Transports across landscapes not physically connected

Hi All.
Our Dev cannot access the Q/P systems due to network boundary constraints.
Currently we are not using SM CHARM (Change Req Mgmt). So we send the Transport files manually to the Q system via a disc/mail and then import it there.
We are not well aware of CHARM as have never used it before. Wanted to know if it could help us in any way in our context.
Thanks in adv.

Hi Aishi,
Yes, the functionnality you're talking about is the Transport of Copies (called TOC).
The general principle is to transfer the content of an open TR (modifiable) to QA system and to make QA test in advance.
With TOC you can :
Anticipate the change and make earlier QA tests
Make as a selection of the change you want to go further by using a correct TR's task management
Schedule automatic import in QA system to provide regular delivery of changes made in DEV system (advanced)
You will find how to customize this functionnality at this page :
/people/rajiv.jha/blog/2010/08/12/transport-of-copies-toc-small-yet-powerful-concept
and the reference
/people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
/people/dolores.correa/blog/2009/08/27/change-request-management-scenario-retrofit-functionality
Don't forget to apply note OSS as described in the central note 907768.
I hope it helps,
KR
Matthieu

Similar Messages

  • Physical connectivity required to support Nexus L2 extension across data centers

    my customer requires L2 extension across their data centers using Nexus 5596/Nexus 2248. I'm unable to find documentation to confirm my physical connectivity to confirm the logical requirement. Will the diagram below support the requirement to extend their vlans across the two data centers? Thanks for any help you can provide.

    I'm not a Cisco PM, who probably should answer this question; my 2c
    Don't know if you have ACI or simply the standalone N9k running NX-OS in mind.
    If you don't need/want APIC, I would not go for N9k/ACI Version.
    See also the newest information regarding integration of N7k..... into ACI
    http://www.networkworld.com/community/node/85429
    http://finance.yahoo.com/news/cisco-delivers-aci-vision-adds-120000751.html?.tsrc=applewf
    As you said, N9K / ACI doesn't support FCoE (its on the roadmap) and definitely not native FC.
    No Fabric Path, all is VXlan based.
    On the other hand, VXlan (and Fabric Path) support seems to show up on the N7k family (new line card)
    Walter.

  • When deploy: Wizard error a connection to the deployment share could not be made "check physical connection"

    Hello everybody,
    yet another issue with deploying a masterdisk. I will give you a short explanation of the situation.
    I need to deploy Windows 8.1 PRO x86. 
    Using: Microsoft Deployment Workbench Microsoft Version: 6.2.5019.0
    1. Reference PC: Windows 8.1 PRO x86 is installed on ORACLE Virtual Box.
    2.  I installed  MDT on my workstation Windows 7 x64, where "C:\DeploymentShare\Windows8" is located.
    3. To change the Unattended.xml file, I have second ORACLE Virtual Box with
    Windows 8.1 PRO x86 with MDT, which connected to the DeploymentShare of Windows 7 x64.
     - The reason is because the Reference PC is x86 and the Unattended.xml file can be changed only if MDT is installed on x86 Windows, otherwise it is not possible.
    The image capture is successful.
    Then I create bootable USB device using rufus-1.4.12.exe. I use: C:\DeploymentShare\Windows8\Boot\LiteTouchPE_x86.iso
    I use a real PC (not virtual machine) and when the deployment starts
    I see: 
    1 Welcome screen, where I select: Run the deployment wizard to  install a new operating system.
    2. The next screen is an error screen where I see the error: 
    "Wizard error
    A connection to the deployment share (\\ComputerName\C\DeployemntShare )could not be made
    DHCP Lease was not obtained for any Networking devices!
    Possible cause: Check physical connection
    I am relatively new with MDT.
    Any suggestions are more than welcome.

    Nick,
    Thank you for the answer!
    Yesterday, I figured out that I need to create an offline bootable disk. 
    The issue is caused, because creating a bootable disk with rufus.exe include only the ISO file and not the WIM file. That is the reason why during OS installation process it asks me for the shared folder...

  • Is anyone having a problem with the new iPad (Gen. 3) not staying connected to the charger? It seems to ALWAYS get jiggled loose and no longer be charging. My iPad 1 has no issue but I can't browse Internet w/o new iPad unplugging. Horrible!

    I notice that my new IPad (3rd generation) will not stay connected to the power cord at all, I'm not exagerating, if I plug it in and browse the Internet without fail it will become unplugged and I will have to push the plug back in (Ba-beep). Ive actually grown to despise that sound when you plug your iPhone or iPad in because it reminds me of how much money I spent on something that PHYSICALLY will not charge while I'm using it.
    I know the problem with it holding a charge while in use, I get it, the screen is amazing and it takes a lot to run the display, however, it is unacceptable to me that I can't even keep the thing plugged in while I'm using it. I can not even leave it on my Cal King bed overnight because I will wake up in the morning to find that the plug has been jiggled loose in a corner, so it's still attached but not making a connection thus not being charged. 
    I love the 4GLTE from Verizon and I love the iPad, but I'm actually using my 1st generation IPad while I am at home so I can leave my new $900 iPad on a table to charge free of incident so I can use the 4G while I'm away from wifi during the day. I have been getting more upset about this because I can not even use the Griffin extended cord to charge the iPad and be far from the plug because only the original apple sync/charge cord will have a better shot at staying in. Absolutely none of my non apple cables will stay in the iPad 3 while having it in my hands.
    The plug is at an angle, unlike the first iPad, not sure about the iPad 2. Please let me know if they have same issue.
    If anyone else is having this problem with the Gen 3 iPad please let me know because I'm tempted to do something about it with apple and I'm hoping that I just for some reason have a bad cable receiver or something and maybe I can get a replacement and enjoy the iPad as I had expected to. There is no reason why I should be even using my first iPad and I have friends that want to buy it but I am not selling it because I'm unable to sell it because I can't handle the new iPad while it's plugged in, that is ridiculous if it's a common issue so please let me know!

    Thanks for the swift reply, I have been looking online and a loose plug seems to be somewhat of an issue with many, I hope mine is actually a problem and not what others are experiencing. It's taken me this long to even reach out for the simple fact I HATE being a complainer but this is just horrible.
    Do you have an iPad 3 as well? And is yours not experiencing any issues close to mine?
    Thanks again!

  • Acrobat does not allow connection to

    Need help with this error message please.  Using Win7, saved a Word 2010 table of contents with multiple links to pdf files across internal servers as a PDF.  Also created the word doc w/multiple pdf links as a PDF file using acrobat9 standard and have same problems.   when a user with Adobe Reader 8+ clicks on a pdf link in the PDF table of contents file, they get an error message Acrobat does not allow connection to:   and they cannot open the linked file.  However, I am able to open the files using the same links with both reader and acrobat.   
    This worked previously until we upgraded to these versions of software... the error message shows a number of % signs and multiple ////.  However, i can open the fiile but others cannot.
    anyone have any ideas or is this a fix that i need to download?  

    not sure where my previous reply went; however, there are numerous machines at varuious sites that will be accessing this server/folder.  I am not sure if it is a trusted sites issue as the file lists numerous PDF links and some of them open to the respective pdf file and others recieve the mssage.  All the files reside on the same server within the same main folder and within subfolders.  never had the problem before.  the users can open some of the linked files and others the connection msg appears.  I however, am able to open the same links they get the error on.  I am totally baffled by this and have been troubleshooting for weeks now.  I just had acrobat X installed to see if that would help but still problem.  I also saved the word doc (2010) as pdf (which lists the links to the other pdfs) but users still have same problem.  there are approx 75 links within this doc and I truly hope we don't have to relink everything..

  • After transporting changes are not happening

    Hi All,
    As per the requirement we need a change in the pricing procedure ZJEXPS
    (Export Sales Switch). We made the changes in transaction code V/08.
    But after transporting the request to quality server, changes are not reflecting there.
    I had checked the request number all the tasks are there and transport was completed with warning.
    our consultant created another request and then also after transporting changes are not reflecting.
    How it is happening particular to this request?
    How to trace this? Kindly suggest me.
    (Ours is two system landscape with master client 009 and quality client 007.I am trying to transport to 007)
    Regards,
    Nagendra.

    Hi
    Check the import logs. If you are getting warnings that original objects cannot be replaced. You need to import the change request in unconditional mode. During performing imports select option, overwrite originals.
    Some times the requests contain the objects, which are original to the target system, e.g SAP standard objects.
    Check if this could help you.
    Regards
    Rahul

  • Physical Connectivity from Fabric Interconnect to MDS and Failover please suggest

    Dear Team
    We have 2 FI and 2 MDS 1 SAN
    Currenlty the connectivity is
    2 direct physical connections from FI-A to MDS1
    2 direct physical Connections from FI-B to MDS2
    From MDS 1 connection to SAN Primary controller
    From MDS 1 connection to SAN Secondary controller
    From MDS 2 connection to SAN primary controller
    From MDS 2 connection to SAN Secondary controller
    Hope the above connectivty is fine?
    we had looked at
    http://www.cisco.com/en/US/prod/collateral/ps4159/ps6409/ps5990/white_paper_c11_586100.html (as team always preferred to go via cisco standards)
    In FI we have to cluster the FI and Primary and Subordinate,likewise here for MDS to we need to? or will it be done via FIs ?
    If not these 2 MDs they work independent but sharing the configs that happens among them?
    Now what ever changes (Zone Creation)we make on MDS1 hope that will get relpicated to MDS2 via FIs?
    If MDS1 Fails will all the configuration be available on MDS2 and still the infra will be smooth running ? and vice versa?
    Any additional steps to be done to achieve it?
    Which is the best way to achieve it please suggest
    Thanks and Regards
    Jose

    Hi Jose.
    Physically your connectivity is good.
    On the UCS side, the 'Primary' and 'Subordinate' role refer only to the Management of the system and which device is actually running UCS Manager.
    Each MDS device will have separate configuration (zoning).  It's different between the 2 devices.
    The blade itself will have a connection out each side, or 'SAN Fabric'.
    e.g.
               +----+
           +---+    +-----+
           |   |    |     |
           |   |    |     |
           |   |SAN |     |
           | +->----<--+  |
           | |         |  |
           | |         |  |
       +---+-+-+    +--+--+--+
       |       |    |        |
       |MDS-A  |    |MDS-B   |
       +--^-^--+    +---^-^--+
          | |           | |
       +--+-+--+    +---+-+--+
       |       |    |        |
       |UCS-A  |    | UCS-B  |
       +--+----+    +-----+--+
          |               |
          |               |
    VSAN100    +-----+    | VSAN200
          |    |     |    |
          +---->     <----+
               |Blade|
               +-----+
    The blade will have a HBA on FabricA (VSAN100) and FabricB (VSAN200)
    Each HBA will have a different WWPN, and on the SAN array, each controller will have a WWPN
    So on MDS-A, the zoning will be:
    Blade WWPN A
    Storage WWPN Primary A
    Storage WWPN Secondary A
    MDS-B, the zoning will be:
    Blade WWPN B
    Storage WWPN Primary B
    Storage WWPN Secondary B
    So the configuration is *not* synced between the two MDS devices, but they each have visibility to the blades vHBA device.  At the blade level, the Multipathing software on the Operating System will handle any failover.
    On the UCS, we would generally use a Port Channel up to the MDS.

  • "The iTunes server could not be connected..." How do I install the new version of itunes now?

    Every time I try to check for updates I get this message across my screen.
    "The certificate for this server is invalid. You might be connecting to a server that is pretending to be “ax.itunes.apple.com”, which could put your confidential information at risk. Would you like to connect to the server anyway?"
    After which it informs me the user could not be connected.
    I need to update so I can sync my phone that just got replaced. Is there any way to do this?

    Refer to this article:
    iTunes for Windows: iTunes cannot contact the iPhone, iPad, or iPod software update server
    http://support.apple.com/kb/TS1814

  • How do I physically connect the SCXI 1180 when using a 1520 and 1346 adapter?

    Here's my current configuration:
    SCXI 1000 chassis
    x2 SCXI 1520 Bridge Modules (Slot 1, and Slot 2)
    1180 Feedthrough panel.
    I recently purchased a 1346 adapter so I can use the feedthrough to access AI channels on the DAQ card.
    My question is, how do I physically connect the ribbon cable of the 1180? Does it plug into the BACK of the last module in the chassis (ie. bridge module2 in slot 2) or does it plug into the other 49pin connector on the 1346 adapter?
    If you read the installation manual for the 1180 http://www.ni.com/pdf/manuals/371062a.pdf (Page 2-3)
    And the installation manual for the 1346 http://www.ni.com/pdf/manuals/320722b.pdf (page 2)
    it seems the instruction contradict eachother. The 1180 manual says connect it to the back of the module
    the note under Fig.2 on page 2 of the 1346 says you cannot have anything plugged into the module next to the one that has the 1346 plugged into it; in my case that's module 2...
    SCXI- 1000 Chassis w/ 1346 adapter
    PCI 6281 DAQ card
    SCXI- 1520 Bridge Board w/ 1314 Terminal Block (x2)
    SCXI- 1180 Feedthrough Panel w/ 1302 Block
    Signal Express 2014.
    Win7 Enterprise

    I have the 1346 plugged into the first module in slot 1.
    But let me try and clairfy what you're saying...
    "Then the cable from the 1346 kind of loops back into the chassis and through the 1180". So this is my answer? But I'm actually taking  the cable from the 1180 and plugging it into the other 49-pin connector on the 1346. Sorry, symantics...
    "...it must be on the first card when using a 1520". By "it" are you referring to the 1346 (which is how it's currently configured) or the 1180 cable?
    and lastly; why does the 1180 need to go into slot 2? I can currently fill both slots (1&2) with the 1520's and with the 1346 plugged into module1/slot1, I can pass the ribbon cable around back of module2 and into the 1346.
    Is there some other reason beside potential space limitations that you'd use the feedthrough in slot2?
    Thanks for your info and patience!
    Message Edited by OKors on 03-31-2010 12:50 PM
    SCXI- 1000 Chassis w/ 1346 adapter
    PCI 6281 DAQ card
    SCXI- 1520 Bridge Board w/ 1314 Terminal Block (x2)
    SCXI- 1180 Feedthrough Panel w/ 1302 Block
    Signal Express 2014.
    Win7 Enterprise

  • Tns_alias: ODI can not establish connection to DB with tns_alias

    Hello everyone
    I have a question again.
    Problem:
    ODI can not establish connection to DB with <tns_alias>
    Envirionment:
    there is remote computer with Oracle DB (tns_alias) (connection works - tested)
    there is another remote computer with Oracle DB (sid)
    there is computer with ODI with (tnsnames.ora -> "...CONNECT_DATA=(SERVICE_NAME = testdbx....")
    Scenario:
    I create physical schema (Oracle -> Insert Data server) and fill in all fields a press "Test" button and connection successful.
    I press "apply", ODI should connect to remote computer for getting information.
    - Remote computer with SID getting it correctly.
    - Remote computer with tns_alias throws exceptin "java.lang.UnsatisfiedLinkError: t2cGetCharSet" and shows empty blank that means information was not downloaded to ODI.
    Question:
    Could You generate some ideas why ODI can not download information?
    Is it settings ODI problem?
    Is it DB problem?
    Best regards.
    Leonid.

    I have found problem!
    file ojdbc14.jar was different for ODI and ODB. (different size and date)
    I have copied ojdbc14.jar from ODB to ODI.
    Now it works.
    So. Thanks for trying to help me.
    It was not simple to find problem.
    Remember this case. It's able to help You in future.
    Best regards!
    Leonid.

  • Transport Script Logic not posting zero's

    Hi Guys,
    I have a piece of transport logic that is supposed to transport data from the TRAVEL cube to the Finance cube. The problem is that in some months the users do not have people travelling and only a zero should be transported across to Finance and clear the data that is sitting there. Unfortunately the zero's are being transported across
    I even force the accounts to be zero before populating them, but that doesn't work
    Here follows my code, please let me know if you can spot anything:
    Edited by: Gert Andries van den Berg on May 29, 2009 3:37 PM

    In theory, *clear_destination should work across applications, and I've successfully used it that way once or twice. But it's always been a challenge for me to figure out exactly what scoping instructions are required. Plus, I've needed to play with the *calculate_difference option, not sure if it should = 0 or 1, to get the expected results.
    Plus, the behavior seems to have changed somewhere along the way, between versions 5.0 and 5.1 SP8.
    I may be wrong, but I don't think that the NOADD specifically is going to solve the problem where a zero value in the source app isn't being properly updated to a zero value in the destination app. I've found this problem is a lot easier to resolve if the transfer is being done in the source app's default logic, since that somehow includes the scoping of that zero-value account in the transfer logic. When the transfer logic is run as a batch process (after the value has already been set to zero), it's impossible sometimes to get the logic to generate that zero-value record.
    So instead, I've played around with ideas such as a script logic in the destination app, that just clears out the entire region of data that is to be transferred, and then re-transfer everything. I'm sure that this is horribly inefficient, and I'm not really happy with that design, but I haven't come across a better solution.
    Regarding the *select's: Correct, these are not "by commit". The commit clears the source data region that was scoped out and was read into memory from the fact tables, during the logic run-time.  The select, however, is evaluated at logic validation-time (along with any for/next loops), and the variables are replaced then.
    It's not possible to assign some variable %foo% one value "2009" in a select (on line 10), then use it (on line 15), and then assign the same variable a second value "2010" (on line 20), and use it (on line 25). I've never bothered to test this out, but I'm certain that both lines 15 and 25 will see the variable replaced with the same value. My guess is that both would have the value of 2010, the final select.

  • BEx Transport Requests '' ist not available or not suitable

    hi, all,
    I want to change a query, that has been transported back from Prod.System into TestSystem. Changes in the query aren't possible - the error message is
    " BEx Transport Requests '' ist not available or not suitable ".
    Now, there is a Standard BEx Transport Request and, in the RSA1 -> Transport Connection I see the query complete with that Transport Request.
    What can the reason be? Any Idea?
    Thanks a lot in advance.
    neven

    Ciao, Paolo,
    thank you for the quick responce.
    I did exactly as described :
    The easiest thing to do is the following:
    1) collect your query in transport connection
    2) check if it is already assigned to a transport
    2a)if assigned to a transport check if this is the standard bex transport. If so go to step 3, If not see if you should just tranport that request (or you can just go to step 3...but i wouldn't advise that)
    3) unlock the standard bex request
    4) now go back to transport connection and put the collected objects in a new request
    5) release and transport your new request
    It still doesn't help. I can't change the Query. The error-message is stil the same.
    best regards
    neven

  • Bex Transport request is not available or not suitable

    Guys,
    I need to make changes to query when I open it...it's saying Transport req is not available. So I have collected the query in a new transport in transport connection, but when I go back to the query its still giving the same error message. How do I resocve this error?
    The transport it is showing in the query was deleted, so I cannot use the old transport.
    Thanks,
    Kris

    Hello Kris,
    What Mahesh said will solve your issue but once you transport that request you will again get the same error when you open any query in BEX. One way to get around this issue is for the first time create a request using the BEX transport button in transport connection and always keep this request open. If you want to transport a query that is assigned to this request just unlock this request using se03 and then collect your query and the corresponding objects in a new request in transport connection and transport the new request. This way atleast everytime you open a query you will not get the error.
    Hope this helps.
    Thanks

  • Bex Transport request is not available

    Hi guys
    I want to change the Bex query from query designer, when i go for change mode it didnu2019t allow me to change and throws error message "Bex transport request " is not available or not suitable" and in second line it gives "choose an existing request.
    Can any one tell me how to change the Bex query with a transport request?
    Gaurav

    Hi,
    You get this message if you have captured the query in a transport request and released or transported the request.
    You can somply capture the query in a new request again from transport connection and then you will be able to edit the query.
    even after capturing the query in the request is not allowing to edit then you need to try the option as explained by our friend above.
    Regds,
    Shashank

  • Physical connectivity of 304, 403, an AI boards

    Support – I would like to send you a diagram of what we are trying to
    accomplish – a simple arrangement, but I need a few technical answers I
    can’t
    get from the documentation I have been through so far.  Please let me know
    if
    we can arrange for me to send the diagram and schedule a time to
    teleconference
    on the issue.  It shouldn’t take long…
    Background:
    Hi Alan,
    Sure thing.  Your software support agreement also covers your hardware.  
    Most questions can be answered by our phone/email/forum/web support at www.ni.com/ask
    Support,
    Can you assist Alan with the questions below?
    Regards,
    John Erdelt
    National Instruments
    Field Engineer - South East Florida
    Cell       321-258-4457
    Office    954-463-3490
    Orders  800-433-3488
    Support 1-866-ASK-MY-NI (1-866-275-6964)
    ----- Forwarded by John Erdelt/AUS/NIC on 02/09/2010 02:00 PM -----
    From:
    "Jordan, Alan -Systems" <[email protected]>
    To:
    "[email protected]" <[email protected]>
    Cc:
    "Vega, Ray -Systems" <[email protected]>
    Date:
    02/09/2010 10:57 AM
    Subject:
    NI digital I/O board questions
    Mr. Erdelt,
    I work with Ray Vega who gave me your contact info.  I am trying to determine the physical connectivity for AI-118, cFP-DO-403 and cFP DI-304.  The documentation is a little confusing.  We seem to have a SW support agreement, but not a HW agreement.  How can I check to see if we have a HW support agreement?
    Can you put me in contact with someone I can send a few diagrams to and get answers to a few questions?
    Thanks,
    -AJ
    Alan Jordan
    SLRSC Engineer
    321 494 9075
    321 693 1361

    Hi Alan,
    It looks like you may have inadvertently posted your question to the discussion forum. Were you meaning to email a question in? If so, please go back to ni.com/ask and click on the phone NI option (see below). John may have sent this question in via email too, so you may already have an personal email by another Applications Engineer. If so, then please work through that channel.
    However, perhaps I can answer your question through this forum?
    Joshua B.
    National Instruments
    NI Services
    NI Support Resources
    NI Training Resources

Maybe you are looking for

  • How do I get my documents to print on the entire page?

    I have an hp 6600 office jet .... How do I get it to print a full page...every tie I email anything it appears in the top left corner using only a quarter of the page? Thanks.

  • 24" 3.06GHz Ram question

    Hi there, I'm trying to upgrade my RAM without breaking the bank. I upgraded using Kingston Value RAM on my Macbook and it worked a treat. What I'm wondering is if I can use similar RAM for my new iMac? I've been looking at the specs and it appears t

  • RESTORE CONTACTS, CALENDAR, AND NOTES TO IPHONE 4S

    I recently had noticed that all my Contacts, Notes, and Calendar entries are gone. How can I get these items back onto my phone. I can see them when I log in to ICloud and can see the Contacts and Calendar, but do not see the stored Notes that I mhad

  • PPT with embedded MP4 videos not being improted as a playable video - how can I make the MP$ play as a video?

    I have a PPT slide presentation that has embedded MP4 videos (captured using SnagIt) in the presentation. When I import and convert, all my PPT slides convert with animations intact, but the videos are not playable and appear only as a 'static' slide

  • Cannot Type Full Serial Number for Flash Pro CS5.5 STUDENT

    Flash Professional CS5.5 STUDENT & Teacher Edition has several letters in the beginning of the serial number unlike the standard releases.  I have purchased my copy from Amazon.com and I have installed my copy fine once before but my computer crashed