Unable to change the status of a project to approved

Dear Members,
I am using the Oracle Vision Instance version 12.1.3 and Database 11.2.0.3.0
I have created a project. I am unable to change the status of the project to APPROVED. I am getting the below error:-
Please enter an active project manager for this project in order to change or update this information._
Can any one please help me in resolving this issue.
Many thanks in advance.
Regards.

R4S wrote:
Dear Members,
I am using the Oracle Vision Instance version 12.1.3 and Database 11.2.0.3.0
I have created a project. I am unable to change the status of the project to APPROVED. I am getting the below error:-
Please enter an active project manager for this project in order to change or update this information._
Can any one please help me in resolving this issue.
Many thanks in advance.
Regards.Please see these docs.
CMRO Partially Implemented Visit Errors with "Please enter an active project manager for this project in order to change or update this information" [ID 864812.1]
Update_Project Erroring With PA_PR_INSUF_PROJ_MGR While Creating Task For Templates [ID 1085068.1
Thanks,
Hussein                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

Similar Messages

  • Unable to change the status of Internal order.......

    Hi,
        I am trying to change the status of Internal order from Technically completed to Release. But i am getting an error that ---Status REL is not allowed (order 4564564).
    We have created this order and till now zero value is used of actual budget means we not used even single amount till now for this order and we want to change the status of order from Tech to REL again.
    Is it possible.
    Please suggest.
    Regards,
    R.

    Hello,
    You can release the Order by the following method:
    Go to KO02
    Enter the Internal Order name
    Go to Control Data Tab
    There we have one screen area as Status: there we have one push button(like); click it and from there you can set the staus of the internal order to Released(or you can also change the current status of the internal order)
    Please let me know if you I am missing something in my reply.
    Thanks,
    Anurag Singh Rathore

  • Essbase Agent is down in version 11.1.2.1 and unable to change the status

    Hi All,
    I've installed and configured Hyperion version 11.1.2.1. When i'm trying to add Essbase server in EAS console, it is giving the Network Error (Essbase Agent issue). When i saw the essbase status from User_Projects/EPMSystem1/bin> opmnctl status it is showing Down. Can you pls. help how to change it to Alive ?
    Thanks,
    PVR

    Have a look at the following link to view the different methods of starting up essbase - http://download.oracle.com/docs/cd/E17236_01/epm.1112/epm_install_11121/ch08s03s10.html
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Can we manually change the status of request which is already approved?

    Hi,
    we are using standard Record Working Time and approal  ESS MSS Application.
    can we change the status of request which is approved     to      not approved or released for approval?
    (in our case,  request released for approval is displayed on weekely basis in approval page and
    on review page (approval) we have number of hours recorded for particular day in that week is displayed.)
    the problem we are facing is,
    user submitted  data for a week and manager approved it.
    but now we have to change the data entered for that week, only for a particular day and submit it again for approval.
    we have changed the data for that particular day  using HR-TSADMN. and submited it again for apparoval.
    but this time only the record (particular day) which has been changed is shown in the approval review page of approval iview MSS.
    but our client needs data of all the days in that week displayed.
    can we get the approved + edited data for the week displayed on the review page of approval??
    if can't, then if we change the status of the approved data for that particular week then the user can again submit the data for that week and data of all the days in that week will be displayed on the review page for approval.
    plz help me.
    Edited by: madhu1011 on Nov 30, 2011 2:23 PM

    to change the status by user, he can modify the hours in the application and resubmit
    For administrator purposes, you should cats_appr_lite, you can reject the all time and do it,
    Do not make any changes directly to CATSDB< it might cause inconsistency
    So better use standard transaction like cats_appr_lite or cats_da

  • Displaying error message on XRPM Portal on changing the status of  Project

    Hi All,
    I want to display an error message on the Portal when user tries to change the status of the Project from 'CREATED' to 'RELEASE' and clicks on SAVE.
    I have checked the following BADI's but i am not able to retrieve the newly selected status.
    DPR_ATTRIBUTES -> Methods 1) CHECK 2) CHANGE_CHECK
    RPM_PROJ_CUST_FIELDS
    Any help will be highly appreciated!
    Thanks.
    Runal.

    Hi Runal,
    I think, the reason is that the status is not attribute of the project, rather a linked object. That is why the Badi method is not get called.
    Please check with the Badi DRP_EVENTS, this Badi is typically called, if the status of object is changed.
    Kind regards,
    Zhenbo

  • Unable to change the data in PSA

    Hello All,
    I have a delta failure because of invalid characters in one of the field and now i wanted to change the PSA. I have deleted the request from all data targets and started changing the error record, it is not showing all columns from PSA hence i am unable to change the data in required field.
    Could you please let me know how will i see all columns from PSA. Thanks
    Regards,Ashok

    Hi Ashok,
    To increase/decrease the number of columns that are displayed on the menu from the Settings option select Change display variants
    Also if you want to see say all the failed records you can sort the order of the data using the Status column

  • Siebel Hangs up when changing the status of service request

    Hi,
    We are facing this typical problem since last 2 weeks. When closing the SR, CRM hangs for random(unable to detect a pattern till now) SRs.
    The steps we follow to an SR is:
    1. Enter the SR #
    2. Change the status to "resolved"
    3. Type the resolution in "resolution" text field and click on white space.
    4. A new row gets generated with status "unscheduled"
    5. Place a check mark near the newly generated row.
    6. Change the status of the SR to "closed"
    Now, some SRs get stuck at step 3. When clicking on white-space, CRM hangs.
    We've tried everything from clearing IE cache / temp / cookies / increasing temp file size (to 5000 in IE6 and 1024 MB in IE7)
    Even set-up a fresh system but no avail.
    Even changed the primary internet link to secondary one but no help.
    On top of that the SRs which make IE hang seem to be appearing randomly. Sometimes I can close 20 SRs at a stretch and sometimes 1-2 SRs get hanged every 4-5 SRs.
    Once in a while an error pops up: "The selected record has been modified by another user since it was retrieved. Please continue (SBL-DAT-00523)"
    No one else was working on the SR when such errors came.

    You can ave a runitme event or workflow triggered that can generate such behavior.
    First increase logging on your object manager (evtloglvl :) ) and look at any error message.
    Second assess with your development team what automation has been setup ranging from script, Business Services, workflow to assist you in troubleshooting.
    Best Regards
    Evtloglvl

  • How to change the status of test cases in Test Plan from Design to Ready using Excel VBA

    HI,
    How to change the status of test cases in Test Plan from Design to Ready using Excel VBA

    Thanks Florin,
    Your piece of code has worked alot, and it was very helpful in changing the Status of the Workitem to "READY" for all the Users fo the workitem.
    Points have been rewarded for your help.
    Process: We have acheived this using the "Work Item Exits", Usng "AFTER_EXECUTION" Method.
    Note: The Exit will be executed if "exit_cancelled"  statement is present/used in the work item method. if not it is not taking to the exit code. I'm unable to find the reason for it. Florin can u please explain this point.
    Please check the link for adding the code in Work Item Exits.
    http://wiki.sdn.sap.com/wiki/display/ABAP/ProgramExitsIn+Workflow
    Please find the Code:
    method IF_SWF_IFS_WORKITEM_EXIT~EVENT_RAISED.
    Get the context of the workitem
      me->wi_context = im_workitem_context.
    After execution of the workitem call the method AFTER_EXECUTION
      if im_event_name eq swrco_event_after_execution.
        me->after_execution( ).
      endif.
    endmethod.
    METHOD AFTER_EXECUTION.
    This method acts as the Event Handler for SWRCO_EVENT_AFTER_EXECUTION
      DATA: LCL_L_WID TYPE SWW_WIID,
            L_STATUS TYPE SWR_WISTAT-STATUS,
            L_NEW_STATUS  TYPE SWR_WISTAT,
            L_SWR_MESSAG  TYPE STANDARD TABLE OF SWR_MESSAG,
            L_SWR_MSTRUC  TYPE STANDARD TABLE OF SWR_MSTRUC.
    Get work item
      CALL METHOD WI_CONTEXT->GET_WORKITEM_ID
        RECEIVING
          RE_WORKITEM = LCL_L_WID.
      L_STATUS = 'READY'.
      CALL FUNCTION 'SAP_WAPI_SET_WORKITEM_STATUS'
        EXPORTING
          WORKITEM_ID    = LCL_L_WID
          STATUS         = L_STATUS
          USER           = SY-UNAME
          LANGUAGE       = SY-LANGU
          DO_COMMIT      = 'X'
        IMPORTING
          NEW_STATUS     = L_NEW_STATUS
         RETURN_CODE    = SY-SUBRC
        TABLES
          MESSAGE_LINES  = L_SWR_MESSAG
          MESSAGE_STRUCT = L_SWR_MSTRUC.
      IF SY-SUBRC EQ 0.
      ENDIF.
    ENDMETHOD.
    Thank You Once Again,
    Ajay Kumar Chippa

  • Unable to chage the status of normal correction to confirm successful test

    Hello,
    I am unable to chage the status of normal correction to confirm successful test in solman. Its shows error:
    Not all test transports are imported .
    I have imported the test trasnport in to test system successfully but still i am getting this error . I have also checked blogs in SDN but non of them refers to any solutions. But I can see lot of people have faced this issue.
    My configuration is fine and no error in application log.
    Can any body help me to find the resolution for this problem? answers will be rewarded.
    Regards,
    Bhavesh

    Hello Mark,
    Thanks for the update. But non of the above option can resolve m issue because :
    1) Note 1352886: is not relavent as I laready have the higher patch level of solution manager for ST comonant( SAPKITL431).
    2) I have already gone through this blog this blog talks about the status of maintenance cycle but in my case the maintenance cycle status is fine  (in developemnt without release) . So as per process till now i am on the correct status.
    I appreciate your updaes but still I am not able to change the status to consolidate. because of error Not all test transports have been imported.
    Please let me know if you have any other solutions for this error.
    Regards,
    Bhavesh

  • How to change the status of a Partially Activated Red request?

    Hi
          I am unable to delete a Request which is partially activated and which is in Red.
    This was due to
    We were trying to manually update a data packet which was struck for a long time in the above request. While we changed the status of the requests to red and were about to perform the manual update, the struck data packet processed automatically and the activation too  started automatically before the request was set to green.
    To recover , we need to delete the request which we are unable to do.
    Please provide help
    Regards,
    Rezwan Asraf Ali

    Dear,
    When you create a production order, an operation created by the system is generated automatically if no routing is used for the creation. As a result the order header receives the status HOGAN; the operation created automatically also has this status.
    If you delete the operation created automatically and then do not have the status HOGAN.
    To avoid this maintain the Routing for the material or delete the setting of default operation from OPJG.
    Regards,
    R.Brahmankar

  • Cancelling a absence request haas not changed the status by the user

    Hi experts,
    An absence request has been cancelled,. Looking in Status Monitor, i will see that the reuest has been cancelled, but the user see the status stay on "Pendig For Approval". Normally the user will see the Absence Category set to Cancelled, but not "Pending For Approval". The reason is unknown to me. Thus i need your support.
    Thanks in advance
    Mehdi

    Just to confirm my understanding, are you saying that:
    1) Employee requested an Absence through SSHR Leave of Absence
    2) An administrator queried the absence in the Workflow Status Monitor and Cancelled it
    3) Now that absence is showing to the Employee as 'Pending Approval'
    Is that right? You mention 'Normally the user will see...'. When you say 'normally' what is the behaviour you expect?
    If I've understood you correct this is the behaviour I would expect: cancelling a workflow does not change the status from 'Pending For Approval' and it definitely does not change the Absence Category on the absence. Cancelling an absence via this route isn't really recommended because - as you are seeing - it gets stuck. It's best to get the approver to reject the absence instead.
    To remove this cancelled absence, take a look at these Oracle Support articles:
    Unable To Remove Cancelled Workflow Item Related To LOA Transaction [ID 1123714.1]
    How to Purge Obsolete Workflow Runtime Data (FNDWFPR) for HR Workflow Completed Processes [ID 237564.1]
    How to Run the HR Workflow Cleanup Process (HRWFDFCT) [ID 237524.1]

  • FM to change the status od DSO Request

    Hi All,
    I need a Function Module (FM)  to change the status of the request in the DSO and subsequently able to delete that request.
    As I am unable to delete a request manully form the manage tab.
    Regards,
    Mayank

    Hi Dennis,
    Thanks your your reply.
    I tried giving the IP technical name and the requets ID. Nothing is happening.
    It remains in the same state. Any other pointers.

  • Change the status of WBS from REL to CLSD.

    How do I change the status of WBS element from REL to CLSD manually in the transaction CJ02.
    The top level WBS element is in REL state so whenever I create a new WBS it is automatically set to REL state.
    Please tell me how do I change the status to CLSD manually as this field is disabled for editing.

    Hi Abhishek,
    I presume that this may be the information massage. It is because you may be having your project end date (Actual finish) later in the year 2008 and you are trying to close the project before specified date of finish.
    Thanks
    Hemant

  • Changing the Status profile in QM

    Hi,
    The status profile (QM_L_001 - Inspection lot profile1) in the Quality Inspection Lot is been manually entered and saved.
    This has set the User Status as IMAT: Material is not correct.
    Due to this, unable to do any of the further processing.
    In QA02, the Status Profile cannot be changed/deleted.
    So how to remove the Status Profile from the Quality Inspection Lot?
    Request your help.
    Regards,
    Sankar.N

    Hi
    An other workaround, you can go to the transaction BS02 and change the status profile to allow the status can execute the following actions temporarily.
    Leon.
    Regards.

  • Unable to change the data source of SAP system

    Dear all,
    We have install SAP netweaver EHP1 standalone java on oracle 10.2.0.5 on windows 2008 R2.
    while installation i have given the central SLD system as solman,
    By mistake i have deleted the system from SMSY.. now when i createed the system manually i am unable to change the data resource as SLD due to this i can start my SMD configuration
    Request please let me know how to resolve this issue.
    Thanks
    Paresh

    Hi Paresh,
    You can proceed with deleting your SAP system from SMSY (along with connected technical content such as AS Java definition) and the run the LANDSCAPE FETCH through transaction SMSY_SETUP to have the correct definition of your SAP system in SMSY.
    Following this, you could use the addon Landscape Verification (a new thing I learnt today!!!)  to check the correctness of transaction SMSY. The following link details the Landscape verification 1.0 for SolMan:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e093b3ce-c034-2d10-01bc-b51f1691d3da?quicklink=index&overridelayout=true
    Hope this helps sort out your issue.

Maybe you are looking for

  • How to change the execution order of data control and backingbeans

    Hi, I have a form for a BPM human workflow. It has an inputText and a selectOneChoice component in the form. The list of value for the selectOneChoice is initiated based on the value in the inputText. I have a data control - JavaBean, which returns a

  • Routing condition in receiver determination

    Hi, In my RFC to JMS scenario, i encountered with a strange routing condition for the receiver determination. I have routing condition like " string length (one field in Bapi)<1" . Could any one help me how to implement this? Regards, Vishnu.

  • Pulseaudio and USB Dac

    How do I get pulseaudio to see my USB dac? It keeps playing sound through the sound card only. I've added "load-module module-udev-detect" to default.pa, and changed my ~/.asoundrc to include: pcm.pulse { type pulse ctl.pulse { type pulse pcm.!defaul

  • Problem in including text id in sapscript

    Hi, I am using the following command to include a text id in sapscript. INCLUDE &VBDKR-XBLNR& OBJECT VBBK ID Z001 LANGUAGE &VBDKR-SPRAS_VKO& But the text is not showing in form. Now when I debug the sap script I found that altough VBDKR-XBLNR is hold

  • Will 2 same file stored in TM cause error?

    Hi to all, OK, let me explain more in details, I have a file (1GB size) in my iMac's hard disk, this file had already backup into my Time Machine's hard disk. Once I move this file to _another location_ in my iMac, will it backup another copy into my