Two XI Systems

Is there any situation where we need to use two XI systems

Hi,
If your qn is regarding 2 Xi porduction systems then the answer is a yes!!
Ususally implemenatations have 2 xi systems one in the internal n/w of the organization and the other one is usally in DMZ exposed to the external world traffic.
these 2 xi servers can be connected through xi adapter (proxy communication)
Cheers!!
Sidharth

Similar Messages

  • Report which reads data from two different systems

    Hi experts!
    By any chance, would be possible to create a report which is able to read from two different cubes and two different systems at the same time?
    Kind regards.

    Good afternoon Raul,
    It should be possible to create a multiprovider on the two different cubes from the two sources
    systems and report on this.
    Best Regards,
    Des

  • How to Trigger an IDOC from SAP R/3 to two XI systems

    Hi experts,
       Can any one please tell me How to Trigger an IDOC from SAP R/3 to two XI systems at a time.
    My current production R/3 system sends a DELCERY01 IDOC to Production XI system ( Name : XIP) .
    I would like to route the same IDOC from production R/3 system to my Quality XI System ( Name XIQ) .
    Problem is production R/3 system triggers an IDOC once.
    Regards
    Ram.

    Hi Ravi,
      Thank you very much for your answer.
    As I am not completely aware of R/3 side,I am getting little problem in understanding your answer.
    Could you please explain the same in some what beter way.. Thank you ..

  • Same logical system name for two productive systems - BW, PI issues

    Dear all,
    we have a productive system which serves two companies (different company codes). This system is connected both to BW and PI for both companies.
    There is a requirement that these two companies must use their own system, so the whole landscape (dev,qa,prd) will be copied to different systems (different server with different system id).
    As a result of the above procedure we wll have two different productive systems, as required, but we wll have the same logical system name for the two productive systems, which must be both connect to bw and PI.
    However as far as I know:
    - we cannot connect systems with same logical system name to BW,PI
    - we cannot convert logical system name of the one of the two productive systems as they are productive and so this is not supported.
    How can we overcome the problem?
    Please advice.

    > However as far as I know:
    > - we cannot connect systems with same logical system name to BW,PI
    > - we cannot convert logical system name of the one of the two productive systems as they are productive and so this is not supported.
    Right.
    > How can we overcome the problem?
    Since you split up systems (or plan to) I highly recommend booking an SLO service (http://service.sap.com/slo). Those people have to the tools and the knowlege to help you. I would not do this on my own.
    Markus

  • Two SNC system and one execution system

    Hi Experts
    Can there be possibilty of Two snc system to co exist with one execution system ECC?
    IF yes can you folks please throw some light on the same?
    This situation is arising because:
    the Lime table in the existing system has really grown huge and the archiving is not helping becuase there are new records that are added to the system every day which are more than the archiving records
    because of this huge data the upgrade is not possible and we are planning for a new setup, now to mitigate the risk we were tryin if two SNC system can coexist with one EEC system.
    Now to add to the problem is there are certain business scenarios because of which we need to put in data in lime table every day
    so reduction in data input is not possible.
    As the data in LIME is only stock of the customer coming every day and if we just transaction data , even if we go away with all the data is not an issue with us as customer reports his existing stock on daily basis to us.
    We have even thought of truncating all the tables available in in lime objects in SARA, we are thinking of this becuase system might act erratic when we setup new system and slow try moving few customer from existing to new system. as a pilot.
    Supposing if we go ahead with it ,wht could be the issues ?
    Thanks for all your help and suggestions
    Regards
    Manas Malhotra

    Hi Manas
    Two SNC systems can coexist together.
    You need to define seperate Business System Groups,RFC settings,Logical System definition
    Also you need to have seperate Identification for your master data, create your own definition in BADI
    Example:If you are sending same material XXX to two SCM systems how to diferrentiate ???
    Because BADi methods EXIT_/SAPAPO/SAPLCIF_LOC_001 & EXIT_/SAPAPO/SAPLCIF_PROD_001
    differentiate when two ERP systems are connected to one SNC system by prefix and sufix, now you need to have your own code to differentiate
    Also big time care should be taken in defining the distrubution models (bd64) and even in XI/PI like
    Example: we have two TM systems coexisting with one ERP, so we used conditoned based mapping
    Itu2019s a condition based mapping.
    1)     When TransportationRequestSUITERequest/TransportationRequest/ShipToLocation/InternalID = BP1 or BP2 or BP3 u2026 the receiver is I5YCLNT100
    2)     When TransportationRequestSUITERequest/TransportationRequest/ShipToLocation/InternalID = BP4 or BP5u2026the Receiver is I5XCLNT100.
    Also care should be taken on master data/FICO settings which both systems use in common. like using Ztypes instead of using standard one like order type, message type. It should be easy when you troubleshoot back!!!
    The inbound message parameters should be taken care w.r.t business needs
    Good to have a matrix mapping like what business process coexit in both systems and which doesnot and then try to see what settings need to be tailored???
    Best Regards
    Vinod

  • How to Archive Files to Two target systems based on Condition

    Hi All,
    Iam doing Idoc--File Interface.
    we have to send the file to Two Different systems based on the plant condition
    If plant = 123 then send to ABC system ELSE if Plant = 999 then send it to XYZ system.
    And Archive the file to one Archive folder of the any one system. this is working fine correctly.
    Archive means not exactly Archiving, just we are droping one more extra file to Archive folder for refference
    Now i need to construct like this
    If plant = 123 then send to ABC system and Archive to Archive directory ELSE if Plant = 999 then send it to XYZ system and Archive to Archive directory.
    Please suggest me on this
    Regards
    Vamsi

    If Plant = 123 then select the BS1(ABC System)
    Ex: //sapdev/test/ABC/item.txt
    For Archive If Plant = 123 then select the BS1(ABC System) Archive folder
    Ex: //sapdev/test/ABC/Archive/item.txt
    If Plant = 999 then select the BS2(XYZ System)
    Ex: //sapdev/test/XYZ/item.txt
    For Archive If Plant = 123 then select the BS2(XYZ System) Archive folder
    Ex: //sapdev/test/XYZ/Archive/item.txt
    Then this becomes very simple:)
    I m assuming you are already using conditional Receiver determination,now for each receiver just configure an extra interface in Interface determination.
    so you will have 2 interface determination and each one of them will have 2 inbound messages,they can use same interface mapping.
    you already will have 1 conditional receiver determination.
    You can also do this via OS script if you have experience in that.
    Thanks
    Aamir

  • Two PI systems in same SLD when upgrading PI 7.4

    We are upgrading SAP Process Integration (PI) from 7.11 to 7.4 with option new installation and phase out. We are going from dual stack to single stack and will have the two PIs running parallel for a longer period.
    Which are the issues we can run into using same System Landscape (SLD) for both PI systems?
    We found that it is not possible to have two Business Systems (BS) connected to the same ABAP Technical System with the same client. Will it be possible to reuse the existing BS, which is then still connected to the PI 7.11, for PI 7.4?
    WIll it be possible in production SLD to switch the Integration Server for backend ABAP BS?
    How did you setup the SLD when new installation?
    Best regards,
    Maria S. L.

    I've never tried that scenario ( two PI environments ->one SLD) but why don't you handle them separately as it's a new installation.
    I believe you will be decommissioning existing PI landscape(SLD) post migration.
    Don't change any SLD connections until you completely migrate to newer version of PI.
    1) Export the SLD content from existing system to new system(TS,BS,SWCV etc)
    2) In the back-end system maintain separate connections to required environment at interface level.
    Refer to below blog to know how to maintain IS_URL paramter at interface level.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/70066f78-7794-2c10-2e8c-cb967cef407b?overridelayout=t…
    3) once you migrate all your interfaces change then change SLD pointers to new PI landscape.

  • R/3 connected to two BW systems ...

    Hello,
    I would like to know is it possible to connect an R/3 system to two BW systems ?
    Please advise,
    Dimitry Haritonov

    Hi dear,
    take a look to OSS Note 775568 'Two and more BW systems against one OLTP system'...
    Hope it helps!
    Bye,
    Roberto
    ...and please don't forget to reward the answers...it's THE way to say thanks here !

  • SLD: Pointing two business systems to the same client...

    Hi Guys,
       Is there anyway to make two business systems point to the same client(on the same r/3 technical system)? how about a work around?
    Thanks,
    Harsh

    Harsh,
    >><i>Finally all collapse to one client in production.</i>
    Even though you will have multiple Business Systems in every envrionment, the final transport will happen from only one environment.
    DEV --> QA --> PROD. In this case, objects are moved from dev to qa and then from QA to prod and so, all you will need is the trasnport target created in the QA business systems pointing to the Prod busines system and do the transport.
    ><i>While transporting to a new SLD(quality to prod) can I choose one transport target for multiple source business systems?</i>
    Take a look at this document for multiple SLD transports. Should answer all doubts,
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9e76e511-0d01-0010-5c9d-9f768d644808
    Regards,
    Bhavesh

  • Two source system in RSA1

    Hello All,
    I have the following scenario.
    I have two source system ECDCLNT200 and ECDCLNT230 and one BI system BIDCLNT200. client 200 is used for configuration and  client 230 is used for data loading and validation.now firstly  i created source system ECDCLNT230 in RSA1  then it comes under SAP menu but when i try to create ECDCLNT200 in SAP Menu it comes automatically under BI menu. i deleted it and tried again but the same problem is there.
    if i remain the same configuration means ECDCLNT200 under BI menu then will it create any problem in future ? or if i want to create ECDCLNT200 under SAP menu what is the otheroption ?
    I tried both the way. first i rightclick on main node and selected create source system and second time i right click on SAP and select create source system but couldn't create it.
    Please let me know the solution.
    Regards,
    Komik Shah

    Thanks vincent,
    i got the solution through SAP note.
    I have assigned the points.
    Thank you again
    Regards,
    Komik Shah

  • Certificate error on only one of two identical systems?

    I recently installed two COMPLETELY identical Ubuntu 12.04 systems, PC01 and PC02. The browser is latest version of Mozilla Firefox.
    When visiting https://www.komplett.dk/k/signin.aspx with PC01, the connection is secure and everything is OK, no error messages. When visiting the same URL with PC02, the following error message is shown:
    This Connection is Untrusted
    You have asked Firefox to connect securely to www.komplett.dk, but we can't confirm that
    your connection is secure.
    Normally, when you try to connect securely, sites will present trusted identification to prove
    that you are going to the right place. However, this site's identity can't be verified.
    What Should I Do?
    If you usually connect to this site without problems, this error could mean that someone is
    trying to impersonate the site, and you shouldn't continue.
    Get me out of here!
    Technical Details
    www.komplett.dk uses an invalid security certificate.
    The certificate is not trusted because no issuer chain was provided.
    (Error code: sec_error_unknown_issuer)
    I understand the Risks
    Why is this happening when the systems are COMPLETLY identical? i have tried to delete the profile folder on both systems, but the result is the same. NO certificates has been manually installed on PC01, so that is not the reason. The file size of cert8.db on PC01 is 94K and on PC02 it is 64K, I do not understand how the size can be different when the profiles are newly created.
    I would really like to find out why I am experiencing different behaviour with Firefox, on two identical systems, so any suggestions or ideas are very welcome.

    The Technical Details show:
    <blockquote>www.komplett.dk uses an invalid security certificate.
    The certificate is not trusted because no issuer chain was provided.
    (Error code: sec_error_unknown_issuer)
    </blockquote>
    The www.komplett.dk server doesn't send a required intermediate certificate.
    *VeriSign Class 3 Extended Validation SSL SGC CA
    You can inspect the certificate chain via a site like this:
    *http://www.networking4all.com/en/support/tools/site+check/
    You can install the intermediate certificate from networking4all site or from this VeriSign page (it is the second one).
    *http://www.verisign.com/support/verisign-intermediate-ca/extended-validation-pro/index.html
    Copy the certificate text to a .cer text file and import this file in the Certificate Manager.
    *Options/Preferences > Advanced > Encryption: Certificates - View Certificates

  • Two BW systems - one partition/server. How do you divide the resources?

    Hi.
    We installed a BW DEV system onto a partition of an IBM p570. Roughly 22 GB RAM allocated and plenty disk. Everything was running smoothely until we decided to install a BW QA system on the same partition. Ever since then, the DEV system has become very unstable and hangs and then crashes on a frequent basis. On inspecting the trace/log files, we can see obvious messages about the system running out of SWAP space and then halting sessions/processes. My understanding of the situation is that, when DEV was installed, it obviously "believed" that the 22 GB of memory was exclusively available to it and, now that QA is trying to run and grab resource, the DEV is somehow complaining that it doesn't have the resource that it believes it SHOULD have (in layman's terms).
    My question is, in order to get BOTH the systems running optimally (i.e. DEV and QA), what parameters do I need to change/force in order for each of the systems to believe that it now only has 11 GB of memory available? I can only think of checking memory-related parms in the config tool (heap memory, etc.), the PHYS_MEM_SIZE and j2ee/phy_mem_size in the instance profile and then one or two Oracle specific parameters around DB_CACHE_SIZE and SHARED_POOL_SIZE. There are, however, lots of other parameters, e.g. em* parameters, that I can see in the active list (TU02) that appear to be memory related, but I don't know if it is necessary to change these values, or whether they are dynamic.
    The two BW systems are ABAP/JAVA combinations (NW2004s) on AIX 5.3 / Oracle 10.2.0.2.
    Thanks in advance!
    Des.

    read SAP note 88416.
    I would leave 1GB for OS and provide 21GB for each instance (including Oracle instances)
    so basicalyl, size each instance as if you would have about 10GB only available.

  • Process chain - Two source system issue

    Hi Experts,
    I face problem when i transport a process chain from BW DEV to Quality.
    I have two source systems in Quality ECI and EXS.EXS is a sandbox server(Source system) which we no longer use.
    When i transport the process chain from DEV to QA, i get two DTP's automatically added to Process chain in quality for two source systems ECI and EXS whereas i do not want the data to be loaded from EXS client.
    I checked the BW dev system, it has only one DTP in the process chain.
    Now I want to elminate the other DTP in the process chain in quality.
    Please suggest.
    Regards,
    Srini

    I Dont think so a DTP for EXS system has got created automatically when you transport the PC to QA (which actually doesn't exist in DEV).
    Please check you DEV system once again, there might a DTP from EXS system also.. other wise go the Release TR and then check the contents-->iif you find two DTP's there then it is there in the dev system..
    Any ways if you want to delete the other DTP from the PC in QA.. you can Delete it directly from the PC itself.. Goto change mode of the PC and then select the DTP which you want to delete-->then right click and hten Click on Remove Process -->then activate the PC..
    Note: You might have authorization to edit the PC in QA then only you will be able to do the changes..

  • I have a two screen system that reads left to right.  With Yosemite it now reads right to left.  How do I fix it?

    I have a two screen system that read left to right.  With Yosemite the screens have switch and now the mouse and my brain have to read right to left.  Any ideas how to fix this?

    a brody,
    After further scrutiny your solution solved the mouse problem of going left to right.  But now the home screen problem.  Display two on the right still has the dock below and the menu bars.  Any ideas how to fix this?

  • How to synchronize two applications system

    HI,
    I work witj Designer 9i, in a Non-versioned Repository. I create a copy of an application system on the same repository.
    I would like to know if there is some mechanism that will synchronize the two application system copies. What i want is how to automate the replication of any modification I made to the copy, in the original application.
    Thanks for your help,
    Malika

    Hi Roel,
    I want to do this because in our organization the repository is non versioned, and we want to make copies for the application system in purpose to sure that only Data modeler and DBA will access it. The developers can't update it. In the original application system we will replicate the changes and then developers go on with their Treatment modules.
    Thanks for your reply ,
    Malika

  • Same IDOC to two receiver system

    I must send same IDOC to two receiver system..I am succeded to send an IDOC to abapProxy for only one system but i need to send it to two different system..I created two XI communication channels but i cannot create second receiver aggrement with same mapping.It gives an error "object already exists". But how can i assign this second communication channel without creating second receiver aggrement.
    Our scenario like this
    IDOC --> systemA abapProxy
             --> systemB abapProxy
    how can i overcome this situation?Could you explain step by step
    Thanks

    Hi,
    in reciver determination, have SysA and SysB both as recivers by adding one more line in reciver section for SysB..........create a second interface determination with  sender IDOC system and this SysB  and create a XI comm channel for this SysB and create a reciver agreement for it also........
    Regards,
    Rajeev Gupta

Maybe you are looking for

  • Problem in starting the weblogic 5.1 server

    I am yet to deploy the bean in the ejbdeployer. When I start it from the startup start-> programs-> weblogic 5.1-> ejbdeployer the weblogic screen opens and remain as it is. I have tried the same in d:\weblogic\bin\ejbdeployer I got a exception as ja

  • VA01 BDC Session - Purchase requisition wiew not shown

    Hello Forum, I've a problem with a BDC session in ECC 6.0 about VA01. When I try to change the purchasing requisition data from the shcedule tab using the button identified from the BDC with the code "EIBB"  (the last one) the subsequent screen is no

  • Installing Reader 9.0 on non-system disk?

    I'd like to install on my D: drive, because the system disk C: is pretty full. Installing Reader 9.0 consumes around 50% of the remaining free space. However, the download/install procedure doesn't provide any options whatsoever (as far as I can see)

  • Location of KM content root

    Hi, i am wondering where on the SAP backend the root is located for the KM content. In portal go to content administration then KM content . In the right hand frame a directory structure appears under root. I need to know where this root is located s

  • HT201210 iphone 4 has died. tried a restore but getting an error 21 - help please

    looked at my phone tonight and noticed that it wasn't responding. Thought the battery was flat so put in on the charger. it then gave me a message suggesting that I needed to connect to itune - so i did. Tried a 'restore' but got a error 21. Phone is