Transportation Lead Time and Transit time

Hi All,
How to calculate the transportation lead time and the transit time from the delivery document in SAP. Please clarify me.
Regards
Srikkanth

Dear Srikkanth,
[How to calculate Lead Time|lead time]
Also refer:
[Scheduling|http://www.sap-img.com/sap-sd/backward-and-forward-scheduling-in-sap-sd.htm]
[Scheduling - |http://www.sap-basis-abap.com/sd/what-is-forward-and-backward-scheduling.htm]
Best Regards,
Amit
Note: Path
SPRO --> IMG --> Logistics Execution --> Shipping --> Basic Shipping Functions --> Scheduling --> Delivery and Tranportation Scheduling --> Maintain Duration

Similar Messages

  • The time for transit, transportation lead time and loading time of the mate

    Dear Friends,
    Please mail to me, where should I give the time for transit, transportation lead time and loading time of the material at the ware house.
    This is at the time of Transportation scheduling, for a specific material.
    With regards,

    i am giving u the exact & specific answer.
    please follow the menu path in SPRO
    IMG, Logistics execution, shipping, basic shipping functions, scheduling, delivery and tranportation scheduling, maintain duration,
    In that screen, maintain the settings
    Hope it answers
    Do reward points if it is useful

  • Transportation lead,pick/pack & Transit time

    Dear Friends,
    After considering transpoartation lead time,pick/pack time,loading time & transit time system do confirm whether stock is available or not.....my doubt is whr do we maintain the above said times in the system?........

    Hi saravanakumar
    Transit time and Transportation lead time is taken  from or maintained in  Route
    Loading time and pick/pack time comes from shipping point
    You need to have clarity on backward scheduling  and  forward scheduling
    For example you are creating a sales order today 15.02.2009 and the requested delivery date is 25.02.2009 from the customer side
    Transit time is 2 Days
    Transportaion planning time is 2 days
    Loading time is 1 day
    Pick/pack time is 1 day
    Consider these settings
    Now backward calculation  System does a backward calculation first
    25.02.2009 (requested delivery date) -- 2 days (transit days) -- 1 day (loading time) -- 2 days (transportation planning time) = that is on 20.02.2009 there should be enough stocks in the unrestricted stocks and system checks stocks for this day or date ,that is 20.02.2009  ,whether the stock is available enough
    This date 20.02.2009 becomes the material available date
    Note Transportaion planning time and Pick/pack time will run parallely and the higest of these two is considered for delivery scheduling so in our case Transportaion planning time is 2 days that is the highest and hence it is taken for calculation and not pick /pack time
    If the system finds enough stocks on 20.02.2009 (that means it performs a availability check for 20.02.2009 depending on OVZ9 settings) that is material available date then it confirms schedule lines for that order this is backward
    Same example order is registered today 15.02.2009 and if the customer wants stocks on 17.02.2009
    This means 17.02.2009-2 days (transit days)-1 day(loading time)-2 days (transportation planning time) = 12.02.2009
    The order registered date is 15.02.2009and the material availablity date is past 12.02.2009 or material available date goes to past.
    This is illogical
    This means backward is failing here and now forward calculation takes place
    Forward calculation
    If you have enough stocks today 15.02.2009 + 2 days transportation planning time+ 1 day loading time+2 days transit time = 20.02.2009
    This means that is on 20.02.2009 the stocks can be confirmed for this order as against a requested delivery date of 17.02.2009
    In forward the system will give 2 schedule lines first that is requested delivery date that is 17.02.2009(in our case) with ZERO qty and the second date as 20.02.2009 with full qty
    In backward you will find only one date in the schedule lines which is the same as requeted delivery date that is 25.02.2009 in our case
    Hope i made things little bit clear to you
    Transit and transporatation planning will come from route if route is maintained otherewise it is taken as 0 days
    Loading and pick pack time will be maintained in shipping pt  if not maintained also then it is taken as 0 days (in enterprise structure logistice execution and your shipping point details it is maintained)
    Regards
    Raja

  • Diff between transit time - transportation lead time

    Hi all,
    What is the difference between transit time and transportation lead time?
    Regards
    Manivannan R

    transpotaion lead time
    is the time taken to arrange for a del i.e
    your picking / packing and loadin time ususally this is done after material available date and ready for shipping point .....
    means if fpr picking and packing it takes 1 days and for loading mat at shiping pint i takes 2 days then ur transpotation lead time wld b 3 days
    transit time is whr is the time taken for the matreial dispatched from ur shipping point to reach the ship to party usually ur route.
    ok

  • Product Specific Transportation lead time

    We need to maintain different sourcing lead times for different products in the "Transport duration" field of the "Means of Transport" of the transportation lane. The transportation lane exists between the Supplier and the DC. A single vendor would supply different products which may have different lead times.
    Could anyone kindly give us pointers as to how this could done in the TL ?
    Best Regards,
    Mukundan

    Hi
    as well as Sanjog's answer another option is to keep just one TL MOT record and instead use the Goods Issuing time on the product Location record to account for the different leadtimes of product from a supplier. This time is added to the transportation time on the TL. It is the "GI Processing Time" field on the GR/GI tab.
    Which method you use depends on the amount of different leadtimes you have from a supplier (a few and I would use Sanjog's method, more and I would use the GI time). The GI time can also be integrated in with the transportation planning of deliveries in the ERP system as well to give better visibility of milestones in the delivery tracking. (e.g. you have a planning point when the goods should be ready to ship as well as when they are due).
    Regards
    Ian

  • Stock transfer between storage locations and lead time

    Hello,
    We use stock transfer orders between different storage locations. Is it possible to maintain the transport lead time between storage locations somewhere or do in need to use routes and scheduling?
    rgsd
    GAR

    Hi,
    Try using movement type 313 and 315
    313 -- Transfer posting SL to SL --- Remove from issuing SL
    315 -- Transfer posting SL to SL  -- Placing in Receiving SL
    Regards

  • Delivery lead time in Sales Order--URGENT

    Hi SAP GURUS,
    How the Delivery lead time works in Sales Order  i.e
    "From the time a confirmed Sales order is punched till the time we have delivered the material"
    How to confgure to use effectively

    When you create sales order, system automatically proposes data based on configuration settings.
    1. Check the schedule line proposed by system in sales order. Let's say CP. Go to transaction VOV6 and see if availability check is checked.
    2. Check the requirement type proposed by system in sales order. Let's say 041. Go to transaction OVZH and see what requirement class has been assigned to it. Let' say 041.
    3. Go to transaction OVZG and see if availability check has been checked for this requirement class 041.
    4. Check the shipping point proposed by system in sales order.
    Go to transaction OVLZ and check Loading time & pick pack time maintained there for this shipping point. If there is nothing let's say we have 24 hours and 24 hours respectively.
    5. Check the route proposed by system in sales order. Let's say route selected is 000003. Go to transaction 0VTC and see Transit duration & Transportation lead times maintained there. Let's say timings maintained are  2  days and 1 days respectively.
    Now let's say a customer calls and says he wants a material delivered on Apr 25. Now what the system does is that it does backward scheduling. i.e. it goes backward from delivery date i.e. 25th April. It reduces 3 days for transit time, reduces time taken for loading time, reduces days taken for arranging transport, reduces time taken for pick pack. After calculation it arrives at date Apr 21. Now it checks whether material is available on this date i.e. Apr 21.
    If material is available, it confirms delivery date.
    Otherwise, if material is not available on Apr 21, it determines date on which material is available. Let's say material is available on Apr 23. Now, system immediately carries out forward scheduling. So it starts calculating from Apr 23 and adds time and dates maintained for picking & packing; transportation lead time, loading time and transit time.
    Also note that system takes into account factory holidays, factory timings when it is calculating above. If factory works 24 hours and is closed on Saturday & Sunday, system arrives at date Apr 30. It now confirms delivery date as Apr 30 to customer.
    I have given a simple example. There are many other aspects you can configure on scheduling.

  • Related to shipment & transportation Dates & Time.

    Hi,
    Could you please tell me where can I find following dates & time in customizing.
    1) Transit time & transit date
    2) Loading time & loading date
    3) Pick/Pack time
    4) Transportation Lead time
    Also can you give one example of forward scheduling & backward scheduling.
    Thanks

    Hi..
    when u r creating sales order first system will go with backward scheduling if it is not reach the dates then system will go for forward scheduling.
    Backward Scheduling:
    material available datepick/pack time loading time transit timetransportation lead time
    for ex order dated is 1st req deliver date is 10th assume like this
    for pick/pack time = 2
    for loading time = 2
    for transportation lead time = 2
    for transit =5
    in backward scheduling from 10th
    522+2 = 11days it is taking that means it crossing the order date ate the time it will go for forward scheduling
    from 1st on wards 222+5 it will confirm 11th..
    this is happening when the material is available on 1st.
    If the material is not available then it will find material available date suppose that is on 3rd the sysstem will calculate like this 225 = 9 ( forward scheduling ) it will not consider Transportation lead time i.e( Lorry arrangement time ) because we can do this arrange ment between 1st and 3rd. then sys confirm on 3rd + 9days i.e 12th.
    Pick/pack time system will pick up from shipping point Transportation time ( Trans lead time+ Transit time ) is from Route. Transit time means travel duration time..
    Delievry scheduling will be started only from the material availability date i.e., system will first determine the material avail date and then do scheduling. By default Standard SAP system does Backward Scheduling in case material availability falls beyond the required delivery date system will do forward schedluing
    Delivery Scheduling consists of the following Basic activities:
    We give deatils while creating order:
    Order Creation Date
    Required Delivery Date
    Order date - Material availability date - Transportation Planning Date - Loading date - Goods Issue Date - Required Delivery Date
    Time Between GI Date and required Delivery Date is called Transit Time
    Time Between LoadingDate and GI Date is called Loading time
    Time Between Material Availability Date and Loading Date consists of 2 components - Pick / PackTime and Transportation Planning Time
    System has to calculate all this before it determines the confirmed delivery date
    Regds
    MM

  • Lead time issue

    Dear Sap Gurus,
    Is there is any report or in table  to check all the transportation Lead time settings  setting for particular plant  for all customers ? Because i need to upload several new Lead Time  due to the updation in transportation
    I want  compare the differences in system and the new Lead time whih is going to be updated.
    Thanks
    Guna

    Hi,
    Try joining VBAK, VBAP, LIKP and LIPS tables.
    take sales order number, confirmed quantity and document date from VBAK and VBAP tables and populate accordingly Actual PGI date and planned PGI date from LIKP and LIPS table. You can also take BKPF and BSEG if required. From this you will be able to find the time required between punching the sales order for confimed quantity and delivery to the customer.
    Thanks
    Anil Hooda

  • Purchase-How could I consider Transit time and lead time in imported mat.

    My doubt refers about master data configuration of imported material.
    My sittuation is :
    Material - Lead Time:  (depend on source)
                   Transit Time: (depend on source)
    My company is responsable to transport all bought material. Besides, I can buy of differents suppliers.
    Considering these rules, It s impossible to fix dates in material master, because material purchase is related with center and not with supplier. By the way, I need to discover other master data to configure it maybe : Inforecord, quotization... Whatever...
    I need to correct this to generate Purchase order with dispatched date of my source against required date of my company after execute MRP.
    I tried to study this scenario but until now I ve not got a solution.
    Probably, you have had it before and can help me.
    I hope your help!
    Thank you!
    Regards!

    Create POs with respect to either PIRs (if you don't need to print out) or Contract/item, both of these are Vendor/material specific so you can set lead times accordingly .  Probably best to use Source List and set requirement in material master too (Purchasing view).
    Regards,
    nick

  • Planned Delivery Time and Transportation duration- Tlane and Means of Transportation

    Dear Experts ,
    I have question regarding lead time calculation my SNP
    I have
    Start Location : A
    Destination location: B
    I maintained Planned delivery time in ECC- material master as 10 days  and cifed to Tlane Product procurement as 10 days
    and leave empty in the transportation duration empty so the total lead time is 10 days from start location A to destination location  B
    now
    I maintain 24 hours in Means of transport as transportation duration by truck
    now the lead time is 11 days from start location A to destination location B
    Now
    i leave empty planned delivery time empty and maintain Means of transport duration as 48 hours
    so the lead time is 2 days from A to B
    does my understanding is correct or not advise please
    Regards
    Raj

    Hi Raj,
    Take a look of these notes. Specially SAP note 379006. This note explains how the system sets the times in ECC and APO. Basically, It recommends a BAdI in order to match the delivery date in ECC and APO (transit time). What I recommend is to set delivery time equal to 0 if this is possible in your company.. This is not an SAP recommendation, because the delivery date is a key master data in the purchasing process and making it equal to 0 could not be allowed.. Now, if its possible in your case, it is the easiest way to ensure consistency...
    These are the notes:
    379006
    - Transport duration and planned delivery time in APO and R/3
    441622
    - Supplying-plant-dependent planned del. time/trans. time
    624982
    - Incorrect dates for RBA controlled stock transfer
    Kind Regards,
    Mariano

  • Sales order is not taking shipping transit lead time into consideration

    Hi,
    We have following scenario -
    1. Sales order is created in AT organization.
    2. There is no onhand in any of the organizations including AT.
    3. The scheduled ship date for sales order comes as order creation date + item lead time = 15-Sep-2011.
    3. PO for sufficient quantity is available at UK org with need-by date as 01-Jun-2011.
    5. Post processing item lead time for this item is 1 day.
    4. intransit shipment is setup between UK and AT.
    5. Shipment Transit lead times are also set up at 3 days between locations of UK and AT.
    6. ASCP plan is run.
    7. Sales Order is unscheduled and rescheduled via API MSC_ATP_PUB, which takes the ATP details from UK (based on the sourcing rules). The sheduled ship date comes as 02-Jun-2011 (PO need-by date + 1 day of post processing).
    8. Expectation is that API should also take transit lead time into consideration while calculating the ATP dates and hence the Expectation is that scheduled ship date should come as 05-Jun-2011 (PO need-by date + Transit lead time + 1 day of post processing).
    Please let me know
    a. if this is standard functionality of oracle or not.
    b. if this is standard functionality then what setups are missing required for the same to be achieved.
    UAT is held up for this issue. Please help urgently.
    Regards.

    Oracle is supposed to take the in-transit time into consideration.
    Are you running a constrained plan or an unconstrained one?
    Make sure you defined the inter-org network as described in http://download.oracle.com/docs/cd/A60725_05/html/comnls/us/inv/shipne01.htm.
    or go to Inventory > Setup > Organization > Inter-Location Transit Times and enter it there.
    Sandeep Gandhi

  • Promised Date Calculation based on Need by Date and Transit Time

    Hi,
    I have created PO with NBD as D25 (Day 25) and approved it. This means that i need the goods to be at my premisis by D25.
    Now the requirement is
    Promised date in my PO should be calculated to D25 - Transit Time. So that supplier will be notified D25-Transit time.
    Or Is there any workaround to overcome this.
    Thanks,
    Jey

    Jey-SCMFG wrote:
    Hi,
    I have created PO with NBD as D25 (Day 25) and approved it. This means that i need the goods to be at my premisis by D25.
    Now the requirement is
    Promised date in my PO should be calculated to D25 - Transit Time. So that supplier will be notified D25-Transit time.
    Or Is there any workaround to overcome this.
    Thanks,
    JeyHi Jey,
    Where you are capturing your lead time. You can do it in item master.
    Once it is there, write a personalization to calculate the promised date and update the field.
    Thanks,
    PS.

  • Lead Time - Customizatiou0131n steps: Shipping point, route, and loading group

    It says about delivery scheduling that "The lead time considers the shipping point, route, and loading group". Can anybody explain me briefly the customization menu steps about this sentence?
    Thanks in advance.

    Please go through this document it will help you
    1) Maintain transportation planning point through Menu as follows:
    IMG Maintain Logistic Execution  Definition Enterprise Structure  transportation planning point.
    Create your own like BP01 enter the general data¡¯s required
    2) Defining modes of transport:
    IMG RoutesBasic Transportation Functions  Transportation Logistic Execution Define modes of transportDefine routes
    Use the standard like:
    Shipping type: 01
    Description: Road
    3) Define shipping types :
    Basic Transportation Transportation Logistic ExecutionIMG Define shipping types Route Functions
    Or through T-code: SM30
    PT: 01
    Description: Truck
    Mdtr: 01
    STPG: 0001
    4) Define transportation connecting point :
    LogisticIMG DefineRoutes  Basic Transportation Functions  Transportation Execution Define transportation connection pointsroutes
    Copy the std point and make it FB01 as departure zone and FB02 as destination zone
    5) Define routes and stages.
     Logistic Execution IMG Define Define routes Routes  Basic Transportation Functions Transportation routes and stages
    Use the standard route and copy it as FB0001 and enter the departure zone and destination as what we created.
    6) Defining Transportation Zone:
    Basic Transportation Logistic Execution IMG Define transportation Router determination  Route Transportation Functions zones
    Use the standard transportation zone depending on the route so as for the example use 0000000003 - Southern Region
    7) Maintain country or transportation zone for shipping points
     Logistic Execution IMG  Route determination  Route  Basic Transportation Functions Transportation Maintain country and transportation zone for shipping point
    Shipping point be ASH1 and route as 0000000003 which is assigned to country India
    8) Maintain route determination:
    Logistic ExecutionIMG Route determination Route  Basic Transportation Functions  Transportation  Maintain route determination
    Country of departure: India
    Departure Zone: 0000000003
    Country of destination: India
    Destination Zone: 0000000003
    And enter the data’s needed like shipping condition 01, etc.
    Maintain Transportation relevance for shipping point, sales document type and delivery types.
    9) Now create shipping types
    IMG Define shipment Shipments  Transportation Logistic Execution types
    Copy the standard 0001 and make it to AFIL
    10) Define and assign traffic zones through T-Code: T_76 (or) thru menu as follows
    IMG Define Basic functions  Shipments cost  Transportation Logistic Execution and assign tariff zones
    Copy the standard and make it to FABTARIFF and assign our transportation planning point as ATP1, ATP2 assign tariff zone to every particular transportation planning point
    11) Define and assign pricing procedures
    Shipments Transportation  Logistic Execution IMG define and assign pricing Price control  Pricing cost procedures
    Copy the standard shipping cost pricing procedure SDFC00 to FBSC01
    12) Assign purchasing data:
     Logistic Execution IMG Assign purchasing data Settlement  Shipments cost Transportation
    13) Assign transportation planning point to shipping condition, purchase organization, purchasing group and to plants.
    14) Define Automatic G/L account determination:
     Transportation  Logistics Execution IMG Automatic G/L Account Determination Settlement Shipment Costs
    Or through T-code: OMWB
    Use G/L account 614000 as used in standard
    15) Automatic determination of CO assignments:
    IMG Automatic Settlement  Shipment Costs  Transportation Logistics Execution Determination of CO Assignments
    Or T-code: OKB9
    16) Maintain shipping point address.
     Logistics Execution  Definition Enterprise Structure Define, copy, delete, check shipping point
    17) Creating G/L account centrally.
    Financial AccountingAccounting  Master Records  General Ledger 
    Individual Processing Centrally
    Or through T-Code: FS00
    18) Enter the G/L account 614000 to the company code AFIL
    19) Create transportation condition records:
     Shipment cost  Transportation  Master data Logistic Execution createPrices
    Or thru T-code: TK11
    Enter condition type FB00 that is freight condition type, which is used as standard in the shipping cost pricing procedure.
    Enter the price and save it
    Process:
    1. The system determines the pricing procedure for the shipment cost item-using transportation planning point, service agent and shipment cost item category
    2. Calculation Basis
    3. Condition Record
    4. Access sequence.
    For the sales order, create a delivery using VL01N and pick the goods. Now create a shipment using VT01N and assign the delivery to the shipment document. Make sure to enter the carrier and other details before performing the transportation planning and execution. Save the shipment document and PGI for the delivery would be done automatically.
    A shipment represents a physical goods movement between two or more locations.
    For the system to create a shipment, shipping-relevant deliveries must exist.
    You use Transportation Planning to group pending deliveries into shipments and then to perform the shipments.
    The outbound delivery documents contain routes that the system calculates in route determination, and a transportation planning date for the delivery.
    Dynamic transportation planning is responsible for grouping together outbound deliveries into shipments that have at least the same route, visit plan type and the same transportation planning date.
    The following restrictions can be taken into account for a shipment in Dynamic Transportation Planning:
    • Weight
    • Volume
    • Variable capacity
    • Number of stops
    • Maximum duration
    • Loading units
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
    Transportation Create Single document Logistics Logistic Execution  TransportationPlanning
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Create Delivery:
    T.code: Vl01n
    Create TO:
    T.code: LT03
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
     Transportation Planning  Create Single document Logistics Logistic Execution Transportation
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Generally process is-
    1) VL01N
    2) VT01
    3) VL02N - PGI
    4) VI01
    5) ML81N – Service Entry Sheet
    6) MIRO – Invoice Verification
    Shipping docs (VT01) are created before PGI...
    You cannot carry out transportation planning or creation of shipment after the goods issue has been executed. Once goods issue is done it means that the material has left your premises so there is no need for a transportation planning after it.
    In case you need carry out the shipment documents at the end of the day you could just create the delivery documents during the day and at end of the day create the shipment documents and the goods issue
    This link is also usseful:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LETRA/SDTRA.pdf
    Hope this helps you.
    Regards
    nitin

  • Lead time and Route time estimation used for deliveries

    Dear Friends,
    Can anybadyu let us know how to estimate lead time and route times for deliveries, and what is the exact meaning of the these two with differences
    if possible can you please give me the configuration steps, as i know at this movement route times are maintained in the route and lead times are maintained in the material master MRP view.
    what was these field impacts in the delivery..
    requesting your view as soon as possible
    Thanks
    raju.

    Hi there,
    Lead time is the time in which the material will be available. It is called Replenishment lead time RLT. It is maintained in MRP view of material master. RLT can either be inhouse processing time for inhouse manufactured goods or order time + goods receipt processing time for externally procured goods.
    Whereas time mentioned in route is used to calculate transit time during delivery scheduling. That is the time taken for the goods to reach customer from shipping point.
    Both the times are imp for delivery scheduling.
    When the customer places an order, if the material is not available, then the system will take end of RLT as material availability date. From that date, it will carry forward scheduling & propose a new confirmed delivery date.
    Regards,
    Sivanand

Maybe you are looking for

  • Synching Centro with Outlook 2007/Vista Problems

    I hope someone can help me. When first set up, I had no problems synching Outlook 2007 with my Centro.  All of a sudden, the phone would complete the synch but the computer would get stuck at 12 of 12 because it stopped responding.  I would then have

  • Webcam is not working in Hp DV6770eb

    Hi, My built in webcam in Hp DV6770eb is not working. Until yesterday it was working fine. My OS is Windows 7. When i found that it is not working then I had downloaded BIAS driver from the Hp site and installed it. After restarting webcam starts wor

  • EXTERNAL SCREEN ON 8220 PEARL NOT WORKING

    Well, I lost my OS in the middle of December. Thanks to everybody's help I managed to get a generic OS reloaded and then I went back to the Blackberry Desktop Manager and reloaded my phone provider's (Orange) specific OS. I've also managed to reinsta

  • Changes Log

    How to find out if anything is changed in configuration Ex: Ob22: changed t.date type from posting date to transaltion date Please advise Regards Bali

  • Mavericks and Quicktime

    I've just upgraded to Mavericks and find many, although not all, of my Quicktime videos will not play. I tried downloading Quicktime 7 and transfering Quicktime from an old G5 computer but neither worked. Can this be fixed ? If not can I remove Maver