Two projects

Hi,
can we work on two projects for one client at the same time or one after the other, like one for global implementaion, one for U.S implementation. Will they usually have two implementaions seperately or together.
Thanks,
Nivi

This depends on a few factors. Here are some. 1) Do you have the resources for multiple projects 2) Are  project components  dependent on the completion of other parts 3) What is the company tolerance for large implemenation versus step implementation.
pls assign points to say thanks.

Similar Messages

  • Can I have two projects open on Premiere Elements at the same time? (Elements 13 for Windows)

    Hi there.
    Can I have two projects open on Premiere Elements at the same time?
    The reason I wanna do this is because I've trimmed many hours of clips in one project (One timeline) and I want to start a new project where I have a "clean" timeline and can add clips from the
    first project (Cut and paste). Or how do I bring a trimmed clip from one project into another in a easy way?
    Thanks
    -Dan-

    Your question is in the Photoshop Elements forum.  There is another forum for Premier Elements and this will probably be moved.
    That said, the answer is that Premier Elements has not be designed with the ability to cut and paste from one project to another.  The only "work around" is to "Publish&Share" to a best quality format that matches your project settings.  You can control the output clips with the "work area bars".  You can then add the new clip to the second project.   The output rendering process can, at least in theory, reduce the picture quality.  Depending on formats, settings and footage, it may not be noticeable.
    There is a third party product called Clipmate that some say works, but not always with good results. 

  • Split Project in two Projects

    In one of my projects there are about 2000 pics made in two different countries. Because in Places view I always see both countries on the map, I decided to split the Project in two Projects - one for each country. How can I do this without losing the Places assignments? Thanks!

    Each Image in your Library carries its own Places assignment.  You can move any Image into any Project and it will retain its specific Places information.
    All you need to do is select all of the Images you want to put in your new Project, and "File→New→Project" w. "Move selected items to new project" checked.
    There are several ways to select the Images for just one or your two countries.  If you need suggestions, post back (the best way depends a bit on your use of Places and other metadata).
    Generally, users have found Aperture works better with Projects kept to fewer than 1,000 Images.  This was the case when 3.0 first came out -- I haven't tested any later versions, as I stick with the generally recommended "One Project for each out-in-the-world Shoot" and I rarely bring back more than 500 exposures per shoot.
    (For what it's worth -- the human world had a very different level of material sophistication -- Ansel Adams took 12 plates with him for a day's shooting expedition in Yosemite.  Twelve shots for the day, including mis-takes.)

  • Dividing a project into two projects

    How do I divide my project into two projects so that I can burn it to a DVD? I have 2hrs 40 mins and this is too long. thanks!

    Go to the Project Library View and select your project.
    Then FILE/DUPLICATE PROJECT and give the duplicate a name like "your name - part 1".
    Then duplicate it again and give the duplicate a name like "your name - part 2"
    Now you can open "part 1" as a project and delete everything that is in part 2.
    Open "part 2" as a project and delete everything that is in part 1.

  • Pictures in two projects?

    Hello,
    It's taken me a little while to figure out how to organize my library and now that I've figured it out, I'm cleaning up the database and trying to make sure that the photos I want in a yearly project are all there (i.e., all pictures from 2011 in one project).  What I've noticed is that even though I thought that pictures were only able to be in one project in Aperture, I have the same images in two projects.  My question is, which one is the Master (I've tried the referencing feature and it often tells me there is no reference) so I can delete the same images in a different project.  Or can you tell me how to figure out if I indeed have duplicates in the library and that is why the same images is in one or more projects?
    Many thanks.
    lsb

    Are the duplicates the photos that say copy or is that a different version?
    That will depend on your naming scheme when you imported the duplicate. But by defaultversions of an image will have "version" in their names. And edited images will show a badge, if you enable badge overlays.
    In the example above the second image (from left) is an edited image and has the edited badge in the lower right corner. The third image is an aditional version of the same image - called version two.
    You can enable the Metadata display from the "View" menu - "View > Metadata Display " and customize them (or from many more places).

  • Linking Two projects in oracle projects

    Dears,
    I need to know how it's possible to link two projects together in one project?!
    Regards,,
    Ahmed Fazary

    Hi,
    Are you expecting project program related functionality. A program is a group of related projects linked together in a hierarchy. If you define the project as program then u can link multiple project under the program.
    Govind

  • Solution Directory----Merging two projects in Solution

    Dear Team,
       I am working in Sol Man 4.0 SP 13.
    we have created two projects in Sol Man & we have done our entire implementation thro Sol Man. Now the two projects are gone live.
    Now we want to maintain "Solution Directory" merging these two projects.
    Please guide me, what are all the primary inputs i have to collect from the customer in order to start this activity?
    Note: I believe, based on the "Solution Directory" only our Business Process Monitoring works. Is it correct?
    any valuable input will be very much appreciated
    Thanks
    Senthil

    Whilst my instructions are lengthy, that is to give a full explanation of all the ins and outs. In your case the work will be little more than creating a parent and setting up your two existing projects as children.
    It's a lot easier than trying to have one source project.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • When I downloaded the update to 10.9.4 on my Macbook, I lost the photos in my two projects in iPhoto. Is there a way to retrieve them?

    When I downloaded the update to 10.9.4 on my Macbook, I lost the photos in my two projects in iPhoto. Is there a way to retrieve them?

    I have just found out that my Mac doesn't back up to iCloud.  So, have enabled Time Machine.  I didn't realise I had to setup the backups - thought they were automatic in the iCloud.  Thanks for your help

  • Conflict of class-names in two projects

    Hello,
    I have one workspace with two projects. On project is "used" by second project (via add libraries).
    Problem: both projects have a package with the same name (system) and class with the same name (system.Session).
    How to reference from project P1 to (P1)system.Session and (P2)system.Session together? >import system.Session< is insufficient... How to extend >import< for P1/P2?
    Thanks for any hint.
    Jara

    Hi,
    As the previous poster noted the easiest option would be to rename one of the classes, otherwise you can deal with by using a different class loader. Take a look at the javadoc in URLClassLoader for how to set up on. This will allow you to load the classes into a different namespace.
    This interestingly enough allow you to have more than one instance of a Singleton in a java vm.
    Thanks,
    Gerard Davison

  • Updating same topics in two projects

    Hi,
    I Have one complete RoboHelp projects.
    For the needs of a team in my organization, I created a new
    projet and I imported only the folder and topics needed in the
    second project. The two projects have differents URL.
    I will like to know : If some change are made in the original
    projects, it is possible to publish these change in the duplicate
    project ?
    If I create a conditional tag and I add a new URL address in
    the original project, do I will have the result I wish?
    Thanks!

    A project contains source files, let's say you have 100
    topics for the sake of argument.
    You can generate two quite separate outputs which can include
    whichever of those 100 you want. It could be all or some.
    So output 1 (which is what I take you to mean the first URL)
    would contain whatever that audience needs and output 2 would
    contain whatever the audience needs.
    Topics that go in both would be untagged. So anything that
    ONLY goes into output1 would be tagged output1 and anything that
    ONLY goes into output2 would be tagged output2. When you generate
    output1, you would use a build expression of NOT output2. That way
    the build would contain all the untagged topics and everything not
    tagged output2, that is the output 1 topics. Read it again, it
    makes sense!
    It's the whole idea of single sourcing. One set of source
    files that can produce multiple outputs.
    If you right click the single source layout folder, you will
    see you can create additional outputs. Set up two for this purpose
    then you will not have to keep changing the target folder and build
    expression.
    Create a small test project to try it out.

  • Two Instances or Two Projects & Albums Trees?

    I've just migrated 30K photos from iPhoto to Aperture. The number of projects is insane and I have a taxonomy in mind to clean it up; Aperture will make it simple to categorize my photos for visual scanning. What's a challenge, however, is the endless vertical scrolling and dragging multiple project selections up and down the Projects & Albums tree in order to move or consolidate projects into folders.
    What I want is to either open two instances of Aperture (ok, I know I'm using a Mac and this shouldn't be necessary) or to open two Projects & Albums trees so I can drag and drop one or more projects from instance 1/tree 1 to instance 2/tree 2.
    Any ideas?

    If Frank's good idea works, use it. I tried it that way and could not get it to work, but that might have been an update or two previous.
    What I ended up doing was using a combination of
    - newly created top-level Folders as holding bins
    - labeling Projects with unique tags for searching (e.g: "{space}XXX")
    - judicious use of the Library search feature (search for " XXX"
    - using "Mark as Favorite" and then filtering to Favorites (then select and move, then select whole Library and "Remove from Favorites" to clear this grouping)
    With a little bit of planning, these tools will let you organize your Library systematically and without too much senseless effort.
    What I would love to see is an interaction between Projects View and the Library Inspector. One should be able to move Projects between Folders in the Projects view, and also by dragging to the Inspector.
    Important: moving thousands of Projects is one of the most processor-intensive things you can dump on the database. Expect Aperture to take hours or even a day to finish updating all the information. +Do not force-quit Aperture+. Let it run, unmolested, until it finishes.
    IME, the effort is well worth it. Good Luck.
    Message was edited by: Kirby Krieger

  • Combining two projects in iMovie.

    Hi
    Can any-one tell me if it's possible to combine two projects into one in imovie? I'd like to slot a project between still photos in an existing project.
    ta

    Hi
    Yes this has no stream-line function - but
    • Make the insert as it's own project
    • Export out as a full Quality QuickTime movie
    • Import this into Events
    • Now insert this as "Cut-away" in the Main Project
    Many complex scenes must be made this way by export/import as many functions etc only can be applied one at a time.
    Yours Bengt W

  • Possibility of Merging two Projects

    Hi,
    I have come across a situation where the users have entered two projects in system for one. They entered planning data for one of them only and both projects are in execution already. There are actual costs posted.
    For some time, it remained un-noticed and now I am looking for a way to clear up this mess.
    Is there any way that I can "merge" these projects or get the things "in line" after this?

    All solutions seemed to be working fine, its just that I faced a problem with different fiscal years. The client has already closed 2009 financially and revenues have been locked. One of the two projects was initiated in 2009, any changes in material costs would also require MM periods to be open for past postings.
    The business realizes the financial impacts this activity may have and decided to leave the projects in their state, considering them as two seperate projects.
    Thank you all for your responses.

  • Merging two projects with Premiere elements 12.

    Hello,
    On my computer (windows 7) i have different directories with movie-fragments. From each directory i made a movieproject. It took a long time to trim everything. Now i have one project from 1,5 hours and another from 20 minutes. I would like to put the two projects together and then cut it into two projects. I was suprised that i could not do that. I could not copy the movie with titles in one project and copy it to the other project. Also i could not find any way to import one movie into the other. Very strange. I would think that this is a basic function the program should have.
    I found out that i can work of course with the Project Asset and import the moviefragments again, but then i have to trim everything again.
    I could also export one movie as for example AVI and then insert it with the Project Asset into the other project. But then i have no possibility to change the titles and transitions.
    Does anyone know a way to merge two projects?????
    Many thanks, Stephan

    Stephan
    You wrote
    I used it a lot when i worked with the program i used before Premiere Elements.
    Important: What version of Premiere Elements are you referring to in the above? Or, are you referring to another program that is not Premiere Elements?
    No version of Premiere Elements allows the user to open one project file (project.prel file) in another.
    You can copy/paste insert between two project files (project.prel) using ClipMate in conjunction with Premiere Elements. You cannot do a copy/paste insert between projects without ClipMate in use with Premiere Elements. The How To for this Windows Only feature is found
    http://www.atr935.blogspot.com/2013/05/pe-clipmate-copypaste-between-pe.html
    The alternative is to export your project 1 Timeline "trim" selectively to a file saved to the computer hard drive and then import that export into project 2.
    In this workflow considerations need to include project 1 export format consistent with project 2 import settings.
    So, we need details to explain the why not for
    Also i could not find any way to import one movie into the other. Very strange. I would think that this is a basic function the program should have.
    and
    I was suprised that i could not do that. I could not copy the movie with titles in one project and copy it to the other project.
    In the first part, what were your export settings from project 1 and your project preset for project 2.
    In the second part, did you use ClipMate with Premiere Elements or something else?
    What you want to do sounds very doable so we need to discover the whys to get to the solution.
    Thank you.
    ATR

  • External Variable Null Pointer Exception when I publish two projects

    I have the following external variables exception thrown when I publish two projects alongside each other. These projects share the majority of there 50 odd project variables. (I know that this is a bit excessive but the customer wants to be able to search under this many variables). I have checked and found that there are not any differences in the variables across the two projects.
    This exception is brought up when the second of the projects is published, no matter which way around they are published. In two incidences, out of about 30, I have managed to deploy this code without this problem occuring.
    I am using ALBPM Studio Version: 6.0.5 Build: #97234 and ALBPM Enterprise Version: 6.0.5 Build: #97234. I am deploying these to a Sun Solaris 10 environment with an Oracle 10G database.
    I would be very grateful for some assistance with this problem.
    Process '/NCTSProcess#Default-1.0' could not be started. Details:\njava.lang.NullPointerException
    java.lang.NullPointerException
    at fuego.metadata.execution.ExternalVariable.getDirectoryVarName(ExternalVariable.java:46)
    at fuego.metadata.execution.DeploymentInformation.addExternalVariable(DeploymentInformation.java:201)
    at fuego.metadata.execution.compiler.ModelVariableCompilerImpl.compile(ModelVariableCompilerImpl.java:56)
    at fuego.metadata.execution.compiler.ModelCompilerImpl.compile(ModelCompilerImpl.java:72)
    at fuego.metadata.Process.compile(Process.java:1172)
    at fuego.metadata.Process.compileProcess(Process.java:1109)
    at fuego.metadata.Process.loadProcess(Process.java:949)
    at fuego.metadata.Process.initProcess(Process.java:755)
    at fuego.metadata.Process.forName(Process.java:191)
    at fuego.server.BaseActiveProcess.getProcess(BaseActiveProcess.java:110)
    at fuego.server.ActiveProcessImpl.loadMetadata(ActiveProcessImpl.java:1466)
    at fuego.server.ActiveProcessImpl.loadMetadata(ActiveProcessImpl.java:1451)
    at fuego.server.ActiveProcessImpl.<init>(ActiveProcessImpl.java:179)
    at fuego.server.BaseActiveProcess.<init>(BaseActiveProcess.java:55)
    at fuego.ejbengine.EJBActiveProcess.<init>(EJBActiveProcess.java:48)
    at fuego.ejbengine.EJBActiveProcess.createAndAddToMaps(EJBActiveProcess.java:66)
    at fuego.ejbengine.EJBActiveProcessManager.createActiveProcess(EJBActiveProcessManager.java:58)
    at fuego.server.ActiveProcessManager.handleProcess(ActiveProcessManager.java:434)
    at fuego.server.service.ActiveProcessService.startProcess(ActiveProcessService.java:136)
    at fuego.ejbengine.service.EJBActiveProcessService.startProcessImpl(EJBActiveProcessService.java:88)
    at fuego.ejbengine.service.EJBActiveProcessService.access$000(EJBActiveProcessService.java:31)
    at fuego.ejbengine.service.EJBActiveProcessService$1.execute(EJBActiveProcessService.java:76)
    at fuego.server.execution.DefaultEngineExecution$AtomicExecutionTA.runTransaction(DefaultEngineExecution.java:304)
    at fuego.transaction.TransactionAction.startBaseTransaction(TransactionAction.java:470)
    at fuego.transaction.TransactionAction.startTransaction(TransactionAction.java:551)
    at fuego.transaction.TransactionAction.start(TransactionAction.java:212)
    at fuego.server.execution.DefaultEngineExecution.executeImmediate(DefaultEngineExecution.java:123)
    at fuego.server.execution.DefaultEngineExecution.executeImmediate(DefaultEngineExecution.java:80)
    at fuego.server.execution.DefaultEngineExecution.executeWithoutComponentImmediate(DefaultEngineExecution.java:185)
    at fuego.server.execution.EngineExecution.executeWithoutComponentImmediate(EngineExecution.java:86)
    at fuego.ejbengine.service.EJBActiveProcessService.startProcess(EJBActiveProcessService.java:73)
    at fuego.server.service.ActiveProcessService.runProcessesLoader(ActiveProcessService.java:118)
    at fuego.server.service.ActiveProcessService.activateProcesses(ActiveProcessService.java:88)
    at fuego.ejbengine.service.EJBActiveProcessService.doActivateProcesses(EJBActiveProcessService.java:62)
    at fuego.ejbengine.service.EJBActiveProcessService.initialize(EJBActiveProcessService.java:50)
    at fuego.ejbengine.DistributableObjectFactory.initializeActiveProcessService(DistributableObjectFactory.java:60)
    at fuego.ejbengine.Engine.startServices(Engine.java:434)
    at fuego.ejbengine.Engine.start(Engine.java:133)
    at fuego.ejbengine.servlet.SchedulerServlet.init(SchedulerServlet.java:95)
    at weblogic.servlet.internal.StubSecurityHelper$ServletInitAction.run(StubSecurityHelper.java:282)
    at weblogic.security.acl.internal.AuthenticatedSubject.doAs(AuthenticatedSubject.java:321)
    at weblogic.security.service.SecurityManager.runAs(Unknown Source)
    at weblogic.servlet.internal.StubSecurityHelper.createServlet(StubSecurityHelper.java:63)
    at weblogic.servlet.internal.StubLifecycleHelper.createOneInstance(StubLifecycleHelper.java:58)
    at weblogic.servlet.internal.StubLifecycleHelper.<init>(StubLifecycleHelper.java:48)
    at weblogic.servlet.internal.ServletStubImpl.prepareServlet(ServletStubImpl.java:507)
    at weblogic.servlet.internal.WebAppServletContext.preloadServlet(WebAppServletContext.java:1853)
    at weblogic.servlet.internal.WebAppServletContext.loadServletsOnStartup(WebAppServletContext.java:1830)
    at weblogic.servlet.internal.WebAppServletContext.preloadResources(WebAppServletContext.java:1750)
    at weblogic.servlet.internal.WebAppServletContext.start(WebAppServletContext.java:2909)
    at weblogic.servlet.internal.WebAppModule.startContexts(WebAppModule.java:973)
    at weblogic.servlet.internal.WebAppModule.start(WebAppModule.java:361)
    at weblogic.application.internal.flow.ModuleStateDriver$3.next(ModuleStateDriver.java:204)
    at weblogic.application.utils.StateMachineDriver.nextState(StateMachineDriver.java:26)
    at weblogic.application.internal.flow.ModuleStateDriver.start(ModuleStateDriver.java:60)
    at weblogic.application.internal.flow.ScopedModuleDriver.start(ScopedModuleDriver.java:200)
    at weblogic.application.internal.flow.ModuleListenerInvoker.start(ModuleListenerInvoker.java:117)
    at weblogic.application.internal.flow.ModuleStateDriver$3.next(ModuleStateDriver.java:204)
    at weblogic.application.utils.StateMachineDriver.nextState(StateMachineDriver.java:26)
    at weblogic.application.internal.flow.ModuleStateDriver.start(ModuleStateDriver.java:60)
    at weblogic.application.internal.flow.StartModulesFlow.activate(StartModulesFlow.java:26)
    at weblogic.application.internal.BaseDeployment$2.next(BaseDeployment.java:635)
    at weblogic.application.utils.StateMachineDriver.nextState(StateMachineDriver.java:26)
    at weblogic.application.internal.BaseDeployment.activate(BaseDeployment.java:212)
    at weblogic.application.internal.DeploymentStateChecker.activate(DeploymentStateChecker.java:154)
    at weblogic.deploy.internal.targetserver.AppContainerInvoker.activate(AppContainerInvoker.java:80)
    at weblogic.deploy.internal.targetserver.BasicDeployment.activate(BasicDeployment.java:182)
    at weblogic.deploy.internal.targetserver.BasicDeployment.activateFromServerLifecycle(BasicDeployment.java:359)
    at weblogic.management.deploy.internal.DeploymentAdapter$1.doActivate(DeploymentAdapter.java:51)
    at weblogic.management.deploy.internal.DeploymentAdapter.activate(DeploymentAdapter.java:196)
    at weblogic.management.deploy.internal.AppTransition$2.transitionApp(AppTransition.java:30)
    at weblogic.management.deploy.internal.ConfiguredDeployments.transitionApps(ConfiguredDeployments.java:233)
    at weblogic.management.deploy.internal.ConfiguredDeployments.activate(ConfiguredDeployments.java:169)
    at weblogic.management.deploy.internal.ConfiguredDeployments.deploy(ConfiguredDeployments.java:123)
    at weblogic.management.deploy.internal.DeploymentServerService.resume(DeploymentServerService.java:173)
    at weblogic.management.deploy.internal.DeploymentServerService.start(DeploymentServerService.java:89)
    at weblogic.t3.srvr.SubsystemRequest.run(SubsystemRequest.java:64)
    at weblogic.work.ExecuteThread.execute(ExecuteThread.java:200)
    at weblogic.work.ExecuteThread.run(ExecuteThread.java:172)
    Thanks in advance,
    Simon

    Hi Simon,
    If I were you, I would try installing the latest hotfix. There were some important fixes (such as #8715504) related to variable mappings.
    May be it is a good idea to undeploy that project and deploy it again once the HF is installed.
    Hope this helps,
    Ariel
    PS: Remember to regenerate and reinstall all the EARs once the HF is installed.
    Edited by: Ariel A. on Sep 9, 2010 2:29 PM

Maybe you are looking for

  • How to read fields from an ABAP Programa

    Hello everyone. The need of the client is to create an Interactive form and first ask for some data in order to query the rest of the information needed for the layout . All this is using only ECC Backend, we do not have portal yet. So I'm not sure i

  • Ipod touch gets 1604 error code on Itunes and wont switch on

    Itunes says my Ipod Touch needs restoring, it goes through the process but get 1604 error. I have gone through the process to correct this without success. Itunes does not recognise the Ipod Touch on the summary page

  • Inbound is not creating with MvT 561 in MB1C

    Dear Experts, My storage location in HU managed. However, when I do a GR in MB1C againt mtype 561, no Inbound Delivery is getting created. Instead, a material document is directly created and stock updated at IM level. can you please suggest me why i

  • Impossible to download photoshop creative cloud

    Hello, I have suscribed in august a one year photoshop creative cloud license. I had recently to reload Windows 8.1, now I can't download creative cloud anymore. I have tried many times. Once appeared a red message reading someting like "we can't dow

  • Editing the Text May Cause Layout Changes Message

    I have tons of files created in old illustrator 6.0 and now that I have CS2 loaded on Mac OS X.5.8 I'd like to open and edit some of these documents. It says, "This file contains text that was created in a previous version of Illustrator. This legacy