Triggering Repetitive manufacturing inspection lot - insp type 13

Dear Expert,
I have activated 13 insp type for my semi-finish material,
in the routing also for the last operation control key has maintained.
Finally in the production version also we have selected the the same routing.
I am not able to create Inspection lot for repetitive manufacturing.
Please tell me what settings need to be done.
Thanks
DON

Dear DON,
               Before posting thread please refer to earlier created theards you may find some thing which you were looking for related to your query.
you will definatly find the solution,If the threads are not there then post the new thread with your query.Our great Gurus will help the needy.
please refer to
[In Process Inspection of Repetitive Manufacturing;
for your repetitive manufacturing
if this is not enough,follow this as given below.
MM01/MM02
Activate inspection type 09 at the time of material creation. AND enter the number of days in the field "Inspection interval" in QM view.
This field indicates at what frequency in days you need to trigger the recurring inspection lot.
QA05
Define a variant for recurring inspection lot generation. Refer the below pasted link for the same.
Related Thread
It will trigger the inspection lots according to the date of next inspection date in he Batch.
QP01
You need to keep a inspection plan ready to record results for this lot.
QA32
Record Results for the inspection lot.
Perform UD for the lot.
To create variant through QA05 will not enough. You need to schedule the job, and release them also.
To check whether you have successfully scheduled the job or not.
Run QA05, here you will be able to see a line item for the variant you have created. correct?
1}
So select that line and click on the button "DISPLAY SCHEDULING", if the scheduling is not carried out, it will through the "Message no. 38001 - No jobs found in the display client" else will show the it will show "Recurring insp: job planning: list of scheduled requests."
2}
To schedule the job, select the variant line, and click on the button Schedule, it will lead you to the screen Recurring insp: job planning scheduling; start time.
here you need to define "Job start date" and "Batch job start time", then click on "Schedule Periodically" and enter the at what frequency you want to replete the job run.
At the this frequency (e.g. if you select day 1) then it will run the job daily at the time you have entered at "Batch job start time".
3}
Then replete the 1} to view your scheduling details. And the job is not released then release them else it will again not run and you will not have the lot.
Edited by: vijaysap123 on Jan 25, 2010 11:33 AM

Similar Messages

  • Inspection lot of type 04 in "assignment" tab in Process order

    Hai,
    How do I make the Inspection Lot that was generated based on 04 Inspection Type in the Process Order - "Assignment" tab?
    Thanks in advance,
    Sonali

    Hai,
    Thanks for your reply. I could find the entries for all inspection types under Production order type (for example, PP01) in the config , but could not find entries other than 03 inspection type in PI01 order type (Process Order). Is this standard? How do i get all inspection type entries in Pi01 order type? At least, 04.
    Also, if I have both 03 and 04 active for the material, then which inspection lot the system populates in the "assignment" tab?
    Thanks
    Sonali

  • Inspection lot 03 type not get generated

    Dear All
    I have set 03 inspction type in material master and checked lot origin of 03 in configuration also there with N task list type is assigned. but problem is inspection lot not genrated when i realsed production order,
    what should i check to find out this cause
    Regards
    Pravin

    I
    Dear
    I tell you the scenario,
    As here in prodution, they combine number of orders having  same material no.  into One Comboorder having different Order type for ex combo order having ZCOM order type and child order having PP04 order type.
    For Ex
    Combo order(50025)
            i
            i
    i              i                  I
    10029    10030        10031
    as given above structure
    we have developed on Z transction which combine all child orders and made one combo order with total of three, but order type of combo order is different and child orders having different order type.and when combo order released child order also get released but problem is inspection lot generated for combo order only  not child orders
    what would be the reason
    Regards
    Pravin

  • Inspection lot for inspection type 08

    Hi Eperts,
    Please tell me following:
    Inspection lot does not create when transfer material from plant to plant.
    Created STO PO in plant 1000. Issueing plant is 2000.
    MMR maintained in both plant with inspection type 01,08 activated in both plant.
    As per me system should create inspection lot after GRN takes place against STO PO in plant 1000.
    What could be problem.
    Regards,
    Raja

    Hi Raja,
    In your previous posts you referred to performing a 101 movement to try get an inspection lot of type 08, this is incorrect.
    For movement type 101 you need to activate inspection type 01 and place a block on the q-info record against the vendor in order to get an inspection lot of type 01.
    In your scenario, you are wanting an inspection lot of type 08. This is an internal stock movement and wont work with a 101 movement as this is for incoming stock. You should activate inspection type 08 on the material master and use a movement type such as the 322 to move stock to quality inspection. This will create an automatic inspection lot of type 08 as long as you have set QM not active = '  ' for mvt type 322 under SPRO -> Quality Management -> Quality Inspection -> Inspection Lot Creation -> Inspection for goods movements -> deactivate quality inspection for a movement type.
    Regards,
    Roderick

  • Order type for planned order in repetitive manufacturing

    hi
    In repetitive manufaturing there is no prodcutiion order
    planned order only. so i want know what is order type  for repetitive manufacturing
    In configuration order type for  reptitive is required or not   if  yes  then how will define order type ,where
    In Discrete order type will define to control  prodution order
    like that i want know details about order type in repetive manufature
    ravikumar

    HI
    Planned order in REM is of PE type thar s non convertible in PO and also these planned orders are assigned to PVs thru Planning table and the Confirmation is done agianst these planned orders.
    check these links:
    Re: order type in repetitive manufacturing
    http://www.sapfunctional.com/PP/REM/page1.htm
    Regards
    Anupam Sharma

  • Cancel inspection lot of origin 09 type

    Hi,
    i want to cancel inspection lot 09 type and inpection lot status is CRTD CHCR SPRQ.
    So pl help me how i cancel this lot .
    Regards,
    Prakash

    Dear Prakash,
    Inspection lot  with origin 9 is  the lot  generated  for Recurring inspection. You define in Material master  the 'inspection interval'  in days, so once that many days are passed  the system will automatically  post the stock of that batch from  unrestricted to quality.
    Once the lot is generated  you should inspect that lot and post stock to unrestricted.
    If you don't want lots of 09 origin to generate do following :
    1) Remove 09 inspection type from material master.
    2) Remove the Inspection interval from material master
    3) Remove the materials from QA07 (deadline monitoring if batches)
    This will ensure that  no lots from 09 origin are generated.
    Best Regards,
    Shekhar

  • Certificate creation for inspection lot

    Dear all,
       Is it possible to create test certificate for inspection lot of type 04. what is procedure to create this test certificate.
    Thanx & regards,
    Harish Parab.

    Hi Harish,
    You can generate an inspection certificate for the inspection lot generated for 04 insp type.
    U need to use QC21 Certficate for inspection lot transaction ( U can search the lot for ur production order)
    Basic steps to be done
    1. Create certificate profile
    2. Assign profile with out any recipient.
    3. Generate certificate
    Regards
    Venugopal

  • QM Scenario for Automatic Data Transfer to Inspection Lot

    Hi Experts,
    I have explained one QM scenario below. And also mentioned queries that I have in this. Could you please help me out on the same?
    There are 2 SAP systems, A and B.
    Process works as follows:
    -Delivery is created at A with B as recipient.
    -Automatically an IDOC is being created and send out with the quality data of the batch/inspection lot (electronic COA)  
    -In the background a workflow is triggered which transfers the data to the goods receipt from production inspection lot.
    In the system B, a subcontracting plant (DE08) will be created. During the subcontracting the materials provided to the subcontractor in real-life, however in SAP it will be brought to the subcontracting plant on a storage location specific to the subcontractor.
    Now the subcontracting service itself will be simulated by a process order (own order type is ZSUB). During the creation of the process order, a service purchase requisition will be automatically created which is connected to the process order. This purchase order will be transferred to A.
    After processing the purchase order, A will send service to B. B will do the process order confirmation. After process order confirmation an Inspection lot of type 04 will get generated automatically.
    Once the service delivery from A to B is done, the IDoc incl. the QM-data will arrive. Workflow will be triggered by inspection lot status CNF (Confirmed) – I0009. Now the workflow needs to identify the 04-'Goods receipt from production' of the process order and transfer the data into this inspection lot. The connection for this would be the purchase requisition number which is included in the process order. So the connection would be from purchase order number- purchase requisition-process order-inspection lot.
    Workflow template: WS03100078
    Business Object: BUS2045
    I have following queries. 
    1. Do I need to create Z-business object or the standard one will do the job?
    2. If I need to create Z-business object, then what changes will be required in coding?
    3. If I am using standard one, what all settings need to be done?
    4. What configuration needs to be done in the workflow template?
    Thanks & Regards,
    Mrunal

    Dear Swarup,
    The standard BAPI 's BAPI_INSPECTIONPLAN_CREATE Or ‘QAPP_CUST_IP_CREATE are not fulfilling my requirement .I need to create inspectiontion lot in R/3 system , which will invoke a process for creation of sample in another subsystem.But it is not very clear to me what a sample really means in QM, as i am an XI consultant .should a sample contain the recently generated Inspection lot number and its corresponding datas  ?

  • Inspection Lot Origin 06 (return)

    Hi Experts,
    What is the logic of system creating 2 inspection lots for Sales return ? If we do not deactivate the mvt type 651 for QM, while creating delivery and also while PGR there will be 2 inspection lot created.
    Regds

    Hi Sujit,
    The lots are with same inspection type of '06'. The mvt type is 651 (for which I have de activated QM). When a return delivery is created, the system triggers a '06' inspection lot. But once the UD is done as accept, and then a PGR is done another Inspection lot with the same '06' type is created but this time with reference to the 651 material doc. (not stock relevant as '06' type)
    I wonder why a second inspection lot get generated if I dont deactivate 651 mvt type ?
    Rgds
    Edited by: Joe2nd on Feb 11, 2010 11:52 AM

  • Inspection lot GM & WM

    Hi Gurus,
    easy question for you.
    i have implemented incoming inspection control (insp type 01). Storage location is WM and HU managed. The insp lot is created when the HU are created in the inbound delivery. after this GR is posted in quality stock. In WM, the HU are posted in storage type 902 and dynamic bin (the purchase order nr). Usually the quality dept. perform the inspection, register the result and post the UD.
    Sometime happens that the logistic dept move the HU in WM from 902-bin to the a custom warehouse bin where the box is stored. In this case, when the quality dept post the ud, the GM for the HU in the inspection lot are not possible due to an error (it try to create a delivery). I noticed that the error is raised because the HU are not on the 902 bin... Moreover, if the Hu are moved in another storage type, some kind of GM can be performed (eg. with HU02).
    There is a way to block the WM movement for the HU reserved in the inspection lot before the UD posting (IM mov are already blocked)?
    thanks in advance.
    Bye.
    MB

    Hi,
    For automatic inspection lot creation. is based on IM movement type only
    what movement type u will use for bin to bin transfer
    why u need inspection for Bin to Bin transfer ?
    thanks

  • Automatic inspection lot creation

    I am working in Pharma industry,
    For each material they have maintained certain validity period till date the material can be used or issued to production. now is there any way dat once the retest date is occured, the material should automatically create inspection lot & status should be under Quality Inspection in MMBE Stock.

    For this you have to activate the recurring inspection 09 insp type for the materials.
    Once the retest date or the expiry date is reached, you can run the transaction QA07 which will trigger the creation of inspection lots for materials which reached the retest date. Or you can schedule this to execute in background every night or weekly which will trigger creation of inspection lot automatically.
    please refer to the links below -
    http://help.sap.com/saphelp_46c/helpdata/en/2d/351ba4448c11d189420000e829fbbd/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/6d/bb16f840f311d4b2f20050da4ceab0/frameset.htm
    Hope this helps you.

  • Stock Transfer to quality without Inspection lot creation

    Hi,
    I want to do stock transfer from unrestricted stock of Plant A to quality stock of Plant B. However I don't want inspection lot to be created.
    Is this possible?
    I am using Movement type 301 and Inspection Lot of type 08 is active in Material Master.
    If I deactivate QM for movement type, can I post to quality without inspection lot creation.
    Thanks

    Do you have any inspection type setup for material in plant B? If yes then you would be not able to transfer stock in QI without creating an inspection lot. If inspection type is active in material master of plant B(destination) then system would through you error message saying - "transfer stock in QM only". The reason is you would not have an option to move stock from QI using 321 (QI to UNR) in plant B if QM is active. 321 managed by an insp lot.
    If inspection type is not setup in material master at plant B then you would be able to post stock in QI without creating an inspection lot. Then move stock from QI to UNR using 321 (MB1B).
    Hope this clarify you.

  • 04 inspection lot with status SPST

    Dear Experts,
    We are using Handling Unit (HU) functionality in FG material,
    1. We create HU's (say 50 HU's) using tcode COWBPACK,
    2. On creation of HU, an inspection lot of type 04 is created for 50 HU's.
    3. In regular scenario, we do GR of all 50 HU's using tcode COWBPACK,
    4. All 50 HU's are posted in to unrestricted & UD is given using tcode QA32 & status UD SPCO.... is updated in inspection lot,
    5. The HU posting in unrestricted can be happen before GR also (which observes no problem),
    But in rare scenario, we need to cancel / delete the some of HU's at that time following steps are involved -
    1. We create HU's (say 50 HU's) using tcode COWBPACK,
    2. On creation of HU, an inspection lot of type 04 is created for 50 HU's.
    3. HU posting in unrestricted is done for 45 HU's (System status SPST is updated in inspection lot),
    4. Balance 5 HU's are deleted from system using tcode HUMO,
    5. UD is given to inspection lot & status UD SPST.... is updated in inspection lot.
    Now the problem is, after settlement & variance calculation of production order when we try to update status CLSD (Close) in production order the system give an error "Inspection lot 040000XXXXXX for order XXXXXXXX has not yet been completed" this is due to system status SPST is there instead of SPCO.
    As the 5 HU's are deleted hence the stock posting can not be completed. Even we can not cancel the inspection lot due to status SPST.
    Please suggest how to resolve this issue to update the status CLSD in prodction order.
    Thanks in advance,
    Leena.

    See if these OSS notes help you
    Note 622758 - Stock posting cannot be completed (HU)
    Note 532946 - HU lots: Status SPST f.stock proposal in usage decision code

  • Inspection lot not getting create for 01 Insp type after Intransit

    Hi Qm Gurus,
    I have a Material 'A' which is producing in the plant IN05 and transferring to IN06 plant. We have Scheduling agreement PO for this. After Scheduling Agreement we are doing Transferring the Goods thro 351 GI Movement type. So now the parts will be there in transit.
    So now when I receive this goods in IN06 thro 101 MT, Insp lot is not getting create, it goes to Unrestricted. If I create a std PO for the same when I receive the goods thro 101, it is posting into Insp lot. But after 351 & if I do 101 material is not going into Inspection. Pls advise.
    I checked the Insp type 01 Active for IN06, Quality info record is fine, Quality plan also fine. Pls let me know whether i am missing something?

    Hi ,
    Please activate inspection type 08 stock transfer ..
    If this inspection type is active then during stock transfer lot gets generated.
    Also check QM active for this perticular movement in custamizing setting.
    Regards
    SANIL

  • No inspection lot created for new inspection type created

    Hi all,
    We create a new inspection type which is based on a copy-version of an existing inspection type. These inspection type has a inspection type origin of standard SAP 04 (i.e. Goods Receipt from Production).
    Question 1 - we bumped into problem when come to testing in which when perform goods receipt, there is no inspection lot created, may I know why?
    The following fields of this new inspection type are all checked; those not specified, are not flagged.
    1 - Insp with task list (flagged); Automatic Assginment (flagged); Check Chars (flagged); Skip Allow(flagged); Automatic UD(flagged); Serial Number Poss (flagged).
    Question 2 - for this kind of inspection type with origin 04, do i need to perform a goods receipt against a production order or purchasing order? How do I perform a GR against a production order?
    Thanks.

    Hi Tuffy,
    Possibly you might not have ticked on preferred inspection type in material master. This could be one of the reasons. Try to do GR after ticking this.
    The setting you have mentioned (flagged parameters)are seems to be correct. But lot generation is governed by preferred inspection type.
    If you have assigned this newly customized inspection type to lot origin 04, then it would be used against production order and not the purchase order.
    There are several ways to carry out GR against production order. It depends on the scenarios which you follow
    1.     MB31 101 movement
    2.     You may use backflush so while confirming order through CO11N auto GR is posted
    3.     In case of repetitive manufacturing scenario generally GR is done by MFBF transaction
    Regards,
    Anand Rao

Maybe you are looking for

  • Sharing External HD For Use With Time Machine

    Hi, I have a home network with an iMac and two MacBooks. I have bought an external HD in order to set up Time Machine. My hope is to leave the HD connected to the iMac and then to mount it via the network to the MacBooks so that Time Machine can back

  • Yellow status in assets as opposed to green status

    when importing video assets, sometimes the status color is yellow as opposed to green. when it is yellow, it runs into problems while im burning. any way to make the yellow status turn green if that is even the problem?

  • Layout Looks Different from Dreamweaver to Email?

    I am currently using Adobe Dreamweaver CS5 to create emails for my work. Last month I started having an issue where the 3 columns I have in the template would look even in Dreamweaver, but when I sent a test email to myself they looked completely off

  • Cannot open pdf files in IOS 6

    Cannot save a pdf file since I upgraded to IOS 6. When I choose the open option (top right arrow) a empty screen pops up with no option to open in Ibooks or other readers

  • Rollover images disappearing in Browser Lab

    I set up my rollover images for my horizontal nav bar in a table and they look great until I test them in Browser Lab. Then randomly, they disappear. Please give some advise.