Two R/3 Systems

We need to Connect Two of our R/3 Systems (NOT THE CLIENT, Two Independent R/3 Systems) to XI. And we are going to Send IDOCS(PO) to xi and then to Supplier(s).
1) What are all the configuration needs to be done at R/3?
2) What are all the configuration needs to be done at XI?
Thanks.

Hi Mohini,
1) What are all the configuration needs to be done at R/3?
a)Maintain a RFC destination pointing to XI system which is having all relevant authorization.
b) Maintain the TRFC port in WE21 transaction of R/3 system which uses the RFC destination created in point a.
c) Maintain partner profiles and the idoc type messages.
2) What are all the configuration needs to be done at XI?
a) Maintain the RFC destination from XI system pointing to R/3 system.
b) Maintain port in IDX1 port which uses the RFC destination created in the previous step.
c) check the connection by importing the idoc metadata in IDX2 transaction.
Over and above all these maintain the Business System and Technical Systems for the R/3 systems which you are using to send idocs to XI.
Cheers
JK

Similar Messages

  • Switch over between two SAP PI systems for downtime minimization

    Hello Colleagues,
    with our interfaces over our SAP PI 7.31 (ABAP/Java) system we assume we will run in a 7x24 h runtime scenario in the future.
    Regarding Business Continuity we have to think about solutions which help us to handle downtimes greater than 15 min. regarding Support Package upgrade, Kernel update, EHP, etc.
    The first idea is to implement a second equal SAP PI productive system in parallel to the existing one.
    On the sender side a switch over implementation like WebDispatcher, Load Balancer, etc.
    For maintenance all Interface traffic can run over PI Nr. 1 and PI Nr. 2 can be updated.
    Afterward all interfaces will switched to PI Nr. 2 and PI Nr. 1 can go in maintenance.
    Could be this as suitable solution for SAP PI Business Continuity or do you know better solutions?
    Many thanks in advance!
    Regards,
    Jochen

    Hello Bernhard, Hello Holger,
    many thanks for reply and providing these valuable information's.
    The nZDM Concept is already known to me but it doesn’t answer all our questions.
    Please let me explain a little more in detail.
    Not currently but in the near future we assume some new interface over our SAP PI System will come with the requirement max. downtime lower thank 10 to 15 min. only allowed.
    To be prepared regarding this possible scenario, we start thinking about possible different solutions.
    First step was the nZDM Concept, of course. But it didn’t meet all our requirements regarding interface downtime.
    Some points are:
    possible min. downtime is 30 min. and thus is over our requirements for interfaces
    only for Update (and planed for Upgrade) the SAP PI application
    all operating system and database related maintenance tasks are not covered by nZDM
    all Hardware (Server, Storage, etc.) as well not covered by nZDM
    Among others, because of these facts we start thinking about a second equal SAP PI system beside to existing productive one.
    Than line 1 will take over the whole interface traffic and in the meantime the line 2 can go in maintenance. After finalizing the maintenance for SAP PI Nr. 2 we can switch the interface traffic to SAP PI Nr. 2 to get SAP PI Nr. 1 free for maintenance.
    Regarding the topic “PI Federation” I found here in these documentation's several hints regarding this scenario (two SAP PI systems in an switch over scenario).
    PI Federation – An Overview
    among others  Page: 27
    Business Continuity: Central PI integration Server with redundant Integration Server to be used in controlled switch over scenarios when upgrading or patching.
    or
    How to Fast-Switch Integration Scenarios between SAP PI Runtimes Part II: Web Dispatcher
    But I didn’t found any further detail documentation's regarding this approach.
    The solution should fit as well to our existing hardware infrastructure.
    For production we use an IBM (AIX) failover-cluster switch between our both data center.
    Regarding our hardware infrastructure prerequisites and downtime requirements, which solution(s) do you recommend? Is PI Federation still an option?
    Many thanks in advance!
    Regards,
    Jochen

  • Two SAP production systems in a single physical server

    Dear All,
    Is SAP support installing two SAP production systems like SAP ECC 6.0 of one customer and ECC 6.0 with a different SID and instance no. for another customer in a single physical server? Would like to know from the experts is this possible? If yes ,  what are the things to take care of this design if any?
    Thanks
    Hany

    Hi ,
    check below blog
    You can check the following blog https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/5124. [original link is broken]
    It helps you to understand different logon pages for portal
    Koti Reddy

  • How to listen to iTunes through two separate stereo systems simultaneouly?

    I was thinking of buying two Airport Express units in order to run iTunes to two seperate stereo systems in two different rooms. Can this be done, or is there a better way to accomplish this?
    thanks for any help!
    pjo
    iMac G4, 800 Mhz   Mac OS X (10.3.9)  

    Hi Pjo,
    Yes, you can listen to iTunes through two separate stereo systems simultaneously. The current version of iTunes allows you to stream your music to multiple Airport Express units. At the bottom of iTunes, where the different Airport Express units' names are listed, there is a "Multiple Speakers..." option; select this to choose from one or more of your units.
    Hope this helps.
    - Keith

  • Two R/3 Systems on one Windows NT Server

    Hello SAP  Guru ,
    I have ECC6 on database DB2 for Development server and quality server as different client . Now i want to install quality server on same H/W . i go through sdn forum and market place but not found sufficient information for DB2 database , i go through      
    Note 28392 - Two R/3 Systems on one Windows NT Server also.
    Please suggest some more information to keep in mind while doing this activity.
    Thanks
    Om....

    Hi juan,
    "When you run two systems in the same box you need to be aware that any mayor mantainance done in one system will have a detriment effect on the other one, specially if you're sharing the Database. During the installation you may find necesary to have some downtime in the system that is currently running as OS or DB restarts are potentially necesary."
    I am agree with your post. but still my question is not answered . i am looking for information about what are the things need to modify in current system (either on OS , DB or SAP side) before start of new instance installation for Quality server.
    let me explain bit more.
    If current system having database name Dev now if i install new instance of SAP on same H/W with name QLT for SID as well as Database name. what are the things i need to change prior installation start so that not any conflict will happen (on OS , DB & SAP)
    Or nothing is require to change i can just start installation as on fresh system.
    Regards
    OM.......

  • ECC connecting to two different PI systems for proxy

    Hi All,
    We currently have a PI 7.1 system to which many client proxies are configured in the SAP ECC system.
    Now that we have installed a new PI 7.3 system we would like to make all new integrations in PI 7.3. Note that the ECC system would remain the same.
    (The idea is to migrate interfaces from PI 7.1 to PI 7.3 in a future date)
    In the same ECC system we need to configure client proxies to the newly installed PI 7.3.
    In SXMB_ADM we can only define one integration server for ECC system. Hence if we want to configure proxy to another PI system, we need to overwrite it.
    Since our current ECC system is 6.0, the workaround given by SAP through transaction SAOMANAGER for ECC 7.0 systemsdoes not apply.
    Kindly mention the alternative solutions/approaches available to configure ECC proxies to two separate PI systems.
    Thanks,
    John

    Hi John
    Have you checked this blog?
    Connect SAP Application System to multiple SAP PI Integration Server - Variant n°1
    Regards,
    Giuseppe

  • How do you connect two OSPF autonomous systems?

    New member. Pls advise if this post does not belong here. Cheers.
    You have two entirely separate OSPF systems. You wish to share routing
    information between the two systems, but you don't want to join the
    systems into one big OSPF system (you still want two area 0's).
    Since OSPF does not use an AS number, as does EIGRP, how do you
    redistribute routes between the two systems? Is it as simple as using
    an ASBR and redistribute routes as you would any other non-OSPF routing
    protocol? In that case, wouldn't configuring two interfaces of an ASBR
    to join two different areas, of two different OSPF systems just screw
    up the protocol and confuse it?
    Thanx
    Jim

    This is simple, but not so simple. :-) On one of the two routers, run two OSPF processes. Then set the processes up so one runs on all the interfaces except the connecting the two routers, and set the other one up so it runs on the interface connecting the two routers. Redistribute between the two processes.
    So, if you have this:
    10.2.0.0/16--A--10.1.1.0/24--B--10.3.0.0/16
    On A:
    router ospf 1
    network 10.2.0.0 0.0.255.255 area 0
    redistribute ospf 1 (insert metric, type, etc)
    router ospf 2
    network 10.1.1.0 0.0.0.255 area 0
    redistribute ospf 1 (insert metric, type, etc)
    On B:
    router ospf 1
    network 0.0.0.0 0.0.0.0 area 0
    I would strongly suggest you use route tags or filters (tags are preferrable) to prevent routing loops between the two ospf processes/domains.
    Russ

  • 'Howto' merge (consolidate) two different BW-Systems in one?

    Hi,
    actual we have two different BW System (BW-FI/CO and BW-CRM - both Version 3.5) which are installed on an own systems (historic grown).
    Now we want reduce our administration and hardware costs and our intention is to merge (consolidate) our two BW-Systems in one - using standard SAP transport method.
    Does anyone have any experience with merge of two and more BW Systems in one?
    Does anyone have a 'Howto Paper' about this topic?
    Thanks in advance,
    Ismet

    Hi Arun,
    thx a lot for your quick answer. My question was more 'merge/consolidate' of two BW-Systems as a 'System Copy'. I am trying to give you more information about our procedure:
    - we have two different BW-Systems - BW-System A and BW-System B
    - both BW-System have same Version and Support Package
    - we want to overtake ALL BW-Objects (InfoProvider, InfoObjects, Variables, etc......) from System B into System A
    - for this procedure we want use STMS (SAP Standard)
    - in second step we plan to transfer physical data from System B in to System A with Data Mart procedure (generate Export-Datsource in System B)
    Do you have (or anybody) any experience about this procedure?
    Thanks a lot and Best Regards.
    Ismet

  • Using two seperate operating systems on a Mac, and a smart-phone to better integrated the flows!

    I am considering to get a new Mac.
    In that I want to be able to use two seperate operating systems. The Mac operating system and maybe either a windows or linux or an other useful and functional alternative!
    The reason for this is, that I have several laptops incl. an iPad. I have concluded that iPad isnt that useful for my needs till now, its not very functional for my needs. I am also going to upgrade my smart mobile still considering functional alternatives (would like to hear yoru thoughts about this as well)!
    I want to integrate them into one machine only and utilize cloud  and / or an external Disk, and be better able to use useful apps and software that are not available on either one of the systems on their own my own system!
    Usage will be both for biz and private, but at the end usefulness, and functionality will play a big part in my final decision!
    Do you think this is practical, useful and cost effective way doing it the way I want to do?

    My reason for wanting to have windows on my Mac is to be able to utilize, some applications that are not available for Mac OS!
    In the past I raised few points relating to that, and wasnt able locate details to consider to have only a Mac system. Thats why I had to have few laptops to handle all! I got myself an iPad(1) but again it didnt met the exact needs that I have!
    Thats why I am going to integrate all in one new system(Mac), and exchange and process while on the road via smartphone or something that is between a smartphone and tablet!
    As to smartphones; I hear positive notes on iPhone, but seems to have some issues with its antena, the new Moterola seems great to exchange files anywhere, and the new Samsung Galaxy, very advanced. However what I lack at this stage is user experiences to see if any of them can meet my needs, and what the best combination could be for efficiency, speed and value for money(laptop, operating sytem, smartphone).
    I am tired of crashes, frozen screens, or not able to open files or pics because they are not compatible in some ways! I try to maintain, clean and update my systems, but some stuff does comes in between despite all!
    Anyhow, thank you for your support, I will try to do some reading on the keywords you used, I might get back to you for some more leads!
    Thank you once again!:)

  • Central contract distribution in two backend ERP system

    Hello All,
    I am implementing SRM 7.0 Contract management (SAPKIBKV07) with two backend ERP system.
    We have a requirement where we will create a Global contract in SRM system. Upon distribution based on purchase organisation this contract should get distributed to two different backend system.
    Q-1) Is this a standard featutre available with Contract management or de we need set up some configuration. If yes,  then please let me know the details.
    Q-2) Again here the master data for both the backend system is not synchronised hence if a Global contract in created in SRM system and distributed to two different countries then each contract in ERP should have the region specific vendor code ?
    How this functionality can be achieved.
    Thanks,
    Yatin

    Hello All,
    Has anyone implemented contract management with two different backend system and with different master data set up
    Thanks,
    Yatin

  • Data copy from infocube to infocube in two different BW systems

    Dear All,
    If i have a scenario like i have an infocube for sales in two different bw systems, and if i want to send the data from one infocube to another infocube what would be the strategy we have to follow. Is it that i need to send it as a flat file or is there any other mechanism with which i can send the data into the other infocube.
    Yours answers would be rewarded.
    Regards
    Vijay

    hi Vijay,
    no, you have no need to send it as flat file if you have these 2 bw connected,
    you can use datamart scenario, where one bw act as source system for the other bw, we have such discussion several times, you can check the steps
    Loading data from cube1 to cube2
    Loading data from one cube to another cube.
    hope this helps.

  • Differentiating Master Data from two different source systems

    Friends,
    i have used standard InfoObjects that provide master data for two InfoCubes which take data from two different source systems. Now the some of the master data is identical in both the source systems (example: 10 stands for "Industrial" in one whereas 10 stands for "Agricultural" in the other). What do i do so that the system(BW) differentiates the two.
    Thanks in advance for all the help.
    Mike

    I tried to include the 0SOURSYSTEM in the compounding of this InfoObject (for master data) but it gives me a list of other objects that use this InfoObject as a reference characteristic and also says that this InfoObject is used in a ODS and data needs to be emptied in the ODS before activating  this InfoObject.  Please let me know if there is any way out of it.
    Thanks
    Mike

  • Connect two Solution Manager systems.

    Hello,
    We are planning to couple two Solution Manager systems.
    We want to get all the alerts ABAP+JAVA(Root Cause) from one Solution Manager to the other.
    What are te steps to take?
    Connect the SLD's?
    Connect the systems thru RFC?
    Point all the agents to the 2 Solution Manager systems?
    Regards,
    Mike Geluk

    Hello,
    It is possible.
    For SLD, two options:
    - Each Solution Manager can use its own SLD. Then you must define the other server in the SLD, and vice-versa.
    - Each Solution manager can connect to a central SLD where the two are defined.
    The rest is just like any other managed system configuration: follow the steps in solman_setup.
    Best regards,
    Guiilherme

  • Two separate speaker systems on one card (audigy 2

    Is it at all possible to have two separate speaker systems (maybe even with different volume levels on windows) on the same card? I thought the card did that but it is not working for me.

    basketcase590,
    You can connect a separate set of analog stereo speakers to rear Lineout and Lineout2. Then in the EAX console, set CMSS3D to stereo surround. This will duplicate stereo output on both rear lineouts. You can affect the front-rear volume by adjusting the stereo focus.

  • Can you daisy chain two Compact DAQ systems together?

    Greetings everyone,
    I have a signal conditioning application and I have been looking at the Compact DAQ Platform as a solution.
    I have a total of 16 TC's channels, a few DIO and a few Analog Out requirements.
    I can basicly meet these needs with a single cDAQ system but I would like to have room to expand more in the future.
    Does anyone know if it is possible daisy chain more than one cDAQ system together or if it woudl be very difficult to program and run two seperate DAQ systems from my computer.
    Any help would be greatly appreciated.
    Thanks,
    Thomas

    alkaline3mc wrote:
    NI, the home of dead links.... 
    You probably noticed that these posts were written 9 years ago...
    LabVIEW Champion . Do more with less code and in less time .

  • Master Data synchronisation between two Solution Manager systems

    Hi all,
    does anyone know if it is possible to synchronise master data (smsy, ibase and such) between two Solution Manager systems with standard jobs?
    Thanks!
    Regards

    I asked a likewise question on the OSS earlier and I was told
    "Use MDM" (which is a separate product and must be licensed separately).
    Markus

Maybe you are looking for

  • Error while running batch update statement

    Hi We are experiencing the below error while running the batch update statement where in the IN clause have more than 80,000 entries. The IN clause is already handled for max 1000 values so it has multiple or clause like update...where id in (1,2...9

  • Terms of Payment for Local and Import Purchase Order

    Hello Experts, I am SAP FICO Consultant, I am given a task of maintaining payment terms for local and import purchase order, I would highly appreciate your help in this regard. I know I can maintain payment terms via OBB8 but I am not sure that how t

  • How to Create a Control In Notepad

    Hello: I am need help creating a control file. I have never done this before. I have to load the following script into notepad: load data infile 'names.txt' badfile 'names.bad' truncate into table names fields terminated by ',' trailing nullcols (fir

  • Upgrade from 867 Mhz to 1.33 Ghz?

    Hi, is it possible to upgrade from 867 Mhz to 1.33 (or better) Ghz? I have a Powerbook G4 I bought in June 2003. I am still running on 256MB RAM and 40G. The battery doesn't really work anymore. I'm guessing I need a new battery, more memory, etc. I

  • DVD not responding

    DVD became my time machine DVD and now does not respond to disks inserted. Help