Trx for opening a storage location.

Hi,
is there a trx for opening multiple storage locations for the same material
<b>instead of setting "Create Storage Location Automatically"</b> in SPRO?
Best regards

U can extend a material to number of storage location by using tcode MMSC.
OR u can use create sloc automatically during first GR

Similar Messages

  • Open a storage location for a material

    Hi,
    how can I open a storage location for a material ?
    Is also possible to do it automatically ?
    Regards

    A storage location is customizing, this is in general open to take any material.
    depending on the customizing setting for Auto.create storage location you allow SAP to add the storage location view to your material master automatically with the first movement of a material to a storage location or not.
    if you dont allow that, then you have to maintain the storage location view in material master manually for each storage location before you can post a movement for this material in a certain storage location.

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • Multiple physical inventory document active for same material-storage locat

    hi experts,
    I am using transaction code MI31 for creating physical inventory document for all materials at a particular warehouse(storage location). User is selecting direct generation of of PI documents in the transaction. If by mistake he presses execute button more than once system is creating as many copies of physical inventory documents. As per ERP system logic it sound very wrong to have multiple physical inventory document active for same material-storage location ( no batches or special stocks exist ).
    Is there a message number or some standard setting to prevent such occurrence.
    regards
    Avinash

    Hi,
    Syetem won't create again physical inventory document, if allready PI is active for the same part number,  plant, storage location & batch/valuation type.
    Check your PI documnets
    Regrads
    KRK

  • Stop billing(sales) for a particular storage location.

    Dear experts,
              How can we stop billing to the customers completely for a particular storage location.
    please suggest...
    thanks in advance.
    Regards

    Hi,
    This can be achieved by restricting the authorisation for that particular Sloc in VF01 which restricts from billing w r t that particular sloc.
    Thanks

  • Creation of PO only for one particular storage location

    Hi Friends
    One of my material is extended to four storage location within a plant say S001 S002 S003 and S004 but here requirment is at the time of raising PO for this material,system should always propose only one particular storage location say S001. Is this possible
    Need your guidance
    Regards
    VS

    Hi supergene
    system will never propose particular  storage location based on material.
    May be u can add particular storage location in <b>personal setting</b> so that for all PO it will be picked as default storage location.
    system will propose storage location at the time of GR based on storage location maintained in Material master
    Or
    you can use the authorisation object M_MSEG_LGO. To restrict users from using storage location other than which they have authorised for
    Vishal...

  • T-code for display the storage locations

    Hi,
    Is there any tcode where we only display the storage locations, which is not the long one by using mm03 except for mmsc which is only authorized for limited people.
    Many Thanks
    Jean

    Hello Jean,
    SE16 will work for you but you will not get material description and also you need to make settings for output (for only required field.)
    The other option is , you can write a small ABAP query using MARD and MAKT (for material description, if you want) table.
    Hope this helps.
    Regards
    Arif Mansuri

  • Auto-copy putaway quantity in Inbound for Non-WMS storage location

    Dear All SAP Gurus,
    I need to create an inbound delivery document for non-WM managed storage location and "copy" the quantity into the "putaway quantity" field automatically. Is there any setting to do this automatic assignment? As far as I know, if the storage location is non-WM managed, we usually need to manually enter the putaway quantity as part of the verification process during the PGR (goods receipt).
    Please help.
    Thank you and appreciated for your efforts.
    Best Regards,
    Edwin

    Dear All,
    Before this, I can't find any similar topic posted before, perhaps I was using an incorrect/not-so-meaningful keywords (although I've tried a lot of keywords). However, I've finally found the same topic in the following link. Anyone who is interested, may proceed to the following link.
    Re: Regarding Automatic Picking Setting in Deliveries
    Regards,
    Edwin Fu

  • How to restrict Availability check for a particular storage location

    Dear all,
    As per the Business requirement, System should not consider the stock in a particular storage location.
    while sales order creation, system should not confirm the requested delivery date based on the stock available in that particular storage location.
    How could we map this requirement in SAP, Please educate me to resolve this issue. Your suggestions will be highly appreciated.
    Thank you,
    Raghu Ram.

    Dear Lakshmipati,
    as you said correctly this storage location is there in MMSC for the article which we are using in Sales Order.
    I have tried to delete this storage location but system is not allowing to do so.
    I could not understand, from where this storage location is being determined. we have not mentioned any where in article master data.
    please help us to resolve this issue, and thanks for your help in advance.
    thank you
    Raghu Ram

  • How to Block postings for WM managed storage location

    Hi Experts,
    The scenario is we want to block posting for all materials for a WM managed sloc. We cannot use Authorisation management due to some limitations. Please suggest any other way to do this.
    Thanks

    Thanks for your responses.
    We are looking for an option where we do not have to do any configuration changes and flag for deletion or archive is not an option for us because it is just a temporary requirement. Moreover there are some technical limitations due to complexities in ALE so we cannot use MM06. Any other ways that anybody can think of?
    Thanks

  • Not getting any Data for Batch and storage Location for 2LIS_03_UM

    Hi All,
    My requirement is to extract Data from 2lis_13_vdkon from R/3 source system.
    currently we are on R/3 PI 2003_1_470, For 2lis_13_vdkon we need to upgrade to PlugIn 2004_1.
    we are planning to upgraded to Solution Tool 2008-1, will that be helpful or we need to upgrade to PlugIn 2004_1.

    http://help.sap.com/saphelp_nw70/helpdata/en/7f/0f8c4037fba62be10000000a1550b0/frameset.htm
    Available from OLTP release
    4.0 B
    Delivery with
    PlugIn 2004_1
    Prerequisites
    Prerequisite for the use of the extractor is the R/3 core SAP Note 673964 or the corresponding support package.
    regards,
    Colin

  • Use of Vendor and Customer in 'Define Shipping Data for Storage Location"

    Under the stock transfer order configuration, there is a IMG step <b>"Define Shipping Data for Storage Location".</b>
    In this at storage location level, we can assign, sales org/distribution channel, division and VENDOR and CUSTOMER to storage location.
    The customer number is used a sold-to-party in outbound deliveries.
    <b>But I am not able to figure out what's the use of VENDOR number we are specifying in this step.</b>
    If I am assiging the VENDOR Number here to every storage location, then when I am creating cross-company code Stock transport order, which vendor code I will select the one assigned to PLANT or one Assigned to Storage location.
    <b>Also I need to know what vendor account group I will use for creating this storage location vendor.</b>  I have more than one storage locations) under one plant. Soif I used account group as "0007" plant, SAP doesn't allow me to assigne one plant code to 2 vendors and in vendor master on 'additional purchasing data' screen I am not seeing storage location field, it has only 'PLANT' field.
    <b>So I need to know-
    1. Which account group to use for creating storage location vendor
    2. What's the ultimaye use of this vendor code
    3. What vendor # I will use while creating cross-company PO (one for plant or one for storage location.</b>
    Thanks

    Hi,
    Define Shipping Data
    Here in this step you maintain the customer number of the receiving plant. This customer number is used in SD shipping processing to identify the goods recipient (ship-to party) if stock transfer to be carried out with an SD delivery
    A goods receipt can be planned in the receiving plant.
    You can enter a vendor (transport vendor) in the stock transport order
    In IMG step "Define Shipping Data for Storage Location".
    You can assign sales org/distribution channel, division and VENDOR and CUSTOMER to storage location through Plant only.Means this Vendor is created for entering in the STO .This vendor is created for the the Plant (Supplying Plant)so as u can create STO.
    Rewards If usful
    Regards
    Sanjay L

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • UD for a Material in HU-Storage location

    Hi Gurus,
    I have situation where Stock posting tab is not coming while doing the UD for a material
    Process flow is below:
    1. Creation/Release of Process - Inspection lot get created since early lot creation status REL CALC
    2. GR of Process Order is done in MIGO in Hu storage location
    3. Inbound Delivery is created (WM integration)
    4. Inbound Delivery is processed with TR creation/Confirmation
    5. Stock can be seen in Q under HU active storage location & Material document is created in IM . Inspection lot status is same
    6. Result recording is done against Lot Status INSP RREC
    7. While doing UD. Tab for Stock posting is missing. Status UD   ICCO CLAS STUP
    This inspection type has following settings: - tick post to insp stock, Insp with task list , early lot creation , auto UD etc
    Not sure what I am missing some settings since that is HU storage location
    Please guide
    Thanks,
    Ishwar

    Hi Yogini,
    Thanks for that .
    I tested as per suggestion but that is also not working basically no inspection lot is getting created for the GR after completion of WM transaction
    I have tested my senerio for non-HU storage location (doing GR in no-HU storage location ) & that works correctly . After UD i was able to see tab for stock posting & stock get posted successfully
    I think need expert advice who has work on QM-WM integration part ... can we able to post the stock from Quality stock from HU storage location to unrestricted use using only IM transaction ( QA11/12 ) or do i need to perform some additional steps in WM ?
    Thanks,
    Ishwar

  • Error while executing MFBF for HU storage location

    Hello Experts,
    Can you please explain me the step by step process as how to perform Backflush for materials stored in HU managed storage location. I am trying to do this for a make to order 'sales order' but I get error "Receving storage location 0200 in plant 2000 is HU-managed".
    I need to do this for HU managed storage location(0200) but I get above error when try to save the document. Please let as what exact steps i need to follow to do GR for the above.
    Your help is highly appreciated.
    Thanks,
    Sharan

    Hi Caetano,
    Thanks for the reply but what i have seen in our production system in Transaction MFBF is showm in the document display and it has Handling unit assigned to it and also it is posted against an order (order has been created only for costing purpose). I have attached screen shot below.
    I am new to REM process, Can you please share me the steps how this is done or any documents or any link to understand how process is done.
    Thanks,
    Sharan

Maybe you are looking for