Unable to create a production order due to error: "CX_SLD_API_EXCEPTION"
Hello,
I am a student and fairly new to SAP.
I could convert planned order to Production order (Using transaction MD04).
While trying to release the order, and saving the change, I am getting a runtime error.
Surprisingly, same exercise was performed with no errors by previous batch.
The details of the error are as follows:
What happened?
The exception 'CX_SLD_API_EXCEPTION' was raised, but it was not caught anywhere
along the call hierarchy.
Kindly help me to solve this problem.
Thank you.
Dear,
Get Help of your ABAPer to analyse it. Also will suggest you to refer SAP note.
Note 832674 - Short dump due to uncaught exception
Note 1287982 - SMSY: Terminatn UNCAUGHT_EXCEPTION for data transf from SLD
Regards
Abhijit Gautam
Similar Messages
-
Duplicate production order due to sales order on credit block
Dear Experts !
Need feedback on the following scenario:
- Sales order is entered for material which is produced in-house specific to the sales order (ie customer's logo is on product).
- Schedule line in sales order creates a production order specific to the sales order.
- Customer runs into credit check a few days later and consequently the schedule line in the sales order is removed due to credit block, however the linked production order still remains and is produced by factory.
- Sales order is released from credit check and a new schedule line is created resulting in another production order being released.
Any ideas on how to prevent duplication of production order?
Thanks in advance!
-AlvinHello,
Apologies for the confusion, let me explain it a bit more.
- Sales order is entered for material with planning strategy group of make-to-order, the schedule line initiates new production order for make-to-order material.
- A few days later - the customer goes over credit limit or has overdue invoices, etc..
- During background rescheduling (or any sales order change) the sales order gets a credit block due to static check.
- Sales order block deleted schedule line in sales order, however the production order remains active.
- Once the sales order is released from credit block, a new schedule line is created which initiates a new production order.
- Duplicate production order is now being made in shop floor.
I hope the above explains my scnario a little clearer.
Thanks and regards,
Alvin -
Unable to confirm transfer order due to error message "enter a storage unit
Hi guys:
I am unable to confirm transfer order due to error message popping up and saying "enter a storage unit", and I tried to search it in whole thread in the forum,it was suggestion to pick up destination storage unit via ls24, but I did went to ls24 and trying to click that line(transfer order) but unable to find the storage unit, so is there another way to fix it?Hi Allen...
Pls check if your Storage Type is SU Active. If yes, then system will create a storage unit according to the setting done for the storage unit management, perhaps in your case you are confirmin TO for the putaway.
Pls confirm and revert
Regards
Shiva -
Is there a situation where we create a production order without BOM/Rtg ?
What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
Is there a situation/scenario where we create a production order without BOM, Rtg
Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
Please clarifyPradeep,
Thank you for detailed answer
Round robin of discussions
When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
maintain the rtg and BOM manually to the prod order
Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
Due points have been assigned -
Co- Product Error while creating a production order
Hi,
While performing the Co-Products Approtionment at the time of creation of Production order..
we are facing a problem regarding cost apportionment I have crated a Source Structure and the cost element is assigned to that Source Structure but still iam facing this issue
kindly help me out.
the error msg is
Debit with cost element 9460404 cannot be settled.
Message no. KD549
Diagnosis
Costs/revenues exist for cost/revenue element 9460404. This cost/revenue element was given source assignment 40 in the source structure (-> settlement rule for sender -> parameters). However, there is no distribution rule with settlement type FUL for this source assignment or the total of the percentages for the rules is less than 100.
Note:
Full settlement settles all the costs and revenues which have occurred up to the settlement period and have not already been settled. In the case of periodic settlement, you can configure the settlement profile so that all the costs occurring in the settlement period are settled, or if an amount less than 100% can be settled.
Procedure
Maintain the distribution rules for source assignment 40 and settlement type FUL or use periodic settlement to settle less than 100%. Change the settlement profile for the sender as necessary.
Change settlement profile
Note:
Cost and revenue elements receive source assignment " " if you have not entered a source structure in the settlement rule parameters.Hi Krishna Murthy I went through the note but i couldnt recive a big help from that note.
I will explain the step by step process that i have done.
I am attaching the Screen shots of the issue.
1. For co-products I have created a source structure and Sec. Cost Elements were assigned in the source structure.
2. The source structure was assigned in the Material Master for co-products equally distrubuting the amount between 2 materials.
3. When we are trying to create a production order the error was displayed but the costs was getting calculated properly.
4. When I was settling the production order the same error was getting displayed.
I have tried various methods to resolve it.
1. I have created a periodic settlement rule and tried to settle but it didnt work
2. I have assigned the source structure in the settlement profile this also didnt work. -
Error while creating a production order
Dear PP gurus
I am trying to create a production order of a material through CO01 , I am getting a error 05.05.2016 date comes after end of valid factory calendar. (Please correct
Although for all other material , no error is coming.
My factory calender is till 2015, but i am not able to understand why and how it is capturing the above date.
please help me how to correct it?
Thanks in advance
RegardsDear Aadi,
When your in operations screen
Extras > Scheduling > Schedule > operation overview = operation segments > Click on Gang chat icon
it should show you the days for ur base qty
then click on scheduling results then click on update material master & save
then Go to CA96
input plant
then mark a tick for ur material & click on update material master icon
then check in material master work scheduling view
Regards
Madhu -
Serial number error while creating the production order
Hello frds,
I am getting the following error while creating the production order.
"Item 000000 requires exactly 100 serial numbers for the asset".
If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
I have tried using the new serial number profile also, but it is giving same error.
Kindly guide.
Regards,
Narendra BoraDear Narendra
Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
Procd Procedure description Ser.Usage
PPRL PP order release 02
since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
Regards
Soundar -
Reserve batch number at creating of production order
Hi,
I would like to know if there is a way to reserve batch numbers when creating a production order. And when the production order is released and create the receipt, the receipt to use that batch number reserved at the moment of the creation of the PO.
How could I do this using the SDK?
Best regards,
IrinaHi,
Thank you for your answer.
But, if I "reserve" the batches in a UDF in the production order, it might be that by the time the receipt from production is added those batch numbers to be used already.
Any other ideas?
Thank you,
Edited by: Rui Pereira on Dec 23, 2008 4:18 PM -
Create a production order with variant configurator data
Hello,
Can anyone tell me the way to create a production order with variant configurator data. Is there a BAPI ? an IDOC ?
Is there several steps ?
I have to create an interface which creates automatically PP orders. The data input is a file.
Thanks for your helpHi,
There are fews BAPI's available for creation of Production Order. They are:
BAPI_PRODORD_CREATE
This bapi will suit to your requirement, as input will be provided from file.
Others are
BAPI_PRODORD_CREATE_FROM_PLORD " this converts planned order to production order
BAPI_PRODORD_CREATE_FROM_REF " this creats production order considering other production order as reference.
Hope your query is answered.
Regards,
Brajvir -
BAPI to create a production order CO07
Hi guys,
Need a help....i need to create a production order with the following data...
1.final date...2.routing group 3.components screen with all the materials needed
there will be multiple components added..as co-products and as a main material
BAPI_PRODORD_CREATE...can we use this to add multiple materials...and will it fulfill the tcode CO07...
any queries or any sort of info..plz share..
Regards,
AshokThanks for the reply.
In these BAPIs..or FMs...we can add one material or a component...
I want to add a main material...as a first one..
then a component of it....so it goes on..
say i have a main material and 10 components needed and created in a single production order...
any info??? -
Unable to create a Purcahse order from Proman-System is hanging
Hi All,
I am unable to create a Purcahse order from Purcahse Requisition from Proman.
When iam executing the Function, convert Purchase Requisition to PO, after giving the required inputs like Vendor,Purcahse Org,Pur Group, Company, system giving the information that, Purcahse order is created with number and ask to proceed further.
When i click, system is hanging and unable to proceed further and when i check the PO, There is no data available in the PO's/
Regards,
N.RajuHi Nitin,
Iam getting the PO Number is generated information with Number. But that number is not available in the system.
Any clue for this.
Regards,
N.Raju -
Create a Production order for rework
Hi,
I would like to create a Production order for rework.
But I don't want to do it in the master PO with trigger point.
I would like to create a new PO for rework and asign to account to the old or master PO.
I've tried to do it but I want to know if it's correct.
CO07, maintained the qty, in the settlement rule maintained (category= order,settlement reciever= master PO number) released the order and by confirmation where can I maintain the qty? (as Yield or as rework qty)
ThanksHi,
Use T code CO07- creation of PO w/o material, settelment rule as u mentioned and the quantity has to be maintained in rework.
When u confirmed the order and settel it, it will be settel againts the main order.
Regards
JDB -
Error "Cost" by creating a production order
Hi,
I' ve create a production order CO01. before I saved I get this error in log "No cost element segment exists for 89000 on 27.02.2009".
With KL01 I've create a activity type and with KP26 I've planed this activity per cost center.
What can I do
Thanks
DedeHi,
Run the T-Code KA03, Key in the controlling area and the given cost element.
If it doesn't exists, contact your CO guy to create that.
It will solve the problem.
Regards,
Rohit. -
Creating a production order for a semi finished product
Hi
I am having a multi level bom scenario over here.
one of the bom components of the header material is a semi finished product.
I am using the planing stratagy 40 for that material.
in standard sap when i create a production order for header material. the requirement gets transerd to all the components. if the components are not available then only a requirement is placed. when i run MRP that requirement gets converted in to a planned order. which converts in to a purchase req or a production order,
well for my semi finished product. its a Work in process item. there wont be any stock for that item in the storage location any time.
what my requirement is. when i create a production order for my finished product it should automatically create a production order for the semi finished product.
is this possible with some configuration settings.Dear Deepu,
for ur requirement u need to maintain MRP type PD for FERT material and also for ur HALB.
If u run MRP only, it will create planned order for FERT and for all its dependent requirement(for PD).
If u create order manually for FERT material then it will not create order for HALB material, u need to create manualy for this also.
sree -
Settlement rule auto created in Production Order with Receiver Type as OIT
Hi,
I am creating a production order with material number in CO01. The system is automatically putting OIT in receiver category, in settlement rule.
And its populating the child materials there. I expect the parent material to be populated in the settlement receiver.
In the settlement profile maintained in order type, I have maitained MAT.
Please let me know, why system is autopopulating the role like above.
Regards
SRHi,
If you are going to settle the production order to Material, there is no need to enter Allocation structure in Settlement profile unless its used for variance settlement...
Allocation structure has an option to settle to OIT with a settlement cost element or primary cost element...which is why i wanted you to check for that.
Anyways, Follow the thread, this should help you
Change the Settlement Rule
Thx
PG
Maybe you are looking for
-
Is there any way to control the volume on my Apple TV?
Here's the scenario: I have a small amplifier under my couch that controls the speakers connected to my Apple TV. When I use Airplay from my iPhone to listen to music, I'm able to control the volume right from the music App on my phone- this is perfe
-
HT201269 How do I transfer mobile number from iPhone 3Gs to iPhone 5?
How do I transfer mobile number from iPhone 3Gs to iPhone 5?
-
Error Message with iTunes update
Since updating to the latest version of iTunes, I'm getting an error message that doesn't make sense. This is the message: "Some of the iTunes Store files in the iTunes library were not copied to the iPod because the iPod may only contain content fro
-
How do I get my screen unlocked so that I can update my ipad. The screen is not responding to my touch, instead it is telling me... " This ipad hasnt been backed up in 12 weeks. Backups happen when this ipad is plugged in, locked and connnected to
-
Does anyone know a good free e-book teaching Struts?? Thanks =)