Unable to Baseline fund at Task Level

Hi All,
We have a project P1 with two tasks T1 and T2. Funding is done at Task Level so initially T1 is funded for 100 USD.
Set Of Books Currency is INR.
When T1 was funded initially the USD-INR conversion rate was 40 Rs per USD.
So the workings are:
PO:      (exchangeRate 40Rs)     100 USD ~ 4000 INR
Revenue1:      (exchangeRate 40Rs) 100 USD ~ 4000 INR
Exchange rate changes to 35 INR = 1USD
Now there is a situation where PRC: Revaluate Funding is run, and in the PO, there is a unbaselined amount of -500, because of exchange rate change.
Now it does not allow me to baseline this -500
It shows message: Total amount allocated cannot be less than amount accrued or billed.
Surprise Part:
I wanted to fund the next Task T2 for another 100 USD @ 35 ~ 3500 INR. Now the unbaselined amount becomes 3000 INR and the funding inquiry screen still does not
allow me to fund Task T2. It gives me the same message "Total amount allocated cannot be less than amount accrued or billed"
I have just given an example of one instance, but we have a huge quantum of such projects and the issue is getting added.
Is this a bug?
Regards,
SA

Hi
The basic reasoning for funding revaluation may be described as follows.
Billing is done over time in the funding currency (customer PO currency), however, the billing amounts are converted to functional currency as they are generated. Each invoice may be converted to functional currency by a different exchange rate. The billing amounts should be limited by the total customer PO amount in the funding currency. The amount in functional currency should not be limited, since this is a dependent result.
Revenue is taken over time in the functional currency.
The target is to get at project end the following - the total billing amount in functional currency will equal the total revenue amount if functional currency. That way the UBR and UER will balance to zero. The revenue amounts are generated in functional currency, and those should be limited by the resulting total functional currency amount of the billing.
Each time you revaluate the fund the system calculates the total billed and paid amount in functional currency, add to that the due billed amount (unpaid) revaluated as of the revaluation date, and then add the backlog, which is the remaining unbilled fund revaluated as of the revaluation date. The summary of those three components represents the as of date value of all potential amount to be billed in the functional currency. The process ends up by adding a revaluation fund line that brings the total amount of funding in the functional currency to equal the calculated revaluated total amount.
The above described logic was the reason for Oracle to develop the revaluation process, the way it was built.
I'm not sure what is the reason your company want to revaluate the fund in the other way.
Could you please explain the accounting reason.
Oracle do offer a revaluation factor client extension which you may want to look at. However, this extension is used by the revaluation process to alter the factor for revaluating the remaining backlog (unbilled amount). It is not affecting the entire formula calculated with the billing components. I"ll be able to suggest a workaround using that extension, if I'll understand the business requirement.
Dina

Similar Messages

  • Funding from Task Level to project level

    Hi,
    Can someone let me know how do we change the Task level funding to project level funding for a project in the following scenario:
    1. I have a line in Contract Funding already interfaced to projects but not baselined.
    is it OK if I update ENABLE_TOP_TASK_CUSTOMER_FLAG in PA_PROJECTS to 'N' and remove the task in PA_PROJECT_FUNDINGS and PA_SUMMARY_PROJECT_FUNDINGS and reverse the Funding and then create a new funding/agreement at the Project level.
    Thanks & Regards,
    Kiran

    Hi Sunny,
    Thanks for the reply. Here just sharing my views.
    It MUST depends on network speed. We need to consider this.
    And the factores u mentioned are comes under how to speed up the process. Any way we can do all, considering all yr system hardware, here ie 4gb only, But my question is very clear.
    Based on basic setup like 4gb ram with normal upgrade, if experienced, we can say appromiximate time lines.
    <removed_by_moderator>
    Read the "Rules of Engagement"
    Regards,
    Rao.
    Edited by: Juan Reyes on Mar 9, 2011 9:53 AM

  • Multiple Revenue Recognition Methods on a Project(Task Level)

    We have projects where certain portion of revenue is recognized based on events(ex: equipment shipment) and certain portion is recognized as cost is incurred(Percentage of Completion).
    In Oracle Projects we can have only one Distribution rule for Revenue per project and doesn't allow to have different Revenue distribution rule at the task level.
    Business case: Project is for Equipment and Additional Service is purchased, separate tasks are created for Equipment(Task#10) and Service(Task#20).
    Billing is based on Events.
    Equipment(task#10) revenue is recognized based on order line shipment(event created),
    revenue for Service(task#20) is recognized as Cost is incurred to perform the Service, based on POC calculation.
    Following is what we tried as Proof Of Concept:
    Funding is at Task Level (set at Project Type), Baseline Funding without Budget is enabled(i.e Revenue budgets are created when funding is baselined)
    Billing extension Cost-to-Cost Revenue is assigned on project type, Forecast Cost Budget is used in calculations
    Set the distribution rule on project to COST/EVENT
    On tasks for Equipment(Task 10), we entered $0 Forecast cost budget
    On tasks for Service(Task 20) we entered a $$ Amount(non zero) for Forecast Cost budgets.
    Task 10( Equipment - Event based revenue), $0 Cost budget
    Create Costs on task 10, Distribute, Account, run the processes to generate revenue
    Create a manual revenue event for equipment shipment
    Revenue events from Billing extension are not generated, since there is no cost budget, Revenue is generated only for the manual event we created - This works as expected.
    Task 20(Service - POC based revenue), Cost budget is $10000 (for ex:)
    Create Costs on task 20, Distribute, Account, run the processes to generate revenue
    Automatic Revenue events from Billing extension(Cost-to-Cost Revenue) are generated, since there is cost budget, Revenue is generated based on POC calculation.
    Questions:
    With the assumption that we will not maintain forecast cost budgets for equipment tasks and use the standard Cost-to-Cost Revenue extension.
    We would like to know what is the impact of the above solution option on standard Project Billing functionality and any others.
    Any other workarounds to achieve what we are looking for(i.e multiple revenue recognition methods on a project)
    How others achieved similar business requirement with Oracle Projects(At present we are creating a 2nd project for Service component) and it has it's cons(consolidated billing etc, since we will be funding 2 projects)
    Harish

    Dear Harish,
    I am not sure i have a perfect solution but you can try this.
    Set Billing extension to Cost/Event (Percent complete revenue) this will be used for all the scenarios where revenue should be recognised by the system like Ex: Task20
    Use Pre-Approved batches for rest of transactions where the cost directly effects the Project.
    Regards
    Shaan

  • Oracle Projects 11.5.10.2 : Generate Invoice at the lowest task level...

    Oracle Projects: 11.5.10.2.
    We are trying to figure out if we can generate an Invoice at the lowest task level. When I looked at the invoice format there was no option to group by at lowest Invoice level However I looked at one of the documents of project partners vendor and created an Invoice format option of lowest task. However I can not fund the project at lowest taks. When I go to the agreement I only see top tasks in the list of values?
    Does any one know how to achieve /generate billing at lowest task level?
    When I looked at the project type setup there is a billing option called funding level: This only gives two options top task and project level or both but not at lowest task.
    any clue/help would be greatly appreciated.
    The reason we are trying to do this is we want to pass a tax code at the lowest task level.
    --Krishna                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

    Hi
    There is no way to fund the lowest tasks.
    You cannot generate invoice with invoice lines per lowest level tasks, using standard functionality.
    Assuming your billing is based on WORK, you could customize the Invoice Format to summarize RDL's by lowest task level.
    However, if you need hard limit control by lowest task level you will need to capture the allocation of fund to tasks. That could be done on a revenue budget you maintain by lowest level tasks. In addition, develop billing extension called during GDI that will perform the fund check for each task.
    Dina

  • Unable to sync with SharePoint task list

    Unable to sync with SharePoint task list
     The SharePoint site is invalid - I can hit the site just fine through IE
    - The SharePoint site is unavailable. Not so since I can naviagte to it just fine with IE
    - The user does not have full or design permissions in the SharePoint site -- My permission level is "Full Control"
    All inside a corporate Lan.  This is a first time setup? Any ideas?

    Hi
    If you open up the project file from within the sharepoint list and then click sync what happens?

  • "Currently unable to add funds to your account. Please try again later."

    ultimatedeterus wrote:
    I tried to add funds to my PSN account with my debit card. but seems like it did not work.it showed "Currently unable to add funds to your account. Please try again later."and also i found there's $1 pending transaction on my bank account. WTH is going on?how can i fix this problem?and I'm pretty sure the billing info on my PSN account is EXACTLY as same as the one on me bank statment.The transaction pending is the way that PSN validates your account. It attempts to withdraw, then deposit £1 or $1 then refund it.  If you are unable to do it yourself on the PS3, try waiting 24 hours as you may have inadvertantly triggered the lockout. (several attempts that fail will lock it for 24 hours). If after waiting it still doesn't work, give customer support a call and see if they can help. The EU numbers are available here.

    r3KoR_Infinity wrote:
    Hello,
    I have the same problem. It just recently occured though. I used my old debit card with no problem at all and purchased a bunch of games in the Playstation Store, however I lost my DC a week ago and got a new one. Obviously I changed my billing information and that's when the problem started.
    1) I see a small pending transaction to Playstation Network which proves that my data that I put in was correct.
    2) Called the bank which confirmed that I have enough funds for the purchase and also confirmed that my card is active.
    3) Tried to buy a game in Google's Playstore for my phone, which also refers to that same DC number and had no problems.
    4) Contacted PSN/SEN customer support and got no response.
    I would buy PSN cards if I could but since I am currently living in Thailand i need to say that it is really hard to find one. I am not even sure if there are PSN cards for the Thai region, since if I do see some they are for the US region. Thus I am really dependent on my DC purchases.
    Any way of solving this?
    The billing address for your card must match the residential address on your PSN account for the transaction to complete.
    Are they both registered to the same address?

  • Project Server Enterprise Text1-40 task level fields in Database?

    Hello,
    There are some custom enterprise text fields available for each entity, such as Enterprise Text fields 1-40 for Tasks or Resource etc.
    documented here:
    http://office.microsoft.com/en-us/project-help/available-fields-reference-HA010370279.aspx#BM2
    more:
    http://office.microsoft.com/en-us/project-help/enterprise-text1-40-fields-HP001023958.aspx?CTT=5&origin=HA010370279
    Now user can easily insert these fields to Project views and insert/modify data of this field. however these fields are not available within reporting databases to be queried for custom reporting.
    understanding is that you can only use enterprise custom fields for reporting, but at the same time these fields are also available to be included in views and knows as Enterprise fields and not
    local fields. the only additional caption available for these fields is that "Project Professional only".
    but its for PP only, then why are they available within views? which means this data is also available somewhere in database.
    Now, based on this assumption, does any one knows that how to retrieve this task level Enterprise Text1 field using query?
    thanks.
    Khurram Jamshed - MBA, PMP, MCTS, MCITP (
    Blog, Twitter, Linkedin )
    If you found this post helpful, please “Vote as Helpful”. If it answered your question, please “Mark as Answer”.

    Hi , thanks James for pointing out to the rite source, i already reached to this table prior to ur reply though :)
    i agree that its not supported to read from published database, and i always stick with the recommendation to customers all the time. However you can understand that there are times when envrionmental factors are unavoidable :)
    on other note, what i do not really understand is that why these fields are even available to be used in views??
    may be someone able to shed light on this, for now i am marking ur reply as an answer closing this thread.
    thanks again, cheers mate.
    Khurram Jamshed - MBA, PMP, MCTS, MCITP (
    Blog, Twitter, Linkedin )
    If you found this post helpful, please “Vote as Helpful”. If it answered your question, please “Mark as Answer”.

  • WorfFlow Agent Assignment at Task Level...

    Hi,
    I have problem in Workflow agent assignment...
    In agent assignment at Task (MM Invoices Parked/Posted) level, I have assigned a position(Account Payable)to AC Role...
    Under this position, there are 8 users....
    In the Workflow process,At this task level the work item is going to only one person inbox not all these 8 users...
    Can you please advise me, where I was wrong...
    Warm Regards,
    Thirupathi....

    Hi Thirupathi,
    There are a couple of things you can try:
    - Agent assignment gets buffered in HR, normally refreshed at midnight. Use txn SWU_OBUF to refresh them manually.
    - Are all agents also possible agents of the task or is the task defined as a general task?
    - (just adding the obvious) make sure your task is in status READY, else it would have been reserved by someone.
    Cheers
    Mike

  • Disable role assignment at task level

    Hi Experts,
    We have a requirement where role should be assigned at task level only and not at sub task level.Any configuration for this ? if not, How to achieve this by development?
    shashank

    solved by development

  • Project authorization at task level for a user

    Dear friends,
        I have created one project called TEST in solution manager. I am have assigned standard ASAP methodology as a road map for that project. I wants to restrict my user to do business blueprinting only for particular business process. I wants to restrict him to access other processes related to the same project.
    How to restrict authorization in individual task level (lower level) in solution manager for an user or team member?
    How is it possible?
    Thanks
    Senthil

    Hi Arkadiy,
       I wants to maintain dependency for my project execution. Let me explain in detail.
    My project name is TEST, it follows ASAP methodology, contains five phases namely,
    1. Project preparation
    2. Business Blueprint
    3.Realization
    4. Final Preparation
    5. Golive & support
    In each phase, some specific tasks to be completed.
    Let us consider, in Project preparation phase, i am having tasks of  following:
    A. Define Project scope
    B. Define Project Plan
    C. Define project team members
    D. Project charter sign off
    My question is:
    without completing( means status should be "Complete") Project scope (Task "A"), the system should NOT allow the team member to jump into next task ( Define Project plan). Like that i wants to maintain dependency for individual each task.
    Is it possible?
    Your answer will be very much appreciated.
    Thanks
    Senthil

  • Is revenue and invoice at sub-task Level possible?

    Is there anyway to generate revenue and invoice at sub-task level. Per Oracle standard we can do it project level or top task level but just want to check if there is anyway to do it at sub-task level. Even if through customization please let me know.

    Hi
    You may consider using billing extensions that will separate the invoices by sub tasks. However, to acheive that you will need to run in a loop the GDI for the same project. After first invoice is generated with only one sub task. you will need to approve and release it, and only than you could go on and run GDI again for the next sub task, and so on.
    If the company agree that draft invoices will be automatically approved and released, you might consider using the automatic release client extension, to facilitate the cycles.
    In order to get a separate invoice per sub-task you should develop an extension that will be called on PRE-Processing place.
    That extension will check the available unbilled expenditures and verify if there are EI's in more than one sub-task. If so, select first sub-task and put one-time hold on all other sub-tasks' expenditures.
    The extension for automating approval/release of invoices is called by GDI after the draft invoice is fully prepared. You can
    develop your own logic for the conditions where invoice should be approved or released.
    Just note, if you leave several invoices as approved, you will need to release them by the order they were created.
    In the example of multiple sub-tasks on the project, the pre processing billing extension will leave EI's on sub-task 1, and all other tasks' expenditures will be put on one-time hold. Those the draft invoice will include only the sub-task 1 transactions.
    The next GDI in the loop will not find sub-task 1 transactions, so it will pick sub-task 2 and all remaining transactions on other sub-tasks will be put on one-time hold. The second draft will include only sub-task 2 transactions.
    The next GDI in the loop will not find sub-task 1 and sub-task 2 transactions. Therefore, next draft invoice will include the next sub-task. When no more sub-tasks'' transactions are available the draft invoice gets empty.
    The automation can go further if you have many projects with that same requirement. You may develop a custom program that call the GDI in a loop for a single project, untill there is nothing more to bill there, then go on and call GDI in a loop for the next project, etc.
    Dina

  • Task Level Unique ID field.

    Hello,
    In Project Pro you can add the task level field Inique ID to the view. I need to report this field on a report, and can't seem to find it in any of the Project Server 2010 database fields. Can anyone tell me the table or view and the database that I can
    find the task level Unique ID field for reporting? Thanks for your assistance! :)

    Have you anyway tried to query the "TaskIndex" from the Reporting DB?
    If you confirm that it isn't the task unique ID you're looking for, I'm afraid that the task unique ID is just meant to be seen in Project Pro for scheduling purpose and not reporting purpose. Thus it'll not be in the Reporting DB. 
    Eventhough it is neither documented nor documented, you might have a look to the draft DB.
    Hope this helps. 
    Guillaume Rouyre - MBA, MCP, MCTS

  • Document Attachment at task level

    Hi all,
    i am trying to attach a document to a task A belongs to some project A. I am able to do it but the document icon is not visible at the task level, it is visible only at the project level. Help me out .
    Tahnk you
    Soumya T | EPM Consultant

    Hi Soumya,
    Which Project Server version and SP are you using? How do you proceed step by step to attach the document to the task?
    Please give us more information so we can help you.
    Cheers.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Unable to Kill the Consolidation task for HFM application

    User is unable to kill the Consolidation task in HFM application. Consolidation process which usually takes 2 mins has been showing status as running @79% since 4-6 hrs. User ID is has the provisioning manager, lock Data and unlock data provisions in Shared Services. The stop task button in the Running Tasks list is not enabled . Our Support team has advanced user access which is not also able to stop the task. Please note Admin access is restricted and not allowed for such tasks.

    I would check the HFM Log to see if you find anything referring to locked / blocked records.
    If your HFM app is killed in the middle of consolidating or performing other activities that requires it to 'lock' a segment of memory in the database, that 'lock' is still held on those data points when the application restarts.
    If you then try to perform another consolidation and it hits one of those locked data points, it will sit there for a very long amount of time waiting for the 'lock' to clear.
    I forget the exact error message that you will find in the log AND I forget the timeout period; however, it sucks having to wait through that.
    The other possibility that comes to mind is that the consolidation really aborted and the status didn't update. (once again check the logs)
    Charles

  • Unable to set the Process Task configuration

    Hi All,
    I have AD Process where in there is a duplicate task customized for adding group to the user. Now, I am unable to delete the process task.
    Also, the columns - Table name "UD_ADUSRC" is selected in CHILD TABLE column and "insert" is selected in TRIGGERTYPE.
    How can I de-select the above? This will ensure that the task is not triggered when we try to add the group in the child table.
    Please help

    You cannot delete a task once added. Workaround is to mark it conditional and attach the 'tcCompleteTask' adapter to it.
    Or, take export of it and remove it from the xml, De-Install the connector (if on 11g)/revert the database and re-import the xml.
    HTH,
    BB

Maybe you are looking for

  • Recovery disc does not work for Satellite A100-197

    I am working on a A100-197 that would not boot into ordinary Windows but was able to boot into Safe mode. I used MSConfig to turn off everything at startup and all non-MS services. No good. I used system restore. No good. I scanned for viruses, rootk

  • Setting HP LaserJet 2200d Duplex Doesn't work

    Machine is fully updated via Software Update as of 7/15/2008 (10.5.4), including the 7/15/08 HP Drivers. Printer: HP LaserJet 2200d Interface: USB Driver: /Library/Printers/PPDs/Contents/Resources/HP LaserJet 2200.gz I installed the printer and ensur

  • Creation indicator purchase requisition in md02

    Hello SAP Gurus,      This is regarding creation indicator purchase requisition in md02.In this creation indicator purchase requisition if we keep setting as 2 than it will create purchase requisition if the dates of PR are in the opening period and

  • Slow so i upgraded mem ram and still no faster

    my new 2000 hp notebook came with 4gb ram and is really slow so i was told to upgrade it to 8gb and it would speed up my notebook alot. i bought the 8gb ram ($85) and installed it only to find out my notebook is no faster at all. why is that?? how do

  • Mp3 opens in new window ... can I control SIZE of window?

    I am opening both an mp3 in a new window \ and a Quicktime movie. Two separate links. But both come up as a Safari window quite large. They can be immediately resized of course, but it will be annoying for the visitor to have to do so. I want the win