Transport request activation for Cost Center/profit Center

Warm Greetings
Which fields i need to activate to get transport request for the below question ?
1.Cost center/profit center
2.Cost center group/Profit center group
Your responce/comment will help me to know how to process,
Regards
Shamul heq
Edited by: shamulheq on Feb 14, 2010 12:08 PM

Hi Shamul,
Please try the following transactions;
1. Cost center / Cost center group etc
Transaction: OKE6
IMG menu: Controlling > General Controlling > Production Start-up Preparation > Transport Settings for Master Data
2. Profit center / Profit center group etc
Transaction: 0KEQ
IMG menu: Controlling > Profit Center Accounting > Tools > Transport Customizing Settings > Transport Master Data

Similar Messages

  • Error Activity type 502000 not set up for cost center 1000 cc111

    hi all
    While creating a work center (CR01) I need to enter a cost center and activity type for machine hours. However, while entering the activity type the following message appears:
    Message no. CR 061
    You are attempting to assign activity type XXXX to the work center. However, this activity type has not yet been set up in controlling area 1000 for cost center xxxxx.
    while creating the activity type in KL01 i have already given * in cc category so it should go for all cc
    What could cause this problem?
    Thank you in advance,
    Kind regards

    Hi,
    Check whether the activity type is maintained at the correct controlling area via KL03. If not, then create the activity type (KL01) in the corresponding controlling area.
    Regards,
    Darrel

  • Activity Type ENGINE not set up for cost center

    Hi all,
    Currently, we have set up a work center in our system, which has the following intergration:
    - Controlling Area --> TECH
    - Cost Center --> TECH001
    - Activity Type --> ENGINE
    - Plant --> PN01
    - Work Center --> PL01
    Based on the above, the work center PL01 has the relationship of where Activity Type ENGINE and Cost Center TECH001 are linked together, where Cost Center is tied to Controlling Area TECH.
    However, when a user tried to create General Task List (Trxn IA05), under Work Center PL01 and Plant PN01, and inserted Activity Type ENGINE in Operation item. It gives the following error:
    Activity Type ENGINE not set up for cost center
    I have also checked KP26 that everything is setup correctly.
    Please can someone shed some light on the above?
    Many thanks and regards,
    Patrick
    PS: Full point guaranteed for helpful answer.

    Hi all,
    I have solved the issue by changing the Start Date of the Work Center. Now everything works well.
    cheers,
    Patrick

  • Actual activity price does not exist for cost center / activity type

    Hi,
    We are trying to upload the time sheet related data(number of hours an employee workred on a project) ect from Non SAP to SAP.
    We have used a customized program and have loaded the data from se38.
    All this HR data will be saved in CAT2
    Later we transfer the time related data into SAP FI/CO using CAT7.
    +When  tested  with a couple of employees time sheets, they got uploaded in SE38 proerly and when transfered it through CAT7 it was properly taking the hour*rate is cost and was reflecting in the respective cost element.
    For a few time sheets in SE38 we were getting an error saying that the cost center(100501)/ activity type(EAT001) does not exist for 2010.
    Hence we have taken, FY 2010, the cost centes and activity types in KP26 and have given the planned Activity as 1. No planned cost in KP06.
    We have run the price calculation forr the FY 2010.
    Then we were able to uplaod the time sheets, but when we tried to transfer the data through CAT7, it throws an error saying no activity price exist for cost center 100501/ activity type EAT001. If I ignore the warning an proceed, no amount is being calculated.
    When uploaded employee time sheets before, all the cost were getting claculated and were entering into  the respective cost elements, but now no amounts are being calculated and it is taking Zero.
    When checked the previous years data i.e, 2009 all amounts are fine, in KSII I can see the activity quantity filled with some numbers in 2009, where from are they comming? I have checked KBk6 nothing was mentioned.
    PLease assit
    Regards,
    shilpa

    Hi
    I never used CAT* though, but the error means that you need to maintain a activity price in KBK6 (Actual price)
    Regards
    Ajay M

  • Activity Type set up for cost center

    Hi All ,
               While creating a task list i m getting a message
    Activity type is not set up for cost center in the year 2008
    Message no. CR062
    How could i set the activity type for cost center? Plz tell the procedure.
    regards
    sunil
    Edited by: sunil gupta on Sep 19, 2008 10:12 AM

    Dear Sunil,
    Check out this,
    1.Create a Cost center using T code - KS01.
    2.Create an activity type using T code - KL01.
    3.Assign the Rates for an activity type & cost center combination using T code KP26.
    4.In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2008,enter the cost center, activity type click on overview screen (F5)---> enter the per hour Rate
    under Fixed price and set value as 2 for distribution key and plan price indicator as 3.
    5.After performing this ,while creating the work center ,this combination of activity type & cost center
    should be assigned.Then while creating routing/task list this work center can assigned for performing
    operations.
    Check with this & revert back if you need any further help.
    Regards
    Mangalraj.S

  • Table name for Cost Center Group/Profit Center Group/Cost Element Group

    Hi,
    Kindly let me know the table names for cost center group, cost element group and profit center groups.
    Thanks.
    Suresh

    Hi,
    The tables for storing groups in SAP are SETNODE and SETLEAF. The codes in the previous message posted by my fellow SAP consultant are transactions and not tables.
    The classes are:
    Cost centres - 0101
    Cost elements - 0102
    Profit centres - 0106
    Regards,
    Eli

  • Why time-dependent not work for cost center and profit center hierarchy

    Has anybody been able to successfully turn on time-dependent for cost center hierarchy? Looks like the R/3 datasource 0COSTCENTER_0101_HIER is defaulted to be NOT time-dependent, and I don’t know how to change the R/3 configuration to enable time-dependent for this datasource.
    Here is what I found. If you go to RSA2 in R/3 and enter datasource 0COSTCENTER_0101_HIER, and then select "Hierarchy Info", you will see that all the time-dependent properties are unchecked by default. By comparison, Cons Unit datasource 0CS_UNIT_CSCU_HIER has “Version Dependent Hierarchy” as selected, and we are able to load Cons Unit hierarchy as time-dependent, but have no luck so far with the Cost Center hierarchy.
    Can any BI guru tell me how I can make time-dependent work for the cost center hierarchy?
    Thanks a bunch!

    Check SETLEAF and SETNODE.
    Basically CO Master data groups dont have seperate tables. They will be available in above tables. Choose proper Set class to filter the results

  • Prompt for cost center when posting depreciation

    Hi all,
    Do you know where can i enable 'Depreciation posting with cost center'? Now each time it ask for cost center.
    Thanks.

    A cost center must be defined in order to post depreciation because it is posting to an expense account.  In the SAP standard setup, expense accounts must have a cost center assignment, revenue accounts must have a profit center assignment, and balance sheet accounts must have company code assignment, respectively.  To my knowledge, it would take a great deal of  FI configuration change to make the deprecation expense accounts not require a cost center (and probably unadvisable).
    Thanks,

  • Activate text for Cost Center for ME51N, ME52N, ME53N

    Hi, experts
    As a requirement on T/C ME51N, ME52N, ME53N is needed to activate on "Account assignment" tab, the text for Cost Center field, how can I do this?
    Thanks in advance.
    Is there any path or exit could help with it?

    I need to add on Tabstrip "Account assignment" for fields
    CO Area and Cost Center text field description ( right side ) for each one.
    How can I do this? Thanks in advance.

  • How to run GR55 reports in background for cost center hierarchies

    1.  I have been asked by our users to create batch jobs to run in the background for some GR55 reports, that can then be sent directly to cost center managers via email.
    I have figured out the process to do this as long as the cost center manager only needs to see a single cost center at a time.  However, if they are in charge of multiple cost centers, we also want to send them a summarized report using the hierarchy we have set up.  I can't seem to make this work, as the job only seem to recognize the last cost center in the group and the report is for that cost center.
    Example.  cost centers 100, 200 and 300 belong to hierarchy abc.  If I run the job just for cost center 100 it is fine.  But if I have a variant to run hierarchy abc, or even if I use the range 100 to 300, all I get is a report for cost center 300.
    We cannot use BW because we only have revenue in BW.  I am being asked to make this work from standard R/3 within the GR55 realm of reporting.
    2.  In addition, the report selection criteria includes two separate plan/forecast versions.  They need to update these each month prior to running the reports and sending them out.  I looked at the variables associated with the versions and tried to set them up with default values that I hoped would update automatically so that they don't have to manually change 50 or so variants each month.  But I don't see any dynamic variables that I can use to have the system make that change without going into each variant individually.
    3.  There is another piece to this equation as well.  There is another report they want sent out in batch, but it is several pages wide in SAP and several pages long.  So when you run it in batch and either spool it or get it sent as an email, it is very ugly in the formatting due to all the page splits horizontally and vertically.  If anyone knows how to get the report to stay together like it would if you had excel integration turned on, it would be very helpful.  I have tried running it with that integration turned on, but the jobs are set up with user batch_mgr and not my id, so it isn't working well.  The batch_mgr id is just a system id, not a dialog id.  We also don't want the jobs set up with a regular user id because if people leave, then the jobs all need to be changed.

    Kim,
    I may have options for issues 1 and 2. In case of 3, what I can tell you is I understand the concern, but this is what  typically happens in some standard CO reports that are not ALV compatible, I don't think there is not much  there to do unless you add some custom code for the output.
    In regards to point 1, yes,  I have noticed that this happens in some standard and custom reporting, not sure what is going on. I came up with a work around that  made the trick for my client in a similar scenario; which is editing the cost center groups. For instance, instead  of having the group set as a range from 100 to 300,  the groups are have  listed the cost centers, 100, 200 and 300. Obviously, the disadvantage of  this option is  that it would require a bit of more cost center group maintenance.
    In regards to point 2,  I understand from your note  that your users already have set up selection variants for the report. One option for you is to get the help from a developer to create a custom period variable and tiny program that runs in batch every month that would update that variable accordingly. Once that's done, you may have to update at least once, the selection variant  attributes to change the period to a selection variable, so everytime from that point of time forward that the variable gets updated,  it will be ready with the right value for every selection variant that uses it.
    Hope this helps.
    GG

  • KO88 - Error when settling for Cost Center AND Auc for the same Internal Or

    Hi Experts,
    We need to configure Investment Internal Orders that could settle to both Cost Center and Auc, but each assignments with different Source Cost Elements
    We did the following:
    1. Created Auc Class
    2. Created Investment Profile "IMOBIL" and assigned to Auc Class, flagging Auc
    3. Created Allocation Structure "CV" with two assignments:
    01, Source = Cost elements 7000000000 to 7999999999, receiver AUC "by cost element"
    02 Source = Cost elements 4000000000 to 4999999999, receiver CTR "by cost element"
    4. Created Model Order, filling the Investment Profile IMOBIL created in step 2.
    5 Created Settlement Profile ZCV0001, assigning Allocation Strucutre CV, allowing CTR and AUC for receivers, default receiver is "FXA", doc type "AA".
    6 Created ORder Type CV01, assigning Settlement Profile ZCV0001.
    When I post only for Asset Expenses (Source Cost element 7, Assigment 01), the settlement through KO88 correctly settles to AUC, and also creates the settlement rule for cost center (i'm using the strategy to create from Responsible Cost Center).
    But when I post for Asset Expenses (cost elements 7, receiver AUC) AND General Expenses (Source Cost element 4, receiver CTR), KO88 generates an error KD506, saying that for Assigment 02 - AUC I didnt define a settlement cost element.
    1. Assignment 02 is not AUC, is CTR;
    2. I flagged "by cost element", so I don't need a settlement cost element. And also, I was able to post to AUC when the source posting was only for cost element 7.
    Did you face any problem like this?
    I cannot find out what is the missing configuration, or if it is a program error...
    Kind Regards
    Mayumi Blak

    Hi Ajay
    I already created Source Structure and assigned to my Setllement profile (so I assigned Allocation Structure AND Source Structure).
    I don't understand when you say that I need to assign the Source Sutrcture in each rule....because the Source structure is in the Settlement Parameters valid for both rules...
    When I post to Asset Expenses only for the internal Order, the 2 rules (CTR and AUC) are created when I run KO88 (but only AUC rule is settled). This is OK.
    The problem is when I post for both General Expenses AND Asset Expenses, the system is not recognizing that I have 2 source structures, neither is findind that for CTR AND AUC the Settlement cost elements are the original cost elements.
    I'm thinking about changing message KD506 to warning, do you know if this can help?
    Kind Regards
    Mayumi Blak

  • How to write a validaton rule for Cost Center and plant in PO

    Hi,
    I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    Thanks
    Sunil

    >
    Sunil Pal Raj wrote:
    > Hi,
    >
    > I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
    >
    > But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
    >
    > Thanks
    > Sunil
    Check OKC7
    Regards,
    Indranil

  • Purchase Order For Cost Center

    Hi,
    1. Please explain as I am trying to create a PO and i gave Account type: K(Cost center). I got the following error
    "Create Account 140000 as a cost element in controlling area 4000 "
    How can i solve this problem. I actually created a cost center : 4000. How to assign a cost element to controlling area.
    2.Is it Necessary to maintain the G/L A/c while procuring for Cost center??
    Or Cost Center is Sufficient ??

    HI Kapil,
    For any accounting entry you need to define a General Ledger Account where the details (Amount) of the transaction will be stored.
    Just by maintaining cost centre will not help in completing any transaction involving accounts. So you need to  maintain G/L account in the controlling area of your company code.
    You can use T Code FS00 to create new G/L account in the chart of accounts.
    In the edit cost element Tab you can give the cost center that you want.
    I hope this helps.
    thanks
    rahul goel

  • BPS Retraction for cost center accounting

    hi guys,
       When i create sender structure for retraction,need to specify the retraction target(eg UPB_RET_COPS) using drop down to find.But i can't find any value after using drop down button.So i want to know how  and where to define the retraction target,in BPS or R/3?
       The dictionary structure has the same problem.
       And what do mean the fields of 'offset'  and 'sender field lgth'?
       Need your help!
       thanks a lot!
    frank feng

    Hi,
    Go through following links where u can get a fair idea for u r problem:
    /people/praveen.mayalur/blog/2006/07/01/bps-retraction-for-cost-center-accounting--i
    /people/praveen.mayalur/blog/2006/07/11/bps-retraction-for-cost-center-accounting--ii-primary-cost-qty
    Thanks,
    Debasish

  • BPS Retraction for Cost Center Accounting - Cost Element - Compounding with

    Hello everybody,
    I'm using the "BPS Retraction for Cost Center Accounting" described in the blog from Praveen Mayalur. I have customized the BPS system  (3.5) as described.
    But if i started the retraction i receive a dump. I have debug a little bit and i found out that there is a problem with the InfoObject "Cost Element". It is compounding with two InfoObjects "Source system ID" and "Controlling area".
    PERFORM FILL_RSRDEP USING I_AREA
                              I_CHANM
                              ITO_CHADEP
                        CHANGING LT_RSRDEP
                                 L_SUBRC.
    IF L_SUBRC NE 0.
    *Abhängige Merkmale müssen in der ITO_CHADEP stehen
      MESSAGE X099(UPC).
    ENDIF.
    Does anybody have this problem before. ?
    Regards Detlev

    Hi,
    it looks that your 0COSTELEMNT has been changed and the additional compounding object 0SOURSYSTEM has bben added. In BI Content it is only compounded to 0CO_AREA. So may be this is the problem.
    To be sure that it works you must make the change in your source system to and "compound" 0COSTCENTER to 0SOURSYSTEM. Or you have to chabge the retraction that way that it ignores the source system and only reads 0CO_AREA and costcenter.
    Regards,
    Juergen

Maybe you are looking for

  • How do I control my office mac throught the internet from home

    I have a small office network with 5 computers. The network is has internet access through a windows 2003 server PC. On the network I have 3 macs, one mac mini server running Filemaker Pro 11 which acts as a filemaker server for the other 3 Macs. Whe

  • TS1381 Keys "Q to O"(q,w,e,r,t,y,u,i,o) are not working? Please help!

    Hi, Hoping someone can help me. As the title says... Keys Q to O are not working. I have removed the letter casing from a couple to check for dirt etc but no evidence and the buttons are also working fine. Any ideas or help would be very much appreci

  • Usb flash drive - How open?

    I am new to Apple interface

  • I can't see tiff files

    I'm trying to import tiff files into aperture from a epson scanner but I can't even see them. Any answers? thanks

  • How to export all the man page in mac to PDF?

    How to export all the man page in mac to PDF? I have tried "man -t cat | pstopdf -i -o ~/Desktop/cat.pdf" but this only output one page. How could I dump all the man pages to pdf with one or few command as possible? The other question is, I copy all