Transporting Info package

Hi
I'm trying to add info package into transport request but I'm not finding the way how to add this. If we transport cube/info- object we can go to extra and click Object Directory entry and change local package into our package . Other way is Go to directly Transport and then select what we want to transport and find object and then we can collect in transport request.
In info-object as I couldn't see Object directory entry under extra and I couldn't find this info-package in TRANSPORT Tab.
Please can you suggest what I'm missing as I've tried these steps 3-4 times but doesn't seem anything is missing.
Thanks

please close your discussion by taking below blog help.
How to close a discussion and why

Similar Messages

  • Process Chain and Info Package Transportation?

    Hello All
    Case 1
    How to transport a Process chain and a Info Package Individually?(<b>first time from DEV to QA</b>)
    Case 2
    I have 9(<b>IP1 to IP9</b>)infopackages and 3(<b>P1 to P3</b>) Process chains and in each Process chain I have 3 Info packages like IP1,IP2,IP3 in P1 and so on.,
    Now is it necessary to transport Infopackages and Process chains individually or is it enough to transport Process chains only(If v transport Process chains will the Infopackages will also transport)then how to assign a request to each one?
    What I mean is,all <b>Infopackages are in $TMP(Package</b>),and Process chain is also <b>$TMP</b>,Now is it necessary to change the package for Infopackages as well as Process chain and Tranport only PC,Iam confused here,can anyone help me out?
    Many thanks
    balaji

    Hi Balaji,
    If you have created new infopackages then you have to transport them. It is not necssary to transport the info-packages if you have them in the process chain but have not changed them.
    Also you cannot transport any BW object with $ tmp package. Assign a package and then transport the objects.
    The best way to transport the process chain is from the RSPC screen. Click the transport button there and collect all the objects and transport them.
    Bye
    Dinesh

  • Error while transporting PCs and Info packages frm dev to qa

    Hello Guyz
    First of all, I am new to this forum. Heard a lot about it, and I hope I can learn a lot by the exchange of information in this forum. I ve already gone through so many threads, and have gained a lot of insight in BW.
    I have an issue, where I am transporting process chains and info packages from dev to qa. But the transports have thrown errors, saying that the 'Source System XXXCLNTXXX does not exist and info package has been deleted'.
    My question: How can I transport these objects in such a way that the loads which were going from ECCDEV to BWDEV, now go from ECCQA to BWQA? Are there any settings in SE09 or SE10 or somewhere in BW where I can do this?
    Thanks in advance.
    Atul.

    Hi Atul........
    There is no such settings........check this.......
    How to transport BW object
    Anyways.....I think there is some problem in the Client name.......Just check the Source system name in RSA1...........if it has been changed somehow........then run transaction BDLS and change the source system assignment........
    Regards,
    Debjani......

  • Info Package Transport has failed

    Hi All,
    I have transported a Request to Quality--it having errors
    Error Message shown below
    Object R3TRISIPZPAK_8EEM4THBUB1V11IHQLM060IMR is in repair status. Therefore, it cannot be imported,
    Can any one pls suggest
    karuna

    Hi,
    If the transport has gone with Return Code 4 no need to worry
    You create the Info package in Quality .
    If the return code is 8 or 12
    you need to collect all the objects in new request and transport them again
    Regards
    Hari

  • Steps to create Info Packages in BI 7.0

    Please Give Steps top create new Info packages in BI7.0

    Hi,
    Steps to create Generic data source:
    If you want to extract the data from MM table in BI Please follow the below steps.
    1) Create a view on that table By going in to se11( Do this for future purpose, no need of joining conditon as of now why because view is containing only one table at this juncture)
    2) Go to RSO2, create generic data source based on view and designate this datasource under mm application component, it helps to replicate easily from the source system in BI side.
    3) While Creating datasource make sure that field selections and selection criteria for fields.
    4)Assign it to a package(specified by the team) for transportation purpose. Make sure the dependencies also will be going through request other wise the request may fail.
    5) Replicate the generic datasource in BI System(by going in to the mm appln comp under r/3 source system)
    6) After replication do create info package, transformations and dtp also.
    7) Trigger the Info package and then DTP.
    now data will be there in your data target in BI system
    Steps to create standard data source
    1> Go to RSA5 ,Select what data source u want , CLICK Transferstructure.
    2> After dooing this u can see the structure in RSA6 , if u want to do any customozation by adding extra fields u can do it her , if not no need.
    3> go to RSA3 and check if the structure is pulling data or not .
    BW SIDE
    4> Select Source system ->Replicate data source
    5> create Transfer rules , update rules and cube and u are done
    6> u can create a infopackage and schedule ur data load into the cube or ods.
    Hope this helps you
    Regards,
    Rakesh

  • Info-package change mode

    hi guys,
    we trasfered all the infopackes FROM DEV TO QA Environment
    when i try to creaate an info package in QA client it was in display mode.
    as i know the reason that client doesn't allow any changes in QA cleint.
    is there any other way where i can create the info packages in QA without chaging the Client setting.
    we dont want to transfer all the time from DEV to QA.
    just i need a solution to create info packages in QA without distubing client setting.
    regards
    ng

    hi naga,
    usually, we do not send the infopack from dev to quality systems. They are created in quality system itself as and when needed according to requirement.
    To make that setting, go to Q system,
    RSA1 --> "Goto" menu --> Transport Connection.
    in the transport connection screen, there is a button in upper right section, "Object Changeability".
    clicking this button will provide you list of type of objects that are allowed to change/no change. So you can set infopackges as changeable objects.
    Regards,
    Purvang

  • Info package issue in Production system?

    Hi experts,
    I would like to know about the scenerio of info packages in production system.
    1) When the objects are transported to production system,
    Do we use the same info packages in the prod system,which are used to schedule the load in development system.
    2) Do we create new infopackages everytime for the data load in production system?. Please let me know about this.
    3) In my case when I schedule the infopackage which are transported to prod system are asking for request number. Is it normal?. I mean everytime we schedule, will it ask for request number in prod system.?
    Please let me know the normal procedure as to how to load the data in prod system(Standard Procedure Which is followed by all developer's to load the data)
    With regards,
    Dubbu

    1) When the objects are transported to production system,
    Do we use the same info packages in the prod system,which are used to schedule the load in development system.
    Ans : The choice is yours.In our system we create infopackages directly in production.Its just flexibility for us.
    2) Do we create new infopackages everytime for the data load in production system?. Please let me know about this.
    Ans : Infopackages are reusuable but if they are used in process chains its better to create new ones as it will affect the associated process chain.
    3) In my case when I schedule the infopackage which are transported to prod system are asking for request number. Is it normal?. I mean everytime we schedule, will it ask for request number in prod system.?
    Ans : Yes its normal to ask request number but in development system.

  • How to set request number of info package using start routine

    Hi All,
    I have a specific requirement in which I need to upload only selective request nos from PSA to DSO.
    Any one can suggest how to set request number of info package using start routine or any other mode so that only selective request should proceed using DTP?
    Thanks
    Sangita

    You'll probably want to do this in a start routine.  It is probably not advisable to hard-code the technical name of the InfoPak.  They seem to remain the same upon transport, unlike DTP technical names which are locally generated.
    I would do a SQL select like this in a start routine, and then filter based on the results of the SQL.  You'll probably want to sort the results by date and time, both descending.  Or do a MAX in the SQL.
    Please let me know if this isn't clear.
    select q~rnr q~logdpid q~tdatum q~tuzeit
    from rsreqdone as q
      inner join rsldpio as p
        on p~logdpid = q~logdpid
    where p~objvers = 'A'
    and p~logdpid like 'ZPAK%'
    and p~source = 'your data source'

  • Creating Info Packages

    Hi,
    I have 80 infopackage in BW system with source system as R3 prod. Now i want to create this all info packages with source system as R3Q. Is there any smarter way to do it rather manually creating them. I mean some tool like LSMW..
    Thank you,
    sam

    Hi Sam,
    you can try with reverse transport which means to create transport request on your production machine and include all the infopacks and import it to your QA system.
    hope it helps.
    Li

  • Delta info Package creation in Production

    Dear BI Gurus
    I just want to know whi is the better approach for delta update in production.
    1. creation of delta info package on production server?
    2. or transport from development .
    if this is yes then what precautions we have to take ?
    Regards,
    Shilpa

    Hi Shilpa,
    If you have the necessary authorisations, you can create InfoPackages in Production. However, it is always preferable to transport them from Development in order to maintain synchronisation between the systems.
    As an example, imagine if you're transporting a Process Chain from Dev. to Production. In this case, if you've created an InfoPackage directly in Production, the technical names of the InfoPackages in the Process Chain and those in the Production system wont match and you wont be able to activate the process chain unless you transport the InfoPackage from Development.
    However, if you need to create an ad-hoc InfoPackage or there is some sort of urgency, you can create the InfoPackage in Production itself.

  • Transporting Info areas and info cubes with all the contents

    Hello Guru's,
    I want to transport Info areas and info cubes with all the contents from 1 system to another. How can this be achieved.
    Background... these belong to the system ($tmp), i already tried assigning them to a package and transported to the system, but only definitions have been copied over, there is no master data for any characteristics (i.e every characteristic is empty), there are no Hierarchies for any characteristics, there is no transaction data ===> effectively only the definitions is copied, but everything is emtpy.
    Regards, Jatin

    No way to transport contents along with structure from on system to another.
    Different system contains different data
    DEV system has only rough data. So developed objects will be tested with rough data for  consistancy of objets.
    Quality system  has some amount of original data. After transporting the delveloped objects  from DEV to Quality  we need to test  the oblects with some original data in Quality.
    Production or Live system has only live data. Afer testing complted  in DEV and Quality ( with rough and Some amount of original data ) if the objects  are giving desired values as per the requrements we need to transport them to Production system.
    considering the above criteria no use of transporting data from one sysstem to another.

  • Data deletion routine in the info package

    Hi All,
    I am writting an data deletion routine in the info package.
    it is working fine...
    but when we are transporting the info package, that routine is not getting transported.
    we have tried sending ths info package through a transport connection.
    but still it is not taking the routine to next system.
    please let me know if any one has a solution for this.
    Thanks,
    Mugdha

    Hi Mughda,
    Collect the infopackage using transport connection, While collecting the infopackage make sure that Routines are also collected in the same request.
    Else most of systems will have authorizations to create infopackages, so try to create one IP and use the routine in IP.
    Hope this helps.
    Rgs,
    I.R.K

  • Info package is inactive in BW production

    I have imported transfer structure, info source, data mart data source and info package. All are in active but info package is inactive. It says that no transfer structure is active. When I open transfer rules everything is active.
    Is there any special methods to folllow when we work with data marts?
    Thanks in advance

    Please Replicate the data source activate the infosource .go to abap editor (SE38) and execute rs_transtruct_activate_all and give the infosource name and the source system name .
    Data marts are not transported . Please create data marts with expoert data marts facility.
    Message was edited by: PSG

  • How to identify the info package deleted by someone in process chain?

    Hi all,
    I can see a couple of info packages were deleted in the production system and it was removed from the process chain too!!
    how to identify who has deleted the info package in the production system:?
    Thanks

    Can you is there any transport available with the Infopackage deletion activity?
    in SE01 you can check in production system and check if your IPAK is stored in it or not..? IF yes then you can check the user.
    Also you can track is there any deletion transport has come from D to P or Q to P? Can you check whether the IPAK is available in D and Q?
    Also you can check the process chain recent modified by in RSPC and check if there is any user details were captured?
    OR you can also look at in transaction SLG1. Check for the logs..
    Hope this helps,
    Murali

  • Info package ABAP Routine to populate date from and To filed

    Hello Experts,
    I have requirement to populate the From and To dates with the: T-1 to T (Current Date u2013 1 to Current Run Date aka Sy-Datum) at info package level.I have written a code for this but see that From filed is not getting populated but TO filed is filled with current date.Can someone please tell me wats wrongwith my code?It is a delta info pacakage.
    data: l_idx like sy-tabix.
    read table l_t_range with key
         fieldname = 'CPUDT'.
    l_idx = sy-tabix.
      l_t_range-sign = 'I'.
      l_t_range-option = 'BT'.
      l_t_range-low = sy-datum - 1.
      l_t_range-High = sy-datum.
    modify l_t_range index l_idx.
    p_subrc = 0.
    Thanks,

    Was able to tackle this using the following code.
    data: l_idx like sy-tabix.
    data: V_date type sy-datum.
    v_date = sy-datum - 1.
    read table l_t_range with key
         fieldname = 'CPUDT'.
    l_idx = sy-tabix.
      l_t_range-sign = 'I'.
      l_t_range-option = 'BT'.
      l_t_range-low = v_date.
       l_t_range-High = sy-datum.
    modify l_t_range index l_idx.
    p_subrc = 0.
    Thanks,
    I am closing this thread

Maybe you are looking for

  • How to connect printer epson l210 to airport express

    How to connect and setup printer epson l210 to airport express

  • HELP! Running slow.

    My mac is running slow and i don't know what the problem is. Could someone help me out? Thanks! EtreCheck version: 1.9.15 (52) Report generated September 12, 2014 at 2:15:31 AM GMT+2 Hardware Information: ?   MacBook Pro (13-inch, Early 2011) (Verifi

  • Mac OS X archive and install?

    will an archive and install preserve microsoft word docs, my folders, pictures, etc.?

  • Auto Mail to Sales Order Booked

    hi, i want to send automail once Sales Order is Booked . is it possible or Not .

  • Illustrator CC startet nicht mehr

    Hi, wer kann helfen? Habe OS X 10.10.2, neueste Wacomtreiber (Intuos 4), mich bei der Cloud abgemeldet, wieder angemeldet, alte Wacom-Treiber entfernt. Stürzt beim Starten ab. aaaarrrrrggggglllll... Dank und Gruß, Holger