Unable to assign multiple company code to a controlling area in PPOME

Hi Experts
In PPOME I was trying to assign multiple company codes under 1 controlling area in account assignment. e.g. ABC is the company, its 2 company codes, ABC1 and ABC2.
In PPOME when I am assigning the root org unit (ABC) with controlling area ABC1 and company code ABC1, it hierarchially inherits the below structure.
Whereas when I want to change the company code for ABC2 orgunit, it doesnot give the provision to change. It hierarchially inherits the root org unit structure.
I have tried to differentiate it by creating different costcentres for different companycodes, but that also doesnot help to fulfill the need.
Please help me to solve the issue as early as possible.
Warm Regards
Anwi

Hi Rajdeep
The same function can be handled from PPOME also, because in case of assignment of enterprise structure components with org structure components we use IT 1008.
However, if yours process is followed, then also I am unable to change the COMPANY CODE. Rest can be well taken care of.
Cheers
Anwi

Similar Messages

  • Two company codes under one controlling Area

    In this client, we have two company codes under one controlling Area
    Will there be any authorisation issues (ie getting the information of other company code date) in Co reports (z reports, standard reports, report painter)?
    Any thoughts on this is helpful for me.
    Thanks
    Aruna

    HI,
    Authorization is a flexible tool used to have control as per organization policies.
    For your specific requiremnt u can set the profiles with Technicals persons help with the desired authorizations . Authorization can be set for single company code or multicompany codes as per our requirement.
    You can make a authorization profile/s and assign the desired roles.
    Warm Regards

  • " Active Company Code check in Controlling Area"

    Hi All
    while assinging the Real Time Integration variant to company code. Getting the following error as
    " Active company code check in controlling area."
    any one can plz suggest me.
    Moderator: Please, search before posting

    Hi Ashok,
    Thanks for the response.
    Here in my case, when I insert the Tcodes related to conrolling like(KO01,KO02,KO03 etc) in a role, then I dont find any authorization objects(bukrs) which is related to the company code in the authorization genaration area in PFCG. So there is no way I can maintain values in them.
    Please suggest any alternate solution.
    Thanks and Regards,
    Abdul Khyoom A

  • Two Company Codes and one Controlling  Area  Issue

    Hi,
    Client has company code 1000 and 1001
    Company code 1000 has been assigned to controlling  area 1000,but company code 1001 was not assigned to controlling area.but in last month they have posted FB75 credit memo with profit center.Now when they are trying to post the same it is giving the error saying company code was not assigned to controlling area.
    they are also using document splitting concept.How to solve this issue without assigning profit center.
    why this is giving the error now and why it was accepted before.any idea.
    Thanks
    Sunitha

    HI,
    Can u explain clearly for which company code u have posted document in FB75. If it is 1001 Company code It will not able to take Profit center or any cost object. Since u have not assigned comapny code 1001 to controlling area 1000.
    Please check Correctly.
    Regards,
    Sreekanth

  • Company code problem in Controlling area Tcodes

    Hi All,
    We are following role based authorisation for creating roles for FI/CO module and we are seggregating roles as per the company codes.We are assigning Tcodes like KO01,KO02,KO03(Internal order) and KS01,KS02,KS03(cost center) which are connected with Controlling area in one role.We have 5 company codes and we are trying to create 5 roles with the above Tcodes for 5 different company codes.
    The problem we encountered is when we entered the Tcodes in the role, and we get to the 'Change authrisation data' option in the 'Authorisation' tab in PFCG, the system is not prompting for the Company code organisational level. Hence in this case, a user will be able to access the above mentined Tcodes for all the company codes. But we need to create a role in such a way that a user who is assigned this role is only able to access Tcode like KO01,02,03 etc for his company code only and should not be authorized to access these Tcodes for remaining 4 company codes.
    Can anybody please help me with a way to restrict these Tcodes to a particular company code in our scenario.
    Thanks and Regards,
    Abdul Khyoom A.

    Hi Ashok,
    Thanks for the response.
    Here in my case, when I insert the Tcodes related to conrolling like(KO01,KO02,KO03 etc) in a role, then I dont find any authorization objects(bukrs) which is related to the company code in the authorization genaration area in PFCG. So there is no way I can maintain values in them.
    Please suggest any alternate solution.
    Thanks and Regards,
    Abdul Khyoom A

  • Company code currency and controlling area currency

    Hello gurus,
          I have doubt can any body clarify me
    My company code currency is INR where as my controlling area currency is EUR. now my question is controlling gets all the data from functional modules like FI,MM,SD.. all the modules are maintained in INR ( Company code currency).
    but my controlling area is currency is EUR.
         Because of the above scenario what is impact
    Regardsm
    sankar

    Hello
    I have almost similar question...
    When executing a profit center report for a company code with another currency (SEK) than the Controlling Area currency (DKK) I get the figures in DKK. When executing a Cost Center report for the same area I get the figures in SEK because of 'Object currency' in RPC0.
    Will I not be able to get data in Profit Center reports in SEK without make a currency 'translation' where I have to choose an Exchange rate type and date?
    Thanks in advance
    Best Regards
    Søren Kirch
    LOGSTOR

  • Can we assign 1 credit control for multiple company codes

    hi,
    sap gurus,
    good afternoon to all
    can we assign 1 credit control area for multiple company codes.
    if yes can any body explain the pro's and cons of the assignment.
    if no can any body explain the why?
    its urgent plz.......
    regards,
    balaji.t
    09990019711

    Yes Balaji,
    We can assign.
    Here the risk categiry and terms of one credit control area will be applicable to all company code.
    Credit Control Area
    Definition
    An organizational unit that represents the area where customer credit is awarded and monitored.
    This organizational unit can either be a single or several company codes, if credit control is
    performed across several company codes. One credit control area contains credit control
    information for each customer.
    Use
    Credit and risk management takes place in the credit control area. According to your corporate
    requirements, you can implement credit management that is centralized, decentralized, or
    somewhere in between.
    For example, if your credit management is centralized, you can define one credit control
    area for all of your company codes.
    If, on the other hand, your credit policy requires decentralized credit management, you
    can define credit control areas for each company code or each group of company codes.
    Credit limits and credit exposure are managed at both credit control area and customer level.
    You set up credit control areas and other data related to credit management in Customizing for
    Financial Accounting. For more information, see the Implementation Guide under Enterprise
    Structure   Definition or   Assignment   Financial Accounting and then Maintain credit control
    area. You assign customers to specific credit control areas and specify the appropriate credit
    limits in the customer master record.
    Thanks,
    Raja

  • Personnel area without assigning to Company code.

    Hi All,
    Can you let me know the scenario where it is not mandatory to assign a company code to the personnel area ?
    Also, is it possible to configure SAP HR for a personnel area in such a situation?
    Thanks & Regards, Swapnil Mishra

    Hi Swapnil,
    I think assignment of Personnel Area to Company Code is required when SAP HR-Payroll results are posted into Accounts, means it is required for integration of SAP HR and SAP FI. Also you will find a feature 'PPMOD' used during accounting posting also use BUKRS in decision tree.
    Regds.
    Suman

  • Assignment of company code to the Equipment.

    Hi All,
    I am new-able in sap pm please guide me.
    During creation of Equipment why we are assigning the Company Code, if plant is already assign.
    What is the need of company code.
    Thanks & Regards,
    B.K.Pathak.

    You will not assign the company code manually. Once you assign Maintenance plant, system will copy from the Enterprise structure configuration.
    To validate the usage of company code in equipment master:-
    Asset numbers will be assigned to company code. These assets are created against company code only.
    Cost centers will be assigned to equipment. Cost centers are created against company code / controlling area.
    To validate the Asset & Cost Center entries in Equipment master, company code should be available in Equipment master.

  • Assignment of Company Code to Controlling Area

    Hi All
    Please see if you can help me out.
    I am working on a Singapore project.
    I have 4 company codes say 2000,3000,4000,5000 which have been assigned to a company SGSS.
    Then I created a controlling area S001.
    I successfully assigned Company Codes to Company & Company Codes to Credit Control Area 5100.
    But when I try to assign my Company Codes to Controlling Area S001, the system throws a problem saying,u2019 Data in Company Code 2000 is not maintainedu2019.
    I have maintained all the data in Company Code 2000. But as per my knowledge we donu2019t maintain u2018currency, fiscal year variant, and chart of accountsu2019 in Company Code. All these fields are maintained in u2018Controlling Area S001u2019.
    __Data in company code 2000 is not maintained.__
    __Message no. KT294__
    __Diagnosis__
    __Assignment control requires that the currency, fiscal year variant, and chart of accounts are all maintained in the company code. At least one of these settings is not maintained in company code 2000.__
    __Procedure__
    __Complete data maintenance in company code 2000. Only then can you assign company code 2000 to controlling area SG01 possible.__
    Please see if anyone can bring some light on thisu2026..
    Thanks & Regards

    Hello,
    You need to fulfill two basic rules to assign two or more
    Company Codes under the same controlling Area:
    Operating Chart of Accounts shall be the same for all
         Company Codes.
    Fiscal Year Variant shall be same for all Company
         Codes.
           However, the fiscal year variant in the controlling area and the company codes
           can have different number of special periods. The number of posting periods
           must be the same.
    Please recheck that you have fulfilled these.
    Regards,
    Ravi

  • Cross company code validation in CO Area

    Dear All Experts,
    I am having one query regarding cross company code validation in CO area. I have ticked Cross company code validation in controlling area, and it is working perfect.
    we have total 11 company codes. 10 for US & 1 for Canada. Say 1001 to 1010 US company codes & Canda it is 1101.
    The requirement is :-
    Now client wants to post cross company code transaction within these 10 US company codes and it should not throw an error  ( Ideally which is giving right now ). It should give error only when posting to US company code transaction and Canada Cost Center or Internal Order.
    Can we restrict the company code for cross posting validation ? OR Can selected company codes set for validation indicator ?
    Experts guidance will be great on this.
    Regards,
    Sharvari Joshi.

    Dear,
    Murali.
    Thanks for your reply.
    As you said :- Validation check applies for all the company codes which are assigned to your controlling area.
    Means simply we can not apply this option to selective company codes, Right ?
    Once it is ticked it is applicable to all company codes.
    Regards,
    Sharvari Joshi.

  • Unable to find company code in assignment of company code (OX19)

    Hi,
    Please advice me why I am unable to find the newly created company code in assignment of company code (OX19).
    TQ

    Hello
    Comapnay code can be assigned to one controlling area only, so this might be assigned to some other CO Area, check the table TKA02, you can see that.
    Before you can delete the assignment, you must delete all master data in controlling area ALMA referring to company code you want assigned.
    Regards
    Dinabandhu

  • Which of the following is required for multiple Company Codes assigned to s

    Which of the following is required for multiple Company Codes assigned to same Company ?                                   
    Same Chart of Accounts                                   
    Same Currency                                   
    Same Fiscal Year

    hi,
    if multiple companies are dependent on each other then you have to follow the below as same for all companies.
    Same CoA
    Same ItemMaster Data
    Same WareHouses
    Same BP Master Data
    Same Currency
    same fiscal year
    and few more master datas which ever necessary.
    if they are independant on each other then no need to maintain the same codes.
    regards,
    varma

  • Entry Channel setup for multiple company codes

    Hello,
    I have a question regarding the entry channel setup (for external requirements in the Plan-Driven Procurement scenario)
    In previous implementations, I 've created an entry channel below each company code (as the documentation says it should be). Now, for each entry channel, there was a EBP user assigned, which corresponded to an RFC entry in the backend system (I was connecting EBP to multiple backend systems)
    Now, what should I do in the following scenario?:
    1. SRM is only connected to one backend system
    2. There are 50 company codes
    Does that mean I have to create 50 users (for each channel) plus 50 RFC connections in the R/3 system (each with a different user in the backend system), pointing to the same SRM system?
    I was thinking of creating an Org iD in the SRM structure at the top (which would be the entry channel), assign only ONE user to it and then fill attribute BUK with all the company codes. However, I don't know if this will work, because the external requirement process might need the company code defined in the "Function" tab... =/
    Any help would be greatly appreciated.
    Regards,
    Gilberto.

    Hi Proyecto Genesis,
    I am also configuring the Entry channel (org unit) for multiple company codes.
    I tried your logic of defining the entry channel outside company code level. Assigned the BUK attribute and extended attribute for plants and storage locations.
    Also in my case the local Pur org and Pur group is defined outside the company code. Is it correct?
    However the system fails to transfer the external requisition to SRM.
    SLG1 displays following error message.
    "No address found for partner function type Ship-To Address"
    So if I move the Entry channel (org unit) under any one company code level then the external requisitions are transferred correctly to SRM.
    But then the issue is the requirements are not transferred with the backend Pur Org and Pur grp. Instead they are transferred to the Pur Org and Pur grp of the company code under which the entry channel is defined.
    Can you please share how do we need to define the entry channel, local pur org and pur grp for multiple company codes scenario, so that the ECC requisitions are transferred with the correct company code, pur org and pur grp to SRM?
    Or do we need to define Entry channel for each company code and RFC user actually mapping the same backend system?
    Please guide.
    Regards,
    Sandeep

  • Vendor Master with Multiple Bank account in Multiple Company Codes

    Dear Team,
    We have multiple companies in our SAP environment, wherein a single vendor is extended to multiple Company Codes  (Cocds).  If we change the bank account in the vendor master, it is applicable to all the Cocds in which vendor is extended.  Few vendors want payment in different bank accounts.
    How do we address this issue?
    Kindly guide.
    Regards
    James

    Hi,
    Two options without any enhancement:-
    1. Use "Partner Bank Type" in Vendor Master's Payment Transaction View where you maintain vendor bank account. Each of the bank account should be assigned to unique Partner Bank Type
    - Based on this setup, at time of invoice posting, user could choose which vendor bank type  and base on the selection, the selected bank will be selected upon payment.
    - You could also explore the option of using substitution to substitute the partner bank type upon posting if the same cocd always using the same vendor bank
    2. A much simpler option, upon payment proposal - user actually could select which vendor bank they wanted to use if you've multiple vendor in the vendor master.
    Thanks,
    Ong Yang

Maybe you are looking for

  • Draw an visio shape as an .vdx file and render the same in a IE browser

    I had generated an Visio Diagrams getting input from the excel file and stored it in an local path. private void DynamicVisio_Load(object sender, EventArgs e)             string strConn = "Provider=Microsoft.Jet.OLEDB.4.0;Data Source= 'c:\\Test\\Full

  • Error while running the stored procedure

    hi , all I am geeting the error when im trying to run any procedures, even a simple procedure. Plz help me.. the error is PLS-00306: wrong number or types of arguments in call to 'PROC2'

  • Time machine won't backup

    I've been having a lot of issues with time machine lately. A couple of days back I suddenly got the message that time machine didn't make backups for over 22 days! The first thing I thought was: why am I just now learning about this but okay let's ch

  • Vendor Master Field Status

    Hi All I Want *Contact person feild as optional field* in Vendor master dara General Data tab. field status for the said field is optional in all the levels i.e Vendor account group  and also in screen layout per activity. Still  while creating vendo

  • No implementing class registered for the interface (ABAP interface, request

    Hi, Proxy has been generated for the Inbound Message interface and i could see the SXMB_MONI entry in Red on the target system. I get the error "No implementing class registered for the interface (ABAP interface, request...." regards, Chaitanya