Two icons showing for same drive

Why would my mac desktop be showing two icons for the same drive? I have a total of four drives on this mac pro and drive four as of today has two icons. Also, I wasn't allowed to repair my main drive in disk utility. some problems did come up on that drive in the systems/library/core that supposedly don't match. Are these two problems related?  Thank you.

I'm sorry but I haven't dug out the DVD in ages. Should I try disk warrior. It said my main drive could not be repaired because of the issue in library/core. Thank you so much for your quick response. I recently tried to download a file that was only for premier which I don't have and it would not open. And I tried to download a trial for adobe after effects. I uninstalled the adobe after effects because it wasn't loading propertly. That probably cause my problem.
Can I keep editing in final cut with drive without repairing it if it seems to work?
Thank you!!

Similar Messages

  • I try to install LR CC in Creativ Cloud (10 times)  on Mac and as propose I logout from iCloud and login again. The Start Icon shows for short time an that is all.....is a deinstallation from the old LR necessary?? Or what is to do. Daniel Berne

    I try to install LR CC in Creativ Cloud (10 times)  on Mac and as propose I logout from iCloud and login again. The Start Icon shows for short time an that is all.....is a deinstallation from the old LR necessary?? Or what is to do. Daniel Berne

    Reboot the computer once.
    Sign out from Creative Cloud and Sign in .
    Important : Try to launch Lightroom CC apps from Apps tab menu. :
    Still same issue ? let me know .

  • Aperture: two browser windows for same project?

    I know that I can have two browser windows, each showing a different project; I want to have two browsers windows for SAME project. Is there a way to do this?

    Can't be done as far as I know. Here's a link to some tips on multiple tabs in Aperture. http://www.apertureexpert.com/tips/2010/9/7/aperture-has-tabseasily-compare-proj ects.html

  • Is there any way to disable preview-icons & fileinfo for connected drives?

    Is there any way to disable preview-icons & fileinfo for connected drives?
    i.e. when i'm connecting to SMB share, and i see .mp4 file, i see icon change to video-frame.
    and when i see folder, i see "5 items"
    and i wanna disable it per-dir or per-connect.

    Praveen-
    The dispatcher caches the entire HTTP response body, so doing what you are describing actually requires two steps:
    1) Loading the non-cacheable component through Ajax (or some other edge side assembly technology like ESI)
    2) Including the Dispatcher: no-cache header in the response when that component is requested.
    #1 is pretty easy to do with jQuery
    #2 is covered here: http://dev.day.com/content/kb/home/Dispatcher/faq-s/DispatcherNoCache.html
    You will probably want to use the WCMMode to only do the dynamic loading on the publish server.
    HTH,
    Justin

  • How to Maintain two different prices for same material in different qty?

    Dear all,
    How to maintain two different prices for same material in different batch quantities in purchase order(ie.,info record)?
    (Vendor is supplying quantities in 2 different batches & also in different prices)
    Expecting valuable reply.
    Jeyakanthan

    In a PO you can create 2 items, and each item can be maintained with a different price in the conditions.
    In info record it is not possible to have different prices for the same period, except for scales.
    so if you have a price of e.g. 2 USD for 1000 kg and 1,90 USD for 2000 kg then you can maintain this in scales, but you still have to have 2 items in the PO so that each one can individually find its price.
    Alternative you can create contracts (as well with more than one item) to reflect the different prices and batches.

  • How to arrive same day two difference prices for same material/customer

    how to arrive same day two difference prices for same material/customer.pls give the solution
    thanks in advance
    Aravinthan.K

    Hi
    This is possible through some careful customization
    In your condition table you need to bring the field PRICE LIST
    That is customer/ Material/ Price list
    That is customer  ABCD / Material X / Price list 01---Price is Rs 10
    That is customer  ABCD / Material X / Price list 02---Price is Rs 20
    The condition records to be maintained like this
    So same material and same customer with price list 01 price is Rs 10 and with  price list 02 price is Rs 20
    Now in sales order you will find  price list field in item details SALES B tab
    Through incompletion log you can make this field as an mandatory field
    Now in sales order same material and same customer according to the price lists different price is picked
    In img-sd-basic functions-Maintain Price-Relevant Master Data Fields--here you can define different price lists
    Regards
    Raja

  • Two reconciliation account for same one time vendor

    Is it possible to have two reconciliation account for same one time vendor?

    Hi
    1.Two reconciliation account for same one time vendor IS NOT POSSIBLE.
    2.create 2 vendor master for the same ONE TIME VENDOR and maintain the recon account accordingly
    3.Multiple recon a/c can be assigned to a vendor only thru spl g/l indicators but if u go thru this way then we cant use the purchase flow of PO-MIGO-MIRO . Vendor invoice can be passed only thru fb60 using spl gl indicators. Spl gl indicators cannot be used in MIRO.
    Check which will help u
    Thx
    Raja

  • Folder is empty on second computer. I have installed adobe CC on two different computers for same account so I can work at two different places. I uploaded files to it yesterday and I can't find it on the CC folder on second computer. What can I do?

    I have installed adobe CC on two different computers for same account so I can work at two different places. I uploaded files to it yesterday and I can't find it on the CC folder on second computer. What can I do?

    Hi DeafScientist,
    Please try the below mentioned links.
    Creative Cloud Help | Browse, sync, and manage assets
    Error: "Unable to sync files"
    Creative Cloud File Sync | Known issues
    Kindly revert if you are unable to sync files.
    Thanks,
    Atul Saini

  • Two script forms for single driver pgm

    Hi all,
    Is it possible to have two script forms for single driver pgm , each for diff output type.If so watz d procedure.Kindly reply.
    Thanks ,
    kavitha

    Hi,
    Yes it is possible to have two or more script forms for a single driver program that forms will be different output types.
    Procedure:-
    1. Create the different layout sets by going se 71 t_code.
    2. Create the driver program related to script by going se38 t_code.
    3. After creating Driver program and Layout inform to the functional people they will configure NACE transaction with ur driver program, script form and output type.
    Reward points if useful.
    Thanks & Regards,
    Vasudeva Rao

  • Two payment doc. for same Vendor in F110

    Dear All,
    In F110,the system is creating two payment documents for the same vendor  with same payment method.
    we have 3 open item(document) for this particular vendor,but the system is posting two payment document.
    we have checked the Vendor master and FBZP payment method settings(Single payment is not selected in both),but how the system is posting two payment document for the 3 open invoice.
    Do suggest.
    Regards.

    Check the following fields in all the 3 invoices
    They must be identical for 2 of them and different for 1
    Paying company code
    Sending company code
    Account Number of Vendor or Creditor
    Customer Number 1
    Payee code
    Currency Key
    Payment Method
    Short Key for a House Bank
    ID for account details
    Partner Bank Type
    Business Area
    Business Place
    Indicator: Capital Goods Affected?
    Grouping Field for Automatic Payments
    Payment Method Supplement
    Instruction key 1
    Instruction key 2
    Instruction key 3
    Regards
    Sach!n

  • Cost Estimation Through Two PIR valid for same material

    Hello Everyone
    I am trying to costing strategy with PIR (Purchase Info Record). Just to check whether its working right or not i have only choosen sub strategy 'Effective Price from Quotation'. My problem is we have got more than one PIR for the same material from different vendors (both have valid dates). My first question is how system will calculate if both PIRs for same material is valid with different prices.
    My expectation was that system should pick up the price from PIR which has regular vendor flag ticked in PIR master record but this is not the case. System is picking up the price from the other PIR although i don't know the logic. I am observing system is picking the lower price (as i tested two materials) in both cases. Can anybody guide me how can i make sure that system picks up the price from PIR which has regular ticked or can anybody suggest something elsethat which is right sub strategy to use for PIR?
    Thanks in advence

    Hi Young Sun
    The link really helped me a lot to understand the process how system is picking up price. We don't use source list and quota requirement. I have noticed that system will not consider regualr flag tick in PIR for costing unless you you configure at backend in
    Material Logistics->Purchasing->Source Determination->Define Regular Vendor
    Once i have activated that tick system is working fine and picking up the price from regular vendor flag. If regular vendor is not ticked system will go vendor with lower price.
    @Imdad: Thanks for your kind help as well and input.
    Many thanks again.
    Regards

  • Two earlywatch reports for same instance in one Solution manager

    Hi
    i am trying to create two solutons for early watch reports for same instance. let me explain here.
    In SAP Solution Manager: Active Solutions  >>> i have two solutions like this
    Solution                                                          Early Watch Alert Reports
    Avnet Global Solutions         >>>> here i have configured the PR1, PB1 PCB instances
    PR1                                      >>>>>here i configured the only PR1 instance.
    so i have configured the same instance in two solutions.
    i am not gettting the early watch report automatically  after after configuring like this . but manually working fine.
    when i kick of the report manually working fine.
    here my question is ... do i can create two early watch reports in one solution manage for same instance or not.  if yes then why i am not getting report automatically.
    Thank you
    Vish

    Dear Paul,
    Thank you for your response
    this is what i got from SAP.
    Hello Vish,
    You can have the same system in different solutions. With regards
    to why the report is not generating automatically, please review
    SDCCN on the satellite system.
    I dialed into the system and found that the SDCCN for PB1 is not
    downloading the sessions from Solution Manager.
    I would recommend that you deactivate and then activate SDCCN.
    Tcode SDCCN -> GoTo - Settings - Task Processor - Deactivate
    Tcode SDCCN ->Utilities -> Activate
    Then create a Refresh Session task and verify if the upcoming sessions
    are getting pulled down to PB1.
    If you need help with this, please let me know if it is fine with you
    if I make the necessary changes to get the system working.
    Thank you in advance and best regards,
    Jared Singh
    SAP Active Global Support - Netweaver Web Application Server
    could i know your comment

  • I have two icons of the same app in Macbook  pro

    After updating iMovies I got Two Icons for the app in Launchpad.  How can I remove One without deleting the App.

    hold down on the trackpad with the cursor over the icon and lift it straight up off the dock and it will disappear and make a poof sound with a cloud of smoke.

  • Using two ipods on two Windows accounts for same computer

    I am trying to connect and iPod nano but it does not appear in the Devices section of iTunes.  Rather, when I plug in my iPod to my Windows Vista computer, I get an error "The software required for communicating with the iPod is not installed correctly.  Please reinstall iTunes to install the iPod's software.".  It does appear in Windows Explorer.
    Yet my daughter has her own (i.e. a second) iPod and iTunes functions properly for her when she accesses it from her windows account.
    I have tried unistalling the iTunes software and reinstalling it but I still get the same error in my account.  I have gone through most of the troubleshooting steps in iTunes support but nothing has helped.  Is it not possible to manage two ipods with the same computer from two different accounts or is it something else?
    Any other thoughts?

    Apple intentionally made the iPod to work this way to help stem the illegal sharing of copyrighted material which is what you are trying to do.
    "i have tried to "transfer purchases from ipod" but this does not work either, even though i have authorised the computer."
    Doesn't work that way. It wasn't your iTunes account that purchased the music.

  • Two route-processes for same vrf on a PE

    Hi
    Is it possible to have two route processes, for example eigrp and ospf, for the same vrf on a PE router.
    The situation would be, two customer sites on one PE, one site is running EIGRP and the other one OSPF
    Thanks for your replies
    michael

    You should be able to use any combination of supported IGP (ospf, eigrp, rip, static) or BGP between the different the PE and the different CEs belonging to the same VRF.
    Hope this helps,

Maybe you are looking for