Trigger point use

consider for finished material there are 10, and 20 operations .for finished material at  10 operation we confirmed quantity of 100 km for example.after that at 20 operation we found that only 80 km is approved and confirmed  by quality ,then for rest we want rework .please clarify can it is possible to tell the system to create rework order as soon as quantity of opration 20 confirmed is less than the operation 10.

Hi,
1. First create a Reference op set in tcode Ca11.
Enter the plant,Description , usage and status
for the ref op set
Enter lotsize and unit of measure.
Enter the op as 0010 / workcenter/op control
key/Description for the op
Enter the standard values and save.
2. Create a Standard trigger point in CO31.(Ex
Production)
Enter the Trigger Point usage /Group as FERT.
3.Tick the Trigger Point Functions.
4. Enable the indicator create order with Reference .
5.Enter the system status as PCNF.
6. Enter change as +.
7. Enable the indicator once.
8 . Now place the cursor on the create order with reference.
9. Goto Parameters.
10. In the Parameter enter in the group the created Reference op set group no.
11. Order type as PP01 and group counter as 1 and save the Trigger Point.
12. Now goto the Routing for your Material.
13. Choose the last op to assign the Trigger point.
14 .Select the OP -
> Goto ---> Trigger Point overview.
15. Enter the Trigger Point usage as FERT.
16.Now choose that line ,select the Details---> Trigger Point
17. The system will says standard trigger point exists from which you can
select the created Trigger Point (EXx Production)and save.
18. MD02/MD04.
19. Convert the Planned Order into Production Order and Release the order.
20 .Now confirm th ops.
21. For the last op enter the yield and rework qty
and set the status as PCNF.
22. If the status of last op is PCNF then in the
system a POP UP will appear as Activited by
Trigger Point /Create order with reference/order
number/sequence and op number which trigger point
works and enter.
22. Now a rework order will be created.
23. In c003 enter the number which is next to the actual prodn order no.Rework
order will be seen.
Pls reward if you found useful
Regards,
nandha

Similar Messages

  • Rework order thro' trigger points

    Hi,
    I am using the trigger point in the routing to create the rework order. The scenario is as below.
    1) I confirm the opn 0010 of the original production order with Yield 99 EA and Rework 1 EA.
    2) Rework order gets created for the rework qty.
    3) I confirm the rework order and set the status to TECO.
    4) After rework, I again want to confirm the opn 0010 in the original production order for the balaqnce qty 1 EA. But I am not able to confirm the operation. I need system to update/propose the balance qty. for which rework has been done.
    Please guide how to solve this problem.
    Thanks,
    Sunil

    Hi,
    The original production order you need to process as it is like 99 nos and you need to confirm all the operations and do the goods receipt. To rework the 1no you are creating the rework order and you are capturing the rework costs and settling this in to the original production order.
    This is the way of handling the rework order.
    Regards,
    V. Suresh

  • Trigger point of function module EXIT_SAPMV45A_002

    Who can tell me the trigger point of function module EXIT_SAPMV45A_002?
    It is the one of user exits of T-CODE VA01.But it didn't be executed all the time during I executed the T-CODE: VA01 as well as finished the sales document.

    HI,
    Go to transaction CMOD.
    Enter project name and select the button Create
    we want to create a project to enahance trasnaction VA01 .
    - Create a project called ZVA01
    - Choose the Enhancement assign radio button and press the Change button
    In the first column enter V45A0002 Predefine sold-to party in sales document.
    Note that an enhancement can only be used in 1 project. If the enhancement is already in use, and error message will be displayed
    Press Save Press Components. You can now see that enhancement uses user exit EXIT_SAPMV45A_002. Double click on the exit.
    Now the function module is displayed. Double click on include ZXVVAU04 in the function module
    Insert the following code into the include: E_KUNNR = '1000'.
    Activate the include program. Go back to CMOD and activate the project.
    Goto transaction VA01 and craete a salesorder.
    Note that Sold-to-party now automatically is "1000"
    Reward points pls.
    Regards,
    Govind.

  • Trigger point for no. of calls of a router

    Hello,
    we would like to limit the number of calls for a router.
    So the first three prototypes should use one router, the following work orders should use another one.
    We would like to inactivate this prototype router and activate the standard router after the prototype router has been called several times.
    It's not enough to reduce the validity period as we do not know befor when the third work order one will be started.
    Can we set a kind of trigger point depending on the no of calls of a router which starts a workflow (like sending a message or does anything else to inform us that a certian no of calls is reached)?
    Thank you!
    Anne Mielke
    Edited by: Anne-Kristin Mielke on Sep 23, 2008 3:38 PM

    Hi,
    A table may not have more than 249 fields. The sum of all field lengths is limited to 1962 (whereby fields with data type LRAW and LCHR are not counted).
    http://help.sap.com/saphelp_webas610/helpdata/en/cf/21eb6e446011d189700000e8322d00/content.htm
    Check the SAP Help Link
    Constraints
    All the key fields of a table must be stored together at the beginning of the table. A non-key field may not occur between two key fields.
    A maximum of 16 key fields per table is permitted. The maximum length of the table key is 255.
    If the key length is greater than 120, there are restrictions when transporting table entries. The key can only be specified up to a maximum of 120 places in a transport. If the key is larger than 120, table entries must be transported generically.
    A table may not have more than 249 fields. The sum of all field lengths is limited to 1962 (whereby fields with data type LRAW and LCHR are not counted).
    Fields of types LRAW or LCHR must be at the end of the table. Only one such field is allowed per table. There must also be a field of type INT2 directly in front of such a field. The actual length of the field can be entered there by the database interface.

  • About trigger points

    hi
      everybody
                   i need,as im new to sap
                            wat is trigger points, wats their functions, how they r used
                        plz. explain in details

    Dear please see the link given by MSH.
    Apart form that, following are the details.
    Trigger point as name suggests, to trigger some action, when some thing is not going as per planned activity,
    In PP, we use it for creating rework order/operation when during confirmation if you find a product is to be reworked, then we use enter the qty is reworked qty field. System will create rework order or rework operation as per you designed in Trigger point.
    Please go through the link...
    You need to design the trigger point in CO31, assign it in routing.
    How to create in C031...depends your requirement whether you want rework operation or rework order..pl come back what actually you want out of two options so that we can guide.
    Edited by: Rajesha Vittal on Jan 13, 2008 1:32 PM

  • Trigger points

    Hi,
        I am wondering how to best use trigger points in routings and production orders to insert a rework operation into an existing production order. On a shopfloor rework could happen at any given operation. Does that mean that I have to maintain a trigger point in every single operation of the routing ? That looks like a lot of data to maintain. Is there any other way to "reuse" a trigger point ?
    Thanks
    GS

    please check this thread:
    http://scn.sap.com/message/6295289#6295289

  • Trigger points for the first operation

    Hi,
    We want to use triggerpoints on operations in PP. We want to set the status on the first operation to be released when we create an order. The problem is that systemstatus CRTD can not be used. Can someone help out how to get the first operation to be release automatically when the systemstatus is set to CRTD?   Thanks Marie Hillerbo

    Hi Marie,
    I dont know if this would meet your exact need.
    Based on my knowledge what you could do, is flag the order to release when it is created & saved. Assign a trigger point to the first operation, such that only on confirmation of the first operation you release the subsequent operations.
    Hope this is of some help to you.
    Rgrds,
    Vivek

  • Trigger Points in Collective Orders

    Hi
    Need a help. I am working with collective orders and my requirement..the order should be released automatically once the previous linked order is confirmed.
    Could you pl let me know " How can i use the trigger point functionlity in the same. I have worked with the Trigger points where next operation is released after the previos is confirmed but tht is in one routing .
    Thanks in advance

    You can setup external job (maintain variant in co41) to release the order automatically once the previous order confirms.

  • Long story short....I restored my computer to an earlier point using time machine and now all of the previous back-ups are gone. My question has to do with itunes...is it possible to restore my itunes library to the most recent backup because the restore

    Long story short....I restored my computer to an earlier point using time machine and now all of the previous back-ups are gone. My question has to do with itunes...is it possible to restore my itunes library to the most recent backup because the restore that I did was in march and the latest backup was in may....the reason being is that there were app that i had downloaded that are in my most recent back-up, that were not in the backup I restored to. Is it possible to just restore one application ie)itunes?

    See this post.
    tt2

  • Hello, I have created a distribution kit for my program.The problem is that the when the program is installed onto another computer, it fails to communicate with field point (Using FP-AO-200 and FP-AO-1000). Help is greatly appreciated, Thanks faen9901

    Hi Everyone,
    I have a program that sends information(analog output) to lab windows cvi in the form of a text file or user input.
    The program runs on the computers that I have the field point explorer and lab windows cvi installed on. In order to run the program without always installing labwindows/cvi and field point; I wanted to create an executable file that could be load on another computer.
    I used the create distribution kit part of labwindows/cvi to do this.After creating the distribution kit, I then installed it
    to another computer.
    My user interface appears on the screen, when the user clicks on the exe. file, but no data is sent to the field point module. I know that the data is being read from the user and textfile because in it appears in the uir.
    The following are some details about the problem:
    1. On another computer without labwindows/cvi and field point explorer not installed - no data is sent to field point module
    I know this because a current is being read on the current meter connected to field point module.
    My questions are the following:
    1. What are the possible reasons for the data not being sent to the field point module?
    2. Do I still need to create an iak. (Installing Field point Explorer) file stored on any new computer that I install my created distribution kit file too?
    Thankyou very much for any help that you can provide. I greatly appreciate it.
    Faen9901

    Re: Hello, I have created a distribution kit for my program.The problem is that the when the program is installed onto another computer, it fails to communicate with field point (Using FP-AO-200 and FP-AO-1000). Help is greatly appreciated, Thanks faen9901Faen9901,
    1) If you do not install FieldPoint Explorer, the FieldPoint Server is not installed so there is nothing on the target computer that knows how to talk to the FieldPoint system.
    2) Yes, you need an IAK file on the target computer. Assuming the settings (i.e. com port#) are identical you can simply include the iak file as part of the distribution.
    3) You also need to include as part of your installer the file "fplwmgr.dll". If this file is not installed, your program will not be able to access the FieldPoint Server. Alternatively, this file is installed automatically if FieldPoint Explorer detects LabWindows/CVI or Measurement Studio Development versions on the target computer or if you choose to do a custom FieldPoint Explorer installation and
    choose to provide LabWindows/CVI support.
    Regards,
    Aaron

  • Connection Points using ActiveX in TestStand

    Hi,
    Had a query . Is is possible to register connections points using Test
    Stand. I am having a COM Dll which incorporates Connection Point
    Mechanism. I am able to use this using VC++ client. But not with Test
    Stand Application.
    Regards....

    That should handled in code modules you write rather than purely in a sequence. Your connection point handlers could set TestStand globals, use TestStand synchronization objects (such as queues or notifications), write to files, set DLL globals, or use any of the dozens of other possible methods to communicate with TestStand sequences

  • Trigger points is not working

    Hi;
    I have an order.It has three operations 0010-0020 and 0030.
    Operation 0010 has a trigger point which TRIG1
    I choise;
    - Release succeeding operations is activated
    - System status : PCNF-Partially confirmed
    - Change: *
    - Activate: 2
    I release operation 0010 and go to CO11N and partially confirmed the operation.
    However the succeeding operations is not released.
    Where am I wrong?

    Hi,
    I guess you have flagged the check box once in trigger point defn, uncheck the same & then proceed.
    Regards,
    Vivek
    Added
    If am right you want to trigger a rework order for each PCNF, so in this case, set the Activation indicator to 2, then you can trigger the rework order each time manually.

  • What is the best way to follow the scenario for Out look integration with share point using SAP Gateway?

    1)what is the best way to follow the scenario for Out look integration with share point using SAP Gateway?
    2)workflow concepts for Purchase order?
    3)Email triggering from out look for an approval process of PO? how these scenario can be best implemented with updated functions in Duet Enterprise.

    Hi,
    I do not have much idea on gateway integration with outlook but found out this document GWPAM Workflow Template which can be helpful for you to start with.
    also you may want to post your question in SAP Microsoft Interoperability forum
    Regards,
    Chandra

  • Configuring shipping point as Trigger point for posting outbound idoc

    Hello All,
    I have a requirement that on saving an Outbound Delivery(VL02N), an Outbound Idoc should be posted...but the condtion for posting the idoc should be its shipping point. I am not sure how to configure shipping point as the trigger point for the idoc.
    Please suggest.
    Thanks for your co-operation.
    Regards
    Anand

    Hi Anand,
    1. Go to transaction: NACE & select application V2 and click on output types.
    2. change display <->Change mode.
    3. select LAVA and press F6 (to copy Standard output type LAVA to ZLAV).
    4. Give ur Z name for the new custom output type.
    5. change access sequence from 0005 to 0012(shipping point).
    6. Press ENTER and click copy all.
    7. Now goto trasaction VV21, give the created output type name. ENTER
    8. Maintain entries, shipping point, customer#, Medium as '6' ...etc
    Now try VL01N with the given shipping point and check the output ZLAV has been triggered or not?
    Let's see, if we miss any configs still!
    Keep this as reference:
    http://www.erpgenie.com/sapedi/messagecontrol.htm
    Reddy

  • How to trigger idoc using commnad line?

    Hi abap gurus,
    anyone knows how we can trigger idoc using commnadline like STARTRFC.EXE.
    Please let me know its very urgent.
    Thanks,
    Jack.
    Edited by: Alvaro Tejada Galindo on Feb 15, 2008 2:34 PM

    solved on my own

Maybe you are looking for

  • How to apply New ADF Faces Skin into JHeadStart Application

    Hi I have downloaded the new skins such as srdemo,mycompany.. I have only changed skinfamily value in adf-faces-config file but when i generate application with JAG the new skin does not apply it. Can anybody help me what's the problem? thanks

  • Attaching MBP to a crt HDTV

    I'll be getting a CRT HDTV soon and i was wondering if the picture, when hooking up the MBP, is as good as a LCD tv? I was wondering because i know if you try to hook up a computer to a non-HDTV CRT the picture is crap. I'll be using a DVI to HDMI ca

  • How to create a circle object with center(lat/long) and radius(kilo)?

    Hi I want to create a circle in my table, the data I have are the coordinate of center(lat/long) and the radius of the circle. The srid of the table is lat/long. Did I have to use some fomula to compute the coordinate of three points on the circle? I

  • Fixing a Trace Problem

    Hi, a newbie question here. I live traced an image, but at some point there's a gap in a shape: I clicked expand so I can edit the anchor points, but what do I do next to correct the gap? Cheers, Dirk

  • Updating records for an employee in PA20

    Hi, Recently i ran RHINTE00 for about 100 employees and as a result the following fields have been defaulted for 61 employees : 1)Position 99999999 2)Org unit 00000000 3)cost center When i check Positions for these 61 employees in PP01, I see that al