Unable to create change order for Operational attributes
Currently we are in 11.5.10 E9 patchset.
Product : Advanced Product Catalog
Unable to find create change order button for any of the operational attributes page.
Steps to reproduce :
1.Switch to 'Development Manager' resp
2.Navigate to 'Item Catalog' > 'Item simple search'
3. Enter criteria to find an engineering item
4. Navigate to the item details page.
5. Select 'Inventory' or 'Manufacturing' or any other page.
Could not find the create change order button.
The profile option 'ENG: Engineering Item Change Order Access' is enabled to YES.
Also, these operational attribute pages are not listed in Change order screen.
Any pointers on this issue pls.
Thanks in advance.
Kumar.
Dear Friend,
Please check following config,
1. Document pricing procedure assignment to ORDER TYPE ( VOV8 under Transaction flow for field Doc.Pric. Proc is
maintained or not )
2. Customer Pricing procedure assignment ( In Customer Master data under SALES Tab for Field Cust.Pric. proc. is mainatined
or not )
3. Pricing procedure determination (Sales Area + Document pricing procedure + customer pricing procedure)
4. Also chcek the condition is maintained for this combination.
Regards
AJIT K SINGH
Similar Messages
-
Creating change log for sales order
hi all,
i want to create change log for any given sales order if it exists.
can any one tell me how to do that??Hi Gouri,
CDHDR and CDPOS are the tables for all change history.
CDHDR contains the details such as who made the change, when, using what tcode and the change type ie. update, delete.
CDPOS contains the field name which was changed, its old value and its new value.
The change document object is VERKBELEG for sales documents.
The object value is the SD document number with leading zeros.
The following link will be also useful.
http://www.sap-img.com/ab024.htm
Regards,
Nitin. -
ORA-01658: unable to create INITIAL extent for segment in tablespace
NEW REPOSITORY INSTALLATION ERROR!!
I want to install a new Repository using Oracle9iR9.2.0.1 and iDS10g on windowsXP Professional the same machine.
After running all the SQL scripts ( ckqa,ckvalqa,ckcreate,ckreport) with success to installing a new Repository on my Database using "the Scripts Method",I start the Repository Administration Utility( RAU) to scheck the priveleges and so on.
After pressing the Install button in the RAU:
-I take public synonyms
-I scheck the box for "Support Designer Objects", then
-The Repository size is Medium
-I have not change the defauft Tablespace of the Repository_Manager names TEMPORARY_TABLES to store the index and table of System Data....Diagram Data.
After Starting, the Installation began an stop by installing some Tables like schown :
Operation: Started : 07/03/04 20:26:32
Reading File: cktabs.sql
Object : TABLE CDDL_TMP_TBL
Executing statement(s)...
Verifying...
.and so on till....uns so weiter bis
Reading File: cktabs.sql
Object : TABLE RM$INFO
Executing statement(s)...
Error Submitting Definition: User intervention required...
RME-02124: Failed to execute SQL statement: CREATE TABLE RM$INFO
(NAME VARCHAR2(128) NOT NULL
,VALUE VARCHAR2(128)
Storage (initial 4K next 4K pctincrease 0) Tablespace TEMPORARY_TABLES
ORA-01658: unable to create INITIAL extent for segment in tablespace TEMPORARY_TABLES
Dumping Buffer...
CREATE TABLE RM$INFO
(NAME VARCHAR2(128) NOT NULL
,VALUE VARCHAR2(128)
...End of Buffer
User Requested: Stop Process
When I read the Help of the Error the
CAUSE was: Failed to find sufficient contiguous Space to allocate INITIAL extend for Segment being created.
ACTION: Use ALTER TABLESPACE ADD DATAFILE to add additional space to the tablespace or retry with a smaller Value for initial.
I then try to resolve it by schecking and changing the Values of INITIAL_VALUE and NEXT_VALUE in the ckparams.txt to 500k.I change the Values of TEMPORARY_TABLES(10214 to 51200k) and TEMPORARY_INDEXES from (20000 to 100000k).Then I run the scripts @ckparams.txt, @ckvalqa, @ckcreate but
-pressing the Scheck Privileges Button on the RAU still give me 106k for the INITIAL_ and NEXT_VALUE.
-And the installato still stop with the same Error.
Question: How schould I resolve this Configuration?
You could respond in ENGLICH, GERMAN or FRENCH
Thank you for your Help!You are running into database errors. You should refer to the database documentation on how to adjust the size your tablespaces. The online Designer installation guide will advise you as to the sizes of tablespaces you require. (http://otn.oracle.com/pls/wocprod/docs/page/ocom/technology/products/designer/supporting_doc/Des10g_9044/cmnhlp72/rep_insgde/igttl_9i.htm)
Regards
Sue -
Creating Transfer Order for a Material document
Hi,
I am transferring the Unrestricted stock from one material to another material through Movement type 309.
I am creating a material document through BAPI_GOODSMVT_CREATE. Once the Material document is created and if the stock is in multiple storage types or storage bins, then I need to perform LT06. Instead of doing BDC recording I am using L_TO_CREATE_MULTIPLE function module for creating the TO. I am passing all the necessary values to this FM. TO is getting created but the Material document is not reflecting in that TO.
As per the configuration, movement type 309 will create the posting change only not the Transfer Requirement.
Does anybody have encountered the same problem?. If so please let me know how you have resolved the issue.
Regards,
Kishore.Hello Kirankumar,
It is possible to assign external number ranges for Storage unit, so maintain storage unit number range to assign SU number externally.
Now when you create Transfer order for material document at that time you can assign SU number externally.
Hope this helps.
regards,
Arif Mansuri -
Unable to create a 'Z' for se16 transaction
Hi everyone,
we have a requirement where we are unable to create a Z for transaction SE16.
I went to se93 and checked it was a function pool so i went to SE80 to make a copy of standard function group SETB to ZSETB.
it made a copy of it anf I copied all the FM's and made a Z of those.
Once it is done. When I activate it it give a lot of errors , I have checked it and made sure that it is copying entire Function Group but all are fine.
My system is ECC6.0, earlier we had ZE16 which is a replica of SE16 and this had a lot of problem like ending in dumps , so we thought we would make a new Z transaction for SE16, but we get many error.
Please try it out once in ur system before U suggest me a change to be made.
Regards,
RajIt is always best to minimize such issues by making a copy of programs or function modules where changes are needed to add new functionality. Also this would ensure any patches/notes added in future would have minimum impact on your clones.
-Cheers -
BAPI - Goods receipt and then create transfer order for a production order
Hello Everyone
We need to do goods receipt and then create transfer order for a production order (Material for WM scenario)
We are using BAPI 'BAPI_GOODSMVT_CREATE'
i_items-orderid = wa_afpo-aufnr .
i_items-order_itno = wa_afpo-posnr.
i_items-mvt_ind = 'F'.
i_items-stge_loc = wa_afpo-lgort.
i_items-stge_type = '901'. "wf_styp.
i_items-stge_bin = wf_sbin.
i_items-entry_qnt = wf_qty.
i_items-entry_uom = wa_afpo-meins.
i_items-entry_uom_iso = wa_afpo-meins.
i_items-batch = wa_zmobtag-charg.
i_items-move_type = '101'.
i_items-move_reas = wl_3131.
We are passing i_items (like line of goodsmvt_item) along with other parameters to BAPI and its creating material document and Transfer order automatically. Problem is the TO created is showing destination storage bin as default storage bin( from material master).
The field goodsmvt_item-stge_bin is just changing the Source bin details. There is no field for bin in the BAPI so that we can change the Destination storage bin as per our requirement.
My requirement : Creating material doc and then TO. Material should move to specified storage bin.
Please let me know any alternate way( No BDC) so that my requirement is achieved.
Regards
SwetabhHi ,
can u check these fields ,
STGE_TYPE_PC UBTYP CHAR 3 0 Storage type for transfer posting
STGE_BIN_PC UBPLA CHAR 10 0 Storage bin for transfer posting
Regards
Prabhu -
Unable to create Accounting document for my Outgoing excise Invoice
Dear All,
I am implementing sales from Factory. I am unable to creat accounting document for my Outgoing excise invoice. When I click the Utilization button, The excise invoice type is selected Deemed.
1. How to control which Which Excise invoice type should be selected in J1IIN.
2. For Deemed exports will system not genererate Accounting document for Excise Invoice?
3. Where to view the excise invoice document types (Like Billing and order types)
Thanks & RegardsFor deemed export sales,
-Accounting documents will not get generated. (ref: Excise Acct Determination in CIN settings, you will not find Excise Tranraction type:ARE3 for which G/L account will not be assigned)
-Excise Invoice type will be automatically triggered based on configuration : Excise Group / Series Group detetermination.
- For Deemed Exports , only Quantity will get updated in RG1, but not the value. thats the reason, accounting document will not get generated.
- This excise invoice is created, for - to update the RG1 registry / ARE3 creation.
hope it clears
regards, -
Extended Classic : Unable to create purchase order
Hi All,
We are using SRM5.0 system, i did required configuration for extended classic. I defined number ranges for local and backend purchase orders. But after creating SC, system is unable to create purchase order. Shopping cart is not ended up in error. In BBP_PD, I found that number generated for purchase order is always 1.
Please advise.
Regards,
Rajare the RFC connections between SRM system and R/3 systems working? please check this.
transaction --> SM59 --> is used for maintaining RFC destination. -
"Bridge is unable to create a JPG for this file"
Some of my exports to Flickr fail with this message. These a larger file but within flickr limits. Does anyone know what are the limitations set by bridge.
I am having the same problem.
It worked perfectly until about 6 weeks ago. Then I started getting the error message. If I selected the images from the exact same directory and dropped them on the export tab, they would usually work. Also if I took 5 or less images, It would usually work, so I don't hink there is any problem with the directoiry or the files.
I have reinstalled brif=deg and photoshop. it is now CS5.1 and all was stable. for a week and now I am having the problem that Bridge is unable to create a jpg for this file.
Previously, I did not notice that erroe message, so I could have been having some other error, but now this is the one I am having. I am not trying to change the size of these images. Just convert from nef and photoshop to jpeg. -
Unable to create transfer order ,
hi
unable to create transfer order with t-code lt06 after receving production order.tell methe process.
thanks in advance.Hi,
Hope you are creating transfer with ref to material doc which is created after issuing goods to production.
Check in customizing for that movement type in WM.
SPRO-IMG-Logistics Execution-Warehouse management-Activities-Transfers-Define Movement Types
also
Check
SPRO-IMG-Logistics Execution-Warehouse management-Interfaces-Inventory Management-Define Movement Types.
Can you elaborate error, like what type of error you are getting.
Regards
Ravi shankar.
Edited by: Ravi Shankar H N on Oct 28, 2008 6:58 AM -
Error: "Unable to create a shortcut for MyApp" on Windows 2008
When I try to install my JAVA app on windows 2008 via Java Web Start, it pop up a error message "Unable to create a shortcut for MyApp". The app can startup and work correctly after clicking "ok" on error message. BUT, there is no shortcut created on Desktop or Start Menu.
This problem occured on Windows 2008 ONLY. I have test the installation process on different OS with JRE 6u14 and 6u20:
Windows XP PASS
Windows 7 PASS
Windows 2003 PASS
Windows 2008 FAIL, can't create shortcut on Desktop and Start Menu
And I have test the demos on http://pscode.org/jws/api.html, the problem is same.
Does any one has any idea on this?AndrewThompson64 wrote:
- Menu items do not work on Ubuntu Linux at all.
- As a result of that, I am thinking to declare neither desktop shortcuts nor menu items in the JNLP file, but instead using the IntegrationService(1) to perform more specific tests, and offer the end user whatever is available.
- This is probably a better strategy overall, because if you automatically create desk-top shortcuts (or menu items) for the user, you will discover there is always someone who considers them an unnecessary bother.
1) BTW - I have been meaning to do a demo. of the IntegrationService and add it to the other examples at PSCode, but have not yet found the time. ;-)Thanks for reply.
But I don't understand very clear. I'm focus on the windows platform not Linux. Do you suggest to create shortcuts and menu items manually by coding in Applet?
I prefer to use the JNLP file cause it works good on the other OS than to change my code.
What I want to know is:
1. Is it a bug for JRE on Windows 2008?
2. If NO, how can I make it work on Windows 2008? Do I need change some System Setting or Browser Setting?
3. If YES, maybe I can try to change my code, but why there is no bug filed in the Bug Database?
BTW, I use the IE browser. -
All Im very new to Oracle DRM and Im trying to get the app setup on Windows server running SQL Server 2008. When I try to login to the Web Client I keep getting this error.
DRM-61026: Unable to create user session for the following reason: Login failed. Invalid user name or password.
Can you please helpThis might be due to The 'Oracle Instance' path may not have been set to a path relative to the 'CSS Bridge Host' (i.e. the Foundation Services machine) on the Configuration > Host Machines > CSS > General tab of the DRM Configuration Utility.
if this is the case then
1. Open the DRM Configuration Console.
2. Go to the Configuration > Host Machines > CSS > General tab of the DRM Configuration Utility.
3. Ensure that the path in 'Oracle Instance' has been set relative to the 'CSS Bridge Host' (i.e. the Foundation Services machine defined in 'CSS Bridge Host').
4. If corrections are made to 'Oracle Instance' then restart the DRM services to pick up the change.
Thanks,
~KKT~ -
How to stop a person from creating an order for a particular region?
Hi All,
Suppose there are three regions viz :
1.Asia
2.Middle East
3.Europe
Now what I want that when a agent /end user is creating an order for a particular person for a specific region, he gets an error message that "Orders cannot be created for this person."
I mean he can create orders for other people of that region but not for a specific guy.
Also the End user has the authority to create orders for all the above mentioned three regions.So (I Guess) there are no changes to be done in SU01.
What is the configuration that needs to be done for this one?
I hope my query is clear and thanks in advance for your advises.
ThanksI don't think so. There is no role that has VIEW only at user level- neither in CRM nor in R/3.
Only at shop level, we can set if "Order Change" is allowed or not. But nothing to limit ordering at any level.
Even in CRM 5.0 up, out of the box, you have only got:
SAP_CRM_ECO_ISA_WU_B2B_ORDER - Can Create an Order but can not Change
SAP_CRM_ECO_ISA_WU_B2B_FULL - Can Create an Order as well as Change
No role for just display only rights. For full set of available [Web Channel authorization roles|http://help.sap.com/saphelp_crm60/helpdata/en/46/7aea16f4ca468ce10000000a114a6b/content.htm], check this link out.
Easwar Ram
http://www.parxlns.com -
Can MRP only create planned orders for ROH, not for FERT?
HI all,
Is there any way to only generate planned orders for raw materials after MRP, forbid creating planned orders for FERT?
We want create planned orders for FERTs manually.
Thanks,
HarveyHarvey,
Yes, that was also my understanding of your scenario. Did you try X0 for Fert? Run MRP against the entire plant, and MRP will not create any new planned orders for the X0 parts. It will explode the BOM and create dependent requirements in the components. In addition, you can create FERT planned orders manually, or using an external planning system, and these manually created orders will also create dependent demand on your components.
If you are also using Sales orders to consume your PIR, you will also have to look at requirements determination for Sales orders. This is configured based on MRP type. If you change existing MRP types, you may have to add SD config so as to continue to pass requirements to MRP. Your SD resource should be able to help you through this, or I can give you basic instructions if you decide that the PIR/demand/planned order/dependent requirements works to your satisfaction.
Rgds,
DB49 -
Error in Depot Repair when creating repair order for SR
Hi,
I am getting the following error in Depot repair when creating a repair order for a Service Request :
"The Service Request Customer (GEJ Service Provider) does not own this item instance (&ITEM_INSTANCE). Please choose another instance. (IB_INSTANCE=21777)"
An Item Instance was created for customer A (Owner), then party relationship was created in IB with another customer (GEJ Service Provider).
Now a SR is created with customer as GEJ Service Provider and this item instance is selected.
The error is coming up when trying to create repair order for this SR.
Any idea how to resolve this issue?
Regards,
MohammedMohammed
Please refer to this in Metalink note that says Deport Repair 11.5.10 enhancements and search for this ER number.
ER: 4723163
Service Request and Repair Order blocks of Depot repair do not allow ability to change Installed Base ownership of an item or creation of TCA relationships between existing TCA parties before creating a service request or repair order.
Ability to automatically change ownership for an install base tracked item when returned for repair.
ER 4723163
Patch 4910836
Look like you have applied this patch.
Coming to the issue you cannot achieve what you are trying. The only option is to add this subfunction Depot: Allow Change of IB Ownership to your menu of the resp you are trying to use and the message will be different:
This allows you change the ownership and create a repair order.
Unfortunately customer relationship is not going to help at this time. YOu may want to log an SR and see if that is intended in the future. I checked R12.06 but the same behavior is exhibited there as well.
Good luck!
Thanks
Nagamohan
Maybe you are looking for
-
My VCAP5-DCA is coming soon , Please HELP !!!
Hello everyone ,,, My Exam in less than two weeks , I have to travel driving 450 KM as there is no place to have it where I am, it will be disappointing to fail , so I need your advice here please. ** Questions of type: -Explain DRS / storage DRS a
-
How do I play the Humble Mozilla Bundle games?
All attempts to find information on or otherwise find ways to play the eight Humble Mozilla Bundle games in Mozilla firefox have reached dead ends.
-
When importing photos from my iPhone black boxes appear in place of random photos in the iPhoto library and in Photostream. It has no apparent pattern, the photos are just blank. It's not just icons, when I go to edit the photos externally in Photosh
-
Costing for Maintenance- and Service Orders
hi Can any one tell me the Configuration steps for Costing for Maintenance- and Service Orders. Kindly please guide me. regards, R.Ramakrishnaraj
-
When e-mailing from iPhoto -some small, some medium/ upgraded to 10.4
When I use to have 10.3.9 I would send several photos at once in iPhoto at medium size, which would launch Mail and all the photo's would be there ALL at medium size. Now with 10.4.8 installed, I try to send several at medium and when Mail launches,