43a06472e17997e47b/frameset.htm
    Hope it helps
    Detlev

  • Messages sent from Outlook, not in transport logs

    We had an interesting problem with our Exchange environment that has left a mystery behind.
    A couple days ago, we had a catastrophic failure that took both of our mailbox and transport servers offline for approximately 1 hour. After we got the servers back online, we had reports of email not making it to recipients, both internal and external.
    We looked everywhere for a problem, but we couldn't find any definite source, so we restarted the Exchange services on both servers. This fixed the mail flow problems, but now we cannot find any trace of the emails sent during this problem period.
    Any ideas what would have happened, why emails were not left in users' outboxes, and why anything that didn't get delivered didn't throw an NDA at least? The emails DO appear in the users' sent items folder, just no record of them after that.

    Hi,
    You can check with your system/application logs, there are related logs generated.
    When a fatal/permanent JET exception (logical corruption) has appeared in the database, the feature will be triggered so that the queue, log and system folders are moved (add .OLD to path), a
    warning event will be fired to inform administrator that the transport database folders have been moved. After that, worker process will be restarted, and then try to attach a new database
    If the transport component can’t move the old folder, the possible cause is that the target folder has already existed as the “Move”  action
    will only perform once, the subsequent recovery action will fail along with event 17104 until the previous queue database backup has been renamed or deleted
    You can see the entire recovery procedure in event 17102
    If you want to stop this feature, please set the value of the “QueueDatabaseRecoveryAction” key to “None” in transport application config file:
    C:\Program Files\Microsoft\Exchange Server\Bin\EdgeTransport.exe.config
    <add key="QueueDatabaseRecoveryAction" value="None" />
    Notes: The default setting is “Move”
    Notes: After you stop the feature, transport service won’t try to recover the queue
    if the corruption happens again. It’ll just log the error event in the application log and stop the transport service. Then, you need to follow the link from Anil to delete the old database, or repair it before the service can be started again
    Hope this helps!
    Thanks.
    Niko Cheng
    TechNet Community Support

  • Adding new field to product allocation catalog?

    We are configuring product allocations in SCM 7.0 and have a requirement to add a new field to the standard field catalog for the allocations check.  We have followed the procedure outlined by SAP to add our new field to the structure /SAPAPO/KOMGOZ, add the field to the field catalog, and copied the source code to ERP.
    The issue that we are having is that new custom field that we added to the field catalog is not being populated when we execute /SAPAPO/ATPQ_PAREA_K - Characteristics Combinations from Planning Area.  The product allocations group that is being used in /SAPAPO/ATPQ_PAREA_K has three characteristics. The first two which are SAP provided fields are being populated correctly, but the last custom field we added to the field catalog is not. It is just blank.
    Is there a step that we missed during the configuation.  We are only using this field for the product allocations check (we do not use Rules Based ATP).

    Hi Arnel,
    I was expecting with examples but anyway.
    consider the examples of your CVC
    Country Region brand SO DV DC mat plant  etc...
    now you want to first get confirmation on SO and DV  , Prd allo group with these 2 characteristics
    same goes for all other combinations.
    now if you want to go with Either Or   /And.. decides if you need to go with one product allocation procedure with many prod allocation group  /or/ a sequence product allocation procedure.
    Its very straight forward as such... if you come up with examples, i can give better details.
    Looking at point 3 it looks like you want to go with 'OR' so you will have to go with sequence.
    (tcode: /SAPAPO/ATPCQ_GENER)-  is to check the customizing,  sometime you might move the Prod allocation from dev system and just to make sure there is no issue in transport /missing config.. it will check with transaction code.  I don't think you have to run this every time. After every transport..may be you have too as a caution check.
    Imp:  just to check @ different levels i dont think you will have to create different planning area.  If all the characteristics on which you want to (combinations) is available in one planning area , you should be good with one planning area only.
    Hope this is helpful.  I would suggest to follow what we have discussed so far and then you can create another message after the configuration/approach you finalized  with new issues/concerns you will be facing.
    If issue are really bothering you much, you can reach out to me directly. Let me know
    Pravin M

Maybe you are looking for