Transport target group

Hi All,
We have one transport target group  /DEVALL/ .Which we deleted and created two target group for importing into different client as /DEV100/ and /DEV200/.
Now alll transport request which has been assigned to /DEVALL/ are coming as a local request and after released they were not going to import in any of the client.
Please let us know the way by which we can assign new target group (/DEV100/ and /DEV200/) to all these change requests (TR's).
As we can manually  assign target to change request at the time of import.But we want to find out the way of assign target group before releasing the TR's
Thanks in advance for your valuable and fast response.

Hi Sumit,
             I am only aware of making this change using transaction se09 and se10. You select the change request number 'Not the task' by double clicking on it. In the resulting screen, select the properties tab. The 'Target' field in the screen can be used to perform the reassignment.
Sajit

Similar Messages

  • In ECC 6.0, can I link a CTS project id to a transport target group?

    In ECC 6.0, can I link a CTS project id to a specific transport target group?
    I configured two IMG projects, namely, Phase1 and Phase2.  In SPRO, I tied them to CTS project ids, DEV_P00001 and DEV_P00002, respectively.  In STMS, I configured two transport target groups called /PHASE1/ and /PHASE2/ that I want to link with the corresponding project ids.  The intention is that Phase1 transports will go to the clients specified in the /PHASE1/ target group and that Phase2 transports will go to the clients specified in the /PHASE2/ target group
    I want to link the CTS project ids to the respective transport target groups so that (e.g.) if a team member creates a transport in SE01/SE09/SE10 and chooses the DEV_P00001 project id from the Project dropdown, then /PHASE1/ will appear as the default transport target.  Likewise, if the team member instead chooses the CTS project id DEV_P00002, then /PHASE2/ will appear as the default transport target.
    Right now, the user has to remember to choose the correct combination of CTS project id/transport target group.
    Solution Manager is NOT involved in this scenario.
    Does anyone know of a way to do this in ECC 6.0?

    Hi,
    Try this it worked for me though,
    1. Goto SPRO_ADMIN
    2. Select the Project
    3. Choose Change
    4. Go To Transport Requests TAB
    5. Activate CTS Functionality
    6. Save it after the Pop Up
    7. Go to Se10 and check if the Project Field is getting Populated with the Desired Project or not.
    Regards,
    Nitin

  • Transport target group and routes setting for 2 system landscape

    Hi!
    I have 2 system landscape (DEV with 2 Clients, 100 CUST and 200 TEST and PRD with productvie client 100).
    Currently I have the standard TMS configuration for 2 systems (with tranport layers/routes ZDEV and SAP) .
    Now I  have to set up my TMS settings client specific
    (Development in DEV 100 and transport to the DE 200 TEST and PRD 100).
    I have created tranport target group /B-DEV/ with both target goals:
    DEV 200 and PRD 100.
    <b>What are the further settings for transport routes?
    I assume, I have to delete the existing routes ZDEV and SAP?
    what are the next steps? </b>
    Thank you very much
    regards

    Ok, I have in DEV system:
    Client 100 (Customizing)
    Client 200 (Test) (it can be considered as replacement of QAS-system, because we only have 2 systems)
    PRD system
    Client 100 (Productive client)
    So we would like to set up the transport management system client specific, in order to develop in DEV 100 to test in DEV 200 and to use the transports in PRD 100.
    Thank you very for your help
    regards

  • Unable to create multiple transport target groups in SLD

    We have multiple R/3 QA systems but just 1 XI QA system and we need to test interfaces with all R/3 QA client at the same time. My XI development team has asked to explore whether its possible to create multiple target systems.
    Currenlty R3_dev has R3_QA1 as target business system, we would like to add R3_QA2 as target system for R3_dev.
    There is a "add/change" option in Transport tab and there is a grid which seems to imply that multilple entries are possible.
    I have added R3_QA2 to the Group "Qa_Bus_Group" and was able to  replace
    R3_QA1  with R3_QA2 however I was unable to create multiple target systems.
    I was wondering if anyone ran into this issue and any suggestions are welcome. Thanks in advance.

    Hi Syed,
               You can create multiple target systems only for different business system groups.If all the business systems like R3_QA1,R3_QA2, R3_QA3 belong to the same business group "QA_BUS_GROUP" , then you can have only one among the three system as target.
               So R3_DEV  can have only one system as target either R3_QA1 Or R3_QA2 or R3_QA3 since they belong to the same business group "QA_BUS_GROUP".
                If there are three different business system groups then you can have 3 target systems that correspond to their respective business system groups ,in this case source business system can be assigned to the 3 target systems that belong to different business system groups .
               Since that is not the case with your scenario, you cannot create multiple target systems.
    Regards,
    Laawanya

  • Transport Layers and Target Groups

    Hello,
    Can one transport layer be assigned to two different target groups?  We have some number range changes that are automatically trying to go to our FIX_QAX target group since it is config, however, the transport cannot be generated because the config is part of package KEG0 which is set up currently as part of the SAP layer which only handles the FIX_IND target group.  I was thinking of making the SAP layer go to both target groups FIX_QAX & FIX_IND.  Is there any danger of this?
    Thank you for your time,
    Erin Byrne

    i think we can't assing a transport layer to 2 different target groups. and, even connection b/n 2 target groups is not possible. i am not sure, if we can use the same transport layer (SAP) twice.
    the alternative way is.. manually (copy the data file and cofile in the other tranport domain) import the request.
    hope this info helps.
    regards,
    Rajesh.
    <i>pls, award points</i>

  • Transport target and transport groups

    hi all,
    i need to create,transport target and transport groups,wht is the use and how to create.
    redards,
    AVR

    Did you check this help section: http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Can you close the other similar thread?
    Regards,
    Abhishek.

  • How & Where to create the Target Groups and Transport Targets for Business

    Hi Experts,
               I am Transporting the scenarios from Development 500 client XI system to Development 500 client PI7.1 system. I have taken the exports of Technical system and Business System from the DEV XI system and correspondingly have imported the same in the PI7.1 system. I can see the all the business system in the Business system SLD of the PI7.1 system. I would like to assign the Business System Groups and Transport Targets for every business system that I want to transport. How can I do that ? Whether this is to be done in DEV XI system or the DEV PI system? Can somebody elaborate the step by step method to create the Groups and Target system for the every Business system so that I can import the object of the Integration Directory sucessfully................................
    Thanks & Regards
    suk4023
    Edited by: sukande on Aug 17, 2010 8:18 AM

    Hi Supriya,
               Thanks for the reply and good illustration............Still going further after defing the destination for transport in the source SLD Business system ( XI dev server) , then we should export it and subsequently import it in the SLD of the PI 7.1 ie the destination server.  Then we should transport the objects of Integration Repository and Integration Directory to the new PI7.1 server. Is this the right way to proceed.?  Hope that this will not give the error while importing the objects in Integration Directory. An typical which comes while importing the objects in the Integration Directory is as follows:-
    *Import failed because of business system transfer of object Communication Component | PCM: Obligatory transport target for business system PCM not found in System Landscape Directory*
    Pls clarify on this ......
    Thanks & Regards
    suk4023

  • Changing default Target Group when creating transports.

    Hi All,
    We have 4 different target groups for the transports created in development systems. I would like to make one transport group default which is mainly used by majority of consultants.
    How to make one transport group default during creation of transport.
    Regards,
    Krishna

    And to just make it more clear :
    and here is the SAP help on the subject:
    Transport Layer in ABAP Workbench
    The Change and Transport System supports the distribution of development work on large projects across multiple SAP Systems.
    The packages in each development system are grouped into one transport layer.
    The transport layer determines whether objects are assigned to a local or transportable change request.
    Use
    Each of your SAP development systems is assigned a transport layer as its standard transport layer. If you use Extended Transport Control, you can assign different standard transport layers to certain clients.
    You can define at the most one consolidation target for each SAP System and transport layer.
    When you create a package, it is assigned the standard transport layer of the SAP System.
    If you want to assign a different transport layer to a package, you require the administration authorization for the Change and Transport System.
    The objects in a package automatically have the transport attributes defined for the corresponding transport layer.
    If a consolidation route originating in their SAP System is defined, then the objects are assigned to a transportable request, and transported into the consolidation target when it is released.
    If a consolidation route is not defined, the objects are assigned to a local request, and are not transported.
    Customizing settings are not assigned to a package. They have the transport attributes of the standard transport layer of the system or client.
    It is best to assign a package a standard transport layer for which a consolidation route originating in the development system is defined.
    To display and maintain the transport layers and routes, use the Transport Management System (transaction STMS).
    Only the system adminstrator can make changes.
    Caution:
    The tables TSYST, DEVL, TWSYS, TASYS are no longer productive as of Release 4.0A and cannot be maintained.
    Best regards,
    Menelaos

  • How to Configuring Groups and Transport Targets ?

    Hi Experts,
             In my scenario i am having two XI Servers XI1(DEV) and XI2(QUA) each system is connected to different r/3 system.
         If i transport object from XI1(DEV) to XI2(QUA) after defining Transport Target in XI1(DEV) as r/3 system connected to XI2(QUA) using file system would be fine (or) should i go for CTS?
    Regards,
    RajeshKumar.D

    Hi,
    You have to use Transpoprt method
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    1) Select the Business systems GroupEdit Groups
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Transport Groups & Transport Targets Creation for BS

    Hi,
    I have DEV and  QTY Servers And i have 2 seperate SLD's. i need to do BS Export.
    In Which Server we have to create Transport Groups and Transport Targets????
    Regards
    Bopanna

    Hi ,
    Refer to these weblogs and links
    Overview of Transition from Dev to QA in XI
    /people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    Two types of transport mechanism are used in PI.
    • File transport method.
    • CMS transport method.
    File transport method:
    http://help.sap.com/saphelp_nw04/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm
    CMS transport method:
    http://help.sap.com/saphelp_nw04/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm
    • CMS for SAP Exchange Infrastructure:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e
    • How to handle Xi with CMS:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/43f5d790-0201-0010-2984-ff72d822b109
    • Configuration of CMS in Central NWDI & SLD to transport XI objects:
    /people/praveen.mayalur/blog/2007/05/31/configuration-of-cms-in-central-nwdi-sld-to-transport-xi-objects
    • XI Software Logistics Solution III: CMS:
    /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    Refer the configuring group and transport group for Business systems.
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/frameset.htm
    Transport mechanism
    1. Create Technical System and Business Systems for the QA system.
    2. Create Transport Groups in the Business System.
    3. Create Transport Targets in the Source Business SYstem.
    Try with this
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/43f5d790-0201-0010-2984-ff72d822b109
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    https://websmp104n.sap-ag.de/nw04 -> SAP NetWeaver 2004 - Release-Specific Information -> How-to Guides -> Exchange Infrastructre
    1. How ToTransport XI Content Using CMS
    2. SAP XI 3.0 - Using CMS for SAP XI 3.0
    Also
    Look at the below weblog for XI transports.
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    CMS for SAP Exchange Infrastructure
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e
    regards
    Aashish Sinha
    PS : reward points if helpful

  • Determination Criteria for Questionnaires with Target Group howto transport

    Hi Experts,
    if I do the Determination Customizing for my Surveys in the Development System I don´t have the Target Groups I am having in Quality or Productive System. As the Determination is Customizing in SPRO, I wouldnt want to change the Target Groups in P System.
    How do you handle/ transport this? Do I have to have the same Target Groups in all Systems (with same name)?
    Thanks,
    Cem

    Hi Lorena,
    The criteria that you have in Criteria Set might not be matching what you enter without the criteria set. You might want to recheck that. And as far as I remember, you can't setup questionnaire determination for campaigns.
    Regards,
    Shiromani

  • Change Management and Target Group in STMS

    Hello, We use the Change Management (SolMan 4.0). Up to now it works fine. We deliver always one client in the System (E33.002; T33.002 and P33.002). Now we try to change this. We will deliver more than one client in every system at the same time (to have always the same status in every client). So we use Target groups in STMS. This works fine if I do the transports manualy. But if I try to do it with the change management it doesn't work. The change management still deliver one client (002).
    Can someone give me a hint?
    Best regards

    Hi Jose,
    check below link.
    Leads not getting created via ELM
    Rgds
    Hari

  • Transport target for business system not found in System Landscape Director

    Folks,
    We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
    We are getting following error when we try to import an interfaces in to new PID system:
    Import failed because of business system transfer object
    Communication component XID_FileSystem: Obligatory
    transport target for business system XID_FileSystem not found in
    System Landscape Directory
    We are yet to install PIQ system.
    All the interfaces in the old XID system have transport target of XIQ system.  I removed the  transport taget for the interface, but transport target is still showing in the Business system under transport target head.
    How can we overcome this issue as we will not have PIQ system atleast for two weeks.
    Thanks in advance,
    Regards
    Chandu

    Hi,
    You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
    Illustrated with DEv & PRD here.
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the Following .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    Edit GroupsGroup1) Select the Business systems 
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Working with target groups in ChaRM?

    Has really nobody worked with transport groups in ChaRM??

    Hello Elena,
    I agree with Prakhar - admin/operator who performs the actual import into production must be VERY careful:
    in case when you have several target systems in the transport route, when you release transport from source system, the transport is exported into the buffer of EVERY target system that is defined in the route - no matter how you group your target systems.
    In the Task List however each producton system will have it's own CTS project generated.
    So your operator must be very well aware of which production system is accotiated with which CTS-project so to execure Import from SCMA correctly, and also be aware of what transports are in the buffer of that system at that time - there will be no pick-n-choose once Import is run.
    The import into production will NOT be made via SCMA or the change request itself, but directly in STMS via the QA buffer.
    We will generate an email with the target systems and transport request numbers out of the change request and send it to the basis team. They are not going to work in the Solution Manager.
    So, actually we need that the target group to be written directly in the transport request itself.
    Do you think this is possible?
    But I don't agree that it is a good idea to create multiple maintenance projects (i.e. separate for each production system) - if all your PRD* systems are fed from the same DEV... In this case it must be just one maintenance project with multiple target systems, I think.
    It is ok if the transports are written to all production buffers.

  • DEV- QAS : Obligatory transport target for business system not found

    Hi guys!
    I have read all the other threads about this subject, but since I still have no success, I´m feeling obligated to ask you for a help (deadline approaching fast!)
    I´m trying to transport a Communication Channel, from DEV environment to QAS. I'm having the 'usual' error:
    Import failed because of business system transfer of object Communication Channel * | SIGA | SOAP_SYNC_SENDER: Obligatory transport target for business system SIGA not found in System Landscape Directory
    Here were my steps:
    Keep in mind that in DEV, everything was up and running: Software Component, Product, Technical System and Business System for this name "SIGA".
    1 - In DEV, I created a new Technical System, named "SIGA_QAS", pointing to my QAS server. (Keeping in mind I already had a "SIGA" pointing to my DEV server.)
    2 - Still in DEV, I did create two groups: GROUP_DEV and GROUP_QAS, one points to INTEGRATION_SERVER_DX1 (DEV) and the other INTEGRATION_SERVER_QX1 (QAS).
    3 - Still in DEV, I created the Business System called "SIGA_QAS" also, pointing to my QAS server.
    4 - Still in DEV, I went inside both Business Systems and put: "SIGA_QAS" as TARGET BS of "SIGA" (which automatically puts "SIGA" as SOURCE BS of "SIGA_QAS")
    If I look at my QAS SLD, I can see all of these objects already there, since my BASIS team did activate the 'sync' between these two environments. So, I dont need to create anything 'new' in my QAS SLD, all the objects are there, same as DEV SLD.
    If I try to EXPORT/IMPORT a simple Communication Channel (using file system or even CTS - I tried both) I get the error mentioned above.
    But this is 'wierd' for me, since the error says: "business system SIGA not found in System Landscape Directory", but it is there, in both SLDs.
    Am I missing something here?
    Thanks!
    Ricardo Sancio Lóra
    Brazil

    Hi,
    If you not tried this then try it. Delete the Business System SIGA from Integration Directory in your QAS system and then again import the business system from SLD. Acitvate the changes and then import the CC from Dev to QAS.
    Regards,
    Sarvesh

Maybe you are looking for

  • Can users without Publisher 2010 view (read only) Publisher pieces in a SharePoint 2010 library?

    I'm (very) new to SharePoint 2010 and fumbling my way through it with a certain amount of success. We have a variety of Publisher 2010 items I wanted to be made available in a library. Not all of the users in the group have Publisher, so I converted

  • Embedding a pdf file into a report

    Hello. I have a pdf file stored in a blob column of DB. Can I include this column (containing the pdf) in a report and shows the pdf contents in that report? How? Thanks. Rosa Paz Espinosa

  • How to get rid of draft e:mail

    I can't seem to get rid of a blank draft mail message screen. I touch cancel and nothing happens and if I add a mail address and press send nothing happens either. Help

  • MySQL Sytax error with master and detail pages

    Master and Detail pages. I get an SQL error when I click on an Item in the Master page. "You have an error in your SQL syntax; check the manual that corresponds to your MySQL server version for the right syntax to use near 'ID = 16 LIMIT 0, 10' at li

  • Thumbails are half grey in Imovie, almost impossible to edit

    Hi, I am new to this forum, and I use iMovie version 10.0.2 I work on a project which is in my iMovie Library. It all works fine, I can play the movie and import new clips/ videos etc. However, the big problem is that there is some grey noise or sort