UK MBP delivery times

Hi all,
I ordered a 1.67 (now 1.83) on 8 Feb, but this was probably held up a bit due to the business leasing going through.
The upgraded processor bumped my delivery date back from 28/2 to 10/3.
Is anyone in the UK finding shipping times to be earlier than quoted? It seems to be happening in the US, but what about in blighty?
Thanks, WS

Mine says
Out For Delivery AMSTERDAM, NH, NL 27 Feb 2006 15:11
after completing the Shanghai leg of its ship. It was due on or before March 7, and is possibly being grouped with my new printer at Daventry (which has been sat there for a week) as far as I know to ship together. I could have gone and picked that up by now (its crossed my mind, I can't wait!), so here's hoping it turns up today/this week! I'll keep you posted.
My order has a 1.67-1.83 upgrade, I specced 2x512 RAM + 100Gb 7200rpm HD and is going to NW UK.

Similar Messages

  • R-MBP Delivery Times

    If I were to order a R-MBP today, would it seriously take 3-4 weeks to get to my door? It seem rediculous that after a month, the shipping time is still the same...
    Thanks!

    it's impossible to say, but if I were you I would assume at least the same shipping time.
    I ordered mine on June 22 and mine's still on 'processing' (18 days later).

  • Apple Store - Delivery times?? _ frustrating!!

    I placed an order through the Apple Store on the 8th Aug at 6:53am GMT (17" MBP, Office and a 4gb Black Nano), the website informed me that the manufacturing time would be 24 hours and dispatch would be on the 9th with arrival on or before the 11th (which is great as I needed the laptop for this weekend).
    I got an email this morning at 2:34am GMT informing me that my order has been despatched on the 10th and will arrive on the 14th. Why the sudden increase in delivery times? The website clearly stated all items were available within 24 hours meaning it should have been ready to despatch on the 9th to arrive with me on the 11th. Really disappointed I use to work in sales myself and if we gave a delivery date that was the date regardless, even if it meant having to have staff work overtime to complete an order and have it ready to leave on time.
    So what’s the chances of my order arriving with me on the Friday? As their will be no one available to collect delivery as of the Sunday for 8-12 weeks as I have to go work abroad.
    //On a side note why am I being shipping the US version of MS Office?
    MBP    

    Delivery to Europe *****. I've ordered several times from the Apple online store. The manufacturing dates Apple told me were always correct. But then, after handover to Kuehne & Nagel in Shanghai, everything comes to a grinding halt. My first MBP got stuck in Shanghai for 5 days. And it took another 5 for it to reach my door-step. The replacement MBP got delivered from Shanghai directly by TNT. I thought that would speed up the process - but I was wrong. Again, the thing got stuck somewhere in China. Once the stuff is in Europe, though, the packages almost always arrive within 24 hours. From what I've read, delivery to the UK sometimes takes 2 days from the Netherlands, though.
    I just wished Apple would try to reduce the delivery times from Shanghai to Europe somehow.

  • MRP - Auto creation of del schedule lines based on planned delivery time

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Nirav,
    This subject has been discussed repeatedly in this and other forums.  I must assume that you overlooked the rules of engagement, which state that you should first search the forums and other public sites, before posting questions here.
    Standard SAP MRP cannot be made to generate multiple items in a Purchase requisition.  The functionality you seek is usually achieved when converting purchase reqs to Purchase orders, where many single purchase reqs can be adopted into a single Purchase order.
    You also might want to investigate use of Vendor Scheduling agreements.
    Best Regards,
    DB49

  • Delivery time in sale order

    Dear Sap Gurus,
    I had created a sale order with reference to a quotation.
    In the quotation-there are 2 line items with different delivery time.
    sale order date is 15/2/2008
    for eg line item 1  is 3 days
    line item 2 is 1 week
    the maximum delivery time is for line item 1 is 3 days
    so 15+3=18/2/2008.
    the system allows me to do the delivery,and pgi  even on 29/2/08.
    so the delivery time is not effective here.
    kindly suggest me what is the exact usage of this delivery time in a sales document.
    Points will be rewarded

    The Delivery date in the sales order is the Earliest date proposed by the system after automatic availability checks and delivery scheduling.
    The system uses the delivery date for each schedule line together with predefined time estimates for delivery activities (such as picking and packing) to determine the
    Material availability date
    Loading date
    Goods issue date
    Transportation planning date
    In ur case, ur order contains two item with different delivery dates of 15th and 28th.
    Suppose if u deliver the order on 15th , the delivery split takes and only one item will copied into the delivey.
    But if u deliver the order at 28th, both the items will be copied to the delivery, since both have already confirmed on the date
    Hope u understand...

  • Planned delivery time in Scheduling agreement and MRP

    Hello,
    Do you know is it possible to determine system so that MRP run will consider the planned delivery time from the scheduling agreement line instead of material master? Now the system read planned delivery time from material master when creating schedule lines automatically by MRP-run.
    Regards, jaana

    This can be customized in
    SAP Customizing Implementation Guide
    -> Production
    --> Material Requirements Planning
    ---> Planning
    > Procurement Proposals
    > Define External Procurement
    Here you can select the indicator "Scheduling according to purchasing info record or agreement" either at plant or MRP group level.

  • Planned Delivery time in case of Scheduling Agreement

    Hi All,
    Does system consider the planned delivery time in case of Scheduling Agreement for Vendor like in normal Purchase order and requisition?
    I am doing the MRP run, but system is taken planned delivery time into consideration. I have one material that is Inhouse produced material for plant X and Y Plant needs this material for further making of a finished goods.
    Y plant have scheduling agreement for STO from plant X. After MRP Run required Delivery date in plant X for Material is same as plant Y. but from Plant X to Y, it take 4 days to reach. So Ideally in Plant X this delivery date should be less than 4 days as plant Y.
    Please look into the issue and reply if you have some answers.
    Thanks
    Pavan

    Hope you have maintained different Planned Delivery times in plant X and Plant Y as per your requirement. For procurement in Plant Y the system would consider the planned delievry time maintained in Plant Y. If you want in-house production time to be considered with Basis date sheduling during MRP run in PLant X then enter the in-house production time approprietely. Else if ou want to consider the exact routing times then consider Lead time scheduling in plant X.
    If the above are maintained properly then you should get the desired result.
    Regards
    Ramanujan

  • System is not considering Planned Delivery time

    Dear Gurus,
    As iam planning for the month of January and running the MRP,schedulelines are getting generated but system is not condering Planned Delivery time maintained in the material master ie. 7days.Following is the example:
    I have a FERT-X with a component A-1PC in its BOM and its planned delvery time from vendor is 7 Days.If iam running the MRP on 13/12/2010 for FERT-X  100 PCS for January1,2011 then the schedule lines are getting generated for for component A is on 01/01/2011.But PDT is maintianed in material master is 7 days and same has been maintianed in vendor inforecord.But system is not considering it.
    Kindly help to resolve the issue.
    With Regards.

    I have one ROH which has two different vendors.
    Two scheduling Agreemnt with target qty 100000 kg each.
    Two different Vendor info record with Min. order qty maintained.V1-1000Kg,V2-6000Kg.
    One source list with two vendors and with respective scheduling agreement.
    Quota arrangement is there in which SOB is maintiained 50:50.
    I hv the requirement of 3084 kg of ROH.
    I run the MRP and two diiferent schedule lines are getting generated with 50:50 qty as mentioned in Quota arrangement.
    Not considering the minimum order qty maintiained in vendor info record.
    The above process is correct
    Only One doubt In Quota Arrangement?
    IS two schedule line is created after MRP run?
    Generally System will  select a vendor Whose Quota value is less
    quota rating   = quota base quantity + quota-allocated quantity/ quota
    Edited by: Sundaresan . E. V on Dec 14, 2010 3:26 PM

  • Is planned delivery time is considered in scheduling agreement ????

    Hi experts
    problem is that the schedule lines (for external procurement) generated from MRP are not taking the "" Planned delivery time into consideration"". System is only taking the G.R processing time.
    I have mentioned the Planned delivery time in .
    1) Scheduling agreement for 1 day.
    2) In material master for one day.
    3) In info record 1 day.
    e.g Suppose req date is 13.07.2008. MRP run date 4.07.2008.
    a) Planned delivery time = 1 day . B) G .R processing time = 3 days.
    Now when i run the MRP on 4.07.2008.
    Schedule line is generated on - 10.07.2008
    Please Guide . How i can take care of that time which is requiered at vendor ends.
    Regards
    Rahul Bhardwaj

    Go to OPPQ for that plant
    Click on "External Procurement " tab and check if you have maintained any planned delivery time?
    Tick indicator " Scheduling info record/agreement " (This will take Planned del time specified in scheduling info rec or agreement)

  • How planned delivery time effects delivery creation?

    Dear All,
    Some time before, while placing order thro' CRM, we came across a typical error (hard error).
    "date (11/12/2011) lies afterthe end of validity calendar". 
    we could not place order in CRM but in SAP we could create save the order despite of same error but soft. However system didn't allow to create delivery for same order & same error message populated"
    Later it was found that it is because for material  " Planned Deliv. Time  maintained for say "X "days in material master MRP2 view" & was corrected.
    How planned delivery time effects delivery creation?
    For material even though planned delivery time was maintained as say for 500 days, sales order requested delivery date & delivery date in order schedule line got determined as order date (Considering avaliability of funds & material).
    i.e order date/req. delivery date/delivery date in schedule line are same as date on which order is placed.
    Regards
    Suhas W

    Hi,
    Extended your factory calender in SCA3.
    Regards,

  • Planned delivery time issue

    Hello Experts,
    We have below requirement.
    Created sales order for a particular material. Planned delivery time is picked from info record for that material and PR has been created.
    We are converting PR into PO and the planned delivery time is fine. Now we are updating the ASN from vendor with some prior dates. In MD04, the same got updated. However the sales order still shows the old planned delivery time only. How to get the new planned delivery time  in the sales order based on the ASN updated in PO.
    Example:
    Material: A
    Planned delivery time is 10 in info record
    Created sales order. Planned delivery time in the sales order is 10. PR created with fixed vendor and planned delivery time is 10 days from the date of creation.
    Converted PO.
    Now we received the ASN from Vendor that the vendor will deliver this material in five days. So accordingly we are updating the ASN in PO with delivery date.
    In MD04, we could the new planned delivery time based on the ASN. However sales order delivery still shows the previouls delivery date only.
    How to get the new delivery date in the sales order based on the ASN update?
    Regards
    Bala

    This is not standard SAP logic. Required delivery date on the original line item stays as it was when you issued the order. Then you create a confirmation (ASN) that is relevant to MRP with the updated delivery date. Planning sees the new date and acts accordingly, and also in the order you can see both "old" and "new" (in the confirmation tab).

  • Planned delivery time

    Hi,
    I have created a sale order on 1/7/2009 with a material which has planned delivery time of 4 days.
    Now when I go to the schedule lines screen I see that the delivery date corresponding to the confirmed quantity is 1/8/2009.
    Why is not SAP taking the 4 days into considerations while determining the delivery date?
    Please see below the screen shots:
    Scheduling configuration in material master:
    [http://i40.tinypic.com/14b2fyc.jpg]
    Schedule lines screen shot:
    [http://i44.tinypic.com/9pxkzc.jpg]
    Sincerely.
    Ketan

    Hi,
    You seems confused with planned delivery time in MRP 2 view of material master to Sales order delivery date.
    Material master Planned delivery time is for the material which is procured externally  through PR -- PO process.
    In Sales order the delivery date is with respect the ATP--Avalible to Promise.
    If the stock is avalible in the storage location on the date of Sales order creation, then system will consider the delivery date an the basis of confirmed qty in the sales order. You can check in CO09 for confirmed qty.
    rgds
    gsc

  • Planned Delivery time not considered after MRP run for scheduling

    Dear All,
    After running MRP, the planned delivery time maintained in Purchase info record is not taken into consideration for calculating start date of the schedule line of externally procured material generated by the system.
    Planned delivery time is 3 days & Requirement of parent material falls on 15/02/2010. With this, system should calculate the start date for schedule line as on 12/02/2010 considering 3 days Planned Delivery time.
    Any idea as to what might have gone wrong?
    thx for your help in advance.
    Rgds,
    Ranjeet

    Hi,
    Determination of PLD from the Purchase info record is maintained in transaction code:OMDT. Planned Delivery time is also maintained in Scheduling agreement. However, it is not calculating delivery date as well as release date.
    Rgds,
    Ranjeet

  • Planned Delivery Time of Schedule Line

    Dear Gurus,
    I have done the setting in SPRO >MM>PURCHASING>PP>PROCESSING TIME from 1 day to 0 day bt still  it is picking up one day for schedule lines.There is 0 days planned delivery time in VendorMaster,Material Master,Vendor info record.
    I hv run the MRP  on 06/01/2011 and system is generating schedule lines for 07/01/2011.I want it for 06/01/2011 only.
    With Regards.

    I hv run the MRP on 06/01/2011 and system is generating schedule lines for 07/01/2011.I want it for 06/01/2011 only.
    During MRP, System will do the backward scheduling... from FG reqmt to Raw material,
    Compare the order start date  of header material in plan order or in prdn order  with the reqmt date for  the schedule line material - Is any difference in days?

  • Plannned Delivery time not considered while calculating delivery date

    Hi PP Gurus,
    We have a situation is that after MRP run system is not taking into account planned delivery time while calculating delivery dates in schedule lines
    It is taking into account GR processing time.We have GR processing time of 3 days.requirment date is 13.10.2011 & delivery date created by the system is 10.10.2011.
    We have maintained correct master data i.e.Materail Master , Info record & Scheduling agreement.
    Please advice why it is happening & what is the significance of planned delivery time in externaly procured materail with scheduling agrement schedule lines?
    Thanks & Regards,
    Sandesh

    Hi Sandesh,
    Is this happening for particular materials or for all materials
    Couple of checks -
    1) Check with material master changes, might be after MRP run PDT is updated in material master etc ..
    2) Check in OPPQ, for option external procurement , whether scheduling info records/agree is marked or not
    Best Regards
    K.Madhu Kumar

Maybe you are looking for

  • The wonders of screen sharing!

    I finally got it working after I realised that you have to deselect Firewall 'block all access'. Two Macs can share each other's screens - bizarre - see for yourself: http://homepage.mac.com/jmshaw/PhotoAlbum48.html

  • "Searching for movie data in file [filename]" and iDVD hangs.

    I have a project I saved and I want to open and make a change to. iDVD loads the project and displays the title. When I click to edit one of the scene selection menus, it goes off "searching for movie data" and hangs until I kill it. Anyone have any

  • Sender File adapter and duplicate file processing

    If I set the sender file adapter to delete or archive and when a file gets picked up and processed, this file will not get deleted/archived unless it was successfully processed.  However, if it errors out during processing, the file remains but it's

  • Configure SLD during the Installtion

    I am installing the XI and EP system with NetWeaver 04s. At the moment, I am at step "Cental SLD", pretty much the beginning of the installtion. It says that I have to enter my SLD configuration. I have the option between: - Configure local SLD - Reg

  • HELLLPPP ! I have a table for navigation with rollovers that breaks apart in explorer 8

    Its happy as can be in every other browser ! In explorer 8 there is also a gap above the table I cant get rid of. The main problem iss the gaps around some of the buttons. I think I am about to lose my freaking mind www.thedamourmethod.com/test www.t