Hello - I've searched extensively, and not found my answer, forgive me if it's been covered before.
I've been on Premiere for about 6 years, and honestly have never had need to use the clip trimming function. 90% of my work is compilation-style music videos. I've always captured tiny (3-10 second) clips by the thousands and compiled them, so never really a need for trimming.
Lately, as tech changes, instead of my contributors sending me tapes from which i capture my 'little clips' i'm getting avi files that are anywhere from 10 minutes to two hours long. My editing is still the same (fast moving music videos with short clips) but my sources are changing.
My question is this: I've noticed that i can load several hundred short clips into a CS4 project and experience no performance problems. However, when i start using these huge files, user interface becomes sluggish. When i drag a 3 second clip from a much larger file onto the timeline, i'll experience a significant delay before i can move on. Within the same project, if i drag a clip from a short file, there's no noticeable delay.
I may use the same source file 20 or 30 times on the timeline, yet is there a simple way to 'trim' those little timeline 'clips' down to improve performance? It seems that these 30 references to a 2GB file are what's causing the slowdown - maybe I'm imagining it.
Thanks a million in advance...
Jonathan

Hi,
No it does not scene detect. I have found that scene detect software ( dv capture software, really) is often more trouble than it is worth.  If I'm the shooter, then it will work well, that is if it scene detects based on timestamp stop/start.  I shoot with that in mind.   However, in my case, often I am not the shooter and very seldom do I get scene detection where it is sufficiently coincidental with my editing requirements.  I find it far easier to scrub the Solveig timeline to make the cuts and dump the unusable footage.
Have you looked at Scenalyzer Live?  It will capture and cut clips based on scene detection, including optical, index footage, and more. That is, if you get tapes to work with. But the format is limited--it won't do mpeg 2, for example.  I believe it only writes type  1 and 2 dv avi.  It is, however, an excellent capture program.  With dv, I often use it's tape indexing, which lets me review an entire tape at fast speed in 4-5 minutes, giving me a good indication of the footage content in general. I then know better what to look for when I scrub the Solveig timeline.
I haven't used HDVsplit.  The last time I looked at it it was in beta and did not appear to me to be developed enough to be much faster than NLE workflow.  However, that may have changed.
I might add that I have tried, at one time or another, every avi and mpeg spliitter out there--well, everyone I could find, anyway.  And none were as effective as Solveig.
I really do not know of any program that will fulfill the requirement of scene detection on avi footage.  If you find one, report back.  I'd be interested in trying it myself.

Similar Messages

  • Exporting trimmed clips

    Hi, how do I export a trimmed clip from a Premiere Elements project to another project or just to a folder on the hard drive? I have about 10 hours of raw footage (from a number of contributors) for a community video. I've captured it all on my 1.5 terrabyte external drive in one project. I would like to trim clips in that project before using them in the final edit, but I would like to create a separate project on another drive for the final edit. Hence the need to export trimmed clips. I think the huge volume of raw footage in the edit would be slow-loading and likely to freeze the computer. The raw footage is in .avi format. I have Premiere Elements 3, I'm using Windows XP-SP3, 3gb RAM 3.06gHz hyperthreading, Intel integrated graphics. Would be grateful for some advice.

    Once you've trimmed your clip on your timeline, use Share/Computer to output the trimmed video.
    For standard definition video, use Share/Computer/AVI with the appropriate DV preset.
    For high-definition video, use Share/Computer/MPEG with the 1440x1080 30i (25i PAL) preset.
    If you'd like to know more about the basics of the program, check out my free 8 part Basic Training tutorial series on Premiere Elements support site Muvipix.com.
    http://forums.adobe.com/thread/537685

  • PE10  archiver doesn't trim clips as advertised in their manual

    can we sue adobe and get our money back for PE10 because archiver doesn't trim clips as advertised

    Sorry. We are just fellow video editors and can not provide legal advice. But I doubt you can prove a lot of pain and suffering over one feature.
    Where does it say the archiver will trim a clip -- and have you tried both archiver options?
    Version 10 is, by the way, a year and a half old. If you purchased it from Adobe, did it take you this long to discover it didn't perform as you expected? Purchases directly from Adobe can usually be refunded within 30 days.

  • I get the error message in QuickTime "operation stopped the operation is not supported for this media" most times when I try and export an .AVI file as something else (.m4v). I have not touched the file in any way (no trimming, clipping or other editing)

    I get the error message in QuickTime "operation stopped the operation is not supported for this media" most times when I try and export an .AVI file as something else (e.g. .m4v). I have not touched the file in any way (no trimming, clipping or other editing), all I want QuickTime to do is export the file in a compressed format. Bizzarely, if I shutdown and open QuickTime many times I can occasionally export a clip as another format (maybe one in 10 times). I have seen that other users have had a similar problem after clipping files in QuickTime but this seems to be a slightly different bug in that all I do is open the file and then try and export the file as is - either way, this is a very annoying bug

    @Z_B-B, thank you for taking the time to respond to my cry for help. However, the link you supplied does not address the problem: I am not trying to export from Final Cut Pro to QuickTime, I am trying to export from QuickTime to the rest of the world (like people's iPhones and Ipads) in .m4v format (so I am not emailing my freinds such huge files).
    If I were to spend hundreds of Dollars on a copy of Final Pro I could export directly from there and not have to bother with QuickTime, but I do not take enough video clips to justify the cost. I must say that I never had any of these problems before I decided to switch from Snow Leopard to Mountai Lion.

  • How to completely remove the excess footage from a trimmed clip?

    I'm sure there is a very basic answer for this, and I'm simply inexperienced.
    I just can't seem to find this exact problem stated anywhere.
    My issue involves time remapping.
    I'm working on a MacBook Pro, using dynamic link between Premiere Pro CC and After Effects CC. When I select a single "slice" of a clip I have trimmed down with the razor and open it in AE via direct link, it works well, and I proceed to enable time remapping. All goes as I want it to.
    The issue arises when, immediately, I notice that the start and end key frames are not visible because they are actually placed at both ends of the full clip, NOT my trimmed down version. When I place key frames at the ends of the smaller area I want to work with, I notice that if I want to move those end frames inward, it actually pulls the excess footage from the sides into the work area, which I would expect if I didn't have the comp trimmed to the work area.
    I'm sure this is just ignorance, but I want to be able to work ONLY with the trim I made, and if I want to pull my end keyframes around, I need them to leave blank black space, NOT the rest of the footage. How do I actually chop out the trim so this works the way I want it to?
    Thanks so much in advance. I'm not well versed in the terminology for this program yet and I hope I was able to explain the issue at least halfway clearly.

    When you enable time remapping, AE automatically creates keyframes at the start and end of the entire clip, regardless of how it's been trimmed (as you already know).
    While there's no way to automatically do what you want, it's an easy manual process.
    Enable Time Remapping.
    Go to the in point of the trimmed clip (press i) and add a keyframe.
    Go to the out point of the trimmed clip (press o) and add a keyframe.
    Use the keyframe arrow buttons in the timeline to step forward to the end-of-layer keyframe.  Even if it's outside the composition time so you can't see it, it can still be (invisibly) navigated to.  Then remove the keyframe by clicking on the remove/add keyframe button between the two arrows.
    Navigate to the start-of-layer keyframe and do the same.
    Now you should have just two keyframes, at the start and end of the trimmed layer.

  • IMovie Won't Let Me Trim Clip Length To Less Than 1.0 Seconds

    Anyone have any luck trimming clips down to less than 1.0 seconds?
    I'm doing some video editing on iMovie for which I want to trim clips down to about 0.4 to 0.6 seconds depending on the audio track I'm trying to match. I can't seem to get iMovie to let me trim a track down past 1.0 seconds. When I try to trim it, the length just stays at 1.0 seconds. I HAVE been able to take a clip that's 1.0 seconds, split it, and then end up with two clips of 0.5 seconds each. However, when I try to make any length adjustment on these shorter clips they automatically jump back out to 1.0 second lengths and I'm back to square one.
    Thanks in advance and happy iMovie-ing!

    I find that splitting a clip is much easier then trimming.
    http://help.apple.com/imovie/iphone/1.2/index.html#kna257fc915
    So I tend to scroll through to where I want to make and edit, and then split the clip, and delete the bit to cut out.
    And then you can go as close as about .4 seconds.
    Sadly iMovie iOS isn't really made for fast cuts.
    So the only advise I can give is to split clips to get them shorter.

  • Saving a trimmed clip as new file?

    hi
    i'm tring to resize clips down to just the parts i want, i'm not wanting to make a dvd or anything at this point.
    in ulead i often used a feature let me save a clip that i trimmed down off as a new file. i did this to save on disc space and get rid the junk frames.  in elements i can see how to trim from the left and from the right, and to split a clip, but i can not figure out how to save off that trimmed video to a new file.  or even change the length of the original.
    thanks

    Once you have your trimmed clip on your timeline, just go to Share/Personal Computer/DV-AVI to output it.

  • "Export Movie" exports original, non-trimmed clip! Help!

    Hello everyone. I'm using iMovie '11, and trying to make a series of videos.
    I have taken clips imported from iPhoto, dragged them to create new projects, then used the "clip trimmer" tool to cut off the beginning and ends of the clip.
    So here's the problem. When I "Export using QuickTime" and select MPEG-4 and various settings, I get the video as I edited it.
    However, when I use "Export Movie" and select 720p, the result file uses the entire non-trimmed clip.
    This makes my HD videos unusable. Does anyone know what is going on or how to fix it?
    Thanks for your help!

    Bumping this in the hopes someone has an answer.
    I've tried exporting other video sizes, and it appears this only happens with 720p. This is the size of the original recording, which possibly holds a clue. But I still need it fixed!

  • PE 10 Archive not trimming clips

    From the PE 10 Help manual
    "Archive Project - Creates a folder containing a new project file, and a new clip for each clip used in the original Timeline or Sceneline at its edited length. The trimmed project includes up to 30 frames of extra footage, called handles, before the In point and after the Out point of each trimmed clip for minor adjustments you may want to make after archiving the project."
    I am using Premiere Elements 10 on a Windows system (XP) and using "archive" (and the archive option within archive) it is not trimming clips at all, it simply copies the full clip to the archive folder. This is extremely wasteful of disc space and is not what is described in the above cut from the manual which is what one would expect an archive function to do (trim clips plus handles). Why not and is there any way around this.
    Cheers
    Andrew

    Andrew,
    This a bit of a guess, as I use Project Manager in PrPro, and it has some major differences.
    I suspect that you have a large Clip, or Clips, and have used Instances of that/those on the Timeline. Is that the case?
    If you had discrete, separate Clips, that had been Trimmed, in either the Source Monitor, or on the Timeline, then those would be Trimmed, with X Frames as Handles.
    Discrete Clips are different than Instances of a larger "master Clip."
    Maybe someone else will chime in, and either validate my thoughts, or tell us both, where I am going wrong.
    Good luck,
    Hunt

  • Having trouble getting premiere pro trimmed clips into compositions

    I'm working on a TV intro mashup in the style of the tv show happy days with another editor.  I'm a complete noob with after effects.  I've never used it before for anything.  The other editor has created template in after effects of the record player with compositions of the actor intros in the center of the record and sent me the project.  He's created a composition for each character intro and I'm trying to go in and replace the clips he used as place holders with clips i've trimmed in premiere pro.
    At first I was successful by dragging and dropping the premiere pro sequence into the after effects project.  Then when I looked at the sequence composition I could see the trimmed clips and could copy paste the clips I wanted into their respective intro compositions.  I noticed the first time I imported the sequence into after effects and made changes to it in premiere pro it updated in real time.  Now all of a sudden any changes I make to the premiere pro sequence no longer update in after effects.  What's weird is they do update to the extend if I watch the sequence play in the after effects viewer I can see the changes but on the timeline where the clips are laid out the changes aren't reflected and it's showing me an earlier version of the sequence.
    So my two main questions are
    1) how come the time line in after effects is no longer updating the changes I make to the sequence in premiere pro?
    2) what is the easiest way to get trimmed premiere pro clips into after effects compositions?

    Question 1:
    Since you're so new to AE, it's quite possible that any of a number of things happened without you being aware of it. That and you haven't given much information for troubleshooting. I mean, we don't even know the rough versions you're using, much less minor version numbers. (For example, we don't know if you're using CC 2014, much less if you're running the 13.2 update for AE or not.) Here's some info we would need to help: http://forums.adobe.com/thread/961743
    http://forums.adobe.com/thread/961743
    Question 2:
    You can choose File>Import Premiere Pro Project and it'll bring the clips in. It won't update at all, but it will give you the clips you need in a way that's easier to deal with in AE.
    Alternatively, you can choose to dynamically link a Premiere Project (which sounds like what you initially did). In most cases, I prefer the first way.
    Since you've never used AE before, there are going to be a lot of things that frustrate you if you try to plow ahead without a knowledge of the basics. I strongly recommend going through the resources linked here: Getting started with After Effects Granted, there is an extensive set of resources there, but that's because AE is such a deep and complex program. Without a foundation in the basics, you are going to just keep on being frustrated.

  • Premier pro, can i save multiple trimmed clips in h264 to new files.

    i have to reduce the size from 120gb to 20 gb by cutting out the unwanted but leave in seperate files.

    You certainly can do this in Premiere by importing a clip, trimming it and exporting to whatever file type and quality you desire.  However if that's all you're looking to do, it's like using a $200,000 Bentley to take your kid down the block when all you need is a wagon.
    If you are on a Mac, Quicktime Player will allow you to trim clips and resave the trimmed version, and it's free as part of the OS.

  • Interesting Observation and fix for crashing while moving / trimming clips

    Since day one I have been plagued by STP crashing when I tried to trim clips or move them in time. Recently I noticed this only happens on projects sent to STP from FCP. New projects have never had this horrible symptom.
    So I copied all the assets of a project to the clipboard and pasted them into a new empty document and the problem went away. I needed to tweak the positions of some of the automation anchor points but that was minor.
    I just thought I'd share that with you folks. After this current project is complete I install FCP Studio 3 and the new STP. Maybe the bug is fixed in the new version.

    Nice workaround. Thanks for sharing it!

  • Never figured out trimming clips with transitions. :)

    I've gone through Ripple Training's training movies and read the manual and, for whatever reason, I can't figure out how to trim clips that have transitions on them. Once I apply a transition to the end of a clip, I can only edit the duration of the transition itself and I cannot click and drag to change the duration of the clip. What I end up doing is deleting the transition and then trimming and then reapplying the transition.
    Ugh! Is this just me?!! LOL
    Thank you for wasting your time on me.

    You trim the transition duration by dragging here:
    You ripple the edits by dragging the handles on either end of the transition bar:
    You roll the edit by dragging the handle in the middle of the transition bar:

  • Premier pro cs5 saving multiple trimmed clips as indivdual files in format h264 mov, what is the quickest way to do it. i have 280 trimmed files.

    premier pro cs5 saving multiple trimmed clips as indivdual files in format h264 mov, what is the quickest way to do it. i have 280 trimmed files.

    Hello Ashraf,
    Sorry you didn't get any help on this post. In the future, please contact Adobe Support for 1-1 assistance on issues like this: Contact Customer Care
    Thanks,
    Kevin

  • Help!  How do I trim clips to smaller size so I can move between movies?

    Help! I am editing a wedding video with a lot of footage. If I try to clip out a very small part of the video, even if it's only 10 seconds long, it still stays the same size of the original clip - 5 gb! I can't create a video like this - I've already deleted everything off of my computer as it is just to make room for the clips. Please tell me there's a way to trim down clips so they're smaller in size so I can move between movies and edit this. I really appreciate your help - thank you!!

    This has been answered in your duplicate post, but just to clarify:
    Non-destructive editing is an important feature of iMovie.
    iMovie preserves the entire copy of every clip you place into your movie in case you change your mind at a later stage.
    So, if you have cut out one minute from a 45 minute clip, iMovie will have stored two complete copies of that clip. This is why is helps to set import as 3-5 minute clips rather than one huge chunk. As DV runs at 13GB per hour your project files can get very big.
    One workaround is to complete the editing of a section of the movie, then export that to Quicktime: highlight the clip/s, choose Share-Quicktime, turn on Share selected clips only, and choose Full Quality from the pop-ip menu.
    Once you have saved the stand-alone clip to your hard drive, you can re-import it into your project using the File/Import command, and delete the original long clip/s from the project.

Maybe you are looking for

  • Mac book air doesnt start

    my mac book air doesnt start and press switch gives buzzer sound my model is of 2010

  • Quadtree index error

    Hi, I was trying to create a quadtree index and it kept returning the following error message: SQL> CREATE INDEX R_INDEX ON ROADS(ROAD) 2 INDEXTYPE IS MDSYS.SPATIAL_INDEX 3 PARAMETERS('SDO_LEVEL=4'); CREATE INDEX R_INDEX ON ROADS(ROAD) ERROR at line

  • JSPM ISSUE

    i have issue with when i upgrade Portal from SP18 to SP21. Please find the JSPM Logs as below.. #1.#C0000A0B26780000000000676CF86CF800049C546871E050#1297786250322#/System/Server/Upgrade/Phases/JSPM/JSPMPhases/JSPM_MAIN##com.sap.sdt .j700.deploymentmg

  • Help! My CS6 InDesign is very slow!

    I need to know why my CS6 InDesign is very slow! I have tuend off my preflight but nothing seems to change?

  • Ld.so.1: java: fatal: relocation error: file :referenced symbol not found

    Hello, I am trying to run my application (using Java) on windows which in turn calls the Remote Manager on Solaris(Solaris 9 on SPARC Processor). It gives the following linker error: ApiInitLocal():ApiInitLocal: START ApiInitLocal():* * * A P I I N I