Two scheduling methods for one plant

Hi
I have a scenario where I have two material, one ,material I am producing 5 days a week and another I want to produce 7 days a week. I need to have planned order for these materials also accordingly as per 5 working days and another as 7 working days.
If I am not wrong we cannot have more than one factory calander for a plant.
Do anyone have any suggestion how to handle this scenarion.
Regards

Neeraj,
Hope these Materials are produced from different workcenters, if so please assign a calender in the capacity header of the workcenter as required.
You can have different factory calender assigned to the workcenter within a plant.
Regards,
Prasobh

Similar Messages

  • DME Configuration - Two Payment Methods for One format

    Hi Experts,
    We have a DME formart which we have to use for two payment methods (Direct Debit and Direct Credit).
    The format should contain different values in the header for two different methods.
    How this can be done? I assume that this can be achieved with Condition tab but unable to understand how to maintain the conidtions.
    Ex: for Direct debit one of the value in the header should be 99 and for Direct credit the value should be 88.
    Please let me know if I need to provide further information.
    Regards,
    Surya

    Hi,
    You can create the coditional node (Create Atom) in the DME structure.
    For the first Atom, give the condition as
    Argument 1-1 = FPAYH
    Argument 1-2 = RZAWE
    Type               = 2
    Operator        = "="
    Argument 2-1 = your first payment method
    Argument 2-2 = blank
    Type = 1
    For the second Atom, give the condition as
    Argument 1-1 = FPAYH
    Argument 1-2 = RZAWE
    Type               = 2
    Operator        = "="
    Argument 2-1 = your second payment method
    Argument 2-2 = blank
    Type = 1
    Regards,
    Gaurav

  • Bank Transfer file: generate two outgoing files for one pmt method?

    Hello Experts,
    Two files (header and item) are expected from the hungarian bank for each payement.
    It's possible to generate two outgoing files for one pmt method using DMEE tree? If yes, can you tell me how?
    If not, there is an other solution? Use a classic program (copy and adaptation) for example?
    Thank you in advance.
    Amal

    Are you sure you need separate files file header and items.
    Usually both header and items are placed in the same file. Please reconfirm or get the formats from the Bank.

  • Two auto-reaction methods for one alert

    Hi,
    I wonder if it is possible to trigger 2 auto-reaction methods for one alert.
    The 2 methods  (tc RZ21) we want to use are :
    1) Trigger a SNMP trap with method : CCMS_OnAlert_SNMP_TRAP
    2) Trigger a Mail with method : ccms_send_alert_to_alm_ccms_container_v4
    Those 2 templates are working fine if we use them separately.
    I want to use them both for the same alert.
    Are there methods, function module, reports,... available to handle this?
    Hope somebody can help.
    Regards
    Paul Van Daele

    Found the solution :
    Note 727584 - CCMS : Triggering several auto-reaction methods for an alert

  • How to put schedule lines for one year  in a schedule line agreement

    dear all
    thanks for the support till now from the forum
    now i need some seetings by which the scheduling agreement will autoumatically take the schedule line for one year automatically
    in my client we are getting open PO so
    we have to make one agreement acording to that PO and thats for one year
    and this one yr will have same quantity to be produced everyday
    means 12nos of material every day for 12 month and this will be for every day
    and as per that it should generate a sales order.i need to put schedule line automatically not mannually one by one for each date.so wat is the settingand how to reffer this scheduling agreement we can produce sales order.
    please help
    subrat
    Message was edited by:
            subrat panda

    Dear Subrat,
    you cannot create a yearly schedule line in the scheduling agreement. It is not possible due to format restrictions of the date field. But what you can do is the follows (it is the modification, but it should work with the help of user-exits):
    1. You can split the year schedule line to the monthly schedule lines. There are two ways to do it. If you apply the DELINS IDOC, then you can do it already during transfer of the data to the application (itr is the best way). Here you can use, for example, user-exit USEREXIT_ZUORDNEN_IDOCS (include LVED4FZZ) or customer function EXIT_SAPLVED4_002, called from the subroutine USEREXIT_DYNPRO (Include LVED4F0U). Alternatively, you can use the user-exit USEREXIT_MOVE_FIELD_TO_VBEP (Include MV45AFZZ) within the call transaction, then it will work also in the dialog case.
    2. After getting the monthly schedule lines, you can create a planning delivery schedule, where you can split mothly schedule lines automatically to daily schedule lines according to the customer factory calender.The settings for generation of planning delivery schedules can be found under:
    Customizing SPRO: Sales and Distribution => Sales => Sales Documents => Scheduling Agreements with Delivery schedules => Maintain Planning Delivery Sched. Instruct./Splitting Rules
    It is the only ways, how you can reach your aim. I hope, this information will help you further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Different payment method for one invoice

    Hello everyone
    Is it possible to have multiple payment method for one invoice? As my client want to pay different payment method for one invoice.
    Could you please advise?
    Kind regards

    Yes. You can provided if you split the invoice amount into multiple payments under scheduled payments tab in invoice workbench.

  • Two warehouse numbers in one plant

    Is it possible to have two warehouse numbers in one plant and how do i get this to work?Can the same users work in first and second warehouse?What are the things that i need to define searately in second warehouse number?What is the difference if i still have one warehouse number and split two warehouses in 2 different warehouse numbers?

    Is it possible to have two warehouse numbers in one plant and how do i get this to work?
    Sure, you just need to create another WhNum and assign it to the SLoc(s).
    Can the same users work in first and second warehouse?
    Yes, but you will be required to change their WM profile in LRFMD to make it work.
    What are the things that i need to define searately in second warehouse number?
    Not sure I understand the question correctly. You need to have all the WM settings for this warehouse number separate, although some values might be the same (print program, storage types, movement type config, etc.) but they need to be specified for the key of your new WhNum.
    What is the difference if i still have one warehouse number and split two warehouses in 2 different warehouse numbers?
    There are many differences... You will be able to make the movement types config different which is important if your process requirements are different.
    You will have two warehouse monitors RF monitors (LRF1/LRF2 t-code).
    You will be able to specify different internal SU number if you are using storage units.
    You will be able to have the same storage types in different WhNUms, e.g. you can have 001 in WH1 and 001 in WH2 too without conflict.
    Have different print programs, settings in mobile data entry etc.
    Well, there are many other differences. It would be good if you could specify which operations / processes are of interest so we could elaborate about the specific differences you are interested in.

  • Valuation category showing for one plant but blocked for other

    Hello all,
    I have two plants both belongs to different companies. For one plant i am able to assign valuation category in mm01 but for other plant val cat is blocked in mm01. I have checked setting and they are active and similar. Any other solution please.
    Regards,
    Diptanshu gupta

    The other plant belongs to other company. For that when i am creating a new material in mm01 it is allowing me to post entry in valuation category.

  • Can you have two iCloud accounts for one Apple id?

    Can you have two iCloud accounts for one Apple id?

    the appleID is you in the ios world if you have an iphone and an ipad and an Ipod touch and an appletv and a mac then you should use 1 appleID on all of them it does not mean the same data is on all of them unless you want it to be

  • To enter two VAT numbers for one vendor in the same country

    Hello All,
    When we try to enter two VAT numbers for one vendor in the master record and belongs to the same country, the system is not allowing and gives the following message,
    "VAT reg.no. already exists for country BE"
    Message no. F2140
    Kkindly let me know the way to proceed further.
    Many thanks in advance.

    Hello,
    Go to OBA5 and switch off the message for online and batch entries.
    If the message is already not there in OBA5,
    Then go to OBMSG and switch off the same.
    Application Area F2
    Message No.140
    Regards,
    Ravi

  • Assign Multiple Sales Org for One Plant in STO process

    Hi Experts,
    Aware that I can assign multiple sales org to 1 plant (relationship: many to many).
    I am trying to create STOs to supplying plant and assigning them to different sales organization but encountered problem.
    Example:
    Supplying Plant 1000 - Sales Org 1000A (food) and 1000B (apparel)
    Receiving Plant 1100
    Plant 1100 wants to issue 2 STOs to Plant 1000 - 1 for each Sales Org (for instance STO1 to food division, and STO2 for apparel division).
    However, when I tried creating STO in the system, noticed that in the shipping tab (item details) the sales org, DC has been assigned to 1 particular assignment and data is locked.
    Tried to get into SPRO to configure and define the shipping data for plants but noticed that it's 1 to 1 relationship (SPRO - IMG - MM - PO - Set up Stock Transport Order - Define Shipping Data).
    How can this be done?

    You can set different sales areas (~sales organisation) for one plant in SAP - based on issuing SLoc provided STO between storage locations is activated.
    SPRO > Materials Management > Purchasing > Purchase Order > Set up Stock Transport Order > Set Up Stock Transfer Between Storage Locations > Define Shipping Data for Stock Transfers Between Storage Locations
    Edited by: Csaba Szommer on Jul 2, 2011 6:14 PM

  • How to Upload the Materials for one Plant and then copy the same to all oth

    Hi All,
       I am using Material Types NonStock, Service, Spare Parts and Trading.
       How to Upload the Materials for one Plant and then copy the same to all other plants.
    can anybody give response for this requirement.
    Regards...
    <b></b>

    Hi,
    Using MM01 Only we can upload Plant Details.
    If you want to extend to other plant also, Use MM01 and select Plant view and give new plant details.
    If you want to copy from one plant to another plant after selecting Plant view , next screen you can select From Plant and To Plant Details.
    Reward Points If it helps you.
    Regards,
    Murali K

  • Import Two Price Lists for one item

    Hi all,
    How we can import two price lits for one item and how to link it.
    For eg.
    Suppose Item A is having price 100 Rs today at 11 am
    and its price changes to 150 RS at 1 Pm.
    how we can do this.
    We also want to see the last price of that item.
    Reply
    Thanks,
    Neetu

    Neetu,
    What do you mean by changing?  Does the Item price flactuate throughout the day every day..if so you need to create a routine to import/update the pricelist constantly.
    If the 11 am and 1 pm are constant times when the prices change then you can maintain a pricelist for each one of them.
    Shooting for a solution without knowing the business background can be a bit wasteful.  If you might want to throw some light on the type of business and what the prices are for..
    I also see you have posted the same question earlier..Price Updation
    I would suggest that you post only one thread for one question.

  • Two item renderer for one datagrid column?

    hi
    i have one doubt
    can we use two item renderer for one datagrid column
    any possibilities
    why i am asking this because
    during drag and drop i need one itemrenderer and during application initialization i need another itemrenderer
    any possibilities
    karthik.k

    Hi,
    I think your requirement can be completed by using ViewStack you can pass selected index to it according to requirement.
    See:
    <itemRenederer ...
         <viewstack selectedIndex = 0 ...>
              <vBox id="vBox1" >
                        Your 1st itemrenderer will come here....
              </vBox>
              <vBox id="vBox2" >
                        Your 2nd itemrenderer will come here....
              </vBox>
         </viewStack>
    </itemRenederer>
    You have to just toggle selectedIndex.
    Thanks

  • Different consolidation methods for one entity on one scenario

    Dear experts,
    How can I have different consolidation methods for one entity on one scenario?
    One entity is going from proportionate to equity method. We would like to check variations due to this change.
    Best regards,
    Benoit

    Hi Benoit,
    How's things?
    Managing the consolidation methods is based on the setup of your consolidation rules.
    However, the first place that you should look is the Ownership Management. Select the parent of the entity that you work to process. In the screen, you will be able to see the available methods and the ownership. All these settings are related with the consolidation rules available in your application.
    Regards,
    Thanos
    < spam signature link removed by moderator >

Maybe you are looking for

  • How do I assign a numeric value to an alpha character within a form and still run a total?

    I am trying to build an attendance sheet where P=Present, A=Absent and so on.  I've created the summary field correctly however the individual fields will only take numeric characters.  I would like for the user to be able to enter P, the P stay ther

  • Unable to see the request in Reconstruction Tab of Info Cube

    Hi Experts, We are scm 5.1 version. Actually I have created extraction process to extract data from Demand Planning area. I have extracted data from planning area also. I can see the request in to PSA as well as Info Cube but I am not able to see the

  • Trouble Connecting Canon, Sony Cameras

    I am a teacher and I have a new batch of G5 iMacs for my Yearbook class. Unfortunately, I am having a problem with Mac OS recognizing the cameras when they are connected. Usually a camera will show up like a disk icon when attached via USB and powere

  • Due Date in new posting period

    Hi All, Posting date range in new financial period (new posting period) is one in which my JEs should posted and they will be having impact in financial system. Which is logical. What is the need of Due Date? Is it useful in any practical situation?

  • Problems with IWDCachedWebResource

    I'd like to use the CachedWebResource to display a pdf in an IFrame/external window/etc, but am having issues... 1) The pdf never shows up in the IFrame or external window... Only a blank screen. I can change the resource type to XML and use an xml f