Two BW systems to one R/3 system

Hi,
We have connected two BW systems to R/3. The physical connection is working as it should, but we have problems loading data. The message we got is to do with basic idoc type "BW unknown in source system".
Can anybody tell me what to do?
Regards,
Harald

Hi
Is the 2 BW systems identical?
if they are check your midlewear (usually a Basis task).
If the 2 BW sys are not the same then u need to check the compatibility between R3 and the failing BW (could be Plug in's or SP's).
Reg's
Edan

Similar Messages

  • When we connect two bw systems to one R/3 system?

    Hi ,
    When we connect two bw systems to one R/3 system,
    could you please exlain what is the imact to SAP and BW in terms of query performance, batch performance,Develoment ,Quality system,security,BW Support.
    Thanks in advance.
    Regards,
    kranthi

    you can connect multiple BW to single R3 source system.
    In the delta queue (RSA7 in source system), you have a field with the target system, so you don´t have problem if you have many target bw system, because the data selection is done by system field.
    Challenge arises when you have multiple R3 feeding to single BW system and then you have to consolidate the master data say 0material fed from different source system R3 then you can consolidate data using consolidated infoobject.
    The following components concatenate to the key of a consolidated InfoObject:
    1)source system ID (two-character source system ID; permitted values are stored NW BI table RSSOURSYSTEM)
    2)one blank character
    3)backend object type (four-character backend object type; permitted values are stored BI table RSBWBEOTYP)
    4)master data key value as stored in the source system
    Note that the key of a consolidated InfoObject solely consists of non-integrated informations from the different source systems. Integration across source systems results from a (maybee repeatedly applied) data consolidation and cleasing process which unveils duplicate master data keys.
    Hope it Helps
    Chetan
    @CP..

  • Two portals (same SID), one R/3 System - changing portal client number?

    We have one R/3 system but two portals.  One is EP6, the other is EP7 and is due to replace EP6.  On installation of version 7.0 we had to keep the SID the same on both portals.
    Now we are having trouble with SSO into R/3 as the ACL in STRUSTSSO2 will only accept one unique SID with client number of 000.  However it does seem to accept the same SID but different client number.
    My question is, is there a way to change one portal generating the verify.der certificate using something other than default 000 client number?
    Is this messy?
    thanks.
    SiB

    Hi Simon,
    > is there a way to change one portal generating the verify.der certificate using
    > something other than default 000 client number
    > Is this messy?
    There is a way and it is absolutely not messy but the supported way; you just have to set the UME property "login.ticket_client" to some different value than "000" on the portal server in question (and of course you have to use this value on the ACL in the SSO target system).
    Also see https://www.sdn.sap.com/irj/sdn/wiki?path=/display/ep/singleSign-Onand+Cookies& -- checklist number 3 and http://help.sap.com/saphelp_nw04/helpdata/en/e2/f71940d4558f5ce10000000a155106/frameset.htm
    I have just done this on my actual project, it's quite straight forward. Remember to restart the portal WAS after changing the value!
    Hope it helps
    Detlev

  • Multiple CRM system with one R/3 system, possible?

    Dear all,
    I wanna see if multiple CRM systems can hook up to one R/3 system.  My hunch is that this is not possible, because information exists in table such as R/3 CRMKUNNR for BP data would not be able to distinguish which system an entry would need to send to for syncing. 
    Am I right? 
    Thanks,
    Kirby

    Hi,
    Well there is also the MDM (Master Data Management) application with SAP Netweaver. Which actually makes things a lot easier with a number of CRM installations with multiple R/3 instances.
    Maybe you would also like to do some read up on MDM.
    Thanks, Debasish

  • Connecting two BI systems to one R/3 system

    Hi Experts,
    We are upgrading our BW 3.x to 7. This activity we are doing on a sandbox server. Now for integration testing we want to connect this BI sandbox to R3 QA system. RFC destination parameters are maintained in both the systems.
    Now when we go for source system Restore option from DW workbench, it pops up with message -
    "Connection AA is used in the ARQ100 (R/3 QA) source system as a connection ABQ100 (BI QA).
    Do you want to delete this connection in the source system? Connection is restored after it has been deleted successfully."
    I checked in RSBASIDOC table in R3 QA system, there exists this entry to ABQ100.
    My question is - without touching the R/3 QA -> BI QA connection, can I create a connection between R/3 QA & BI sandbox? & How?
    or Can we create new connection similar to AA for this new BI sandbox system?
    I have already gone thru SAP Note - 775568, but it does not mention anything related to my scenario.
    So appreciate help from experts.
    Regards,
    Vikram.

    Hi WernerS,
    Thanks for the reply.
    Both the BI systems have diff Logical Sys names. And at this time I am not concerned about delta.
    But as I mentioned earlier, while trying to restore source system from new BI sandbox server, it is asking to delete the connection from R/3 QA to BI QA which I dont want.
    My question is How to establish this new connection without disturbing the existing R3 QA to BI QA connection.
    Regards,
    Vikram.

  • Multiple CRM systems to one R/3 system

    Hi all,
       Is it possible to connect Two CRM systems to the same R/3 system?
    My gut feeling is, it is impossible to do that. Am I correct or is there a way to do it.
    Any help will be highly appreciated...
    Thanks
    Jothi

    Hi,
    I it is very much possible to do this. SAP provides the functionality in the form of Multiple Backend Exchange feature. Please refer to SAP Note 853430 and also the link http://service.sap.com/crm-mep.
    Also you can find a presentation in the link https://websmp107.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000579336&_SCENARIO=01100035870000000112&_OBJECT=011000358700002029062003E.
    Hope this helps.
    Regards,
    Pradeep
    MapBox Specialist

  • Number ranges - APO or ECC system - Which one is master system?

    Hi
    In SRM always SRM system is a  master system for issuing number range. to create a folow on documents like purchase request and Purchase order . SRM system always determines the number range  for  purchase orders , Purchase request .
    for example in Classic scenario :-
    SRM we create a Shopping cart and Purchase order in  ECC system.but SRM determines the number range which number Purchase order needs to be created.
    What about in APO number ranges for Purchase request and Purchase order ? .iS That SAME ? .
    In APO , do you have technical scenarios like Classic and Extended classic?
    classic :- shoping cart crated in SRM and Purchase order will be created in ECC system.
    Ext Classic :- Shopping card created in SRM and Purchase order will be created in SRM itself and replicated to ECC system.
    But both above scenarios, SRM system is a master system to issue number ranges.
    i learnt that APO system dont supply any number ranges to create a PR or PO in ECC system (trigger from APO) only ECC system determines? is it true?
    BR
    Muhtu

    Hi,
    For Purchase requisition there is temporary number range in APO system but once requisition gets transfered to ECC through CIF it determines number range from ECC and returns back same number to APO.
    For Purchase order number range exists in ECC only and not in APO. Even if you trigger conversion of PR to PO from APO number range will be taken from ECC only.
    So ECC remains master system .
    Regards,
    Santosh

  • One R/3 system connecting to TWO BW systems

    Hi ,
    When we connect two bw systems to one R/3 system,
    could you please exlain what is the imact to SAP and BW in terms of query performance, batch performance,Develoment ,Quality system,security,BW Support.
    Thanks in advance.
    Regards,
    kranthi

    Hi,
    Well at first thought, i wouldnt go for the Landscape that you are suggesting. Because of obvious reasons:
    1. Performance issues while loading, on reporting.
    2. Data sources might work fine for one system and not for the other, then the whole setup is hit badly.
    3. Security and management of the 2 systems, will be a big task.
    4. Jobs would take a longer time if the Batch processes are not sufficient.

  • Evironment with two Netweaver systems and one BPC server

    Hi there,
    I heard it could be possible to use only one BPC microsoft server and direct one development/test netweaver system and one production NW system to exactly one BPC server?
    Can I somehow define two instances on the BPC server? How about transport management?
    We plan to implement BPC NW 7.0 or 7.5 if version is available in time.
    Thanks in advance,
    Dierk

    Hello Nilanjan,
    thanks for the immediate response!
    I understood that you can access different BPC servers using one client. That would be achivable entering different servers withtin the connection wizard?
    My question is if it would be possible to only have one physical .NET server and the dependent BPC client from where I can access two separate Netweaver servers (test/production). This would need something like a switch where the Netweaver system can be selected.
    Reason is that my customer gets his servers hosted and wants to avoid to pay for two .NET servers.
    To run development and production version of Netweaver on one physical system is not possible/recommended at all I heard.
    Kind regards,
    Dierk

  • Three sender systems and one receiver

    Hi Experts,
    In my scenario I have three sender R/3 systems and one receiver file system.This is Idoc-XI-File bypass scenario.
    Idoc can get trigerred from any one of these R/3  systems and reach the file system via XI without any mapping or routing.So I didn't touch any of the IR objects.
    In ID,
    I have created three business systems for three senders and one business service for receiver  file system.
    I have created three receiver determinations,three interface determinations and three receiver agreeements.I have created one receiver communication channel.
    All the ALE configurations are correct.
    The Idoc is reaching XI system when I trigger from any one of the R/3 systems but the error it is showing is <b>no receiver could be determined</b>.
    Can any one of you through light on where I have done the mistake .
    Regards,
    Lokesh

    Lokesh
    Can you pls. try these two different options & let us know the result -->
    Option 1.
    Design this scenario as 1 Sender & 1 Receiver and check whether you are able to create the IDOC xml in Receiver System. With this atleast we can say that rest of the configuration are correct.
    Option 2.
    For the Receiver System, create 3 different Business Services & now map each of them with 3 Senders individually. I mean in this case also you will create 3 Rec. Determinations but now receiever is going to be different in each of them. Then in File Adapter you can actually mention the same location path.
    - Lalit -

  • Two SNC system and one execution system

    Hi Experts
    Can there be possibilty of Two snc system to co exist with one execution system ECC?
    IF yes can you folks please throw some light on the same?
    This situation is arising because:
    the Lime table in the existing system has really grown huge and the archiving is not helping becuase there are new records that are added to the system every day which are more than the archiving records
    because of this huge data the upgrade is not possible and we are planning for a new setup, now to mitigate the risk we were tryin if two SNC system can coexist with one EEC system.
    Now to add to the problem is there are certain business scenarios because of which we need to put in data in lime table every day
    so reduction in data input is not possible.
    As the data in LIME is only stock of the customer coming every day and if we just transaction data , even if we go away with all the data is not an issue with us as customer reports his existing stock on daily basis to us.
    We have even thought of truncating all the tables available in in lime objects in SARA, we are thinking of this becuase system might act erratic when we setup new system and slow try moving few customer from existing to new system. as a pilot.
    Supposing if we go ahead with it ,wht could be the issues ?
    Thanks for all your help and suggestions
    Regards
    Manas Malhotra

    Hi Manas
    Two SNC systems can coexist together.
    You need to define seperate Business System Groups,RFC settings,Logical System definition
    Also you need to have seperate Identification for your master data, create your own definition in BADI
    Example:If you are sending same material XXX to two SCM systems how to diferrentiate ???
    Because BADi methods EXIT_/SAPAPO/SAPLCIF_LOC_001 & EXIT_/SAPAPO/SAPLCIF_PROD_001
    differentiate when two ERP systems are connected to one SNC system by prefix and sufix, now you need to have your own code to differentiate
    Also big time care should be taken in defining the distrubution models (bd64) and even in XI/PI like
    Example: we have two TM systems coexisting with one ERP, so we used conditoned based mapping
    Itu2019s a condition based mapping.
    1)     When TransportationRequestSUITERequest/TransportationRequest/ShipToLocation/InternalID = BP1 or BP2 or BP3 u2026 the receiver is I5YCLNT100
    2)     When TransportationRequestSUITERequest/TransportationRequest/ShipToLocation/InternalID = BP4 or BP5u2026the Receiver is I5XCLNT100.
    Also care should be taken on master data/FICO settings which both systems use in common. like using Ztypes instead of using standard one like order type, message type. It should be easy when you troubleshoot back!!!
    The inbound message parameters should be taken care w.r.t business needs
    Good to have a matrix mapping like what business process coexit in both systems and which doesnot and then try to see what settings need to be tailored???
    Best Regards
    Vinod

  • Two Message Servers in one System

    Dear all.
    I learned from http://help.sap.com/saphelp_nw04s/helpdata/en/84/54953fc405330ee10000000a114084/content.htm that one SAP system has one central instance which contains one message server. But our system seems to have two message servers.
    Our system ID is "ABC". When I open the SAP Management Console, there are three children nodes under our system: One blue database icon named "ABC" and two green icons named "ABC 14" and "ABC 31". Under "ABC 14", there are nodes "ABAP WP Table" and "J2EE Processes Table". In addition, there's a "Process List" node here. The processes include "msg_server.exe", "disp+work.exe", and "igswd.exe". Under "ABC 31", there's no "ABAP WP Table" or"J2EE Processes Table". There's only one node "Process List". It contains "msg_server.exe" and "enserver.exe".
    My questions are:
    1. What are "ABC 14" and "ABC 31"?
    2. Does "ABC 14" contains at least two instances? One is for Java and another is for ABAP?
    3. What's the role of "ABC 31"? It seems to only contain enque server and message server.
    4. Why are there two message servers in a single system "ABC"? One is under "ABC 14" and another is under "ABC 31".
    Thanks + Best Regards
    Jerome

    Hi Sunil,
    Thanks a lot for the clarification. Just have a little bit confusion left.
    1. Since there're two message servers, may I say that there are two central instances? Or these message servers belong to a single central instance?
    2. There's no "enserver.exe" in ABAP instance. So is the "enserver.exe" in the JAVA instance also responsible for the ABAP enque and deque operations?
    Thanks + Best Regards
    Jerome

  • Loading two different SAP BW system from one SAP R/3

    Hi all,
    is it possible to load the data from one SAP R/3 4.7 to two different SAP BW systems in parallel?:
    A) BW 2.1C
    B) BW 3.5
    I mean not because R/3 has for example version of R/3 Plug-In which is compatible only to one R/3 Plug-In installed on BW side.
    Are there any other restrictions? Ar there any workarounds how to hande this situation?
    Thanks,
    m./

    Hi dear,
    I think you shouldn't have any problem!
    Look at OSS Note 775568 'Two and more BW systems against one OLTP system' to have more details...
    "R/3 has for example version of R/3 Plug-In which is compatible only to one R/3 Plug-In installed on BW side"...what's your plug-in version in R/3 ? I can't understand what do you mean with "R/3 Plug-In installed on BW side" !!!
    Hope it helps!
    Bye,
    Roberto
    ...and please don't forget to reward the answers...it's THE way to say thanks here, my dear colleague !

  • Two SRM systems connected to One back end system

    Hi..
    Note: I have posted this message earlier ......but couldn't find that. I am just reposting the message:
    In our quality environment, we have two SRM and two backend systems. One for testing purpose and other for training purpose. We are planning to remove one back end system and connect both the SRM systems to one backend system.
    1. Is it possible to have this landscape?
    2. In SRM & R/3 we can define two RFC connnections but from R/3 side, I am not sure how the system will determine the respective RFC connection during GR or any other process.
    3. Are there any other difficulties?
    We are in SRM 4.0 using Extended classic scenario. We are using SRM for processing shopping cart, Po and confirmations.
    Please advise.
    Thanks.

    Hi Prashanth,
    is  very much possible.
    for this you need to configure the partner profiles.
    need to define port
    need to configure inbound paramters and outbound parameters.
    we20 - create partner profiles.
    define outbound parameters and inbound parameters of the message type.
    we21 - define port.
    under Transactional RFC.
    and create a distribution model and add message type.
    revert back to me if any problem still you find.
    regards
    sai

  • PO No range when we ink two SRM system with One ECC system

    Hello Experts,
    We have a client requirement to link Two SRM Systems with One ECC system.
    In this case what number range we need to maintain in both SRM systems for PO.
    -The number range of ECC PO should get update whenver the PO is transferred from any of the two SRM system.
    -We have Extended classic scenario.
    -Also PO Doc type is going to be same.
    Can we handle this by increasing the buffer of the number range in one of the SRM system?
    Any idea...pls help urgently.
    Best Regards,
    Anil
    Edited by: anil.s.verma on Oct 1, 2010 4:33 PM

    Hello Anil,
    Being in Extended Classic Scenario (leading PO being in SRM, R/3 PO number range is concidered as external because PO number is given by SRM), the only solution for you is to:
    1- give same number range interval for PO (internal in SRM system 1 and SRM system 2, external number range in R/3), e.g. 3100000000 - 3199999999
    2- in SRM system 2, fill in current number with (for example) 3159999999 and let empty (or current value) in SRM system 1
    3- assign, in each system for your concerned transaction type, number range as internal in SRM and external in R/3.
    In this way, you will avoid overlaping in R/3 between PO numbers coming from SRM system 1 and SRM system 2
    Regards.
    Laurent.

Maybe you are looking for

  • Multiple hard drive failures on multiple mid-2012 13" macbook pros

    I have a mid-2012 13" MacBook Pro (500GB hard drive), which is actually the third one I've owned in two years. The hard drive on my first laptop failed and was replaced at least five times (I lost count) before Apple agreed to just replace the machin

  • Status distribution incorrect in GOA

    Hi, i've created a shopping cart, then bid invitation followed by Bid submission to bid acceptance. Then i created a contract from this bid response successfully. But the problem is when i distribute this contract to R/3, distribution fail with statu

  • Batch of pdf documents to drop rev into table

    Hello; It is frequent that I utilize large numbers of pdf documents with the engineering firm. On many occasions, I have 500-1000 drawings where I need to pull the revision from the sheet and place it into a table. 99.5% of the time it is a single ch

  • Nokia N8 Contacts Ringtone

    Hi there... I programmed some contacts in my nokia with each a simmular ringtone. But each time i synchronise with MS OUTLOOK to get an update of my contacts and calendar...the programmed ringtones are gone again. Already programmed them 4 thimes...a

  • Can I put my startup/home folder on an external drive?

    I would like to stripe my four internal drives for a high-performance RAID 0 for video editing. Is there ANY reason that it would be unwise to put my applications/library/system/users folders on an external firewire drive? (Of course I will continue