Trying to run Vertex vprtmupd for first time

I am trying to run the Vertex vprtmupd for the first time on a fresh install on Linux. I am on 11.5.10.2 and have run the "Quantum Program Update Installer" with no problem ran great!
I tried to run "Quantum Data Update Installer" and it failed with this error:
HR_6882_HRPROC_ASSERT
LOCATION py3vntsetup:2
APP-PAY-06882: Assertion failure detected at location py3vntsetup:2.
Cause: an internal error has occurred at location py3vntsetup:2.
Action: please contact your Oracle customer representative.
I then tried to run it manuly by running "vprtmupd" and this is what happened:
Select a Monthly Update Function
1. - Update Payroll Tax Database
2. - Exit Program
Select: 1
Beginning Payroll Tax Monthly Update Process.
Enter Data Source: /u01s/app/oracle/appl/pay/11.5.0/vendor/quantum/data
Unable to establish connection with the Payroll Tax Database. Verify the
information entered and retry.
Press Enter to continue...
WARNING! The update process will destroy the contents of the
current database before it creates a new one. Please make
a backup before proceeding.
Any idea? It seems like I need the tax database created before the "vprtmupd" program will work. How do you create the tax database for the first time?

Chris,
The same error is reported in the following docs, please review it and see if any is applicable.
QuickPay Fails with HR_6882_HRPROC_ASSERT, APP-PAY-06882: Assertion failure Detected at Location py3vntsetup:25 [ID 242952.1]
VERTEX: Troubleshooting Document [ID 1059679.1]
Payroll/Quickpay - APP-PAY-06882: Assertion failure detected at location py3vntsetup:1c [ID 315195.1]
QuickPay Error APP-PAY-06882: Assertion Failure Detected At Location Py3vntsetup:1d [ID 1186805.1]
Vertex/Quantum Troubleshooting Guide [ID 735986.1]
After Patch 5366666 Quantum Update Data Installer Fails With APP-PAY-06882 [ID 399182.1]
After ''Rapid Clone'' Payroll Fails With HR_6882_HRPROC_ASSERT [ID 368124.1]
After YE 2008 Phase 1 Patch 7259999, Quick Pay Fails with HR_6882_HRPROC_ASSERT [ID 742556.1]
Thanks,
Hussein

Similar Messages

  • Mac 10.9.5 trying to launch Illustrator CS6 for first time and prompts Java even though I have Java 8 installed.

    Mac 10.9.5 trying to launch Illustrator CS6 for first time and won't launch, prompts for Java 6 even though I have Java 8 installed!
    Apple says Java 6 is very insecure and not to use it.  I have the latest Java installed.  Why won't Illustrator launch?  What else can I do?

    tm,
    I believe you should be able to get round the issue by following this:
    http://oliverdowling.com.au/2014/03/28/java-se-8-on-mac-os-x/
    It is even more thoroughly described in this thread, see post #3 on by gator soup:
    https://forums.adobe.com/thread/1706469

  • Script runs not corrextly for first time

    Hello,
    i have kind a strange problem.
    Always wenn i run my script first time (after opening Diadem), it works not corretly. Specificly creating a report goes wrong.
    When i start the script for second time (and each additional time) everything works fine and correctly?!
    For understand:
    - I do some (mathemtical) analyse  - always works correctly
    - Load/Append prepared ReportLayout, add curves, create text objects - doesn't work for the first time, then it alwas works correctly
      The mistake is, that all curves (that should be in several appended layouts and text objects) are added in the first loaded report sheet (though the reportsheets were appended)
    As i said, when i start the script second time (and each additional time) everything works fine as it should?!
    Thanks
    Solved!
    Go to Solution.

    Hello,
    yes i tryed with debugger step by step. No errors. Ironically with debugger step by step everything works fine (even for he first time)
    It looks like, when i run the script for the first time, the appended report sheets are not active, because all curves are added in the first report sheet.
    But why works it wrong only for the first time and then everything works fine?
    Thanks

  • Getting error 36331 while running prebuilt  etl for  first  time

    Hi all,
    I have installed BI apps 7.9.6 and OBIEE 10.1.3.4.1, DAC 10.13.4.1 on a Linux machine with Oracle 10gR2 as data base and EBS 11 i as the data source. I am running the prebuilt ETL for the first time for a new execution plan created with Financials-Receivables subject area added to it. Of the total 292 tasks 30 tasks run well and the ETL fails after that with the following error.
    The following error message is from the DAC server log. I have seen the session logs and workflow logs for the SDE_ORA_CodeDimension_Supplier_Payment_Method task, but could figure out what could be the issue. Please let me know if any one has encountered the same issue.
    =====================================
    ERROR OUTPUT
    =====================================
    524 SEVERE Tue Sep 22 06:41:14 EDT 2009 Could not attach to workflow because of errorCode 36331 For workflow SDE_ORA_CodeDimension_Supplier_Payment_Method
    525 SEVERE Tue Sep 22 06:41:14 EDT 2009
    ANOMALY INFO::: Error while executing : INFORMATICA TASK:SDE_ORA11510_Adaptor:SDE_ORA_CodeDimension_Supplier_Payment_Method:(Source : FULL Target : FULL)
    MESSAGE:::
    Irrecoverable Error
    Error while contacting Informatica server for getting workflow status for SDE_ORA_CodeDimension_Supplier_Payment_Method
    Error Code = 36331:Unknown reason for error code 36331
    Pmcmd output :
    Thx
    RM

    Found that the indices on tables are failing to be created while running the workflow. I have updated the status of the task as completed and re queued the task. ETL ran successfully then.

  • Getting warning while trying to start the Jdeveloper for first time

    Hi ,
    Every day i am facing this problem while trying to start the Jdeveloper first time, and not able to start till some time.
    i am getting the below exception...
    Unable to create an instance of the java virtual Machine Located at path
    E:\Oracle\Middleware\jdk160_24\jre\bin\client\jvm.dll
    Please can i have the solution to this..
    Regards,
    Rajesh

    user,
    better you remove the contact number. dont leave those things in forums,
    some one may misuse that.
    nice, you can search over forums.
    Jdeveloper installation issue
    https://cn.forums.oracle.com/forums/thread.jspa?messageID=9665899
    http://adfhowto.blogspot.in/2011/09/troubleshooting-unable-t-o-create.html
    https://kr.forums.oracle.com/forums/thread.jspa?threadID=1070230
    unable to create an instance of the Java Virtual Machine Located at path:
    http://pisceansheart.wordpress.com/2009/08/06/solution-to-unable-to-create-an-instance-of-the-java-virtual-machine-for-jdeveloper/

  • HT1551 Trying to connect to tv for first time. TV does not recognize device, saying nothing is connected, when it is. Help!

    I am trying to connect Apple TV for the first time. I went to my HDMI settings on my t.v., and tried to update so it would recognize the Apple TV. Everything is plugged in correctly, but the t.v. is saying that no HDMI devices were found. Help?

    not sure about how different tv handle it but i go into the input source settings on my tv
    and choose which input source is the active one
    if i did that for the hdmi port my appletv was connected to and it said no signal then I would suspect that the tv could not handle the resolution the appletv display in and I would test with another tv if the same problem was present there then I woudl suspect that the appletv was defect

  • In oneasset class i have created 2 assets by using of aso1 after that i acquired one asset for that i run the depreciation for first 5 periods, it has been showing depreciation for those period but if i am trying to run the depreciation for second asset i

    in on asset class i have created 2 assets by using of aso1 after that i acquired one asset for that i run the depreciation for first 5 periods, it has been showing depreciation for those period but if i am trying to run the depreciation for second asset it is not showing first 5 periods why it is not showing? Is there any reason?

    Hi
    Repeat run you can do only for the last depreciation period. For the asset which you are tryin to post depreciation from July to Jan, please check the asset value date which you have given while posting the transactions or in the asset master.
    If the asset value date is in July, then deprecaition from July - Jan will get posted in the current month depreciation in total. You will not be able to post depreciation individually month wise using AFAB.
    REgards
    Malathi

  • HT204380 help. tried for first time to use FaceTime with another iPhone user & it would not work. "FaceTime failed". we are both on wi-fi networks & iTunes accounts are set up correctly.

    help. tried for first time to use FaceTime with another iPhone user & call refused to connect. Call would dial, allow us to accept call, then error message "FaceTime failed" would appear & call disconnect. we are both on wi-fi networks, both phones have updated software & both enabled FaceTime with iTunes logged in. don't know what else to do to get FaceTime to connect. Someone please help.

    Thanks Helen for the response. At least you can get some of the contacts to work. Absolutely none of mine will. Feel like my phone is cheating me out something it should do. Think I'm going to just have to dump all the Apple products in general because this phone hasn't worked right since I got it.

  • Tried to trim a video clip for first time iOS 6 trimming in progress last 10 hours. Not responding cant access photos. Help

    Tried to trim a video clip for first time iOS 6 trimming in progress last 10 hours. Not responding cant access photos. Help

    Reset your device by pressing the home button along with the sleep/wake button until you see the apple, then let go.

  • I'm trying to run an update for bridge CS6 and the dialog keeps telling me to close bridge first even though Bridge isn't open

    I'm trying to run an update for bridge CS6 and the dialog keeps telling me to close bridge first even though Bridge isn't open

    Bridge is probably running in the background.
    Error "Installation cannot continue until... Adobe Bridge is closed" | Installation | CS5

  • HT5312 I'm trying to buy iTunes for first time, but can't verify security questions.

    I'm trying to buy iTunes for first time and can't answer security questions.
    <Personal Information Edited by Host>

    The page that you posted from has instructions for how to reset them i.e. if you have a rescue email address (which is not the same thing as an alternate email address) set up on your account then steps 1 to 5 half-way down that page should give you a reset link.
    If you don't have a rescue email address (you won't be able to add one until you can answer your questions) then you will need to contact iTunes Support / Apple in your country to get the questions reset (these are user-to-user forums).
    Contacting Apple about account security : http://support.apple.com/kb/HT5699
    When they've been reset (and if you don't already have a rescue email address) you can then use the steps half-way down the HT5312 page that you posted from to add a rescue email address for potential future use

  • Itunes application error when attempting to open for first time. HELP

    Running windows xp pro, just bought new ipod classic, installed itunes software. When attempting to open for first time i get an itunes.exe - application error, error message that reads "The instruction at "0x100001040" referenced memory at "0x100001040". The memory could not be "read". Click ok to terminate the propgram. Click on CANCEL to debug the program. I have tried re-installing several times, cleaned temp etc. Nothing. Please help, i really want to start using my new ipod.

    You have to unhide your library folder and adjust the user permissions to allow write access.
    Mylenium

  • Long time to open workbook for first time

    Hi,
    I have a workbook with three queries . Performance of workbook is good when it was created for first time. It has additional 22 sheets with formulas and other sheets with values based on query sheets.
    The problem starts after I close the existing session and open in another session when it takes 15 to 20 minutes to come up.But after that the book is slow even for single click button action.
    Version of analysis 1.4.6
    Win 7(64 bit)
    Ms office 2010(32 bit)
    Refresh on opening is disabled.
    Few thing which I did:
    >> I opened up task manager and did analyze wait chain, I found that excel.exe is waiting for splwow64.exe process.
    >> I enabled logging at "debugging information" in support setting for workbook and checked things out in log file.
    Found that
    There was warning "AddSerializer failed (Command processors not initialized)
    Looking at log file for events when book took time to open, I found that time stamp gap between  following events"
    -verbose: Working mode as serialized in document:'Local'
    -verbose: Successfully deserialized system info from workbook  XML
    - verbose: ...its logs various properties of queries like query name,id etc"
    and its immediate previous event of cache formula string is 20 mins.
    >> in another session I opened a workbook with normal performance.Found above mentioned warning message and deserialization... information.
    the difference in this case is that there is not delay in events.
    Has anybody faced this issue? Any idea on deserialization of workbook xml in analysis.
    Any idea where is metadata saved in analysis. is it in form of some hidden script object just as in BEx 7.0
    Thanks
    Pramod.

    Hi Pramod,
    Since you have several sheets in this workbook, have you checked the number of custom styles?
    Please check the SAP note http://service.sap.com/sap/support/notes/1899658
    According to the note, too many styles slow down Analysis for Office.
    The note also contains a macro that you can run on your workbook to delete the custom styles if you want to check.
    Regards,
    Filipe

  • Performance issue in browsing SSAS cube using Excel for first time after cube refresh

    Hello Group Members,
    This is a continuation of my earlier blog question -
    https://social.msdn.microsoft.com/Forums/en-US/a1e424a2-f102-4165-a597-f464cf03ebb5/cache-and-performance-issue-in-browsing-ssas-cube-using-excel-for-first-time?forum=sqlanalysisservices
    As that thread is marked as answer, but my issue is not resolved, I am creating a new thread.
    I am facing a cache and performance issue for the first time when I try to open a SSAS cube connection using Excel (using Data tab  -> From Other Sources --> From Analysis Services) after daily cube refresh. In end users system (8 GB RAM but around
    4GB available RAM), for the first time, it takes 10 minutes to open the cube. From next run onwards, its open up quickly within 10 secs.
    We have daily ETL process running in high end servers. The configuration of dedicated SSAS cube server is 8 core, 64GB RAM. In total we have 4 cube DB - out of which for 3 is full cube refresh and 1 is incremental refresh. We have seen after daily cube
    refresh, it takes 10 odd minutes to open the cube in end users system. From next time onwards, it opens up really fast with 10 secs. After cube refresh, in server systems (32 GB RAM, around 4GB available RAM), it takes 2 odd minutes to open the cube.
    Is there, any way we could reduce the time taken for first attempt ?
    As mentioned in my previous thread, we have already implemented a cube wraming cache. But, there is no improvement.
    Currently, the cumulative size of the all 4 cube DB are more than 9 GB in Production and each cube DB having 4 individual cubes in average with highest cube DB size is 3.5 GB. Now, the question is how excel works with SSAS cube after
    daily cube refresh?
    Is it Excel creates a cache of the schema and data after each time cube is refreshed and in doing so it need to download the cube schema in Excel's memory? Now to download the the schema and data of each cube database from server to client, it will take
    a significant time based on the bandwidth of the network and connection.
    Is it anyway dependent to client system RAM ? Today the bigest cube DB size is 3.5 GB, tomorrow it will be 5-6 GB. Now, though client system RAM is 8 GB, the available or free RAM would be around 4 GB. So, what will happen then ?
    Best Regards, Arka Mitra.

    Could you run the following two DMV queries filling in the name of the cube you're connecting to. Then please post back the row count returned from each of them (by copying them into Excel and counting the rows).
    I want to see if this is an issue I've run across before with thousands of dimension attributes and MDSCHEMA_CUBES performance.
    select [HIERARCHY_UNIQUE_NAME]
    from $system.mdschema_hierarchies
    where CUBE_NAME = 'YourCubeName'
    select [LEVEL_UNIQUE_NAME]
    from $system.mdschema_levels
    where CUBE_NAME = 'YourCubeName'
    Also, what version of Analysis Services is it? If you connect Object Explorer in Management Studio to SSAS, what's the exact version number it says on the top server node?
    http://artisconsulting.com/Blogs/GregGalloway

  • Opening premier elements for first time. Been "gathering user info" for 15 minutes...what to do?

    Opening premier elements for first time. Been "gathering user info" for 15 minutes...what to do? Previously hit "organize", ran for 25 min till hit 100%, then "had to close"?

    Unfortunately, there's not enough info listed to give you an effective answer.
    Can you give more detailed system spec's.  There are a lot of differences in RAM, & Hard Drive Technologies.  Is your 2TB a single hard drive, or multiple drives in RAID?  While a single 2TB drive is nice for the storage capacity, they also sacrifice some performance to reach that capacity... What speed is the RAM, & I'm assuming it's properly opperating in Dual Channel mode (watch your POST screen to be sure).  Which Core i7 CPU are you running, & what Operating System are you running.   Finally, bring up your task manager, & see what processes are using CPU cycles.   Also, are you starting up PrE8 through the default shortcut which uses the Welcome screen?
    A quick guess is that Auto Analyzer & the Welcome screen are behind your troubles, but can't be sure till more info is available.
    There is a current thread about Auto Analyzer, & I've posted a way to bypass the Welcome screen in several threads. 
    See my post in this thread to bypass the Welcome screen http://forums.adobe.com/thread/516524 (2nd post in thread)
    Message was edited by: chaosdsmFL -  added link

Maybe you are looking for