Transporting holiday calendar gives export error

I have changed settings for a holiday calendar and I am trying to transport the calendars to my test system. But in the process I get an export error saying "scrap char in NUMC field found in TFAIT.VON."
Does anybody know what the issue might be and how to solve it? What I have done is only to remove a fixed date holiday from one calendar.
The error refers to note 718511 for further information but it does not suggest how to fix the problem directly.
Any thoughts?
Regards Jesper

Hi,
All public holidays calandar will be deleted in the target system.You can include objects of this type in a
Workbench request only and crete tranport request manually.If you want any further clarifications pl revert back to me.
Regards,
Ramana.

Similar Messages

  • Next button on calendar gives following error..

    Hello,
    I'm getting following error when I press next button on the calendar portlet. The portlet is displayed on the homepage of one of the users.
    Surprising part is - From the Navigator, I can run this successfully from "Run" and "Run As Portlet" options. The previous, Next buttons work fine.
    Any help would be appreciated.
    Viral Desai
    Here are the details.
    The URL in the Address is as follows:
    ===================================== http://inferno/servlet/page?_pageid=69,132,144&_dad=portal30&_schema=PORTAL30&_mode=3
    =====================================
    Error Message:
    =====================================
    Error: The servlet produced the following error stack.
    java.lang.ArrayIndexOutOfBoundsException: 1024
    at javax.servlet.ServletInputStream.readLine(ServletInputStream.java:69)
    at oracle.webdb.page.PageBuilder.getMetaData(PageBuilder.java, Compiled Code)
    at oracle.webdb.page.PageBuilder.process(PageBuilder.java:3053)
    at oracle.webdb.page.ParallelServlet.doGet(ParallelServlet.java:79)
    at oracle.webdb.page.ParallelServlet.doPost(ParallelServlet.java:128)
    at javax.servlet.http.HttpServlet.service(HttpServlet.java:521)
    at javax.servlet.http.HttpServlet.service(HttpServlet.java:588)
    at org.apache.jserv.JServConnection.processRequest(JServConnection.java)
    at org.apache.jserv.JServConnection.run(JServConnection.java)
    at java.lang.Thread.run(Thread.java:479)
    =====================================
    The query of the calendar is :
    =====================================
    select
    ev.EVENTDATE the_date,
    Initcap(DECODE(ev.emp_id, NULL, ev.eventname,
    ev.eventname | | ' - ' | |
    e.fname| |' '| |e.lname)) the_name,
    null the_name_link,
    null the_date_link,
    null the_target
    from empl.events ev, empl.employee e
    where ev.emp_id = e.emp_id
    union
    select
    ev.EVENTDATE the_date,
    ev.eventname the_name,
    null the_name_link,
    null the_date_link,
    null the_target
    from empl.events ev
    where ev.emp_id is NULL
    order by 1
    =====================================

    ooops...
    found messages regarding this error, pls. ignore this, solution seems to be upgrade to 1.0.2.1
    Viral

  • Errors in Christian Holidays calendar - please update

    I subscribed to the Christian Holidays calendar at http://ical.mac.com/ical/Christian32Holidays.ics. It has some errors and since I didn't create it, I can't fix them.
    The problems:
    - Easter should be an entire day, not just from 1-2 PM.
    - The following holidays between Epiphany and Easter are missing: Shrove Tuesday/Mardi Gras, Ash Wednesday, Palm Sunday, Maundy Thursday, Good Friday, and Holy Saturday
    Since these are some of the most important holidays in the Christian calendar, and also some which change their date every year, it would be nice if whoever is in charge of this calendar could fix these problems. Thank you.
    Message was edited by: superflippy

    I searched for this thread because I too noticed that "Good Friday" was missing from the "Christian Holiday Calendar 1.0" file for this year. The bottom line is that despite the 10/07 time stamp on the Downloads/Calendars page, this file has not been updated (by Apple) in three years.
    For example, "Good Friday" exists in this ICS file for 2004,2005,2006,2007 only.
    The challenge in keeping a calendar like this updated is that certain religious holidays such as "Easter" do not fall on a Gregorian calendar interval that can be repeated in iCal. (Easter is the first Sunday after the first full moon on or after March 21.)
    Of course Apple could go a long way in at least helping their users avoid this confusion by simply including a date range reference or last updated reference in the description field of these calendar files.
    So basically you can wait until the (correct) Apple folks catch on to this thread (don't hold your breath) or their mistake (I wouldn't wait for that either) or you can start updating this calendar yourself.
    To do this, click on the Christian Holidays calendar in iCal. Then click File/Export. Save. Drag the resulting exported (saved) file onto your iCal icon. An "Adding New Events" dialog will appear, pull down the menu and select "New Calendar".
    You will now have an editable local instance of the original "from URL" based calendar and can start updating (or changing) as you see fit.
    Good luck fellow disappointed Apple provided iCal calendar downloaders.

  • Error While Creating the holiday Calendar

    hi Gurus
    This is in regard to the Holiday Calendar When iam tring to create it its showing the error as "A date was Already entered for this year" but when i try to assign a different date for the public holiday also its not taking .. and when i chkd the List of Public holiday its not showing the holidays for the same day
    pls suggest
    Rgds
    M Bharath

    HI Bharath,
    First delete the holiday(which u want to delete ) in the list of holidays calender ID.
    Than Create the same in the holidays than again assign the to your Holiday calender ID.
    Hope this will help you
    KRC

  • Error while accessing public holiday calendar

    Friends,
    Well when creating a work schedule for the year 2008 (practice mode - at home) i am getting the below message..
    I checked all the configurations and no where i mention about 2009. Any tips and suggestions.
    Error while accessing public holiday calendar
    The function module HOLIDAY_CHECK_AND_GET)INFO has generated an error

    friends the problem still exists..
    i created a new calender, new dws, pws, bws.. but again the same error comes in play.
    Friends,
    Well when creating a work schedule for the year 2008 (practice mode - at home) i am getting the below message..
    I checked all the configurations and no where i mention about 2009. Any tips and suggestions.
    Error while accessing public holiday calendar on 20090101
    The function module HOLIDAY_CHECK_AND_GET)INFO has generated an error

  • Error while accessing public holiday calendar on 20120101

    Dear All,
    When I'm posting PL(Personnel Leave) against 31.12.2011 it is working fine but If I'm posting a Sick Leave against 31.12.2011 or CB the error is coming like "Error while accessing public holiday calendar on 20120101".
    Please suggest what to do.

    Dear All,
    When I'm posting PL(Personnel Leave) against 31.12.2011
    it is working fine but If I'm posting a Sick Leave against 31.12.2011 or
    CB the error is coming like "Error while accessing public holiday calendar on 20120101".
    Please suggest what to do.
    the error clearly saying that you dont have holiday calendar for 01.01.2012,, so please change it using PT02 to avoid the error.
    then you check what exactly system is doing.
    you have to create a wsr with one month extra validity than the exact periods required to avoid the future errors as you are getting now.
    system always takes one month extra validity it is standard functionality.
    regards,
    mohammed

  • Error while accessing public holiday calendar on 20100101

    Dear Gurus.
    When i was created Work Schedule TC-PT01
    Error Showing
    "Error while accessing public holiday calendar on 20100101"
    Message no. P2518
    Diagnosis
    The function module HOLIDAY_CHECK_AND_GET_INFO has generated an error.
    Please Advised
    Regards
    MHPO

    Hi
    As Surisetti told that, that public holiday might not created in that year. So check the same in SCAL and again re-generate the work schedule.
    Thanks & Regards
    Bharathi

  • How to transport the Holiday Calendar.

    HI Experts,
    How to transport the Holiday Calendar.
    Actually the "Transport" option in menu bar is showing but it is disabled.
    Please advise.
    Regards,
    Tomesh

    Hi Tomesh,
    Once you created the holiday calender, you have to click on the transport icon which can be displayed at the left top of the scree "SCAL" transaction.
    Once you click on the transport icon with " truck symbol " then only all the holidays and holiday calender will be moved to the target system.
    Try this and let me know the feedback.
    Hope it will sort out your issue.
    Regards,
    Azish

  • Attaching Holiday Calendar to a Transport Request

    Hi experts,
    We are rolling out individual countries to our existing system in ECC 6.0. Therefore a lot of new holiday calendars are getting created. The existing option that is there in the system makes us transport all the calendars together to Production system.
    Since we already have old calendars in place and do not want to risk them, we wish to attach only new calendars to a transport request and move them to production individually. Is it possible? How can this be achieved?
    Thanks in advance.
    Peeyoosh

    Hi Peeyosh,
    Can you tell me how did you achieved.I do have a same Scenario.
    I thought in following way to achieve the btransport of individual calendars.
    I have included the Transport thru SCAL in a Workbench Request.
    I went on to SE10 and double clicked on the Workbench Request in chnage Mode.
    Then i double clicked over the tables.
    THOC ,THOCD , THOCI ,THOCS ,THOL ,THOLU,THOCT ,THOLT .
    Then in each i limited with the Required Calendars,public Holidays to be transported.
    Like i have entered the Calendar id's.
    Do you think this is right approach.I havent tested this option yet.
    Can you anyone suggest me on this.
    Regards,
    Nachy

  • ICal U.S. Holiday Calendar Download Error

    Hello!
    So I've been trying to subscribe to the U.S. Holiday Day Calendar 1.0 on my iCal (version 3.0.5) and I keep on receiving an error message: *Error subscribing to the calendar* +Data downloaded from http://ical.mac.com/ical/US32Holidays.ics is not valid.+
    Here is the URL for the subscription: webcal://ical.mac.com/ical/US32Holidays.ics
    Thank you ahead for any help!

    Here's what worked for me (trying it for the first time today), using my macbook pro with OS X Mountain Lion:
    Go to http://www.apple.com/downloads/macosx/calendars/usholidaycalendar.html for Apple's ics file for US holidays. You can get an ics file from elsewhere if you'd like (some people want more holidays listed, but this one's good for me).
    Click the upside-down triangle beside the word "Download" on the download button.
    iCal opened the subscription window automatically for me, and the "Calendar URL" online address for the ics file appeared in the appropriate box.
    iCloud was, by default, selected for the subscription, and I kept that setting (so the holiday calendar would appear on my iPhone, too).
    Clicked "Subscribe" and it worked.
    Then, I went to my iPhone, opened "Settings" and then "iCloud" to confirm settings were ok there. Since I hadn't activated iCal there previously, I had to turn on "Calendars."
    Now, US Holiday calendar appears in iCal on my macbook pro and in Calendars on my iPhone. (I do have "All Calendars" as the setting in my Calendar app on my iPhone.)
    I see some people up here wondering whether the file is new/compatible enough, but since it is an ics file, which is supposed to be a universal standard, there shouldn't be a problem with it even though the file posted a few years ago.

  • Notes to be implemenented after Factory and holiday calendar are extended.

    Hi All,
    Since most of SAP Factory and Holiday Calendar used had Validity date that ends on 12/31/2010 we have extended them till 2020.
    This was done manually using SAP note 1529469 and 501670.
    We have also implemented SAP Note 1532398 to avoid jobs going to dump that are running to deleted old spool request in SAP.
    We would like to know if there are any other note to be implemented in our SAP production system as a part of year end activity related to Factory and holiday Calendar.
    We could find the below note under 1532398
    1534735 - Job terminates with error message BT 518
    1532398 - Spool requests are no longer deleted as of beginning of year
    574628 - Change calendar dates in production system
    538344 - Transporting calendar dates
    501670 - Public Holiday Calendar Creation/Change
    1529649 - Factory Calendar expires 2010
    Thanks

    Hi
    I suppose the notes 1529649 - Factory Calendar expires 2010 and 501670 - Public Holiday Calendar Creation/Change are sufficient for the extensions.
    I don't any extra tasks are involved during the year end activity as far as factory / holiday calendar is concerned.

  • Assigning an attendance to Holiday Calendar  !

    Hi All,
    We have a situation where the employee can work on holidays. If they work on holidays , they enter an attendance type say 2000 - Holiday worked.  While entering time in CATS.., this attendance type must be entered. But we also want to make sure that this attendance type can be entered only on the holidays.. if  an employee tries to enter att type 2000 on any other day apart from holiday , the system should give an error. 
    Question: Is there a way in IMG/config that an attendance type can be attached/tied to a holiday calendar so that the above functionality can be achieved..
    If not.. then i guess CATS0006 would come to my rescue ??
    Thanks,
    Mark.

    We had a similar(I can say same) requirement and as far I was able to search through, there wasnt any IMG configuration step to achieve this requirement. But CATS0006 is a God Sent! :)..It does the work perfect!..Just compare the holiday class for a particular day and ascertain whether the required absence type is entered and based on the holiday class of the day, throw an error message as required.
    Thanks,
    Krish

  • Problem in generating Holiday Calendar

    Dear All,
    I have created Holiday Calendar for 2009 through SCAL. After that I had generated work schedule rule through PT01. But after generating work schedule, 19th Oct,2009 which was marked as public holiday in the calendar is not coming as an OFF day in work schedule.
    Please suggest how to rectify this error.
    Thanks and Regards,
    Kanupriya

    Hi friend
    First please check your Holiday Calender.  See whether the holiday is assigned to your holiday calender and make sure that you have assigned to your personnel subarea grouping and employee subgroup grouping.  Once you finish that, please run PT01.  After this go to PT03, give the correct information like the employee grouping, holiday calender, personnel subarea grouping and work schedule rule.  Give the current year 012009 to 122009 and select the ALV list and display the information.  If all the specified information is given correctly, it will work.
    Regards
    Santhosh.S

  • FIM MA Export errors. There is an error executing a web service object creation.

    While checking for the permission, we have figured that the Built-In Synchronization account is being deleted by an Expiration Workflow.
    FIM MA Export errors. There is an error executing a web service object creation.
    While checking for the permission, we have figured that the Built-in Synchronization account was deleted by an Expiration Workflow
    Is there a way to restore. Thanks.

    I would re-run FIM setup - I think it can re-create this account
    If you found my post helpful, please give it a Helpful vote. If it answered your question, remember to mark it as an Answer.

  • Export error adobe premiere elements 12

    im trying to save a video as AVCHD with the YouTube HD presetting. ive done it before but this past time ive tried it, it gave me a message saying export error an unknown error has occured.
    Please help
    Thanks,
    Noah Ogan

    Noah Ogan
    Thanks for the reply. It is late where I am so I will just give a few comments now and more in the morning.
    1. If you have not already, open a new project and try the export
    Publish+Share
    Computer
    AVCHD
    with Presets = MP4 - H.264 1920 x 1080p30 (assuming a NTSC setup)
    2. What is the video compression for your file with the .avi file extension? The file property appears to include
    a. file size 101 GB and file extension .avi.
    b. duration 25 minutes and 7 seconds
    But, when you get to export as cited above, what is the estimated file size and duration? The duration should
    remain 25 minutes and 7 seconds, but what does it show for estimated file size.
    3. Is your computer optimized - no pile ups of preview files, conformed audio, or conformed video files? Where are
    the Scratch Disks pointed to and how much free hard drive space is there?
    4. Do you have any older source files that worked before for export that you could try in the present situation to compare with this current source?
    More later.
    ATR

Maybe you are looking for

  • How to connect a microsoft webcam to my L4300 TV?

    Hi There,  I am enjoying my Smart Toshiba TV (L4300) very much with its Android OS. Recently I installed Skype, and tried to connect my webcam (Microsoft HD-3000) which the TV does not recognize as a driver needs to be first installed, and all I can

  • Why is it so hard to get reqular updates to Service Requests

    I have a number of Service requests that have been running for a long while with no updates. That is despite my posting requests for updates and hanging for extended periods of time on the "chat" facility (usually in vain as no-one picks up the chat

  • Intenet Recovery take initial start up data from somewhere on my iMac, not from Internet

    Hello! Was experimenting with Internet Recovery (Ctrl+R on startup) on my iMac. After a few reintalls a spinning globe that usually appeared on the initial phase didnt appear anymore. Instead of that the Utilities load right after the initial startup

  • RMAN-11001: alter database mount standby database

    I'm doing a duplicate for a standby database and I'm getting this error Oracle 8i Tru64 RMAN-03002: failure during compilation of command RMAN-03013: command type: Duplicate Db RMAN-03015: error occurred in stored script Memory Script RMAN-03006: non

  • JDBC2 support for Oracle 8i Lite

    Hi, I was just wondering if the JDBC driver included with Oracle 8i Lite supports JDBC2, and if not, is there a newer version that does (I couldn't find anything on the downloads page). Thanks, Raj.