Transporting SolMan Project

Hi Gurus,
Does anybody have the success story of transporting SolMan projects from one SolMan system to the other?
I have read that it is possible. Also have heared that lot of people are facing lot of issues while transporting. So, looking forward for some expert advise.
best regds,
Alagammai.

Hi Raja,
Thank you for the reply.
But as I told you, I have heared people saying that it is possible. But I also have heared people saying that they are facing one or the other problem like:
Structure got transported, but not documents
(ii) Only released docs can be transported, etc.
In the link specified by you, again the issue has not got resolved. The user has got the error of "specify transport target". But as said in the forum it looks more like a Basis issue.
Thats why, I am looking for somebody to confirm me, "Yes it is possible. And these are all the prerequisites for successful transport".
But many thanks for your efforts to help me out.
Thanks & best regds,
Alagammai.

Similar Messages

  • Transporting SolMan project with Aris integration to new SolMan system

    We have a sandbox SolMan that was installed for temporary use, and some people on the team have done some process modeling with Aris.  We need to move this to a new SolMan development system that we're about to install.  I haven't really found good documentation on doing this, but in SOLAR_PROJECT_ADMIN, I do have the option to transport a complete project.  Can I do this, and then manually import that transport request into the new Dev system?  What has to be done on the Aris side to insure consistency?

    Hi David,
    There is not a lot of information about this topic. Just finished a project migration at the customer site. I used the solar_migration transaction, worked very good. But has some downsites, test plans are not migrated anc change documents. Be carefully with content repository this really painful. Even the Aris synchronisation worked because the SAP ids are not replaced.
    regards,
    Ralph

  • Solman project transport from one server to another

    Hi All,
    i have a small query , regarding project management . I have a Template project with some manually designed tamplate inside that. and test case created.
    Now i want to move this project with all config. , selected template and test case from one server my another solman server.
    I am hoping transport icon given below in solar_project_admin will work for me . please confirm me and let me know if other options too available   . can i use solar_migration for this activity ??
    please suggest all possible way for export (transport) this project from one server to another.
    Thanks
    gyanP

    Unfortunately, transaction SOLAR_MIGRATION is  not released to be used in the Solution Manager 4.0/7.0  and therefore is not supported.
    See also the PDF-document: 'SAP Solution Manager - Content Transfer'
    which can be found at:
    http://service.sap.com/solutionmanager
    -> Media Library
      -> Technical Papers
    Besides the "Transport Project" functionality in SOLAR_PROJECT_ADMIN for projects and the transport of testpalns from transaction STWB_2 there is no other function available/supported at the moment.
    you have to make sure that you have in the source system the corrections from the notes:
    for Projects:
    1147186  Unreleased documents are not transported
    1119462  Problems transporting projects
    1134578  Document types missing when transporting projects
    For Testplans/testpackages:
    1224283  Test plan incomplete after transport
    1246383  Transport connection for test documents in test plan

  • Problem in Transporting LSMW project

    Hi,
    We created LSMW project in development environment. Then we created Transport request through menue <b>Extras -> <u>C</u>reate Change Request</b>
    We successfully transported this request to test environment. When status is checked through STMS_IMPORT everything was fine. However when we tried to open project through LSMW, it didn't exist.
    Can anyone suggest, what could have gone wrong ?
    Nishad

    Hi,
    if your problem is not allready solved.
    You can not transport LSMW-Project - I do not know what this icon is for.
    You have to export the project and than import on the new system.
    use these icons.
    best regards

  • Solar_project_admin to transport whole project

    We have some documentation in Solution Manager (in transaction "solar02"). It is version 3.1 we are using.
    We have to transport Documentation of project "smart" to a newer Solution Manager(version 3.2). However project "smart" exists aso on newer Solution Manager system but can be overwritten.
    I am pritty new in Solution Manager.
    I wander if transport function (track icon) can be used in transaction "solar_project_admin" to transport whole project to transport files and then import them to newer Solution Manager

    Hi,
    check this
    http://sap.ittoolbox.com/groups/technical-functional/sap-solution-manager/where-are-uploaded-office-documents-physically-stored-in-sap-2647587?cv=expanded
    as per above link u can try with option
    1.
    use Tcode - SOLAR_PROJECT_ADMIN
    1. Select the project in the project overview.
    2. Choose the Transport Project pushbutton or Project ® Transport.
    3. Specify the transport scope in the following dialog box. To transport the project without project documentation, reset the With Notes flag. The project documentation is transported by default.
    4. Specify a transport request or create a new one.
    5. Save your entries.
    Regards,
    Ravi

  • How to offline transport ESS project?

    Hello experts,
    I had configurated NWDI , created  track, download develop configuration into NWDS , created ESS project, then modify  some ESS project .Of course , I had created some activities for my modify of ESS project.
    I had deployed my changes by "Development Componnent -> Build/Deploy "   to development system  .
    But our product system was in another LAN ,  and the message server port was forbidden by firewall.So I can't deploy the modified ESS project by NWDI transport or NWDS directly deploy.
    Is there any offline solution to transport my modified ESS project to production system ?
    I  had builded the ESS project by "Development Componnet -> Build ", then got the .ear file . Then deploy the ear file with SDM, deploy was succeded , but the ESS project was not updated in production system.
    I also deployed ear file with visual admin deploy service ,  it occured error "Can't conver file ..... " , can't deploy.
    Then I used "create archive" to create ear file of ESS project, and deployed with SDM and visuam admin deploy service.
    Deploy with SDM was also succssed ,but project was not updated; deploy with visual admin deploy service ,also got error "Can't convert file ....".
    Could you please give a suggestion about offline transport ESS project ? Thanks.
    Best Regards,
    Louis Chen

    Hi Louis,
    Do you have CTS configured in your landscape?
    You can also achieve your Java transports using CTS.
    If it is configured, then you can choose the option.
    "Connect to CTS" option inside General Track Data of your Track, in Landscape Configurator from CMS Web UI.
    I hope that helps.
    Regards,
    Shreyas Pandya

  • Export of SOLMAN-project

    Does some one know how to export the SOLMAN project with existing documents and structure on OS-Level?
    The transaction solman_migration gives the opportunity to export only few files...
    Thank you very much!
    regards
    Thom

    Hi Thom,
    if I get it right, you are only interested in the documents, not the structures, Business blueprint etc.
    I have recently used the SAP Knowledge Workbench. It is an MS-Windows base program the can be found under:
    Programs -> SAP Front End -> SAP Knowledge Warehouse -> Knowledge Workbench
    You can download all ducuments that are assigned to a project to your local disk or network drive. Using it for the first time is a bit cryptic so I recommend reading the SAP Notes  336968 ,  196078 and 817529.
    Hope that piece of information is helpful to you.
    Cheers
    Markus
    Edited by: Markus Müller on Oct 9, 2008 5:04 PM

  • Assign CS-Project to SolMan Project

    Hello together,
    i'm looking for a way to assign a SAP CS - project to an Solution Manager project in order to provide detailed task and ressource planning and cost collection. I was not able to find any settinga in SOLUTION_PROJECT_ADMIN, RMMAIN, SOLAR01 or SOLAR02.
    Is there an extension to the current SolMan project reporting tool to include actual costs and service charges from the corresponding CS-Project.
    I'm using Solution manager 7.01 EHP1 and ERP 6.0 EHP3
    Thanks a lot for your responses
    Regards
    Matthias

    HI,
    Hope There is no direct link to assign SAP CS Project to Solman Project.
    Both are different activities.
    Through the RFC SAP can be linked to Solution Manager. In Solution Manager, Creation of Project ( SOLUTION_PROJECT_ADMIN) is the first step. for which the project can be furhter useful  for Project Documentation ( Business Process Repository), Creation and Assign of Road Maps ( Upgrade Projects) etc.,
    But once your Logical System is assigned to Solution Manager.Based on your Roles and Authorizations you can directly go to the Satelite System ( SAP R/3).
    Hope this clears your doubts.
    Regards,
    Sateesh.Kandula

  • How to transport wdj project code from one server to other server?

    Hi, experts,
    I development 100 wdj component and deployed them to development server(A_development_server).
    I have download sca file of my WDJ project from A_development_server.
    I have config the SLD and Track in the other development server(B_development_server).
    I don't know how to transport the project code from A_development_server to B_development_server for download the project code ?
    Do you give me some hint?
    Best regards,
    tao
    Edited by: wang tao on Mar 12, 2010 4:41 AM

    Hi Wang,
    You can directly deploy project from A_development_server to B_development_server. For that you need to Define Runtime details under RUNTIME tab in landscape configurator for B_development_server in CMS. To access CMS, go through http://host:port/devinf
    Automated Deployment into Multiple Production Systems
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/44/355093ba830a67e10000000a422035/frameset.htm
    Getting Started with the Development Infrastructure 
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/44/0d18d725301a78e10000000a1553f6/content.htm
    Hopt it helps
    Regards,
    Arun

  • How to transport Implementation project template changes?

    Hello All,
    I have made changes to the project template (added doc types, assigned status schemas) for Implementation projects in my dev system by going to SOLAR_PROJECT_ADMIN > Goto > Project Template > Implementation projects.  I want these values to be the standard values whenever I start a new Implementation project.
    When I save my changes, I am not prompted for a transport request, nor can I find any transport option in the menu.  Do these project templates need to be manually configured in my test and production systems, or is there another way of assigning the changes to a transport that I cannot figure out?
    Thanks in advance,
    Michele

    Hi,
    Just enable the GLOBAL field for the values which you want to be available for all the implementation projects.
    e.g
    You created a documentation type which is having global field tick so it will be available for all
    Hope it helps
    Regards
    Prakhar

  • Error when transport LSMW project

    Error description:
    When set up LSMW project in develop system, it is all right. But when transport to production system, its file path shows wrong. It looks the same as in Develop system. Now We delete the file path in P-System and re-create new file path the same as before, it can work. How could we solve this problem?
    Thank you.

    Hi,
    LSMW is a transaction, which will let you mass upload almost any other transaction (FB01, FD01, AS91, etc.). You do it in the following way: 
    1. Enter into transaction LSMW (no menu path), possibly in a development / test system 
    2. First, define a project, subproject and object (relatively formal task). 
    3. On the horizontal menu, go to Goto -> Recordings. Click on "Create recording". 
    4. Enter the name and description of recording (freely definable). 
    5. I cannot simulate this now in my system, but SAP will ask you about transaction code (AS02) and will take you into the AS02 transaction. In this step, do the change manually. Make sure you "touch" (change / write something) in all fields which you want to update. 
    6. Once you are done, save the recording and return on the start page of LSMW. Click "Execute". 
    7. You will see a list of tasks. Do them one by one. They should be relatively simple (and I cannot help you with them). Important is step 3 (maintain source fields) - here you define the columns of your excel (csv) file in the particular order. In step 5 (field mapping and conversion rule), you assign file columns to SAP fields (note that you will see only those fields which you "touched" during recording). You need to go through all the steps. In the end, you get (and run) a batch session. 
    8. <b>If you did this in a development system, transport the LSMW object (menu Extras - Export project, Extras - Import project). You have to do it via file, not via standard transports of configuration (it is perhaps more simple). </b>
    Make sure you test it first in development or quality system! 
    Pls reward points if useful.
    Regards,
    Ameet

  • RFC_NO_AUTHORITY during ChaRM Activation for SolMan project

    Hi experts,
    We are trying to create a solution manager project and activating ChaRM for the project. Upon project creation, this error occurs:
    Landscape being used is: SCM Dev > SCM Test > Virtual System PRD (based in the solman system where this project is created). RFC_NO_AUTHORITY issue is being faced under the SCM Dev System. (*DD)
    Any help would be appreciated. Thanks!
    Thanks!

    Hi Luigio,
    Please check the below note
    93254 - RFC short dump RFC_NO_AUTHORITY
    Rg,
    karthik

  • How to transport LSMW  project

    Can LSMW project be transported? If the answer is yes, how ?

    <a href="http://help.sap.com/erp2005_ehp_02/helpdata/en/da/a22506a3291b418b759524b278dcde/frameset.htm">Steps are here!</a>
    Step 1 Create a request SE10
    Step 2 Export from client where LSMW is recorded
    Step 3 Import in the client where LSMW is to be transported to.

  • Newly created task does NOT show up at SOLMAN project

    We have CHARM configured.
    However, the newly created task cannot be seen at SOLAMN's project. The existing tasks showed without issues.
    What could be the reason?  Thanks!!

    Hi Christy,
    Please refer to the spro configuration at following path:
    Scenario specific setting --> change request management -->extended config --> schedule manager
    Also refer to SAP note 927124.
    Hope this helps!
    Thanks & Regards,
    Kriti Bhalla

  • Transporting Projects in SolMan

    Hi,
    I have a simple question regarding the transporting of project templates between SolMan systems.
    I understand that it is a best practice to have the source and target system at the same patch level when performing this task.
    Does anyone know if it is this process is backwards compatibile? In other words, is there a risk if I am transporting to a target system that is at a high patch level? (NW70 EHP1 SP20 --> NW7- EHP1 SP22).
    Is there an OSS note that addresses this issue for NW70? I haven't found a note newer than 603336.
    Thanks,
    Bill

    Hi William,
    Please refer Note Note 1090842 - Composite note: Transport across several releases . Ideally target system should be equal patch level . If it is lower , then it would be complex and probably you cannot . If it is higher, we can have  a try I guess . But you may need manual modification , some times.
    Regards,
    Nibu Antony

Maybe you are looking for

  • Free Goods not appearing in the Sales Order

    Hi, I have created the condition record for Exclusive free goods for a material. However when i create a sales order with the same material, the free goods materials is not appearing. I did a Free goods Analysis in the sales order and when i checked

  • How do I install a pdf printer driver on my window computer using create pdf

         How do I install a pdf printer driver on my window computer using create pdf

  • Mac OS 10.9.2 Upgrade - Can't Print Disk Error

    I upgraded to Mac OS 10.9.2 and I can no longer print from PhotoShop CS5 or CS5.1 I have Verified permissions and repaired permisions on the Applications Disk but still can't print from PhotoShop since I Upgraded to the new Mac OS Mavericks 10.9.2 An

  • DBMS_DATAPUMP package  ERROR ;;;; PLS HELP mE

    Hello Everybody, I have a problem using the DBMS_DATAPUMP package ; I have just created on procedure that lunch one job and put the dmp file into an oracle directory ; the procedure works fine until yesterday and sadly strange today the procedure doe

  • Finder Window won't open since 10.6.6 update

    I recently did a software update on my Macbook Pro to get the App Store. It worked great for a day. Now my time & date, and battery life icons will not show up on the top right of the screen. Also I cannot open any Finder windows. I can still open ap