UI Element NETWORK

Hi all,
I have few questions for UI Element NETWORK.
1- What is the use of UI Element NETWORK?Can we set its height and width?
2- When we set a Context element to it as a XSTRING and then exectue application a icon for java Applet displays and pass a information applet acf applet notinited.
After it it displaying after few minutes Loading applet failed.
What does it means.
Suggess.
Points will be sured.
Thanks
Sanket sethi

Hi,
- What is the use of UI Element NETWORK?Can we set its height and width?
It is a generic editor for network graphics. It can be used to display anything that can be visualized as a set of nodes and links between nodes
You can set the width and height one of this should be in pixels.
2- When we set a Context element to it as a XSTRING and then exectue application a icon for java Applet displays and pass a information applet acf applet notinited.
It expects an XML which is based on its schema
http://graphics1.wdf.sap.corp:1080/jnet/devdocs/schema/xml-spy/jnet-schema.html
Using the "Network" UI Element
Regards
Ayyapparaj

Similar Messages

  • Tutorials for using the UI element  "Network" in webdynpro.

    Hello,
      Where can I find tutorials or illustrations of using the Active component/UI element "Network" in webdynpro.
    Regards,
    Anupama.

    This is the only video tutorial that I know of:
    http://tv.adobe.com/watch/insights-on-acrobat-solutions/introducing-adobe-reader-for-ios/
    Unfortunately, that is fairly old and doesn't cover any of the editing features. More tutorials would be a great idea: Thanks for the suggestion. As for changing the color and size of a freehand drawing, please tap on the drawing. This should show a menu from which you can choose "Delete, Thickness, Color, Opacity". Once chosen, we will remember your choice for subsequent drawings. Hope this helps!

  • Error when clicking on open button of UI element Network (JNet API)

    Hi,
    I use the UI element Network (JNet API). It allows you to define a user interface. I use the predefined command "OPEN" in my user interface. But when running the application and pressing the open button in the user interface of the Network UI Element no file chooser appears. Instead there is this error message:
    Resource '<native>' not found.
    And this message is in the Java console:
    network: Cache entry not found [url: http://w2kidm:50000/webdynpro/dispatcher/local/WelcomeApp/%3Cnative%3E, Version: null]
    network: establishing connection of http://w2kidm:50000/webdynpro/dispatcher/local/WelcomeApp/%3Cnative%3E with Proxy=DIRECT
    network: establishing connection of socket://w2kidm:50000 with Proxy=DIRECT
    network: connection http://w2kidm:50000/webdynpro/dispatcher/local/WelcomeApp/%3Cnative%3E with Cookie "saplb_*=(J2EE6997820)6997850; JSESSIONID=JLcM5rS0r0APPJbt1zZHQAqhHywzcdivHgFax2oA_SAP"
    Remark: The original error message is in German, I translated it to English.
    Can anyone help me?
    Thanks and best regards,
    Albert

    Hi,
    does other predefined commands work, such as SAVE?
    Which java version do you have?
    Regards,
    Ladislav

  • Project  Definition/WBS element/Network Creation Date?

    Dear All,
    request kindly let me know, which standard report gives the details of
    created on
                 Project Definition or
                 WBS Element  or
                 Network
    I am checked up the available standard reports, created by is available but created on is not available.
    pl help if any one knows which PS report gives this information.
    thanx in advance
    regards
    Srihari

    Hi Shrihari
    Field "created on" is not delivered in the standard reports.
    Sunil's suggestion is quite a good option. You can also consider adding the field
    to your report's layout by means of a modification. In note 43493 you will find all the necessary steps and details to do so.
    Hope this helps!
    Regards
    Martina

  • Enable fields in ME21N/ME22N(WBS Element & Network)

    Hi, need your help!
    How to enable the fields WBS Element and Network in transaction codes: ME21N and ME22N?
    Thanks in Advance

    Hi,
    You can implement BADI ME_PROCESS_PO_CUST and implement the method FIELDSELECTION_ITEM. For srep by step process check below link. Thanking you.
    how to keep wbs element  field in display mode in me22n?

  • Is adobe photoshop elements network-friendly?

    Hello.
    I have all my pictures stored at a server (LAN), and I need to access (and also edit) a central catalog which should be located at the server, from various other PCs.
    Is this possible and friendly?

    Friendly is relative and so is network performance.
    I have both PrE and PsE.  My catalog, video, and photo content are all stored on a server.  PrE's media cache is on a local drive.  The catalog size is fairly large -- I don't have the exact numbers in front of me now but ~17,000 pohotos. The performance is fine for me (even for video editing).  However, I have a gigibit LAN, a Ubuntu server, and a optimized samba configuration.
    I would suggest you run some network performance tests.  If you are getting above 500 Mbps throughput with low latencies you should be fine.  Possibly even this is overkill if you are not editing videos.
    And the previous post is correct in that the catalog is locked exclusively which will prevent multiple people from opening the catalog at the same time.

  • Cj8g actual settlement ; projects/wbs elements/networks

    We are every month running cj8g with variant and it is useful for settlements of costs from network>wbs>auc. We are running the variant with Project field with * option.
    We are facing one issue, how can we eliminate /avoid  the projects which are in having  System Status with  CLSD, if we dont put restriction the actual settlements are done for all the projects.
    Experts please help
    Thanks
    srihari

    Hi,
    Search the forum for "Status selection profile" and you will find howit can help you in achieving this. Meanwhile, jsut to give you a start, refer transaction BS42. You can define the desired status selection profile here and use it as required..
    Revert with any specific queries.
    Regards,
    Gokul

  • Assigning of PR document types to Network and WBS Element

    Dear Experts,
    We have created Purchase Requisition document type as ZPRJ for Project system to create a automatic PR. When we run Project Builder the Auto PR will get create for Network by selecting the PR document type ZPRJ. But PR for WBS element instead of selecting ZPRJ it is selecting NB document type. Our requirement is whenever PR generate through Project builder it should create for doc. type ZPRJ.
    Please let me know how to assign the ZPRJ PR document type for WBS Element. For both document type NB & ZPRJ we have maintain same number ranges but it should select only ZPRJ document type for WBS element & Network.
    Thanks & regards
    Dhanu

    OPTT will help you.
    Regards

  • Assigning of PR document types to Network and WBS Element to create auto PR

    Dear Experts,
    We have created Purchase Requisition document type as ZPRJ for Project system to create a automatic PR. When we run Project Builder the Auto PR will get create for Network by selecting the PR document type ZPRJ. But PR for WBS element instead of selecting ZPRJ it is selecting NB document type. Our requirement is whenever PR generate through Project builder it should create for doc. type ZPRJ.
    Please let me know how to assign the ZPRJ PR document type for WBS Element. For both document type NB & ZPRJ we have maintain same number ranges but it should select only ZPRJ document type for WBS element & Network.
    Thanks & regards
    Dhanu

    OPTT will help you.
    Regards

  • How to create and use templete or standard network / activity and wbs

    dear
    i have define the structure for my project which have WBS elements, network and activties. the strucutre is same for all the projects that i define.
    i wanna know whether to use templete or standard wbs network and activities as templete for the project.
    for a network there are almost 150 activties across 10 wbs elements i want this structure as a templete what can i do create it.
    Further, how can i use LSMW to create relationship for ativities?
    regards
    saqib usman

    I have create std wbs level 1 5 wbs further i create std nwrk and activities and assignMENT are as follows
    h1.*Create std wbs from CJ91 *
    STD DEFINITION IS
    E00-BSS-CO-BTS-0000              STANDARD BTS
    LEVEL 1 WBS ELEMENTS
    E00.BSS.CO.BTS.0000.RFP     RADIO FREQUENCY PLANNING
    E00.BSS.CO.BTS.0000.SA     SITE ACQUISITION
    E00.BSS.CO.BTS.0000.TXN     TRANSMISSION
    E00.BSS.CO.BTS.0000.CW     CIVIL WORKS
    E00.BSS.CO.BTS.0000.PMO     PMO
    RELEASE THE STD PROJECT OPTIONAL BY EDIT > STATUS > RELEASE
    h1.CREATE STD NETWORK FORM "CN01" tcode
    NEWORK HEADER WITH FOLLOWING SETTING
    9000000    STD NETWORK CORPORATE BTS 0001
    Network usage     UNIVERSAL
    Planner group   1      1
    Network status     RELEASE (GENERAL)
    Std.WBS element     E00.BSS.CO.BTS.0000.BSS
    Predefined plnt      CO01
    press activity overview button or (shiFt+F7)
    I ASSIGN ACTIVITY TO STD WBS ELEMENTS
    ACTIVITY    OPR. SHORT DESC  STD WBS ELEMENT
    A01            ZERO VERIFICATION   E00.BSS.CO.BTS.0000.RFP
    A02            DESIGN DOCUMENT   E00.BSS.CO.BTS.0000.RFP
    B01            SITE SURVEY 1          E00.BSS.CO.BTS.0000.SA
    B02            SITE SURVEY 2          E00.BSS.CO.BTS.0000.SA
    C01            CIR Doc Input              E00.BSS.CO.BTS.0000.CW
    C02            CIR CW Input by RM    E00.BSS.CO.BTS.0000.CW
    D01            CIR Doc Input              E00.BSS.CO.BTS.0000.TXN
    D02            CIR TXN Input by RM    E00.BSS.CO.BTS.0000.TXN
    E01            Rollout Month               E00.BSS.CO.BTS.0000.PMO
    E02            ON Air Date                 E00.BSS.CO.BTS.0000.PMO
    h1.PREREQUISITE FOR ASSIGNMENT OF STD NETWORK and WBS are:
    PROCESS TRANSACTION "CJ20N" TO INCLUDE STD NETWORK ALONG WITH ASSIGNED ACTIVITIES AND STD WBS.
    FURTHER, I WANT TO COPY STD NTWORK SEVERAL TIMES with different network number. EACH TIME I COPY STD NWK TO OPERATIVE STRUCTURE THE SYSTEM SHOULD PROMPT NEW NUMBER FOR NETWORK AND ALSO PROMPT TO ENER ASSIGNED STD WBS ELEMENTS WITH REPLACE OPTION for operative WBS NUMBER.
    STANDARD WBS                                               OPERATIVE WBS
    E00.BSS.CO.BTS.0000.RFP     REPLACE BY     E00.BSS.CO.BTS.0003.RFP
    E00.BSS.CO.BTS.0000.SA     REPLACE BY     E00.BSS.CO.BTS.0003.SA
    E00.BSS.CO.BTS.0000.TXN     REPLACE BY     E00.BSS.CO.BTS.0003.TXN
    E00.BSS.CO.BTS.0000.CW     REPLACE BY     E00.BSS.CO.BTS.0003.CW
    E00.BSS.CO.BTS.0000.PMO     REPLACE BY     E00.BSS.CO.BTS.0003.PMO
    IN MY OPERATIVE STRUCTURE
    I HAVE TWO LEVEL FOR WBS I.E.:
    E00.C0.BSS            LEVEL 1
         E00.BSS.CO.BTS.0001    LEVEL 2    ASSIGNED NWK  0001 WITH ACTIVITIES AND WBS
         E00.BSS.CO.BTS.0002    LEVEL 2    ASSIGNED NWK  0001 WITH ACTIVITIES AND WBS
         E00.BSS.CO.BTS.0003    LEVEL 2    WHERE I WANT TO ASSIGN STD NWK AND WBS
                                                                  (I HAVE CREATED EXTERNAL NUMBER FOR NETWORK)
    I GO TO THE TEMPLETE AREA AND CLICK ON STD NETWORK BUTTON AND DRAG STD NETWORK 09000001-1 TO E00.BSS.CO.BTS.0003. ENTER NAME FOR NETWORK "BTS 0003". SYSTEM PROMPT TO ENTER EXTERNAL NETWORK NUMBER I.E.
    Enter network number
    WBS elem:E00.BSS.CO.BTS.0003
    Copy from network:
    E00-BTS-0003
    h1.CLICK CONTINUE BUTTON  NOW REAL PROBLUM COMES A DIALOG BOX APPEARS
    Include standard network
    You want to include a standard network that has assignments to standard WBS elements. However, the selected WBS element does not correspond to the standard WBS element.
                   Copy Assignment                            Ignore Assignment
    In case, if i select button Copy assignment or select Ignore Assignment then:
    New network created E00-BTS-0003 under WBS     E00.BSS.CO.BTS.0003 with all assigned activitites but no WBS elements i.e.
    STANDARD WBS                                               OPERATIVE WBS
    E00.BSS.CO.BTS.0000.RFP     REPLACE BY     E00.BSS.CO.BTS.0003.RFP
    E00.BSS.CO.BTS.0000.SA     REPLACE BY     E00.BSS.CO.BTS.0003.SA
    E00.BSS.CO.BTS.0000.TXN     REPLACE BY     E00.BSS.CO.BTS.0003.TXN
    E00.BSS.CO.BTS.0000.CW     REPLACE BY     E00.BSS.CO.BTS.0003.CW
    E00.BSS.CO.BTS.0000.PMO     REPLACE BY     E00.BSS.CO.BTS.0003.PMO
    After all my finding i am not able to bring activity assigned WBS elements. Kindly help and provide information to resolve the problum.

  • Unable to caluclate cost in CJ20 for wbs and network level.

    Hi All,
    I have a query in the project Builder(CJ20N).
    I created Project>WBS Elements>Network> and posted costs via assigning activity.
    If I select an activity and go to edit>Costs,  the "calculate costs" option is activated.  ( I get "Message Costs were calculated: See menu Edit -> Costs -> Planned - Actual")
    And also I am able to view the cost in Edit>Costs> Plan/Actual.. "Activity/Element". Please see the screenshots of Plan /actual comparison.
    However if I select the WBS or Network and go to edit>Costs,  the "calculate costs" option is disabled (frozen) and also in the same path Plan/Actual> "activity/Element"  option is disabled (Frozen).
    Request you to review the attached screenshot and advise is there any way to defreeze the option "calculate costs" and view the costs in WBS and Network level?

    Hi,
    why you want to see plan cost in project builder CJ20n? any specific reason please let us know...
    every structure report having this kind of feather as CN41n/CNS41 then check these two report.
    and lots of hierarchical report is there for seeking plant cost in project as Gokul suggested above.
    so in project builder only plan VS actual cost can be look like by network activity.
    Regards,
    Sanjeev

  • WBS element  no in PO

    Hi Freinds,
    When I am creating a PO with account assignement A. 
    WBS element not displaying in PO.  What is the Config required to display the WBS element in PO.
    Pls help
    Thanks,
    Satya

    Hi,
    Go to SPRO > MM >Purchasing > Account Assignment > Maintain Account Assignment Categories > Here for "A" make WBS Element (Network / Project) as optional field and check in PO
    Otherwise, use "P" instead of "A"

  • WBS elements migration

    Hi to All,
      I want to migrate the Standard WBS elements,Network from one syatem to another SaP system..
       Can u specify,which is the best method to migrate the data...
       If it is ALE,Pls give the details of process code and message type..i didnt get..
      if any other,pls give me corresponding details...
    Regards
    Satya

    Hi,
    I have migrated Projects, WBS, Networks by Recording.
    Best Regards, Murugesh

  • Settlement Rule in Networks

    Hi Friends,
    I'm trying to create settlement rules for networks in CJ20N and facing issues. I have projects with WBS elements, networks, and activitieis (standard projects). System is allowing to maintain dettlement rules for WBS elements, but not for networks, i.e., when I go to Edit - Cost - Settlement rules, after selecting networks, the settlement rule page is coming up only in display mode. Any suggestions on what could be the root cause? FYI... I have all necessary authorizations roles in Project Systems.
    Regards,
    Aman

    Also check if your network is header assigned or activity assigned. if the same is header assigned in that case only you can assign settlement rule at network header if the same is activity assigned in that case you need to assign settlement rule at activity  level.
    With  Regards
    Nitin P.

  • Posting for secondary cost element

    Hi All,
    After running KSU5 (cost centre settlement, we have small balance in secondary balance. Could you please advise how we can post entries between secondary cost element.
    Regards
    Deepak

    KSU5 is used for cost center assessments (settlements are a type of allocation for internal order/WBS elements/networks/etc). Once you define the rules for the allocation, SAP will follow those rules and post the appropriate entries. You cannot post manually/directly to secondary cost elements. SAP cannot get "out of balance" during an allocation. When you say "small blance in secondary balance", I am not sure what you mean. Are you saying there is a financial balance remaining in the Sender cost center? More info is need to properly address the issue.

Maybe you are looking for

  • SSIS package runs from BIDS and by Executing package, but failing with Job

    I have SQL Serve 2012 SSIS. I have problems to run from SQL Server Agent Job. Steps runs SSIS package without configuration file. Package Run64BitRuntime is False in BIDS. Package is runned by SQL Server Agent Service Account. Server does not have Of

  • Nothing works in SQL Developer 1.2

    I have been using SQL Developer for quite a long time, and never had any issues - until I downloaded version 1.2. Note, I did not do an upgrade and I did not do a migration from an earlier version. This is a clean install on SQL Developer 1.2 with bu

  • J1INCHLN - Not creating chalans

    Hi FI Gurus, I created a vendor incoice through MIRO with TDS. Now when I am creating a remittence challan through J1INCHLN.....the system does not show any output upto 30 mins and then there is a ABAP overflow error. I checked the entry...there is B

  • Reg Table Design

    Hi, Iam working on the Customization of table in WebDynpro.I have an application which has 2 views - TableView and CustomView.In the CustomView i have a dropdownbyindex ui element which has the values as "Standard", "Transparent", "Alternating".When

  • Library Preview window

    In the upper left hand side, there is a small display box that will show a preview of whatever is highlighted in the library. Whenever the library item is a text sequence, the font/animation begins as "Script" from the LiveFonts and also includes the