Transporting LSMW single object instead of entire project

Dear Experts,
When I am selecting LSMW object and then selecting Generate Change Request from Extras, then it is creating Transport request for entire project instead of a single object.
How can i transport single LSMW Object instead of entire project.
Please help me.
Thanks & Regards
Rangababu

Hi,
when you are on the first screen of LSMW, can't you go via Extras->Export Project. Then you can select on detailed level what you want to export to a flat file.
On your other system you can import this flat file (and you can even rename stuff while importing). Not sure, but it might be that the import functionality is blocked on your other system. If not, I think this is the way to go.

Similar Messages

  • Logic project in glitched state, no apparent fixes or explanations - Opening single vet instead of whole project

    I was working on a Logic Pro x project, using retro synth, on closing retro synth a the panel interface was replaced by a blank, black screen where the interface of retro synth had been. It became the colour of the surrounding borders of most of the effects and virtual instruments in logic, the almost matte black. The plugin had disappeared but would not close, so in my hast to fix the problem i saved the project and closed the program (Logic Pro x). On opening the project again, instead of my project, the only window that opens is that of the retro synth interface, when I go to close the retro synth it asks me if i want to save my project and then closes the entire project. Note: The only window that will open is that of retro synth, not the project interface or mixer etc. When doing commands to show all windows (When i open the glitched project with only retro synth appearing), the only window available is retro synth, and on scrolling through all windows open on my computer the project is not to be found apart from the retro synth window. When i close the project and reopen it there is simply a repeat of what i have described. I have restarted my computer, Logic Pro x, and my finder, none of which have fixed the problem, meaning the project has saved in a state of the retro synth window.
    Any ideas of how to fix this?! Note: I can hear my project fully when i press the space bar for a short command to play, the program acts as if the full project is open when it is simply only the retro synth, i haven't lost data or work, just can't access it for some reason. (I have used all available commands to show all windows, open the project in different ways but none have prevailed.)
    Thanks for any help! -

    Thankyou very much, solved the problem, i was far too hasty on the situation, just a simple problem. Thanks again!

  • How to export single object of LSMW to already existing project

    I want to export one object of LSMW project to another project which is already exists and conatins some subprojects and objects. Menas I want to export one object to already exsiting project. How can I do this?

    hi,
    you may copy objects between projects....
    see: lsmw-all project objects,,and here fucntion "copy entry"
    regards,darek

  • Error when transport LSMW project

    Error description:
    When set up LSMW project in develop system, it is all right. But when transport to production system, its file path shows wrong. It looks the same as in Develop system. Now We delete the file path in P-System and re-create new file path the same as before, it can work. How could we solve this problem?
    Thank you.

    Hi,
    LSMW is a transaction, which will let you mass upload almost any other transaction (FB01, FD01, AS91, etc.). You do it in the following way: 
    1. Enter into transaction LSMW (no menu path), possibly in a development / test system 
    2. First, define a project, subproject and object (relatively formal task). 
    3. On the horizontal menu, go to Goto -> Recordings. Click on "Create recording". 
    4. Enter the name and description of recording (freely definable). 
    5. I cannot simulate this now in my system, but SAP will ask you about transaction code (AS02) and will take you into the AS02 transaction. In this step, do the change manually. Make sure you "touch" (change / write something) in all fields which you want to update. 
    6. Once you are done, save the recording and return on the start page of LSMW. Click "Execute". 
    7. You will see a list of tasks. Do them one by one. They should be relatively simple (and I cannot help you with them). Important is step 3 (maintain source fields) - here you define the columns of your excel (csv) file in the particular order. In step 5 (field mapping and conversion rule), you assign file columns to SAP fields (note that you will see only those fields which you "touched" during recording). You need to go through all the steps. In the end, you get (and run) a batch session. 
    8. <b>If you did this in a development system, transport the LSMW object (menu Extras - Export project, Extras - Import project). You have to do it via file, not via standard transports of configuration (it is perhaps more simple). </b>
    Make sure you test it first in development or quality system! 
    Pls reward points if useful.
    Regards,
    Ameet

  • Problem in Transporting LSMW project

    Hi,
    We created LSMW project in development environment. Then we created Transport request through menue <b>Extras -> <u>C</u>reate Change Request</b>
    We successfully transported this request to test environment. When status is checked through STMS_IMPORT everything was fine. However when we tried to open project through LSMW, it didn't exist.
    Can anyone suggest, what could have gone wrong ?
    Nishad

    Hi,
    if your problem is not allready solved.
    You can not transport LSMW-Project - I do not know what this icon is for.
    You have to export the project and than import on the new system.
    use these icons.
    best regards

  • How to Transport LSMW to development server to Prodution server

    Hi all,
    I would like to know how we transport LSMW(project, sub-project, Object) from development server to Production server.
    Thanks
    Vipin Nagpal

    Hi Vipin,
        Actually, it depends based upon the requirement. There are some advantages and disadvantages with both of the methods.
    See the following documentation. I think this would be helpful for you and based upon your requirement you proceed further.
                 <b>Transport LSMW Projects</b>
    The LSM Workbench provides data transport for a project via both the SAP transport system and down-/upload. (Excluded are the presettings for IDoc inbound processing. These presettings should be manually created in every SAP system and every client.)
    <b>1. Generate Change Request</b>
    Choosing this function creates an SAP change request containing all information about an LSMW project. This SAP change request can be exported / imported with the usual means of SAP correction and transporting. You can find this function in the initial screen under Extras -> Create change request.
    When transporting LSMW data this way, you can trace the transports any time in SAP correction and transporting.
      <b>Note 1</b>: When importing such a request, the complete project is deleted from the target system first. It is then created again.
      <b>Note 2</b>: When exporting the transport request, all changes to the selected project made until the time of export are entered (not only until the time of creation of the transport request.)
    <b>2. Export Project</b>
    In the initial screen, select Extras &#61664; Export project. This first displays the structure tree of the selected project. Via Select / Deselect you can select whether the entire project or parts of the project are exported. Then select Export. The program then creates an ASCII file.
    Note: The selected elements are exported together with their documentation
    <b>3.Import Project</b>The exported mapping and rules can be imported into another SAP system.
    On the selection screen, select Extras -> Import. The program then prompts you to enter the name of the PC file. The file is imported and the contents are analyzed. After the analysis, a list of the subprojects and objects found is displayed.
    You can now mark the objects to be imported. Project data existing already are check-marked. They are overwritten by the import.
    You can prevent a project already existing in the target system from being overwritten by using function "Import under different name".
      Note: The selected elements are imported together with their documentation.
    If you feel this is helpful, don't forget to reward points.

  • LSMW Copy Object

    Hi,
    In LSMW we have Project, SubProject, Object in this,
    When I copied the Object Which is having Batch Input Method the Recording is not copied to my destination Object can any one please help out.
    To Copy the Object I went Tcode: LSMW -> All Objects of the Project
    You will get the list of the Object under the Project there click on the Object u wants to copy and go with (Ctrl+F4).

    hi
    r u looking to transfre the lsmw project to development server if so fallow the lines
    Actually, it depends based upon the requirement. There are some advantages and disadvantages with both of the methods.
    See the following documentation. I think this would be helpful for you and based upon your requirement you proceed further.
    Transport LSMW Projects
    The LSM Workbench provides data transport for a project via both the SAP transport system and down-/upload. (Excluded are the presettings for IDoc inbound processing. These presettings should be manually created in every SAP system and every client.)
    1. Generate Change Request
    Choosing this function creates an SAP change request containing all information about an LSMW project. This SAP change request can be exported / imported with the usual means of SAP correction and transporting. You can find this function in the initial screen under Extras -> Create change request.
    When transporting LSMW data this way, you can trace the transports any time in SAP correction and transporting.
    Note 1: When importing such a request, the complete project is deleted from the target system first. It is then created again.
    Note 2: When exporting the transport request, all changes to the selected project made until the time of export are entered (not only until the time of creation of the transport request.)
    2. Export Project
    In the initial screen, select Extras &#61664; Export project. This first displays the structure tree of the selected project. Via Select / Deselect you can select whether the entire project or parts of the project are exported. Then select Export. The program then creates an ASCII file.
    Note: The selected elements are exported together with their documentation
    3.Import ProjectThe exported mapping and rules can be imported into another SAP system.
    On the selection screen, select Extras -> Import. The program then prompts you to enter the name of the PC file. The file is imported and the contents are analyzed. After the analysis, a list of the subprojects and objects found is displayed.
    You can now mark the objects to be imported. Project data existing already are check-marked. They are overwritten by the import.
    You can prevent a project already existing in the target system from being overwritten by using function "Import under different name".
    Note: The selected elements are imported together with their documentation.
    If you feel this is helpful, don't forget to reward points.
    if u find it useful plz mark the points
    Regards,
    Naveen

  • How to transport the report object from development clint to quality clint

    any body knows different ways of transferring  report object  from  development clint to quality clint.pse send ...

    Hi..
    LSMW:
    There are 2 ways for transporting LSMW data from a system to another.
    Export/import this method gives you the opportunity to select the subprojects or objects you want to transfer. LSMW -> Extras -> Export project
    Transport request with this method, you can transport a LSMW project in full (you can not select the objects you want). With this method, the project will be transported as any other SAP object in a transport order. LSMW -> Extras -> Create change request
    Program variants
    If you have several program variants in a development system that you want to transport, use the following method to transport them:
    Execute program 'RSTRANSP' (via se38) and inform the program and/or variant names (you can transport variant of several programs in one shot).
    Layout
    In some transactions, one can save layout of the screen (sort, filter, ... criteria).
    These layouts can be transported: In the required transaction, when your layouts have been saved, go to Settings -> Layout -> Layout Management. Select the desired layouts and go to Layout -> Transport... There you can add your layouts in existing TO or create a new one.
    Database data
    In some unusual cases, you might have to transport data of a SAP table.
    Go to transaction SE16, select your entries and go to Table entry -> Transport entries. It's only possible for some tables...
    If you cannot do it that way,you have to create a Workbench transport order with transaction SE10. When created, click on it, go in menu Request/task -> Object list -> Display object list.
    Go in modification mode and add a new line with:
    PgmID = R3TR
    Obj = TABU
    Object name = Name of your table
    Double-click on the created line and, depending on your need, put '*' in the key field or double-click on it and select the key you need to transport.
    Queries
    Queries, datasets and user groups can be exported/imported between the systems using the Program RSAQR3TR.
    Report template (ALV variants)
    There is a button or somewhere in the menu Change/Select/Save/Manage Layout.
    Go to Manage Layout, than Layout menu/ Transport.
    SAPSCRIPT Files Transport
    Use the program RSTXSCRP to upload and Download the SAPSCRIPT files to different systems
    Transport SAPSCRIPT
    Use the Program RSWBO052 to create the Transport Request for a SAPSCRIPT, In the Selection screen of the program, give R3TR – FORM – Give the Form name and press Execute button, it will ask the Development Class and the transport Request No.
    Standard texts
    Standard texts used in SAPScript(created with transaction SO10) can be included in transport orders. You have to create a Workbench transport order with transaction SE10. When created, click on it, go in menu Request/task -> Object list -> Display object list. Go in modification mode and add a new line with:
    PgmID = R3TR
    Obj = TEXT
    Object name = TEXT,,ST,
    Example :
    R3TR / TEXT / TEXT,YMM_MEDRUCK_MAIN_16_EC,ST,F
    Reward if useful
    ~Lakshmiraj~

  • Combining separated text into single object ...

    I remember in older versions of Illustrator that when you used pathfinder to combine multiple objects into a single object ... it actually made them into a single object, regardless of weather or not they where intersecting.
    With the more recent versions of illustrator, when you try to "unite" objects in pathfinder ... the only ones that are truly combined into a single object are the ones that overlap ... anything separated will simply be "grouped" and remains a totally separate object ... even if you use "expand objects" on the group.
    I'm trying to use a third party program (path styler) and the problem I'm running into is that when I apply a stroke effect in path styler, it treats every letter in my headline as a separate object (even when united in pathfinder), causing the strokes to overlap the previous letter.
    What I want to do is combine all the letters into one single object (while still leaving space between each letter) so that path styler treats the text (and the outlines) properly. (So the outlines run into each other, instead of overlapping the fill.)
    Any help would be appreciated ... this should be simple ... but I think it may be a case of the program trying to preserve the history of "united" objects when I don't want it to.
    Thanks!

    Make your logo ONE entire compound path, you probably have each letter as an individual compound path.

  • Multiple Materials on a single object

    I'm sure I'm missing something...but I'm finding it impossible to use multiple materials form the 3D toolkit on a single object unless I separate the material differences to separate objects....which I'm sure is crazy. But if I import an object with multiple materials, there seems to be no way to assign the toolkit materials separately. If I drag a toolkit material to one part of the object...the entire object turns into that material. It would seem it would be right if you dragged a toolkit material to the materials list of the object....but that won't work either. Anyone know what I am missing here?
    Thanks in advance for any help

    Right click on the object and select Tools -> Separate Meshes which will divide the object into it's component parts (i.e. parts that aren't part of the same polygonal mesh will be divided)
    From there, you can apply materials to them individually.
    To rejoin them (you don't have to) just select them all, then right click and select Tools -> Collapse Hierarchy.

  • How can I transport a single DP Macro???

    Hi,
    I have a macro book that has a number od DP macro's that have been developed within it.
    Over the years macro's have been updated directly within our production system so that I cannot be sure that the macro's already within our development system are the same as the macro's within our Quality System and production system
    I have developed a macro which I want to transport through correctly through the Development and Quality system in the correct way. However, I dont think that you can transport a single macro, I think you have to transport the whole Macro Book.
    Can anyone advise if there is a way that I can transport my single macro avoiding alot of jiggling around and the risk of making mistakes and overwriting the Production Macro's by mistake.
    Thanks in advance for any advise that you can give
    Mark

    Mark
    Please refer this thread
    How to transport single macro, NOT the entire macro book
    I also have another suggestion for you. Create a temporary data view which is a copy of the data view that contains the "new macro".  now go to production system  and backmigrate the macro book from the production system to developemnt system (take help from basis to do this).
    Now in development system your original data view will be in sync with the data view and macros in production. Now copy the "new macro" from your temp data view in development to the original data view and then create a transport for the original macro book  and release it
    Thanks
    Aparna

  • Testing Process for Gathering Single Object stats.

    Hello Oracle Experts,
    I work a critical system and due to some high stakes all and every change is very heavily scrutinized here whatever the level is. And one of such changes which is currently under scrutiny is gathering object stats for single objects. Just to give you a background its an Oracle eBusiness site so fnd_stats is used instead of usual dbms_stats and we've an inhouse job that depending on the staleness of the objects gather stats on them using FND_STATS. (RDBMS : 10.2.0.4 Apps Release 12i).
    Now, we've seen that occasionally it leaves some of the objects that should ideally be gathered so they need to be gathered individually and our senior technical management wants a process around it - for gathering this single object stats (I know!). I think I need to explicitly mention here that this need to gather stale object stats has emerged becs one of the plans has gone pretty poor (from 2 ms to 90 mins) and sql tuning task states that stats are stale and in our PROD copy env (where the issue exists) gathering stats reverts to original good plan! So we are not gathering just because they are stale but instead because that staleness is actually causing a realtime problem!
    Anyway, my point is that it has been gathered multiple times in the past on that object and also it might get gathered anytime by that automatic job (run nightly). There arguments are:
    i. There may be several hundred sql plans depending on that object and we never know how many, and to what, those plan change and it can change for worse causing unexpected issues in the service!
    ii. There may be related objects whose objects have gone stale as well (for example sales and inventory tables both see related amount of changes on column stock_level) and if we gather stats only on one of them and since those 2 cud be highly related (in queries etc.) that may mess up the join cardinality etc. messing up the plans etc.
    Now, you see they know Oracle as well !
    My Oracle (and optimizer knowledge) clearly suggests me that these arguments are baseless BUT want to keep an open mind. So my questions are :
    i. Do the risks highlighted above stand any ground or what probably do you think is there of happening any of the above?
    ii. Any other point that I can make to convince the management.
    iii. Or if those guys are right, Do you guys use or recommend any testing strategy/process that you can suggest to us pls?
    Another interesting point is that, they are not even very clear at this stage how they are gonna 'test' this whole thing as the 'cost' option like RAT (Real Application Testing) is out of question and developing an inhouse testing tool still need analyzing in terms of efforts, worth and reliability.
    In the end, Can I request top experts from the 'Oak Table' network to make a comment so that I can take their backings!? Well I am hoping here they'll back me up but that may not necessarily the case and I obviously want an honest expert assessment of the situation and not merely my backing.
    Thanks so much in advance!

    >
    I work a critical system and due to some high stakes all and every change is very heavily scrutinized here whatever the level is.
    Another interesting point is that, they are not even very clear at this stage how they are gonna 'test' this whole thing as the 'cost' option like RAT (Real Application Testing) is out of question and developing an inhouse testing tool still need analyzing in terms of efforts, worth and reliability.Unfortunately your management's opinion of their system as expressed in the first paragraph is not consistent with the opinion expressed in the second paragraph.
    Getting a stable strategy for statistics is not easy, requires careful analysis, and takes a lot of effort for complex systems.
    >
    In the end, Can I request top experts from the 'Oak Table' network to make a comment so that I can take their backings!? Well I am hoping here they'll back me up but that may not necessarily the case and I obviously want an honest expert assessment of the situation and not merely my backing.
    The ideal with stats collection is to do something simple to start with, and then build on the complex bits that are needed - something along the lines suggested by Dan Morgan works: a table driven approach to deal with the special cases which are usually: the extreme indexes, the flag columns, the time-based/sequential columns, the occasional histogram, and new partitions. Unfortunately you can't get from where you are to where you need to be without some risk (after all, you don't know which bits of your current strategy are causing problems).
    You may have to progress by letting mistakes happen - in other words, when some very bad plans show up, work out WHY they were bad (missing histogram, excess histogram, out of date high values) to work out the minimum necessary fix. Put a defensive measure in place (add it to the table of special cases) and run with it.
    As a direction to aim at - I avoid histograms unless really necessary, I like introducing function-based indexes where possible, and I'm perfectly happy to write small programs to fix columns stats (low/high/distinct) or index stats (clustering_factor/blevel/distinct_keys) and create static histograms.
    Remember that Oracle saves old statistics when you create new ones, so any new stats that cause problems can be reversed out very promptly.
    Regards
    Jonathan Lewis

  • Duplicating an entire project?

    Hi there,
    I have duplicated all of the files and the folder structure in an ID CS4 project that contains 40 chapters organized under a book file. I renamed the parent folder to indicate a new version.
    When I open the book file in the duplicate folder structure and open one of the chapters, ID opens the chapter file from the original folder.
    How can I edit my book file to point to the newly duplicated files in the new folder structure?
    I haven't found a discussion on this subject nor does my CS4 Bible seem to mention this. Am I trying to do something that shouldn't be done at all?
    Thanks,
    Peter H.

    Thank everyone for the feedback. I wasn't aware of the package feature you mentioned so I'll investigate that possible solution.
    I successfully updated the book file to point to all of the copies... it just took a while with 40 chapters.
    I suspected there would be an issue with the image links. I'd like to find a solution to that as well. Since I'm the newest person on the team but solely responsible for his particular document, it is up to me to fix things without rocking the boat too much. (politics)
    After investigating a few of the links, I see that some of the hundreds of images are pointing to indivisual computers belonging to people no longer employed by the company. I'm finding links pointing to user folders on distant C: drives.
    I don't mind independent copies of the entire project with all the images in folders below the ID files. Wish those links were relative paths instead of the full path but it is what it is... I am more concerned with the missing images and the fact that ID now has to use whatever temp file it is using to display the image of the missing file.
    Sounds like I've got a busy week ahead of me... but I'm done for now... got my 40 hours in and I'm not authorized any overtime no matter how much I'd like to clean this up as quickly as possible. :-)
    Thanks again,
    Peter H.

  • OWB copying entire project to another repo environment

    Hi Experts,
    We are using Oracle 10g R2 and I'm still pretty much new to OWB. My question probably have been answered before but I can't find in the forum.
    Details:
    - We have 3 Repository Environment (Dev,Test,Prod).
    - Users login in Dev
    - In Dev we create our projects, deploy mappings and execute for initial test
    - When everything works fine, we set the locations and configuration to TEST environment. Again deploy and test for larger data set
    Question:
    - Is it possible to copy the entire projects from Dev into TEST environment? If yes, please assist me on how to do it.
    Concern:
    Although changing location and the configuration for control center from one environemnt into another works fine. For me, having the copy in TEST is more organize and easier to manage.
    Thank you for reading and hoping to get some answers.

    After the import, you can check if all the objects were imported in the log. If the project wasn't recognized, all the internal objects will fail.
    But before you should choose if you want to match by names or id. If the projects were created isolated in each enviroment, you have to choose "by names". If the project names are diferent, then nothing will be imported. I only use "match by id" when one project was a result of a previous import of the other project.
    Also, you have to choose if you want to merge or replace the objects, because you'll have many duplicated objects. If you have chosen "create only" and the objects was already there, nothing happens.

  • RH8 HTML:  Publishing Sections of Project (Not Entire Project)

    Hi,
    I have a fairly large project that I'm doing various updates to.  Is there a way to publish just the areas that have been updated instead of the whole entire project?  Currently, I select "generate primary layout" once I commit through SVN but this publishes the entire project.  I just want to publish certain sections as they're being updated.
    Thanks!

    Hi there
    You can accomplish what you want in many ways. I cannot help but to notice you used the word "Publish". Are you using the built in Publishing feature to do this? If so, note that typically this operation only copies over the files that have been added or changed since the last time you published.
    From what you stated, one may also infer that you wish to prepare certain content but prevent it from going out as you update. If that's what you are hoping to do, you would use Conditional Build Tags to accomplish that. Just create a tag and name it perhaps IP (for In Progress) and exclude anything tagged with IP during the generation of the output. Assuming everything has been correctly tagged and is working, nothinig tagged with IP should end up among the output files.
    Hopefully this was helpful... Rick
    Helpful and Handy Links
    Captivate Wish Form/Bug Reporting Form
    Adobe Certified Captivate Training
    SorcerStone Blog
    Captivate eBooks

Maybe you are looking for

  • I need help changing a drop down menu on a template

    Hi there ive been using dreamwearver on and of for a few years now and just about get by,  ive just bought a web site template and although ive managed to ajust most things, the template had a drop down menu using CSS  currently on the "about us" opt

  • Setting the header in http request object

    I am facing a problem while trying to test a particular flow of my application.The details are given below: The controller servlet of my main application reads the header "Referer" from the request object and then based on this it forwards the reques

  • Unloading library on HP UX11 and AIX crashes in 8.1.7 and 9i

    We dynamically load/unload Oracle client libraries(libclntsh). Unloading the library hangs/crashes with 8.1.7 or 9i client. Works fine with 8.1.5. This happens only on HP11 or AIX. Windows and solaris work fine. Has anyone else seen this problem? Tha

  • Retrieve document Iphone

    Hello, I deleted an important document in my NOTE on my Iphone4.  Can somebody tell me how to retrieve it. Thank

  • Not all the fonts get smoothed

    http://www.associatedcontent.com/articl - power.html The headline of the article is not smoothed in my system, other text is smoothed. Why? My .fonts.conf: <?xml version="1.0"?><!DOCTYPE fontconfig SYSTEM "fonts.dtd"> <fontconfig> <match target="font