Transportation Planning in Logistics Execution
Hi Friends,
As of now in our company we aren't using transportation planning in Logistics Execution for shipments from mother go-down to Depot (33 in Number) and also from factory to Depot.
How to dynamically update the Transti time and transit route in SAP R/3 ECC 5.?
I have defined OVTB,OVTA,OVTD,OVTC in define routes and also OVR1,OVSY etc in route determination in master data.
How to use those information to get update for tranit time dynamically?
I'm ready to give more info on this. Thanks in advance.
Regards,
Arasu
Transit time is pre-defined in the route. Based on your route determination (essentially, departure and receiving zones), the pertinent route is selected that invokes the calculation of the dates including the planned GI and delivery date. So, essentially, the transit time is pre-defined so to calculate these dates.
Not sure what you mean by 'dynamic' calculation of the transit time as oppose to manually entering the time during route creation.
Similar Messages
-
Transportation Planning Auto Leg Execution
G'day all
When re-planning a Shipment by clicking on the "Planning" status in the deadline tab, a pop-up window to propose the action "Execute leg determination again?" with an empty check box appears.
How can I force the check box to be ticked by default? This causes problems when the user rearranges the itinerary of deliveries and then forgets to tick the Execute leg determination again check box. Which causes our SHIPMENT05 idoc to transmit with the incorrect itinerary.
Either that or get rid of the pop-up box and when the Plannng status is ticked the system will automatically execute leg determination.
For shipment type we are using:
3. Collective shipment using one mode of transport
4. Direct Leg
Adopt all stages
1. Legs determined according to departure point & itinerary
Please advise.
Thanks and regards
LukeI would like to do the same... this must be possible without programming I would suggest... but I can't find it neither.
-
Transportation Module in Logistics Execution ( SAP R/3 ECC 5 version)
Hi Friends,.
I want to know how to update the transit route,transit time in SAP. Also route scheduling
In my company finished products is sent to either mother go-down or any of the 33 depots If it is bulk volume.
PR is created based on the sales planning. Excise invoice is made at the factory level.
How to define the routes for this process.I'm ready to give more info on that.How system can display the transit time for each shipment from factory or from mother go-down.
Forgive my newness in SAP
Thanks in advance.
regards,
ArasuHi
In the definition of routes and stages (tcode 0VTC) you can set the transit duration in days for each route.
I hope this helps you
Regards
Eduardo -
The Transportation Module provides a very detailed functionality to capture & control the transportation both inward and outward. However there is a set of transaction codes in SAP ECC 6.0 which may provide some functionality on transportation.
Can Logistics Execution provide some basic control in the absence of Transportation Module? Also what are the advantages Transportation Management module provides over Logistics Execution in SAP ECC 6.0?Hello Prasad,
For ESS and MSS you do not require special data from the backend side, If a person has master data maintained in PA30, He can see his personal details in ESS, For that employee should maintain the Portal user id in Infotype 0105 , subtyp0001.
With that userid he can able to enter the portal and maintain his details. Same is the case for MSS , Manager should have maintained 0105 subtype 0001. and he can see the details of his employees in MSS application.
For ESS you need to have Portal
SAP_ESS
PCUI_GP
BP for ESS
You can check the following link :
http://wiki.sdn.sap.com/wiki/display/ERPHCM/HOWTOGETRIDOFSPSTACKMISMATCHISSUES
about the compatibility of Support Packages..
All the above mentioned package should be deployed on Eneterprise Portal.
You can search on various blogs also about this information.
Best Regards,
Deepak.. -
Info-structures used in Transportation of Logistics Execution.
Hi
Can any one send me notes, information, or any links on Info-structures used in Transportation of Logistics Execution.
Cheers
Maruthicheck this link,
http://help.sap.com/printdocu/core/Print46c/EN/data/pdf/CAARCLE/CAARCLE.pdf -
Transportation planning point in SHPMNT03
Hi friends,
Please I need to know where I can find the "Transportation planning point" in the IDoc SHPMNT03.
It s an urgent need,
Thx in advance.
Sofiane.These are the input parameters should be configured
Transportation planning point,Shipment Type,Route,Route determination.
Step1-Create Transportation planning point
Enterprise Structure>Definition>Logistics Execution>Maintain transportation planning point.
Step-2.Shipment Typer and Route and Route determination
You could refer this path.http://help.sap.com/saphelp_47x200/helpdata/en/d5/2285347860ea35e10000009b38f83b/frameset.htm
Process.
Stock Transfer Order(ME21N)>Outbound Delivery Document(VL10B/VL10D)>Shipment Creation(VT01N)>Shipment will assigned in delivery document(VT01N/VT02N).Based on the delivery assignment shipment will be planned for shipping the goods.>Post Goods Issue(VL02N).
Murugan Mallaiyasamy
Edited by: sapmurugan on Jan 28, 2010 2:55 PM -
Shippment and transportation planning point
Hi sd gurus,
Plz kindly send me the configuration screen shots for the above documents
my mail id is [email protected]
Thanks & regards,
srinivas.THi Srinu - I don't think, there's much to look into shipping and transportation planning points. Here's a quick overview and you should be able to see it yourself in the test system:
Shipping point : A logical point in SAP in a plant, that will regulate shipping activities for a particular business opertaion. Say shipping point for Full truck customers, or Small parcel goods etc.... is Defined in Enterprise structure and assigned always to a plant. A plant can have many shipping points based on the needs of the business operations of the plant. A shipping points is determined in a sales order in the following way:
Combination of Shipping condition (as derived from sales document or customer master) + Loading group (assigned to the material master) + Plant (as derived from customer info rec or Customer master or material master). You do the assignment of shipping point to these combinations at SPRO->Logistics Execution->Shipping->Basic Shipping functions->Shipping point and goods receiving determination.
Transportation planning point : Is a logical definition, which in business terms relates to the team of transportation folks who are responsible for transportation activities in a plant. However, Trans Pl. Point is not assigned to a plant, but assignment is done to a plant in a way such that the external transportation processing determines which TPP to use for a particular plant, but only for external processing. A tansportation planning group is burdened to create shipments and manage other transp. activies. They will use this transportation planning point always to create and manage transportation documents.
Transportation planning point is assigned to a company code when you do shipment cost set up to report transportation charges etc.
Thanks
Nikhil -
hi,
sap gurus,
Transportation Mangement:
(1). Frieght Charges Happens Frequently Basing On The Seasons/distance/cargo weight/volume etc...
How Do You Handle That?
(2). Can You Block A Particular driverVendor In Transportation Module?
(3). How Can We Define Delivery Priority To Deliver The Material For A Paticular Customer?
(4). How Can We Know That Material Delivered By Us Is Achieved The Despatch Target Or Not.
(5). List Of Black Listed Truck Should Be Blocked By The System Automaticlly.
(6). Frieght - Should Compare By Which Mode I.E. Optimisation
(7). List Of Pending Orders Given To Frieght Forwarding Agent To Deliver The Goods And Services.
(8). As Well As List Of Pending Sales Orders From The Systempoint Of View.
my id is [email protected]
regards,
balaji.t
09990019711.Hello Andy,
If you get any info gathered on Logistics execution plz share with me also
it will be more help full. I am a procuremnt process guy but Now on words I am working on Logistics execution
so plz help me in configuration and business process involved. It would be more help full.
thanks in Advance.
Vijay -
Transportation planning in sap erp
hello sap gurus,
when i m trying to save my shipment cost document thru vi01 there is an error in the log (No G/L account could be determined for shipment costs item
Message no. VY065
Diagnosis
The system has attempted, in vain, to find the respective G/L account with the posting key through the valuation class, debit/credit indicator, and transaction key.)
in obyc i have done relevant setting in fr1 transaction key
i.e.-vbr-3200-192100-192100
vbr-3100-192100-192100
please revert asap
mohitIn setting our shipping cost configuration, I too encountered this error.
Having read the other notes on SCN, I was unable to resolve the issue.
I worked through the VI01 document, selecting the 'Display item details', and then the 'Account assignment', and here was the missing clue. The document is looking for account modifier VBR, with a valuation class/valuation group code combination.
At first, I created the required account determination in OBYC, however I looked further and found the configuration point that determined the valuation class. What causes the issue is the valuation class associated with the shipment cost type and item category (Transaction T_56, IMG: Logistics Execution > Transportation > Shipment Costs > Shipment Cost Document > Shipment Cost Types and Item Categories). -
Transportation planning pt. and loading points
Hi Experts,
How many Transportation planning pt. and loading points is to be maintained?
Is it to be maintained according to plants?
Thanks in advance
Regards,
shabnumDear Shabnum
The transportation planning point is an organizational unit in Logistics, responsible for planning and processing transportation activities.
It organizes the responsibilities in a company, e.g. according to shipment type, mode of transport or regional departments.
Loading Point is nothing but Shipping points which are independent organizational entities within which processing and monitoring of the deliveries as well as goods issue is carried out. A delivery is processed by one shipping point only.
A shipping point can be determined for each order item. How the shipping point is determined depends on three factors:
<b>=></b> The shipping conditions from the customer master record (Shipping screen)
For example, it might have been agreed with the customer that the goods are to be delivered as soon as possible.
<b>=></b> The loading group from the material master record (Sales/Plant Data screen)
You could, for example, specify a loading group that defines that the goods must always be loaded with a crane or a forklift.
<b>=></b> The delivering plant
This plant is determined per order item either from the customer master record or from the material master record. However, you can also enter it manually for each order item.
Thanks
G. Lakshmipathi -
Memory-Based Snapshot Main Process for Transportation Planning getting erro
Hi All,
I have created a Plan in Transportation Planning module and asigned a facility to that plan then i did launch plan, then the program 'Launch Transportation Planning Process' running successfully but with that program Memory-Based Snapshot Main Process for Transportation Planning running and error outing.
the completion text is:
The executable file /u04/NRVIS/apps/apps_st/appl/mst/12.0.0/bin/MSTSNWRK for this concurrent program cannot be executed.
Contact your system administrator or support representative.
Verify that the execution path to the executable file
i have verified the path but there is only have '/u04/NRVIS/apps/apps_st/appl/mst/12.0.0' but no /bin/MSTSNWRK file
can anyone tell me what has to be there actually, is MSTSNWRK file missed?
thanks
vijayThanks for your suggestions. I finally able to resolve this issue.
- I'd relink all MSC and MSO exe files. No error found. Still not unable to launch Memory-Based Snapshot.
- I'd turned on all possible debug, trace, etc to see any possible reasons for the failure. But no help at all.
I almost created a TAR (which will need to run numerous useless checkings, talking to some clueless people, and waiting for weeks for doing nothing) and I found out I forgot to check one place - Windows Event Log. Bingo - I found the error and it's because of DLL unmatched (typical Microsoft DLL hell issue).
Using Dependent Walker to see the linking of the MSC exe file, and then I pinpointed which version of MS C++ libraries were missed. Installed the latest MS VS2005 and 2008 redistributable libraries, relinked MSC exe files again, and FINALLY it's fixed.
I need to talk to the DBA who prepare this clone to me....
Edited by: 960630 on Sep 24, 2012 1:01 AM -
Delivery 0080000276 is not relevant for transportation planning.
At the time of (delivery related) invoice creation, system throws a message "check the error log".
Log says:
" Error Log 0080000276 000010 Delivery 0080000276 is not relevant for transportation planning
LongText
Detail
Diagnosis
Copying control for billing requires that shipment costs
are copied from the shipment belonging to this delivery.
No shipment costs could be determined, because this
delivery is not relevant for transportation planning.
System Response
The system assumes that no shipment costs are to be billed
in this case.
Technical data
Tech. data details
Client 251
Group Number
Sales Document Number 0080000276
Item Number of the SD Document 000010
Schedule Line Number 0306
Counter in Control Tables 00
Message Identification VY
System Message Number 306
Output Type I
Message Variable 01 0080000276
Message Variable 02
Message Variable 03
Message Variable 04
Group Type F "
Please advice if anyone have any idea for this error log.Error Log 0080000276 000010 Delivery 0080000276 is
not relevant for transportation planning
It is not necessary to assign the Transportation Planning to Delivery type. Only recently, I completed a similar configuration and running successfully for a client. The issue is because of your copy control VTFL. For more information, check note 713171.
thanks
G. Lakshmipathi -
Interview Questions in Logistics Execution
Dear Expert SAP Guru,
Please let me know the List of Interview Questions and Answers of LE (Logistics Execution) module.
With Regard
Vijay KumarHi Vijay,
Please post your query in the correct topic space in SCN. For help, see this document:
Find Topic Spaces on SCN (Forums)
Thanks,
Kristen -
Transport planning and shipping condition
What is the meaning of transport planning and shipping condition,
Please explani<b>Shipping Conditions (VSBED):</b>
General shipping strategy for the delivery of goods from the vendor to the customer.
You can define shipping conditions in your system which corresponds to the requirements of your company. You can specify a shipping condition in the customer master and in the vendor master.
The loading group, the plant and the shipping condition determine the shipping point that will be proposed by the system.
Apart from the country and the geographical region of the shipping point, the ship-to party and the transportation group, the shipping condition determines the route that the system proposes in the order for the delivery of the goods. In the delivery, the route proposal also takes the weight group into account.
<b>Transportation Planning:</b>
Transportation Planning is part of the Transportation Planning/Vehicle Scheduling (TP/VS) application and is used for medium to long-term planning. It enables the transportation planner to optimally distribute the available capacities for trucks, trains, ships, and planes. The aim of Transportation Planning is to load capacities in the most efficient way and reduce costs. Most customers currently rely entirely on external shipping companies to carry out an optimal transportation of goods, which means that punctual and cost-effective deliveries are a high priority.
Regards,
AK
reward points if helpful -
Can I register operation breakes in Logistics execution module of SAP
Good Morning,
We are making a SAP implementation in our company, there is a logistics operation covering on this implementation and so far we have not found how to record this breakes in the logistics operation in logistics execution module, we need to record a reason for the break, the beginning date-time and the end date-time and have a text field for further information.
As an operation break i mean any topic that stops the logistic operation of the company it could be rain, damage of equipment, accident or any other.
We've been searching and we've found something in the maintenance module and the production module but we need it in the logistics execution one.
Thanks a lot for any answer that can help us.
Luis.Hi
In the definition of routes and stages (tcode 0VTC) you can set the transit duration in days for each route.
I hope this helps you
Regards
Eduardo
Maybe you are looking for
-
GL account balances by Profit Center
Is there a transaction to extract GL account balances by Profit Center. Something like this... Account No. 1 Profit Center A $xxx Account No. 1 Profit Center B $xxx Account No. 2 Profit Center A $xxx Account No. 2 Profit Center B $xx
-
Removing disk from a volume storage space 2012 r2
Hi, I've got a issue, here's my situation, i'm using storage space on a windows server 2012 R2 for my backups. Fisrt I had 14 3tb disk in mirror so there was 19tb usable for date. Now I needed more space so I just added 14 more disk and I extended th
-
I had to reset my iPhone and lost most of my apps. Is there a way to copy my iPad apps to my iPhone?
-
How to get Workitem ID of workflow
Hi all, i need to get the Workitem ID of workflow in my extended BOR method for some manipulation. how to achieve this. Please help, its urgent. Regards , Gaurav.
-
Please explain how to connect to an Oracle database with CF9 standard
Can someone walk me through this process? I am trying to help a group that upgraded frmo cf8 enterprise to cf9 standard.