Two materials ordered separately from vendor to be used as single material

Hi All,
Suppose there are two materials say A and B which are ordered separately from vendor and then placed in storage location as two diffrent stock materials.
But while issuing the goods, these two materials A and B need to be combined as different material C and has to be issued against.
Please let me know if there is any possibility of such scenario.
Regards

Hi,
Two materials A and B which are ordered separately must be created with same  material type(say ROH) & a different material C must be created with a separate material type HALB.Now can keep /create BOM for  material C where you can mixing combination of  materials A and B.
You can issue now  material C after mixing of materials A and B.( after receiving to warehouse).Just get help from PP consultant.
Regards,
Biju K

Similar Messages

  • Two production  orders at the header level one for one single requirement

    Hi Gurus, Please provide me your valuable suggestion on the issue.
    *Client wants to have a only two production  orders at the header level one for one single requirement .*
    1) Manufacturing Order u2013 In this order for Finsihed prodcut system should pick all the assemblies whcih are manufactured inside i.e depending on the material type.\
    2) Assembly order u2013 In this order system should pick all the assemblies whicih need to be assembled also procured or subcontracted items in this order against depending on the material type.
    It means for Sales order of  5 EA there is going to be only 2 order ( MFG & assy order).
    For Example.
    L45-7000 is the header material now client wants only two production orders one Manufacture order and anothe Assmebly order , thet dont want to use Phantom assembly concept and also multiple production orders for  SFG.
    Please confirm if this requirement can be mapped in SAP ?
    Thanks...

    Hi Shishir,
    As soon as each order is related to only one material, if your manufactured (or purchased) assemblies are of different materials, you will have a separate order for each material rather than a single order for all manufactured assemblies. I don't thing all your assemblies are of the same material - thus I would say no, it is not possible to map your requirement.
    Regards,
    Sergiy

  • Sample materials(FG) receive from Vendor

    Hi all,
    We need you advise on the below requirment?
    Scenario: Company receive the sample materials  (Finished goods) form the Vendor. After receiving this into the Company the Marketing department send this to our company customers for advertizing. Sofar they are doing this activity  in out off SAP.
    From now onwords they want enter this goods in SAP suystem.
    So now the business busienss is looking for solution ( just kind of report in SAP) which should show the current availble stock when we run this report.
    How much qty received from the vendor, How much qty taken out by Marketing dept and currently what is the availble stock( sampels).
    Please note : The stock will be counted on number base.  not on value base.
    Plese adivse how to achieve this ?
    thanks,

    surya,
    To get a report with stock, available stock etc. in some way the information has to be inputted in SAP. How are you planning to do that?
    One option is to create documents in SAP and then use these for inbound and outbound movements.
    - for receiving these goods from vendor
    - for sending sample goods to customers
    I am not sure about Procuring part (inbound). For outbound part, please see below:
    For the sample sale process:
    Use FD document type - This is provided by SAP to deliver free of charge sample goods to customers.
    In FD process, there is no billing document. Only sales order > delivery
    Read about standard FD process in the internet.
    TW

  • Open Purchase Order Separation from item Order Qty

    Hi All,
    Kindly  suggest me how to separate open Purchase order from Item Order Qty.if i have 2 WH with different Order qty.in report it will be shown total order qty of both WH's.like
    Item            WH              Order Qty
    A                 01               100
    A                 02                 50
                      or
    A                 01                  0
    i need like this A--150   OR A--50(order qty).
    plz look into my query and suggest me how to do this.
    select distinct t3.CardName as SuplierName,t2.[ItemCode], t2.itemname,t2.[U_pperson]as PP,((SELECT sum(T4.[OnHand])FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = '01')
    +(SELECT sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = 'EWH')) as Stock,t2.MinLevel as 'Min Bin',(((SELECT sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = '01')
    +(SELECT sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = 'EWH'))-t2.MinLevel) as balance,
    sum(t1.openqty)
    as OrderQty,
    t2.MaxLevel as 'Max Bin',(((SELECT  sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = '01')
    +(SELECT sum( T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = 'EWH'))-t2.MaxLevel)as 'Balance II' from OPOR t0 inner join POR1 t1 on t0.DocEntry=t1.DocEntry inner join OITM t2 on t2.ItemCode=t1.ItemCode inner join ocrd t3 on t3.CardCode=t2.CardCode inner join OITW t4 on t4.ItemCode=t1.ItemCode and t4.WhsCode=t1.WhsCode   where t2.validFor='y' and  t2.[U_pperson]='p1' or t2.[U_pperson]='p2'  or t2.[U_pperson]='p3' group by t3.CardName,T4.[OnHand],t2.[ItemCode], t2.itemname,t2.[U_pperson],t2.MinLevel,t2.MaxLevel,t1.OpenQty
    Thanks&Regards,
    P.Pratap

    Hi,
    Try this:
    select distinct t3.CardName as SuplierName,t2.[ItemCode], t2.itemname,t2.[U_pperson]as PP,((SELECT sum(T4.[OnHand])FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = '01')
    +(SELECT sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = 'EWH')) as Stock,t2.MinLevel as 'Min Bin',(((SELECT sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = '01')
    +(SELECT sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = 'EWH'))-t2.MinLevel) as balance,
    sum(t1.openqty)
    as OrderQty,
    t2.MaxLevel as 'Max Bin',(((SELECT  sum(T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = '01')
    +(SELECT sum( T4.[OnHand]) FROM OITW T4 WHERE T2.[ItemCode] = T4.[ItemCode] AND  T4.[WhsCode] = 'EWH'))-t2.MaxLevel)as 'Balance II'
    from
    OPOR t0 inner join POR1 t1 on t0.DocEntry=t1.DocEntry inner join OITM t2 on t2.ItemCode=t1.ItemCode inner join ocrd t3 on t3.CardCode=t2.CardCode inner join OITW t4 on t4.ItemCode=t1.ItemCode and t4.WhsCode=t1.WhsCode   where t2.validFor='y' and  t2.[U_pperson]='p1' or t2.[U_pperson]='p2'  or t2.[U_pperson]='p3'
    group by t3.CardName,t2.[ItemCode], t2.itemname,t2.[U_pperson],t2.MinLevel,t2.MaxLevel
    Thanks & Regards,
    Nagarajan

  • 2 TopLink Java Object from Table to be used in single selectOneChoice

    Hello everyone, can I ask for help on how to solve my problem....
    Here's my scenario, I have 2 tables namely tblCollege and tblCourse, they are related through tblCourse.CollegeCode = tblCollege.Code.
    I use the jdeveloper wizard using TopLink -> Java Object from Table to add these table to my project. I created an EJB Data Control so that I can use them to my Userinterface using ADF Faces.
    What I really want to do is that I need to have selectOneChoice component displaying:
    tblCollege.Name + tblCourse.Name, and it should have a value of tblCollege.Code + tblCourse.Code,
    so for example in my
    tblCollege:
    Code---------Name
    1---------------Science
    2---------------Music
    tblCourse
    Code-------Name-----------CollegeCode
    1-------------Biology----------1
    2-------------Computer-------1
    3-------------Guitar------------2
    what I want in my selectOneChoice is like this:
    value----------display
    1-1--------------Science-Biology
    1-2--------------Science-Computer
    2-3--------------Music-Guitar
    I'm a little stuck on how I'm going to that. Thanks.

    Bawasi,
    I see a couple of angles of attack, but this really depends on the technologies involved. If you are using ADF Bindings in combination with ADF Faces then you need to shape the data at the entity level. If ADF Bindings are no the in equation, you can take a less aggressive approach and shape the data in a managed bean. What is not clear to me is the end-to-end use-case. I see the read-only (i.e. how to get data to the drop box), but I am
    not certain what attribute on an entity you are attempting to set. Are you trying to set the course for the current user or for a master schedule? Finally, notice that the final shape of your data set shows a unique combinations, you could increase the performance of your use-case and ease of development simply by denormalizing your schema.
    --RiC                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

  • Automatic ORDCHG Change Purchase Order after Order response from Vednor

    Hi
    How to trigger Change Purchase Order action after receiving PO Confirmation - Order Response from Vendor.
    The scenario is that Order Confirmation vednors sends contains delivery date or delivery qunatity variance within defined tolerances. In such cases it is acceptable to allow automatic PO change.
    This is an EDI scenario. Idocs ORDRSP and ORDCHG in use.
    Thanks for hints.
    Mariusz

    - For automatic document adjustment, you must make the necessary settings in Customizing (SPRO ->Materials Management->Purchasing->Conditions->Automatic Document Adjustment). The system logs all the relevant purchasing documents and can therefore determine all the documents affected by a change to a condition.                                    
    - This is only possible for purchasing documents for which follow-on documents (goods receipt, invoice receipt) do not exist.           
    - Before you run this report, you must have run report RMEBEIN4 (creation of worklist for automatic document adjustment).

  • Standard workflow from vendor

    Hi,
    I don't know whether this is the right forum for my question. Please let me know the standard workflow for the following:
    1) Order response from VENDOR. Order response is send from an external environment and creates an inbound IDOC (ORDRSP) in SAP. I need to identify what standard workflow can be enabled to be able to activate an approval process and update of purchase order in SAP (TR ME22N). Also it (i.e. the standard workflow) has to trigger an outbound return (IDOC) flow showing the approval result from workflow. I need to know the name of the workflow, how to activate it, what messages/IDOCS are allocated to the workflow and if all functionality is possible.
    2) Dispatch advice from VENDOR. Dispatch advice is send from an external environment and creates an inbound IDOC (DESADV) in SAP. I need to identify what standard workflow can be enabled to be able to activate an approval of goods received and automatic creates the input for MIGO. Also it (i.e. the standard workflow) has to trigger an outbound return (IDOC) flow showing the approval result from workflow. I need to know the name of the workflow, how to activate it, what messages/IDOCS are allocated to the workflow and if all functionality is possible.
    thanks.
    tuff

    Hi you could activate the event queue and see which events are triggered when you change vendor data.
    Or you could find out the package of the mentioned transactions and then use this in se80 to see which business objects are related.
    Kind regards, Rob Dielemans

  • Clubbing two Pl Order to one prod Order

    Hi,
    In MTO scenario we have two Sales orders from two different customers for the same FG and two pl orders are generated after MRP now we want to have a single prod Order for these two as production people does not bother about customers while producing and after conformation of this single Prod order we need to allocate to the customers according to their sales order qty.
    How to map this in sap, as we want to use Individual u201C02u201D indicator in MRP views against availability check.
    Please suggestu2026u2026u2026u2026u2026u2026..
    pavan

    Dear ,
    As you have mentioned that two planned order generated  from different sales order , it means finsihed good will be in two individual Sales Order Stock once the production gets complete and subsequently , invoice n delivery will be done .
    Now , in that case why two planned Order should be clubbed in PO and how will you do the cost analysis in individual level as its MTO order .
    I think  you can achieve this if you follow MTS busniess process with Planning Stratgey 20 or Gross Requirement Palnnig -11(Mixed MRP) .In that case , you need to Sale the FG as traded item (TAN Item categoery ) and stok will be lying in Unrestricted stock .
    Just analysis and revert us if you need farther help
    Regards
    JH

  • Regarding rejection of material from vendor

    Hi All
    My scenario is like this
    My semi finished material is come from vendor after that i put that material on production after doing all process production done the GR for that material as finished goods. This material goes into quality and here I come to know that the material is rejecting because of vendor. But the GR is done on finished material code so I have to do the material to material transfer by movement type 309. And then reject the material on vendor coz Material code for vendor material is different and material code after production is different
    I want to ask is their any other process to map this scenario
    Regards
    Sachin

    Hi,
    Sorry for replying late.
    Pl. I am not worring about points. My only concern is I should share my knowledge and improve knowledge by following the others inputs.
    Whatever the quantity you have to reject against a particular vendor, can be enterered in the complaint quantity.
    You have to enter the FG material no., in which you are rejecting in the parent material field.
    In the child material field, you have to enter the material no. which you have recd. from the vendor (refer BOM)
    After that, you have to scrap the material by using T code QM10.
    Then for Return delivery process, pl. discuss with your MM counterpart and for Debit to supplier pl. involve FI/CO counterpart.
    My suggestion is that, First write down the Business Process Procedure for material defect found out during processing. i.e your current problem process.
    Madhava

  • Buy Materials from Vendor

    Dear Experts,
    We have few hundred materials need to advance buy from vendor
    But our client donu2019t want to raise manual PR and these materials do not consider the stock
    How to handle this?
    Regards,
    Sankaran

    Hi
    Two way you can do :
    1. Planning w/o Final Assembly and w/o MTO (52)
           Production quantities can be planned relatively effectively by means of planned independent requirements for the finished product. It is possible to use information from the sales forecast,  Only the procurement of the component is triggered before the sales order stage. Final assembly takes place after a sales order has been entered.
    2
          . Do the forecasting for the components based on the past consumption. and maintained the mrp type as Forecast based planning -VV. so when run the mrp you can get the PR for the components without respect to sales order for the final product.
    3.
              keep planning strategy 70 for the assembly level and enter the pir for the assembly material. so system will get the PR for the components.

  • Production order with components consumed from vendor consignment stock

    Hi expert,
    I have a production order with components and some of the components should be consumed from vendor consignment stock.
    When the order is created/released : is there  a possibility to have those components created with "special stock indicator" = 3 (consignement stock) by default?
    Thanks,
    P.

    Dear Pete,
    In my understanding it's not possible to populate this value as 3 - consignment stock in the component overview.This has to be
    done manually.
    Check in this way,by indicating a value in any of the material master field(for eg ABC indicator in MRP1 view) and if there's some
    value,then while saving the system populates for all those materials with this value as 3 by using some user exit or BADI.
    I'm not sure,it's only an idea,check and revert
    Regards
    Mangalraj.S

  • How to ship back subcontracting materials from vendors to company .

    Hi
    Our client is delivering subcontracting materials  to vendors  using  ME2O transaction .
    She is asking me how can I  ship back materials  from vendors to company .
    Example :
    Shipped 236.C from  company  to vendor .
    Now we need to ship back 236.K from vendor  to  company .
    Could you  brief  me T codes to be used and entire process in step by step .
    Thanks In Advance

    hi jaya
    check whether these points will help you
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product.   In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    regards
    harish

  • How do I go directly from one frame to another particular frame which is far away in the time line? (e.g the two frames are separated by 100 frames)

    How do I go directly from one frame to another particular frame which is far away in the time line? (e.g the two frames are separated by 100 frames). I mean, is it possible to take the playhead from one frame to another frame directly which is 100 frames away in the time line? Thanks for any reply.

    In the Timeline, go to the first frame and press M to put a marker on it. Go to the other frame you want to jump to and put a marker on that one too.
    Now press Ctrl+Semicolon to go to the previous marker - or Ctrl+Comma to go to the next marker.
    Andy

  • I would like to import two different cf cards from two different cameras into the same project/folder and have them be in order of the times they were taken, is there a trick?

    I would like to import two different cf cards from two different cameras into the same project/folder and have them be in the order of the times they were taken, any ideas on how to do this?

    Just import them normally and sort the project by date. They will fall into place. If you tried this and it isn;t happening then make sure the data and times on the two cameras are identical and make sure you are sorting by date and time and nothing else.

  • Create list of materials with its purchase order texts from material master

    Dear all
    Simple question I do wanna ask.
    Just need to get out a list with my materials with its purchase order texts from the material master.
    As I do know that PO text is not stored on a table, it might be difficult to get it out from the system.
    Does anyone of you know how to retrieve it simply?
    Regards
    François

    Check this link Material Master Purchase Order Text.

Maybe you are looking for

  • Can't sign in to my Creative Cloud desktop app.

    Hi, I'm new here. I have installed Creative Cloud ver. 2.5.1.369, and when I try to sign in I just get a message that says "You've been signed out". I have followed this: http://helpx.adobe.com/creative-cloud/kb/unable-login-creative-cloud-248.html 3

  • JAVA MApping errors

    Hello,          I have got following errors in sxmb_moni : Error Details: Trace level="1" type="T">Java mapping com/capgemini/bc/mappings/order/ZORA_DPO_TRANSFER_2_XMLSQLCoreInsert has thrown a StreamTransformationException.</Trace>   <Trace level="1

  • Error starting 4.0 console on Solaris 10

    When I bring up the console (es-start -c -- -p 1611) the login window appears, and after I enter the username, password, and server name, I get the following text in a popup window: WARNING Communication could not be established with the server. The

  • C7250 Software UInstall problem with blocksysuserinstall.exe

    Hello, I changed by ISP so I have a new router now and had to reconfigure my C7250 to a different WiFi address.  After doing this, the HP software said it wasn't properly installed.  So I downloaded the complete package and tried many time to install

  • Floating palettes are locked- how do I unlock?

    Just downloaded CS5- palettes were not previously locked and now they are. I canonly move with command key. (OSX 10.6.3) what can I do to unlock them?