UD  Insp. Lot for Vendor Source Inspection

Experts,
I set up Vendor Source Inspection for some of our parts. Customizing setting for Rejected is "Create New Lot".
So in case of a "rejected" UD  before GR I get a second insp. lot after GR. Both insp. lots are refering to the same PO, but I see no reference regarding the insp. lot number 1 in the insp. lot nubmber 2.
Same happens if I generate a QN refering to Insp. Lot before GR, QN Information will not be copied in the insp. lot after GR.
So my question is, is such a reference in between the inspection lots available ?
-Jörg

Thanks for your reply...
But it doesnt work....
I have mentioned a material with the Check box "Documentation reqd" ticked as "Construction type material of the object" in the Equipment in the Structure tab.
And tried the lot....But not able to get the long Text while UD...

Similar Messages

  • Creating inspection lot for vendor returns

    Hi All,
    In Subcontracting, components are sent to vendor using Mov Type 541, if vendor returns the components without any value addition we recieve the goods with Mov type 542.
    Now, when we recieve the goods using 542 customer requires that the material has to be posted to quality inspection and a lot has to be created.
    I have already tried with inspection type 08 but its not working.
    Any ideas how it can be done?
    Regards
    Naveen Goveas

    Hi Naveen,
    You have come across a common problem in later releases of SAP. Ram is nearly right in the settings for control of inspection lots for goods movements. In the standard system movement type 542 has no inspection lot origin assigned, so even if you have maintained an inspection type for your material there is no "trigger" for the inspection lot creation from that movement type. Unfortunately, you cannot change the inspection lot origin settings for movement types. The only choice you have is to create (as a copy) a customer defined movement type (one which already has the appropriate inspection lot origin assigned) and use that instead. You have to also be careful about the 'Quantity' and 'Value' updating strings for your new movement type.
    Hope that helps.
    Colin

  • Creation of inspection lots for vendors

    Hello friends,
    How can we create inspection lots for all vendors at a time? I want to record results for my vendors(near about 2000 no.) by inspecting their raw matwrials in a lab.

    Hi Kiran,
    Why you are going for manual lot creation if the scenario is like above?
    1.     Assign inspection type 01 to material master
    2.     Prepare an inspection plan through QP01 with usage 5
    3.     Inspection lots will get generated with lot origin 01 whenever you do good receipt through
    migo with 101 movement type
    Conclusion: Inspection lots will get generated automatically whenever you do good receipt with vendor material combination.
    Best Regards,
    Anand Rao

  • Reg insp lot for material

    Dear all,
    One material which is sometimes used in plant and sometimes sent to subcontractor as a component , if it is procured from
    same vendor and when it is coming to plant for usage we should get insp lot and when it is sent to subcontractor we do logical
    GR in the plant and material is directly sent to subcontractor at which we donot want insplot .
    here material and vendor are same
    Please advice
    regards
    venkat

    Got your point.
    Look, when you are physically receiving it, in MIGO receive the material with mvt type 101, normally as you do.
    In case the material goes to the subcontractor and you make your GR, make the following:
    Receive the material with MIGO with mvt type 103, this will not create FI document yet, the material will be in the blocked stock, after that release it with mvt type 105, this will create the FI doc you need.
    Now the problem is the inspection lot, because in the standard system, mvt type 105 creates inspection lot, therefore deactivate QM on mvt types of 105, and that will stop the creation of inspection lots.
    Regards,
    Max

  • QM insp lots for mvt type 315

    Dear All,
    senario is as below
    we are doing 313 movt within the same plant for stock transfer after 313 stock will be in transit after that we
    do 315 movt for recieving of the stock.
    settings done insp activated for 313 and 315 movt types and 08 insp type is activated in M.M.
    but system is not creating insp lots and the stock directly goes into unrest use.
    can any body suggest what setting is missing?
    your suggestions will be highly appreciated
    Thanks
    Anil

    Hi Anil
    when you post using 315 mvt. type, system will create inspection lot
    plz. check @ OMJJ -- for the 315 mvt.type -- QM should be active --> then system will create inspection lot
    before that make sure Mat. master for that material 08 insp. active ,and post to inspection stock,task /mat spec, and Automatic assignment and characteristc --> these fields to be active
    let me know if u need further detail
    Thanks
    Sami

  • Cancel insp.lot for batch material with serial number?

    We have a problem with an inspection lot....
    A few months ago we made a goods receipt for batch material... it ended up in Q- stock.
    The weeks went by and the material was changed ito a serial number material... that process works fine...
    But now we want to scrap the material that is batch-handeled ... the inspection dont want to let go.. it want serial numbers... even if I create serial numbers for this the inspection lot
    dont let me register any numbers.. So I cant cancel/delete it... And after all I just want to scrap the batch...
    Can someone help me?
    // Andreas

    if stock of that material with serial numbers exist, then scrap that stock and disable the serial number for the material by deleting the serial number profile in the work scheduling view of the material master.
    then try cancelling the inspection lot. After cancelling the inspection lot, activate the serial number for that material again and bring back the scrapped stock into the unrestricted use.
    Note: please advice the users not to post any stock for that material till you complete this or else block the posting t.code for all the users.

  • Manual Insp Lot for Equipment

    Hi
    Can we create manual inspection lot for Equipment with mentioning inspection type , please give some details
    regards

    Hi,
    Still there are 10 equipments in which material will be same , Can I create inspection lot with type 89 for material & serial number combination.
    Regards

  • Inspection type 04 should not generate Insp.lot for specific Process orders

    Hi Guyes,
    I Want to skip the Inspection lots generation for specific process orders of a particular material during Goods Reciept and stock should be directly posting in to Un-restricted stock.
    In the material master assigned with Inspection type 04.
    Please advise me the possible options to map this scenario.
    regads,
    Rao

    In  QDR1
    stage 10-click on insp stage
    stage 10
    no. of insp : 5
    new insp stage : 20
    rej : 1
    new insp stage : 10
    stage 20 - tick on skip
    stage 20
    no. of skip : say "5"
    new insp stage : 10
    rej : 1
    new insp stage : 10
    Now use this DMR in Header of inspection plan of material of process order.
    what this will do is after 5 inspections it will skip the next 5 inspection lots.
    Make sure :
    You can maintain setting for "maximum skip duration in plant level.
    In QM view click on Skip & auto UD
    Create variant in QA16 & run through QA17
    Here in QA17 maintain the duration after which you want to take UD
    Also make sure that in selected set maintain stock posting proposal for unrestricted.

  • Runtime error at maintain insp lot origins and assign inspection types

    Hi all,
    When i want to assign a new inspection type to lot origin 05 i get a runtime error. I don't know what's happening, but i think that it is caused because the system cannot find a record. When i look in TQ31 and TQ33 i see a line with lot origin 05. In table TQ32 there is no line.
    I can still maintain all other inspection lot origins. I removed the inspection type from 05 and want to add another one, but it's not possible anymore because of the error...
    Does anybody have an idea?

    It sounds like you deleted the 05 insepction type that SAP delivers and had linked to origin 05
    You shouldn't do that. 
    SAP is very picky about having the 01 variant assigned.  You have deleted the 01 variant. 
    You can try to create it back maybe.  If it fails, my guess is you'll have to have the basis team regenerate the TQ32 table from the 000 client.  Then you'll have to redo any entries you need, like any custom inspection types.
    FF

  • Source inspection - inspection lot skip for certified vendor

    Hii,
    I have a requirement in which during source inspection, the inspection lot should not be created if the Vendor is certifed. I have made the following settings:-
    1. In Vendor Master, maintained the Actual QM system in control-reference data.(QM system marked for skip in customizing)
    2. In Material Master-
        - Activated QM Proc- QM control Key -Delivery release
        - Target QM system
        - Inspection type for source inspection activated in inspection set up
    3.In Quality Info Record for Vendor,Material,Plant combination-in Inspection Control tab-
        - Maintained the existing QM system & validity
        - Selected 'No Inspection' in Insp. control
        In Vendor source inspection tab maintained the inspection type & lead time.
    Inspite of the above settings, I can see this PO (for vendor,material,plant) in the source inspection worklist(QI07).
    Please suggest as to which setting I might be missing.
    Thanks!!!
    Regards,
    SV

    Hi,,
    You have to go T code QI07
    where give input Vendor ,Material plant,
    Delivery dateopening peroid
    Then execute the transaction .
    Select line item click oninsp lot & save.
    Where you have trigger lot for the same then only lot will get genarated.
    Regards
    SANIL
    This confugaration required if you have option if lots get rejected.
    Quality management-QM logistics-QM procurement -Control key
    Define control key;
    GR/Source inspection control;
    GR for rejection; three option is available
    1.source inspection has no effect on goods receipt
    2.Creation of new inspection  lot
    3.Goods receipt not allowed
    Regards
    SANIL
    Edited by: Sanil Vadke on Mar 12, 2010 7:29 AM

  • Quality Mgt - can I create a new inspection type for source inspection

    I want to create a new inspection type for surce inspection and I will assign it to Miscellaneous insp lot origin.
    What is the application of vendor inspection lot origin ? Can be used for source inspection ?

    HI,
    For source inspection.
    If existing insp types are not going to solve your purpose , you can create insp type & assign it to insp lot origin 01.
    But before that , check whether you can use  the existing insp type 01 / 0130.
    You need to assign that inspection type in the Q-info record , in the source insp field of insp control.
    Also go through the help tips provide by SAP
    Inspection Type for Insp. Lot Origin (Source Inspection)
        Inspection type for the source inspection
    Use
        If you enter an inspection type for inspection lot origin 01 in this  field, you can create an inspection lot for the source inspection within the lead time before the (scheduled) delivery date.
    Dependencies
        The inspection type must be active in the inspection setup (Quality Management view) of the material master.
        If a status profile is stored in the quality info record for the supply  relationship, a goods receipt inspection takes place instead of a source  inspection.
    Regards
    K.M.Arun

  • In-process insp seperately for al products

    Hi, my production order qty is for 5 qty. for header material 03 insp type is assigned, in routing micu2019s are assigned. In routing insp point assigned as 100. System generated the insp lot for in-process inspection. Now wants to record the inspection results of all 5 products separately. In results recording screen, entered u201C1st part inspectionu201D as text and recorded the results, similarly for all parts results were recorded. During results recording, individual part valuation is mentioned as accepted or rejected. Say, now out of 5 parts 3 are good, 2 are rejected. In UD, I have not seen any field to show 3 are good and 2 as rejected qty. pls advise how to maintain Different UD qty for the same inspection lot.
    Edited by: ys yadav on Mar 18, 2010 12:40 PM

    Hi,
    You can here 150 inspection type & can give inspection at regular qty interval.say in your case qty interval will be 1 .
    You can do confirmation also their it self  but finally posting you can do during GRN only.
    Regards
    SANIL

  • REPORT TO CHECK DIFFERENCE G.R DATE AND U.D DATE FOR A INSP LOT

    Hi
    I want to track how many dates it has been taken to clear a insp lot for a G.R. So I am looking for a report which shows these days or a report which have G.R date and U.D for inspection lot.
    Please guide if there are any reports for this.
    Thanks
    Dhananjay

    Dear Dhananjay
    This is available in MCXA, MCXC report as lead time. Lead time is nothing but time taken for clearing the lot after GR
    Regards
    Gajesh

  • Customer number not in the inspection lot for a make to order scenario

    Hi All,
    I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12.  I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit.  The quality users want to be able to see the customer no. in insp. lot without having them to go to process order. 
    It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
    Any light on this topic is appreciated.
    Thanks.

    Hi Srikant,
    I guess.........
    Normally the inspection lot refers the triggering document that are the trigger cause for them.
    - Inspection type 01: - Purchase Order and GR material document.
    - Inspection type 03: - Pro. Order Number
    The same way...
    The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
    But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
    But I think one way you can achieve it,
    Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
    Regards,
    Shyamal

  • Inspection lot for certificates

    Hi
    Is it possible to generate inspection lots for goods receipt inspection for a purcahse order only on absence of quality certificate .
    Thanks

    Sankar,
    You can do this by selecting the appropriate value for the field "Control without certificate" for the required certificate type in the configuration settings.
    Here's the path  QM->QM in procurement->Define certificate processing. For the certificate type(which you have assigned to the material) select the appropriate value.
    Hope this helps.
    Award me the points if this info is helpful
    Prakash

Maybe you are looking for

  • Strange problem with ACLs

    Hi, I have just migrated an oracle database from 11.1.0.7 on Win Server 2003 to 11.2 on Linux 64 bit. I am having a strange problem with ACLs - I can create the ACL but when I perform either of the following two commands: SELECT * FROM DBA_NETWORK_AC

  • A205-S5804 "Dark Screen" start-up

    My A205-S5804 (P/N PSAF3U-0NR00V) starts up with the screen totally dark until it gets to the mouse pointer and "circulating ring", just before the circular Windows logo. Before that there SHOULD BE (which I still see on my wife's unaffected computer

  • Photoshop Elements 9.0 ACR version upgrade

    I haven't been able to upgrade my camera raw plug-in in Photoshop Elements 9.0 above a 6.5 version. Unfortunately I need a 7 version to process my camera raw files (powershot G15). I hope there is an easy way?? Any advice is very much appreciated

  • Lost Calendar info after update

    After updating the software my entire calendar disappeared. How can I get it back???

  • Hide Null Value in Drill Down KPI

    Dear Sir, I have Problem : i want to Hide the Null Value in SSM KPI. This is the link picture ( http://tinypic.com/r/aak9r6/5 ). Thanks for your answer.