Hi,
It is giving the following error while doing delivery.
Item 900001:only            0 each from material XXXXXX are available.
Thanks & regards,

Hi
kindly check out..
Co09...
besides, in MMBE check out in which st location as well as Batch stock is maintained..
apart from that also check out batch status in MSc2N..
hopw u will get any clue from there..
thanks
mahesh

Similar Messages

  • TS4185 i have a macbook pro and when using FaceTime people are unable to hear me, even though i can hear them

    I have a macbook pro and when using facetime people are unable to hear me, even though i can hear them.

    I have a macbook pro and when using facetime people are unable to hear me, even though i can hear them.

  • Unable to create delivery using ADSUBCON

    Hi Gurus,
    I am unable to create delivery using ADSUBCON transaction for the PO which has material with different Order Unit. My base unit of measure is EA where as the Order unit is Roll. If I delete the order unit system allows me to create delivery where the PO.
    Why the system does not allow me to create the delivery when the order unit is different than base unit of measure.
    Thanks in advance,
    Shashidhar
    Edited by: Shashidhar on Jan 29, 2011 5:19 AM

    HI,
    Its already been  maintained.
    Shashi

  • My ipad2 does connects to 3G even though ther is available wifi. How can I make it prioritize wifi?, My ipad2 does connects to 3G even though ther is available wifi. How can I make it prioritize wifi?

    My ipad2 connects to 3G even though there is available wifi. it finds the network but loses it in seconds and turns again to 3G. I've tried resetting network settings, rebooting iPad etc with no luck
    Thanks

    If you are not using data and the iPhone goes to sleep, it will automatically drop the wi-fi, and will not reconnect until you wake the phone up. That is the way it is designed. The only way around that is to turn off cellular data while at home and on wi-fi.
    Cannot answer the xbox question since this is an iPhone forum and I would have no idea.

  • How to release process order even if stock not available...????

    Hi All,
    Kindly tell me how to release process order even if stock not available...????
    Its urgent.
    Thanks in advance,
    Regards
    Anish Verma

    Hi Daniele,
    Need your help to clear COGI Error.
    Actually some how for one process order, two confirmation happened.
    Scene 1 : When first time did confirmation then automatically without any error display came process order saved but all goods movement failed.
    Scene 2 : Then for the same without checking COGI error, did second confirmation and then it worked perfectly. Process order got saved without any fail.
    Scene 3: When doing TECO its showing Post processing Error.
    So checked by COOISPI and found two confiramtion done for one process order.
    Now when doing COGI the FERT movement is not happening. Its showing deficit of stock. But smae stock is available in MMBE.
    Pls help me in resolving the same.
    If any query pls contact me. Its urgent
    Regards
    Anish Vema
    07773009107
    [email protected]

  • Unable to create delivery for BOM items not in stock??

    Hi Experts,
    We have created a sales order with Parent item and its 3 BOM items, with pricing doen at BOM items. Of the three BOM items, stock exists for only 1 item. When we are trying to create the delivery, it is bringing only the stock item in delivery overview and not the items without stock. We would like:
    1. System to bring all the items while creating delivery. It may not permit picking and PGI till the stock is brought in system.
    2. System to not allow creating delivery till stock exists for all the required items.
    For the non-stock items, system is not allowing to carry out the availability check also. It can give a future date and confirm the quantity for future delivery!!
    Please provide your expert opinions asap. Points would be awarded to all helpful answers.
    Regards,
    Peeyoosh.

    Hi Peeyoosh,
    had you a look at the customizing of your item categories for delivery? Did you use the standard item category TAN? Perhaps the customizing of "availabilty check for delivery item" and "Check quantity 0" in your category for delivery will bring you forward.
    Regards Thomas

  • Delivery date not confirmed on the same day even though stock available

        Hi Experts - We are creating an STO in Brazil where stock is moving from 1 plant to another plant.
        Current ATP situation is as follows: which shows 22 EA still available.
    We are creating the STO from the plant 3004 to plant 3005.
    We are confused why the system is proposing the delivery date of March 17 instead of March 14, in spite of sufficient quantity being available.
    We do understand that it takes 03/17/2014 because of the upcoming weekend. But when stock is available on March 14, we would have expected this result.
    These are the key configurations that I have done:
    Material Master:
    MRP View: Planned Delivery Time is 0
    MRP Type: PD (MRP)
    Checking Group: 02
    Assign delivery type and checking rule config for Material Master is also done as follows:
    Request your help please!
    Regards
    Siddharth Sridhar

    Yes If Stock is available for material & still date is changing in STO creation than may be this could have happened due to time zone setting,
    2 option-I would request you   also go through Stock requirement List (MD04) & check where some pending order is lying & some purchase orders if yes then first block them,
    Sometime it heppens if earlier for same material you would have created Sales order (qty is 20) & stock available qty is 15 & still with 15 qty you would have done PGI.& after some time your would have done migo for the same shortage material & this time 5 qty material could be adjusted in shortage order that's why if you go through md04 then you would be able to block shortage qty which  is adjusted,n now date is showing deff,
    hope this would help,
    Thanks,
    Kamlesh

  • *MRP unable to create Delivery Schedule Lines in MM Scheduling Agreement*

    Hi Experts,
    I need your help...
    The issue is, in-spit of maintaining Source List with an u201CScheduling Agreement with item No.u201D & u201CSource List Usage in MRPu201D as 2 (Record relevant to MRP. Sched. lines generated automatically), MRP run does not generate Schedule Lines, instead PRs are created.
    Please help me to understand such behavior and fix the issue as the requirement is to generate Schedule Lines only.
    Thanks,
    Pratap

    Hello
    Please check
    1) Source List maintained properly in terms of Material # ; plant # ; proper POrg ; Schd Agr # and line item# ; proper validity date & MRP relevant indicator
    2) Please also check Quata arrangement if you are using. whether % is maintained correctly against the vendor
    3) MD03 , Delivery schedules- should be 3
    4) check your planning horizon whether it is NETCH or not
    5) check material master -MRP2 view, Procurement type is F- external procurement, schedule margin key if you are using
    if everything above is set, then I feel it should work
    Also please verify-
    lot size, safety stock and the corresponding prod volume for MRP input v/s the stock available in MMBE
    example.
    MD04, we can see the open del lines.
    if SS = 50 , prod volume is 150
    1) if MMBE shows 200 then it wont generate any schedule.
    2) if MMBE is 180 and your lotsize is 40, then after MD03, you will have a schedule line of 40 (provided if everything is set properly)
    Please ensure there are NO open delivery lines . if you find such in MD04, then please close open delivery lines
    in calculation of MRP, system considers such open delivery lines are going to receive and no additional schedule line generated even after MRP run
    thanks

  • Possible to delete delivery even though Transfer Order exists

    Dear Experts
    I am able to delete deliveries even though Transfer order exists and confirmed. How can I restrict this as in this Transfer Order remains open without delivery in Place.
    Regards,
    Neeraj Srivatava

    Hi Frenchy
    Many thanks for your valuable inputs.
    What is the reason I can delete delivery even after Transfer Order is confirmed. This will leave the Picked  stock stranded in Dispatch area which cannot be linked with any delivery.
    Regards,
    Edited by: NEERAJ SRIVASTAVA on Aug 13, 2008 2:42 PM

  • Schedule line confirmed but unable to create delivery

    hi,
    schedule lines are confirmed but still not able to create delivery, stock is available in the storage location, no reservations are against the storage location, when i try to create a delivery, delivery quantity field is empty then when i try to enter deliver quantity and picked quantity system give error message ; only 0 ea of material XXXXX available.
    issue has high priority kindly assist me with this

    hi,
    There are so many reasons for not able to create a delivery.
    1) Check the stock in storage location In MMBE
    2) In MD04 check the requirement whether the stock is reserved for any other order
    3) In MD04 or in material master check if any safety stock is maintained.
    regards,
    balajia

  • Unable to create delivery

    hi
    i have stock alot of stock, and my order is fully ready no issue with schedule lines or stock in the order, but when i try and create a delivery its saying that one item doesnt get copied in my delivery saying the following
    only 0.00 PAL OF MATERIAL AVAILBLE.
    I can se alot of materials available via MMBE and via MD04.
    HELP help

    Hi,
    Check whether you have already created some sales orders or deliveries for that material.
    If youhave indeed created some sales orders or deliveries then you shall see that in MD04, the material is reserved for these created sales orders/deliveries.
    That may be the reason that the system is not allowing you to create delivery.
    If you still want to create a delivery then you have to make some modifications in Availability check settings particularly for checking rule -delivery

  • Error in creating delivery document from stock transport order

    hi sd gurus plz help i m nt able to create delivery in vl10b from stock transport order me21n after giving shipping point and  po number also. can u help me out and can u tell me how to maintain copy control from stock tarnsport to delivery docu.

    Hi Debesh,
    The settings for Delivery type for STO is maintained using the following path:
    Materials Management>Purchasing>Purchase Order>Set up Stock Transport Order>Assign Delivery Type and Checking Rule . Here you assign the Delivery type to Stock Transport order (with reference of Suplying Plant)
    For creation of STO for delivery creation use T-code- VL04. Enter the Relevant Shipping Point and the Delivery Creation Date. Also tick mark the option Purchase order. If you already have a Purchase order enter the no.
    System will show the details of the STO here by using the Main Menu > Delivery> Create Deliveries you can create the Delivery against the STO. Then by using the VL02n option you can do the Picking / PGI for the Delivery.
    Hope the above helps you.
    REWARD if it helps you!!
    Regards,
    Ajinkya

  • Re:Unable to Create Delivery !

    Hi all,
    I have created a sales order dated today, i.e. 12.1.2008. When I select the tab "Item Overview", the confirm/delivery date is taken by default as 15.1.2008. If I try to change the date to current date, it doesn't accept.
    When I use VL01N, I get an error message "No schedule lines due for delivery up to the selected date".
    Hence, I am unable to use VL01N to create delivery and hence unable go to the next step of creating a billing and generate an Invoice.
    Can anyone help?
    Please let me know.
    Thanks,
    Amba Prasanna

    hello, friend.
    you tried to change the delivery date in the sales order from 15 jan 2008 to 12 jan 2008.  the system will not allow you because the configuration settings and the master data (probably material master) have entries that tell the system to calculate delivery time to at least 3 days (includes purchasing, picking, loading, delivery preparation lead time, replenishment lead time etc.).   the system is telling you it is impossible to delivery before 15 jan 2008.
    before doing VL01N, make sure that in the sales order there is a CONFIRMED quantity in the schedule lines tab.  take note of the confirmed date, because this is what you need to put in VL01N.
    when doing VL01N, use 15 jan 2008 or a later date.  make sure you have the right shipping point and sales order reference.  this should work for you.  however, if this still does not, then there could be other settings that need to be checked.
    please inform us what item category and schedule line category is determined in your sales order.
    hope this helped, and please do reward if it did.
    regards.

  • Unable to create delivery through ME2O in subcontracting process

    Hi,
    I am trying to create delivery for the subcontracting order in ME2O, but it was giving the error. Stock also exist for component material.
    The error messange is:
    "An item with no delivery quantity is not permitted. Item will be deleted".
    Please let us know the reason.
    Thanks in advance!
    Thanks,
    Jana

    Hi
    Please check the Stock overview MMBE of the material, in the stcok overview check the stock qty click on
    details and check if any stock qty is reserved for any delivery.
    Usually the delivery is created but PGI is not done , in such cases systme reserves the stock for that delivery, in the sytem it shows that stock is availble but that may be reserved.
    Thanks & Regards
    Kishore

  • Rush order :-Even though stock available  Sytem is not ablet   to confirm

    Hi all,
    In case of Rush order- insipite of  stock available in the system  its not able to confirm the quantities .
    Immediate delivery is not happening because of this
    Please let me what might be the reason?
    Regards
    Anil

    Hi anil maripady
    As you are doing rush order , first of all go to VOV8 and check the following things in  rush order document type :
    1) Shipping Conditions - immediate
    2) Immediate Delivery - [X}
    3) Lead time in days - NIL
    Now go to  MD03 and check how much  stock is available of that material and how many open orders are also there with that material in that plant
    Another option go to MMBE and check how much stock is there for that material in that plant and storage location
    Regards
    Srinath

Maybe you are looking for

  • Can i move iWeb site control from one computer to another?

    We hired someone to create a website for our company. He created it using iWeb on his computer and now is no longer with the company. How can I move the control of this website to the iWeb application on my computer so that I can manage the site?

  • JDBC adapter connected to a DB in high availability!

    Hi folks, I have finished my scenario File -> XI -> JDBC and now I’m preparing to transport it to QAS. I found that Data Base of QAS is in two cluster nodes. I have two hostnames to fill the parameter <b><IP address></b> and I don’t know which hostna

  • Screen resolution problem after i-tunes installed on XP pro

    Just purchased 5th Generation 60Gb for my daughters 16th Birthday which starts in about 14 minutes! Loaded the software on her XPpro service pack 2 laptop. When itunes executed the screen resolution drops to 8 bit! It can be changed in control panel

  • Drag and drop parts of an image

    Is there a way to display an image (such as a scanned page) and then have areas that can be dragged and dropped? For instance, suppose the scanned page has some text fields. I would like some of text fields in the scanned form to have boxes around th

  • IPhone 3G (new) touchscreen doesn't respond

    Hi, I have a new (1 week for me from the AT&T store) iPhone 3G. The touchsreen freezes up with some regularity. It will always come back after the screen saver goes on and will sometimes come back before the screen saver activates. It doesn't seem to